ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt...

22
ADEOS-II & AMSR-E/Aqua Science Project Status 7-8 June, 2000 MODIS Science Team Meeting Greenbelt, MD Yasuyuki ITO Earth Observation Research Center

Transcript of ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt...

Page 1: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

ADEOS-II & AMSR-E/Aqua Science Project Status

7-8 June, 2000MODIS Science Team Meeting

Greenbelt, MD

Yasuyuki ITOEarth Observation Research Center

Page 2: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

2

Table of Contents

1. Introduction2. Launch Schedule3. Results of JRA4. Level-2 algorithm development5. Calibration & Validation

- MODIS Data utilization

6. GLI PFM Dynamic Range Issue

Page 3: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

3

Executive DirectorY. Furuhama

Assistant Executive DirectorALOS Program Manager

T. Tomita

Executive DirectorY. Furuhama

Assistant Executive DirectorALOS Program Manager

T. Tomita

Office of Earth Observation Systems April 10, 2000

JAERI: Japan Atomic Energy Research InstituteJAMSTEC: Japan Marine Science and Technology Center* : concurrent post

Joint Project of NASDA & JAERI & JAMSTEC

Earth Simulator R&D Center

Director H. Miyoshi

Earth Simulator R&D Center

Director H. Miyoshi

Joint Project of NASDA & JAMSTEC

ALOS Project Team

Proj.Manager T. Katagi

ALOS Project Team

Proj.Manager T. Katagi

Senior Engineer K. Tomioka T. Hamazaki

ADEOS-IIProject Team

Proj.Manager T. KurosakiDept.Proj.Manager Y.Nakamura

ADEOS-IIProject Team

Proj.Manager T. KurosakiDept.Proj.Manager Y.Nakamura

Senior Engineer T. Kawanishi * Y. Tange

EOS-PMProject Team

Proj.Manager T. Kawanishi

EOS-PMProject Team

Proj.Manager T. Kawanishi

Earth Observation Planning Dept.

Director T. InadaTRMM/ADEOS-II Program Manager

Earth Observation Planning Dept.

Director T. InadaTRMM/ADEOS-II Program Manager

General Administration Y. Kitou Strategy, Planning andProgram ManagementTRMM/ADEOS-II Dept.ProgramManager S. UenoFuture MissionALOS Deputy Program Manager T. Moriyama

Earth Observation Systems Engineering

Dept.Director N. Saki Deputy Dir. T.Kawanishi*

Earth Observation Systems Engineering

Dept.Director N. Saki Deputy Dir. T.Kawanishi*

Future Mission(Optical Sensor) Y. Tange *

Ground Systems Y. Ishido

Future Mission(Microwave Sensor) Y. Hisada

Earth Observation Center

Director M. Nukariya

Earth Observation Center

Director M. Nukariya

General Administration T. Oshima

Earth ObservationResearch Center

Director T. Ogawa Deputy Director Y. Harada

Earth ObservationResearch Center

Director T. Ogawa Deputy Director Y. Harada

Research Planning T. Matsuyama

Senior Scientists T. Tanaka T. Igarashi M. Shimada M. Suzuki

Data Analysis System I. Nakanishi

Chief Scientist Y. TobaADEOS Science H. ShimodaTRMM Science T. NakazawaADEOS-II Science A. Sumi/Y.Yasuoka

Global Change Research Division

Manager K. YoshidaManager Y. Kamiya

Global Change Research Division

Manager K. YoshidaManager Y. Kamiya

Frontier Research Systemfor Global Change

Director T. Matsuno

Frontier Research Systemfor Global Change

Director T. Matsuno

GCOM ProgramEarth Science Mission, CEOSInternational Coordination C. Ishida

Science Project Promotion Y. Ito

Operational Technology K. Kaku

Page 4: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

4

Science Project Organization

ContractorsMELCO, MSS, Fujitsu, SED, RESTEC

PI’s

EORC TeamA.Shibata,K.Imaoka,M.Shimada,GAIT

Science Project Manager &Mission Operation ManagerYasuyuki ITO

Program CoordinatorsNobuo Nakagawa,Vu Saito (GLI)

Secretary, PC support Contractors

Program ScientistsProf. Akimasa Sumi,Prof. Yoshifumi Yasuoka

AMSR TeamAkira Shibata, LeaderToshio Koike, Cal/Val

GLI TeamTerry Nakajima, LeaderJoji Ishizaka, OceanRyutaro Tateishi, LandTeruo Aoki, Cryosphere

Page 5: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

5

ADEOS-II Science Project

ADEOSADEOS--II ProgramII Program❧ ADEOS-II Spacecraft Development Project

❧ H-IIA Launch Vehicle Development Project

❧ Satellite Tracking & Control Project

❧ Ground Data System Development Project

❧ Ground Data System Operation Project

❧❧ ADEOSADEOS--II Science ProjectII Science Project❧ Data Utilization Promotion Project

Page 6: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

6

Science Project Scope of Work

ADEOSADEOS--II Science ProjectII Science Project

❧ Higher-order Algorithm Development

❧ Calibration & Validation● In-situ data collection, Campaign

● Match-up Dataset generation

❧ Processing System Development● Computer Procurement

● Software Development & Integration

❧ Science Team Management

Page 7: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

7

ADEOS-II Geophysical Products

AMSR < same for AQUA/AMSR-E >● Water Vapor● Cloud Water● Precipitation● Sea Surface Wind Speed● Sea Surface Temperature● Sea Ice● Snow Depth● Soil Moisture (Research Product)

Page 8: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

8

ADEOS-II Geophysical Products

GLI <overview>● Aerosol parameters● Cloud parameters● Chlorophyll-a● Colored Dissolved Organic Matter● Suspended Solid weight● Sea Surface Temperature● Vegetation Index● Snow Grain Size & Impurities

Page 9: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

9

ADEOS-II Geophysical Products

SeaWinds● Sea Surface Wind Vector

POLDER● Cloud and Aerosols parameters

ILAS-II● Ozone, HNO3, etc.

(ARGOS-DCS)

Page 10: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

10

Science Projects at EORC

❧ JERS-1 : data 92-98

❧ ADEOS : data 96-97

❧ TRMM : data 98-

❧ AQUA/AMSR-E : Launch Dec. 2000

❧ ADEOS-II : Launch Nov. 2001❧ ALOS : Launch 2002

❧ GCOM : data 2001 - 2015 (TBD)

Page 11: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

11

ADEOS-II JRA Results

Sensor AMSR GLI Mult iple

ResearchAlgorythm

8 6 0

CAL/VAL 2 9 3

Ear thScience

6 14 2

Tota l 16 29 5Contract/Agreement process in progress.

Page 12: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

12

ADEOS-II JRA Results

ILAS-II Mu lt iple

31 0

Sea Win ds Ot h er s

21 34

P OLDE R Mu lt ip le

29 0

Information from EA, NASA & CNES

Page 13: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

13

❧ Standard algorithms from PI have been received, tested and integrated at EORC environment.

❧ Ver.1.0 algorithm/software, to be used for the initial products for public from EOC +12 months after launch, will be delivered from EORC to EOC +6 months.

Algorithm Development Status

Page 14: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

14

❧ EORC is responsible for (Cal)/Val.

❧ Basic Cal/Val plan completed. ● ( PI’s web ; having network security issue )

❧ Cal/Val implementation plan to be defined more in detail.

❧ Needs cooperation with many organizations / researchers worldwide for validation.

Calibration & Validation

Page 15: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

15

Calibration & Validation

Collaboration for attaining world-wide area coveragee.g. Data exchange: GLI Mongolian site; MODIS Land sites

Standardization of instrumentationStudies of validation instrumentation in various missions seem to generate a similar strategye.g. Sky radiometer: NASA-AERONET, NASDA-SKYNET (Asia, Pacific rim)

Page 16: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

16

Validation sites over Asian land

Tsukuba

Sri Samrong

AnhuiKorean sites(Anjun, Cheju)

SKYNET

Yinchuan

Mandalgovi

GLI-Land

Page 17: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

17

MODIS data utilization

Plans to use MODIS data :

❧ As simulated GLI data as a part of pre-flight algorithm validation activities.

● < by ADEOS-II science project >

❧ To receive DBS and create LAC for Asian ocean studies. < by Ocean science project >

❧ for Earth Science studies. ● < by individual researchers >

Page 18: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

18

GLI Algorithm Development Tools

Retrieved PP

GSDGLI Synthetic Data

Calculateradiance

Convert Forward to Inversion

PP DistributionInput P.P.

Output

Inputradiance

Parameteri-zation

GMD(GLI) Measured Data

GRSGLI Retrieval System

System module

System module

Data module

Data module

PP Physical Parameter

GSSGLI Signal Simulator

EvaluationPP Distribution

Inp

ut

radian

ce

Fie

ld M

easu

rem

ents

Evaluation

Flow 1 Flow 1

Page 19: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

19

GLI Signal Simulator (GSS)

Cloud & Aerosol Scattering

Snow-BRDF

Vage tation-BRDF

LambertianOcean Surface

Upwelling WaterLeaving Radiance

Rayleigh Scattreing

Visible to Infrared

Molecular Absorption

Page 20: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

20

GLI 250m resolution data

❧ Data acquisition analysis in progress.❧ Data availability heavily depends on the Data

Relay Satellite utilization.❧ ESA’s “ARTEMIS” and NASDA’s DRTS

launch schedule (TBD).❧ ARTEMIS Link budget at Ka-band to be

confirmed in the test operation.❧ Thermal design margin for X-band Tx to be

confirmed in the initial check-out.

Page 21: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

21

GLI PFM Dynamic Range Issue

❧ Inappropriate specification at some of the ocean channels found in PFT data analysis.

❧ Utilizing the launch delay, planning for PFM modification under study.

❧ Realistic candidate modification method would to decrease input light energy to all the visible and near IR channels.

Page 22: ADEOS-II & AMSR-E/Aqua Science Project Status...7-8 June 2000 MODIS Science Team Meeting @ Greenbelt 2 Table of Contents 1. Introduction 2. Launch Schedule 3. Results of JRA 4. Level-2

7-8 June 2000 MODIS Science Team Meeting @ Greenbelt

22

Joint Workshop 2001(JFY2000)

❧ Individual Sensor Team Meetings● US-AMSR-E team meeting, July @ IGARSS

● Standard Algorithm PI meeting, Oct (TBD)

❧ Joint Symposium/Workshop● Dec’99 Kyoto ; Success with ADEOS

● Mar’01 Hawaii ; Planning with TRMM, ADEOS and Aqua

• Model researchers participation also planned