Address: KPCL, Bellary Thermal Power Station, Kudathini...
Transcript of Address: KPCL, Bellary Thermal Power Station, Kudathini...
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 1/58
KARNATAKA POWER CORPORATION LTD
List of Files and Records Under Section 4(1)(a) of the Right to information Act 2005
Name of the Office: Superintending Engineer (Civil)-3
Address: KPCL, Bellary Thermal Power Station, Kudathini,Bellary Tq & Dist
LIST OF FILES: TECHNICAL
Vol-I to IX 08.03.04 21.08.09
Vol-X 01.09.09 Running
2 SEC-3/BT/RPW-II/ Raw Water pond Stage-II Vol-I 02.04.07 Running Permanent
3 SEC-3/BT/RWP-AM/
Maintenance of Raw Water Pond Vol-I 04.08.08 Running Permanent
Vol-I to IV 01.12.04 27.11.09
Vol-V 30.12.09 Running
5 SEC-3/BT/AP-AM/ Maintenance Of Ash Pond Vol -I 12.06.08 Running Permanent
Vol-I to IV 03.03.05 10.02.10
Vol-V 11.02.10 Running
Vol-I 11.06.05 02.05.09
Vol-II 03.05.09 Running
Vol-I 11.05.07 26.05.08
Vol-II 03.06.09 Running
Vol-I to VI 14.02.05 08.04.09
Vol-V 08.04.09 Running
10 SEC-3/BT/JC/ Jungle Clearance Vol-I 13.01.07 Running Permanent
11 SEC-3/BT/WH/ Ware house - 1 & 2 Vol-I 17.03.08 Running Permanent
Vol-I to IV 26.05.05 01.10.08 Permanent
Vol-V 23.05.09 Running Permanent
13 SEC-3/BT/QC/ Quality control Vol-I 23.05.09 Running Permanent
14 SEC-3/BT/FQ/A/ Accounts Vol-I 28.02.05 Running Permanent
Vol-I 08.02.06 01.10.09
Vol-II 11.10.09 Running
Vol-I 17.03.04 26.11.08
Vol-II 27.11.08 Running
Vol-I 21.10.04 18.03.09
Vol-II 20.03.09 Running
18 SEC-3/BT/F2D/ Bank Guarantees Vol- I 09.03.06 Running Permanent
Vol-I to V 04.08.05 02.04.09
Vol-VI 05.04.09 Running
20 SEC-3/BT/KTPP/ KTPP/Tender guidelines Vol- I 20.12.04 Running Permanent
21 SEC-3/BT/SR/ SR guidelines Vol-I 12.11.05 Running Permanent
Vol-I 02.09.05 03.03.09
Vol-II 04.03.09 Running
Vol-I 17.01.05 25.02.09
Vol-II 26.02.09 Running
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 2/58
Vol-II 26.02.09 Running
Vol-I to III 11.06.04 21..04.09 Permanent
Vol – IV 22.04.09 Running Permanent
25 SEC-3/BT/Adm.A/ Administrative approvals Vol-I 02.04.09 Running Permanent
Vol-I 20.12.04 01.10.09 Permanent
Vol-II 03.10.09 Running Permanent
27 SEC-3/BT/SHE/ Safety, health, Environment & canteen Vol-I 29.08.05 Running Permanent
Vol-I 16.05.05 31.03.08 Permanent
Vol-II 01.04.08 Running
Vol-I to VIII 31.12.05 25.04.09 Permanent
Vol-IX 02.05.09 Running Permanent
30 SEC-3/BT/EPC-U1/ Unit-I correspondence Vol-I 31.08.06 Running Permanent
31 SEC-3/BT/RODM-U2/
Unit-II RODM Plant Vol-I 10.06.09 Running Permanent
32 SEC-3/BT/PTP-U2/ Unit-II PTP Vol-I 10.06.09 Running Permanent
33 SEC-3/BT/PR-U2/ Unit-II Pipe Rack Vol-I 10.06.09 Running Permanent
34 SEC-3/BT/Misc.Tech/
Miscellaneous correspondence (technical) Vol-I 10.10.05 Running Permanent
35 SEC-3/BT/Misc.work/
Miscellaneous correspondence (general) Vol-I 08.02.08 Running Permanent
36 SEC-3/BT/HOD/TCM/
HOD meetings & TCM meeting Vol-I 25.04.05 Running Permanent
37 SEC-3/BT/P1A/ MD’s letters, approvals & circulars Vol-I 26.07.05 Running Permanent
38 SEC-3/BT/Colony/ BTPS colony Vol-I 18.10.08 Running Permanent
39 SEC-3/BT/C.Works/
Ceremonial works Vol-I 24.06.08 Running Permanent
40 SEC-3/BT/Proj/Gen/ Project Information Vol-I 02.03.02 Running Permanent
41 SEC-3/BT/RTI/ RTI Correspondence Vol-I 17.07.07 Running Permanent
SEC-3
KARNATAKA POWER CORPORATION LTD
List of Files and Records Under Section 4(1)(a) of the Right to information Act 2005
Name of the Office :Superintending Engineer(Civil)-3
Address :KPCL,Bellary Thermal Power Station ,Kudathini, Bellary Tq & Dist
LIST OF FILES: ADMINISTRATIVE
Sl No.
File Name Subject Volume OpeningDate ofFiles
Closeing Dateof
file/Runningfile
Nature of FilePermanent/Temporary
Remark
Vol-I toIII
18.10.05 06.08.09
Vol-IV 08.08.09 running
Vol-I 28.07.05 11.07.08
Vol-II 22.08.08 running
3 C.C(PÁ)-3/J1J/3 ºÁdgÁw Vol-I 15.02.05 running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 3/58
Vol-I 21.03.05 11.04.09
Vol-II 26.09.09 running
Vol-I 08.06.05 01.12.07
Vol-II 17.12.07 running
6 C.C(PÁ)-3/ J5J/6 vÁvÁÌ°PÀªÀÄÄAUÀqÀ Vol-II 05.07.05 running Permanent
Vol-II 17.03.06 running
Vol-II 18.10.08 running
Vol-I 29.11.05 24.04.08
Vol-II 18.08.08 running
9 C.C(PÁ)-3/ J1J/9 ¹§âA¢ü PÁ0iÀÄð§®/ºÀAaPÉ Vol-I 18.08.05 running Permanent
10 C.C(PÁ)-3/ J1J/10 UË¥Àå ¥ÀvÀæ ªÀÄvÀÄÛ ¥Áåqïì Vol-I 20.05.05 running Permanent
Vol-I 13.01.06 01.01.10
Vol-I 10.01.08 running
12 C.C(PÁ)-3/J1J/12 UÀÄwÛUÉzÁgÀgÀ £ÉÆÃAzÀtÂzsÀÈrÃPÀgÀt ¥ÀvÀæ.
Vol-I 24.01.05 running Permanent
13 C.C(PÁ)-3/J1J/13 DeÁÕ ¥ÀvÀæUÀ¼ÀÄ (Memos) Vol-I 13.01.06 running Permanent
14 C.C(PÁ)-3/ J1J/14 C¢ü¸ÀÆZÀ£ÉUÀ¼ÀÄ(Notifications)
Vol-I 20.01.06 running Permanent
15 C.C(PÁ)-3/J1J /15 ¸ÀA¸ÁÜ¥À£Á ºÁUÀÆ EvÀgÉ ¢
£ÁZÀgÀuÉUÀ¼ÀÄ
Vol-I 20.06.06 running Permanent
16 C.C(PÁ)-3/ J1J/16 ªÀiÁ¹PÀ PÀ£ÀßqÀ ªÀåªÀºÁgÀzÀ
¥ÀvÀæUÀ¼À ªÀgÀ¢UÀ¼ÀÄ
Vol-I 20.06.06 running Permanent
17 C.C(PÁ)-3/J1J/17 EvÀgÉ/¸ÁªÀiÁ£Àå
¥ÀvÀæUÀ¼ÀÄ
Vol-I 07.10.05 running Permanent
Vol-I toV
23.09.05 12.12.07
Vol-VI 01.01.08 running
19 C.C(PÁ)-3/J1J/19 ¤AiÀÄvÀPÁ°PÉ(Magzines)ºÁUÀÆ ¥ÀwæPÁ¥ÀæPÀluÉUÀ¼ÀÄ
Vol-I 14.04.06 running Permanent
Vol-I 23.02.05 10.01.08
Vol-II 15.01.08 running
21 C.C(PÁ)-3 / PÀÆå3J¥sï/21
¨sÀ«µÀå ¤¢ü
Vol-I 10.10.05 running Permanent
SE(C-3)
KARNATAKA POWER CORPORATION LIMITED
List of Files and Records under section 4(1)(a) of the Right to Information Act 2005
Name of the Office : CEC/BTPS
Address : BTPS, Kudathini, Bellary
Sl no
File
Subject
Opening
Closing
date of
Date of
transfer of
Nature of
Remarks
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 4/58
no date of file file/
Running
file
file &
Authority
whom
transferred
file/Permanent
/Temporary
I UNIT-1
1 1 EPC 13.02.03 Running - Permanent
2 2 BHEL 26.07.07 Running - Permanent
3 3 CHP 30.07.07 Running - Permanent
4 5 Cooling Tower 08.06.04 Running - Permanent
5 6 Chimney 15.06.04 Running - Permanent
6 23 SNC Balance Works 19.02.08 Running - Permanent
II NON EPC WORKS
1 7 Raw Water Pond 09.02.05 Running - Permanent
2 7A RWP EIRL / WorkSlip 29.06.05 Running - Permanent
3 7B RWP HO Approvals 12.07.05 Running - Permanent
4 8 Ash Pond 26.05.05 Running - Permanent
5 8A Ash Pond EIRL/ WorkSlip 13.02.06 Running - Permanent
6 9 Maralihalla RS Shetty 18.10.04 Running - Permanent
7 9A Maralihalla EIRL 20.01.06 Running - Permanent
8 9B Maralihalla WorkSlip 15.10.04 Running - Permanent
9 10 Pipe Line GIL 03.03.06 Running - Permanent
10 10A MS pipe line EIRL/Work slips 30.06.07 Running - Permanent
11 11 MCC Rescinding of Contract 23.01.06 Running - Permanent
12 12 Daroji Water Supply 19.08.05 Running - Permanent
13 13 Railway Siding & Marshaling
Yard
01.06.04 Running - Permanent
14 13A RSMY EIRL/Workslip 11.10.05 Running - Permanent
15 14 South Western Railway 25.10.05 Running - Permanent
16 15 Concrete Apron 24.07.06 Running - Permanent
17 16 Peripheral & Internal Road
P1&P3
08.02.06 Running - Permanent
18 16A Peripheral & Internal Road
EIRL/ W.slip
11.07.06 Running - Permanent
19 17 Internal Road- P2 01.04.06 Running - Permanent
20 18 Road Package -P4, P5, P6 24.09.07 Running - Permanent
21 19 Approach Bridge &HLB 23.08.05 Running - Permanent
22 19A Approach Bridge &EIRL/
Workslip
05.05.06 Running - Permanent
23 20 RWP-U/s Dislodgement
restoration SVR
02.09.08 Running - Permanent
24 21 Yard Master Building 04.05.07 Running - Permanent
25 22 Unit-I Environment-MOEF 11.03.04 Running - Permanent
26 24 Entrance porch 24.05.07 Running - Permanent
27 26 House keeping and garden
maintenance
22.09.05 13.03.10 - Permanent Closed
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 5/58
28 27 Piece work 12.09.05 Running - Permanent
29 25 Estimate Approvals for works 23.03.06 Running - Permanent
30 28 Technical Sanction by
Divisions
10.06.08 Running - Permanent
31 28A Technical Sanction by CEC 26.12.05 Running - Permanent
32 29 Compound wall, watch tower Running - Permanent
33 32 Fly Ash Disposal / Rain
commodities
01.08.07 Running - Permanent
III OTHER FILES Permanent
34 4 Env Q'lity Monitoring 26.10.07 Running - Permanent
35 30 Miscellaneous 29.07.02 Running - Permanent
36 31 Quality Control 22.09.05 Running - Permanent
37 33 Tender notification 12.05.05 Running - Permanent
38 34 Meeting (H.O) 05.05.05 Running - Permanent
39 35 SCM / Nukkad meeting 18.05.05 Running - Permanent
40 36 CMG Agenda 24.09.09 Running - Permanent
41 36A CMG minutes 09.05.05 Running - Permanent
42 37 Progress Review Meeting 04.01.06 Running - Permanent
43 38 Minutes of Technical
Commitee Meeting (TCM)
20.01.06 Running - Permanent
44 39 Budget 02.01.06 Running - Permanent
45 40 Internal Audit 18.05.05 Running - Permanent
46 41 Technical Audit 11.05.06 Running - Permanent
47 42 Funds/AGMF Correspondence 19.12.05 Running - Permanent
48 43 Lands/ Land loosers
grievances
05.01.08 Running - Permanent
49 44 Legal file 05.02.08 Running - Permanent
50 85 Corres. With Head (Land, R
&R)
01.02.08 Running - Permanent
51 86 Corres. With Vijayanagar Area
development authority
01.11.09 Running - Permanent
52 87 Property register 01.12.09 Running - Permanent
53 47 BUDA correspondence 04.01.03 Running - Permanent
54 45 Wel fare measures 30.09.06 Running - Permanent
55 46 Afforestation 15.05.06 Running - Permanent
56 48 DC Bellary correspondence 25.04.05 Running - Permanent
57 49 Dozing, levelling and muck
disposal
06.06.08 Running - Permanent
58 50 PF / KTPP act Correspondence 29.06.06 Running - Permanent
59 51 MCC RI Act 18.07.06 Running - Permanent
60 52 Weekly Progress (ED) 02.12.06 30.05.09 - Permanent Closed
61 53 Daily / Weekly Progress Report 29.06.05 08.03.10 - Permanent Closed
62 54 Contractor Registration 05.07.02 Running - Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 6/58
63 61 Furniture /Assets / HRD 10.06.05 Running - Permanent
64 62 SR correspondence 06.09.05 Running - Permanent
65 63 Circulars 26.07.06 Running - Permanent
66 64 BATF 13.06.05 Running - Permanent
67 65 Welpsun correspondence 10.02.06 Running - Permanent
68 66 Fisheries Development BTPS 15.11.07 Running - Permanent
69 67 Indure 12.07.07 Running - Permanent
70 68 Right to information act 26.12.06 Running - Permanent
71 69 Water Supply from
Narayanapur
04.04.07 Running - Permanent
72 70 Rent for KPCL office 21.03.03 Running - Permanent
73 71 Colony 09.07.08 Running - Permanent
74 72 Borewell 24.06.08 Running - Permanent
75 73 Safety / Security measures /
Accident File
21.12.06 Running - Permanent
76 74 Suppliers Brochure 15.07.06 Running - Permanent
77 75 Excise Duty 22.03.05 Running - Permanent
78 76 New Thermal Power Plants 05.03.07 Running - Permanent
79 77 Water Analysis of Maralihalla 17.04.02 Running - Permanent
80 78 NEWS Paper Cutting 29.09.06 Running - Permanent
81 79 Canteen file 25.08.04 Running - Permanent
82 80 Work force 28.07.05 Running - Permanent
83 81 Tech. Data 23.09.04 Running - Permanent
84 82 Coal sampling building & Coal
handling office
22.01.09 Running - Permanent
85 83 Rectification of Bottom ash
hopper
06.08.09 14.12.09 - Permanent Closed
86 84 WH No.2 13.11.08 Running - Permanent
87 1CL BHEL Statutory tax 02.03.06 02.08.07 - Permanent Closed
88 2CL BHEL payment 12.09.06 06.06.07 - Permanent Closed
89 3CL BHEL Boiler 11.08.04 27.09.04 - Permanent Closed
90 4CL Maralihalla Est. approvals 30.10.07 22.07.08 - Permanent Closed
91 5CL Floor area of concreting ,
schedule of doors/windows
and bricks
24.09.05 30.12.09 - Permanent Closed
92 6CL Requirement of materials 13.10.06 12.01.07 - Permanent Closed
93 7CL CW system/PT plant 30.01.07 18.06.07 - Permanent Closed
94 8CL Providing chain link fencing 20.12.06 09.10.07 - Permanent Closed
95 9CL Pipe rack / Cable rack 03.02.07 30.04.07 - Permanent Closed
96 10CL Technical papers & Clearances 24.06.02 20.02.06 - Permanent Closed
97 11CL Establishment of 66/11KV sub
station, Lighting system,
Internal roads, Procurement of
MS pipes, WPR
17.05.05 03.06.09 - Permanent Closed
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 7/58
98 12CL ADPH Correspondence 21.10.06 27.11.06 - Permanent Closed
99 13CL Fichtner 19.04.07 08.08.08 - Permanent Closed
100 14CL Ramappanahalla pond &
cladding colour sheets
17.05.05 01.06.07 - Permanent Closed
101 15CL Third party inspection 23.12.04 16.05.09 - Permanent Closed
102 16CL Srinivasa Construction 02.01.06 31.08.06 - Permanent Closed
103 17CL Cooling tower (Protocol of
materials)
01.03.06 17.03.07 - Permanent Closed
104 18CL Construction of helipad &
Dormitory
27.06.06 18.02.09 - Permanent Closed
UNIT-2
105 201 EPC - Unit-II 27.12.07 Running - Permanent
106 202 BHEL Correspondence 15.10.07 Running - Permanent
107 203 Cooling Tower 11.11.08 Running - Permanent
108 204 Chimney 06.03.10 Running - Permanent
109 205 Raw Water Pond 23.11.09 Running - Permanent
110 206 Environment/MOEF 28.10.09 Running - Permanent
111 207 EIA studies 21.04.08 Running - Permanent
112 208 Geotechnical Investigation 30.06.09 Running - Permanent
113 209 3rd Party Inspection
(Shanthala)
08.12.09 Running - Permanent
114 210 Quality Control 26.09.08 Running - Permanent
115 211 Drawing details 13.02.08 Running - Permanent
116 212 Unit-II - Invoice 24.01.07 Running - Permanent
117 213 Daily Progress Report CEC 25.07.08 Running - Permanent
118 214 Daily progress Report EEC-4,6
& 10
25.07.08 Running - Permanent
UNIT-3
119 301 MOEF 26.09.07 Running - Permanent
120 302 Geotechnical Investigation 22.05.08 Running - Permanent
121 303 Site grading 15.06.09 Running - Permanent
KARNATAKA POWER CORPORATION LIMITED
BELLARY THERMAL POWER STATION
LIST OF FILES AND RECORDS
NAME OF THE OFFICE : SUPERINTENDING ENGINEER(CIVIL-2)
ADDRESS: KPCL, BTPS, KUDATHINI - 583 152
CLOSED FILES TECHNICAL SECTION
SL.NO.
FILE NO. SUBJECT
OPENINGDATE OF
FILE
CLOSING DATEOF
FILE/RUNNINGFILE
DATE OFTRANSFER OF
FILE &AUTHORITY
WHOMTRANSFERRED
NATURE OFFILE
PERMANENT/TEMPORARY
REMARKS
1 SEC2/DPRC-4 DPR EE(C-4) Division Volume-I 25.01.05 31.12.05
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 8/58
Volume-II 03.01.06 01.07.06
Volume-III 03.10.06 26.12.06
Volume-IV 27.12.06 30.03.07
Volume-V 02.04.07 06.07.07
2 SEC2/DPRC5 DPR EE(C-5) Division Volume-1 20.04.05 30.11.05
Volume-2 01.12.05 23.03.06
Volume-3 31.03.05 10.06.06
Volume-4 11.06.06 22.07.06
Volume-5 22.07.06 14.10.06
Volume-6 14.10.06 23.11.06
Volume-7 17.09.06 24.11.06
Volume-8 18.09.06 26.12.06
Volume-9 28.12.06 27.02.07
Volume-10 01.03.07 30.04.07
Volume-11 02.05.07 13.06.07
Volume-12 08.07.07 31.08.07
Volume-13 21.09.07 29.10.07
Volume-14 30.10.07 11.12.07
Volume-15 13.12.07 21.01.08
Volume-16 10.07.07 06.04.08
Volume-17 21.01.08 25.02.08
Volume-18 02.09.07 13.07.08
Volume-19 08.04.08 02.06.08
Volume-20 14.07.08 31.08.08
Volume-21 04.06.08 16.10.08
3 SEC2/DPRC-6 DPR EE(C-6) Division Volume-1 03.08.05 23.05.06
Volume-2 20.07.06 14.10.06
Volume-3 16.10.06 08.12.06
Volume-4 08.12.06 01.07.07
Volume-5 24.05.06 25.06.07
Volume-6 22.03.07 26.05.02
4SEC2/DPRC-6 DPR EE(C-6)
STRUCTURAL Volume-1 18.10.05 30.01.06
Volume-2 31.01.06 17.03.06
Volume-3 18.03.06 31.05.06
Volume-4 31.05.06 29.08.06
Volume-5 31.08.06 01.12.06
Volume-6 02.12.06 14.03.07
Volume-7 01.02.07 22.03.07
Volume-8 14.03.07 07.06.07
Volume-9 28.06.07 23.08.07
5SEC2/WPRC-4,5,6
WPR EE(C-4, 5 & 6)DIVISIONS Volume-1 09.09.05 04.05.06
Volume-2 11.05.06 31.08.06
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 9/58
Volume-3 01.07.06 30.09.06
Volume-4 07.09.06 21.12.06
Volume-5 28.12.06 03.05.07
Volume-6 03.05.07 23.11.07
Volume-7 30.11.07 10.07.08
Volume-8 01.08.08 27.08.09
6 SEC2/CMG CMG UNIT-I Volume-1 04.02.04 04.11.07
Volume-2 04.11.07 09.08.08
Volume-3 29.08.08 03.02.09
Volume-4 03.02.09 25.06.09
Volume-5 27.06.09 22.10.09
Volume-6 22.10.09 24.12.10
7 SEC2/WPR ED WPR ED Volume-1 16.11.02 02.04.05
Volume-2 19.03.05 19.11.05
Volume-3 26.11.05 17.03.06
Volume-4 24.03.06 24.06.06
Volume-5 30.06.06 16.09.06
Volume-6 22.09.06 18.12.06
Volume-7 22.12.06 30.03.07
Volume-8 07.04.07 22.09.07
Volume-9 29.09.07 12.07.08
8 SEC2/EPC DRG EPC DRAWINGS UNIT-I Volume-1 15.04.06 27.07.06
Volume-2 06.07.06 14.03.06
Volume-3 21.06.04 31.03.08
S E (C-2)
List of files and records under section 4(1)(a) of the Right to information Act 2005
Name of the Office : EEC-10
Address : Karnataka Power Corporation Limited
Bellary Thermal Power Station
Kuduthini-583152
NON EPC WORK FILES (All Files From Sl.No. 1 to 65 are Handed Over By EEC-2 at the time of merging ofEEC-2 with EEC-10 on 16.12.2008)
SlNo
FileNo
SubjectOpeningDate of file
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure of filePermanent/Temporary
Remarks
1 1A General vol-1 11.06.2004 04.03.2006 - Permanent
2 1B General vol-2 16.07.05 05.09.08 - Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 10/58
3 2A Attendance vol-1 07.05.04 09.03.07 - Permanent
4 2B Attendance vol-2 02.04.07 11.11.09 - Permanent
5 3A Inter office correspondence vol-1 01.07.05 02.02.06 - Permanent
6 3B Inter office correspondence vol-2 03.02.06 15.03.07 - Permanent
7 3C Inter office correspondence vol-3 30.03.07 22.05.08 - Permanent
8 4 Office rent 19.07.04 01.06.07 - Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of file
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure of filePermanent/Temporary
Remarks
9 5 Telephone/BSNL correspondence 15.11.04 2008 - Permanent CLOSED
10 6 Imprest 10.03.05 15.12.08 - Permanent CLOSED
11 7 Legal cases 17.07.07 07.11.08 - Permanent CLOSED
12 8 H O Circulars 01.09.08 15.01.09 - Permanent CLOSED
13 9 Progress review meetings 30.06.04 06.11.04 - Permanent CLOSED
14 10 PF Correspondence 14.10.05 17.12.05 - Permanent CLOSED
15 11A Budget 16.12.06 13.11.08 - Permanent CLOSED
16 12AModern Constrn CompanyCorrespondence-vol-1 01.04.05 13.05.05
-Permanent CLOSED
1712B
Modern Constrn CompanyCorrespondence-vol-2 01.04.05 29.07.05
-Permanent CLOSED
18 12CModern Constrn CompanyCorrespondence-vol-3 01.08.05 28.10.05
-Permanent CLOSED
1912D
Modern Constrn CompanyCorrespondence-vol-4 23.01.06 08.12.08
-Permanent CLOSED
2013A
Modern Constrn Company RAbills-vol-1 11.07.05 30.04.05
-Permanent CLOSED
2113B
Modern Constrn Company RAbills -vol-2 31.08.05 21.12.05
-Permanent CLOSED
22 14 Third party correspondence-CES 12.07.05 07.08.08 - Permanent CLOSED
2315
Third party weekly progressreport-CES 07.05.05 22.07.08
-Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of file
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure of filePermanent/Temporary
Remarks
24 16 Third party bills-CES 10.10.05 09.08.08 - Permanent CLOSED
25 17 South West Railways 30.08.02 29.04.08 - Permanent CLOSED
26 18Welspun pipes Excise dutyexemptions 19.04.07 19.05.07
-Permanent CLOSED
27 19A Welspun bills Vol-1 07.12.04 21.03.07 - Permanent CLOSED
28 19B Welspun bills Vol-2 12.03.05 10.02.08 - Permanent CLOSED
29 20 ALCONS survey 11.11.05 07.02.09 - Permanent CLOSED
30 21 Daily progress report 15.07.05 25.05.07 - Permanent CLOSED
31 22 Weekly progress report 03.07.04 26.05.06 - Permanent CLOSED
32 23A PWD correspondence vol-1 03.06.02 26.05.06 - Permanent CLOSED
33 23B PWD correspondence vol-2 29.06.06 25.01.10 - Permanent CLOSED
34 24 Irrigation correspondence 02.08.02 09.11.09 - Permanent CLOSED
35 25 Quality control correspondence 12.05.03 12.03.08 - Permanent CLOSED
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 11/58
36 26 RT,UT & other tests. 12.05.05 04.02.08 - Permanent CLOSED
3727
Right OF USECorrespondence/Records 22.12.05 02.02.07
-Permanent CLOSED
38 28 Right OF USE Records 29.04.09 - Permanent CLOSED
39 29A ROU-Thimmalapur vol-1 14.11.05 31.07.07 - Permanent CLOSED
40 29B ROU-Thimmalapur vol-2 10.12.05 17.01.07 - Permanent CLOSED
41 30 ROU -Madapur village 07.11.05 04.08.09 - Permanent CLOSED
42 31 ROU Madapur to Hosa daroji 13.06.06 30.05.08 - Permanent CLOSED
43 32 ROU -Hosa daroji 12.11.05 20.09.06 - Permanent CLOSED
44 33 ROU- Hosadaroji to Haledaroji 12.10.06 14.08.08 - Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of file
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure of filePermanent/Temporary
Remarks
45 34 ROU-Hale daroji bypass 27.12.06 16.09.08 - Permanent CLOSED
46 35 ROU-Navagram-haledaroji 20.11.06 06.01.07 - Permanent CLOSED
47 36A ROU-Devalapur vol-1 10.12.05 22.09.08 - Permanent CLOSED
48 36B ROU-Devalapur vol-2-Records - Permanent CLOSED
4937A
ROU-METRI village vol-1-Records
-Permanent CLOSED
50 37B ROU-METRI village vol-2 20.06.06 14.08.08 - Permanent CLOSED
51 37C ROU-METRI village vol-3 06.05.06 10.09.09 - Permanent CLOSED
52 37D ROU-METRI village vol-4 05.07.06 22.09.09 - Permanent CLOSED
53 38A ROU-Devasamudra vol-1 21.01.07 - Permanent CLOSED
54 38B ROU-Devasamudra vol-2 21.01.07 - Permanent CLOSED
55 39 ROU-Metri yard & others - Permanent CLOSED
56 40 Gammon India correspondence 27.02.06 18.09.07 - Permanent CLOSED
57 41A Gammon India RA bills vol-1 03.06.06 30.09.07 - Permanent CLOSED
58 41B Gammon India RA bills vol-2 17.03.07 02.05.09 - Permanent CLOSED
59
42
Modern ConstrnCompanyWorkslip-
14.12.05 23.01.06
-
Permanent CLOSED
60 43 Gammon India workslip 29.06.05 16.12.08 - Permanent CLOSED
61 44 Internal Audit papers 07.09.06 17.11.08 - Permanent CLOSED
62 45 Master file 05.05.06 19.09.08 - Permanent CLOSED
63 46 Reply to land owners-Records - Permanent CLOSED
64 47 Reply to land owners-RECORDS 29.01.09 - Permanent CLOSED
6548
Metriyard payment to workersrecord 23.09.06
-Permanent CLOSED
Name of the Office: Executive Engineer (Civil-5)
Address : Office of the EEC-5, KPCL, BTPS, Kudathini-583115, Bellary
SINo
FileNo
Subject Opening
Date of file
Closing
Date of file/
Running
file
Date of
Transfer of
File &
Authority
Whom
Nature of
File
Permanent/
Temporary
Remarks
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 12/58
Transferred
1 1 Coal handling correspondence
Volume-1 to VII 02.03.05 20.03.09 Permanent
Volume-VIII 21.03.09 Running Permanent
2 2 Daily progress report
Volume-1 to XV 05.04.05 13.08.08 Permanent
Volume-XVI 15.09.09 Running Permanent
3 3 Issue of excavated rubble 18.03.05 Running Permanent
4 4 Circular 28.03.06 Running Permanent
5 5 Chimney correspondence (Unit-I) 1x500MW 25.05.04 07.11.09 Permanent
6 6 Quality Control
Volume-I 02.07.04 23.02.05 Permanent
Volume-II 24.02.05 08.08.09 Permanent
Volume-III 09.08.09 Running Permanent
7 7 M.R. bills/Festival advance/T.Abill
27.01.06 Running Permanent
SINo
FileNo
Subject Opening
Date of file
Closing
Date of file/
Running
file
Date of
Transfer of
File &
Authority
Whom
Transferred
Nature of
File
Permanent/
Temporary
Remarks
8 8 Joining report/ leave/transfer 25.10.05 Running Permanent
9 9 Site co-ordination/record note
Volume-I 17.06.06 27.09.07 Permanent
Volume-II 28.09.07 Running Permanent
10 10 Attendance/extra wages/shift
Volume-I 16.10.04 15.09.06 Permanent
Volume-II 16.09.06 Running Permanent
11 11 Budget file 13.07.06 Running Permanent
12 12 Audit File 14.02.06 Running Permanent
13 13 Diversion canal (Ramappanahalla) correspondence.
29.03.05 Running Permanent
14 14 General file
Volume-I to VII 07.02.04 04.02.10 Permanent
Volume-VIII 05.02.10 Running Permanent
15 15 Geotechnical investigation Unit-2
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 13/58
Volume-I 29.03.05 25.11.06 Permanent
Volume-II 10.03.07 24.05.07 Permanent
SINo
FileNo
Subject Opening
Date of file
Closing
Date of file/
Running
file
Date of
Transfer of
File &
Authority
Whom
Transferred
Nature of
File
Permanent/
Temporary
Remarks
16 16 Geotechnical investigation Unit-3 07.05.08 22.02.09 Permanent
17 17 Third party inspection Unit-1 17.10.05 29.08.09 Permanent
18 18 Third party inspection Unit-2 26.08.08 Running Permanent
19 19 Imp rest A/C
Volume-I 27.06.05 31.03.08 Permanent
Volume-II 01.04.08 Running Permanent
20 20 Material indent 18.10.05 Running Permanent
21 21 Provident Fund file 10.10.05 Running Permanent
22 22 R.A. bill file 17.09.05 Running Permanent
23 23 Weekly progress report
Volume-I to IV 17.09.04 30.10.08 Permanent
Volume-V 06.11.08 Running Permanent
24 24 Fitchner letters
Volume-I to IV 15.04.05 20.02.08 Permanent
25 25 T & P 02.08.07 Running Permanent
26 26 RCC wall for LBS 26.06.09 Running Permanent
27 27 Protection to cable rack at JNT-3 12.02.09 Running Permanent
SI
No
File
No
Subject Opening
Date of file
Closing
Date of file/
Running
file
Date of
Transfer of
File &
Authority
Whom
Transferred
Nature of
File
Permanent/
Temporary
Remarks
28 28 Steel foot bridge 03.08.09 Running Permanent
29 29 Ash handling corresp. Unit-2 04.06.09 Running Permanent
30 30 PCC pavement for balanceportion of SCR
05.01.10 Running Permanent
31 31 Providing aluminium partition inWT-1 & WT-2 Control room
08.06.09 08.09.09 Permanent
32 32 Providing partition in MCC-2 & 10.11.09 Running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 14/58
MCC-3 building
33 33 Diversion canal desilting(Ramappana halla)
15.10.09 Running Permanent
34 34 CHP road quality documentsUnit-1
12.03.09 Running Permanent
35 35 Leveling & depression filling 18.08.07 23.03.09 Permanent
36 36 Disposing & clearing of excavatedmuck.
23.06.08 23.03.09 Permanent
37 37 Providing & fixing aluminiumpartition in MCC-2 building
12.07.08 Running Permanent
38 38 Balance works of Unit-1 19.02.08 Running Permanent
39 39 Topographical survey works forUnit-3 @ BTPS
04.10.07 13.11.08 Permanent
40 40 CMG meeting file 19.03.08 Running Permanent
41 41 Dismantling, fabrication, erectionof structural steel at Crusherhouse.
19.07.09 10.11.09 Permanent
42 42 Strengthening of ERH 17.08.09 Running Permanent
43 43 Attendance Register Permanent
Volume-I 16.09.04 15.12.06 Permanent
Volume-II 16.12.06 Running Permanent
EEC-5/BTPS
Name of the Office : EXECUTIVE ENGINEER(Civil-6) CLOSSED FILES
Address : BELLARY THERMAL POWER STATION, KUDATHINI-583152, BELLARY DISTRICT
SlNo
FileNo
SubjectOpening
Date of file
Closing Dateof file/
Running file
Date of Transferof file &
Authority whomtransferred
Nature of filePermanent/Temporary
Remarks
1 1 Compound wall Jan-2003 Nov-2004 Permanent
2 2 Geophysical Jly-1998 Mar.2000 Permanent
3 3 General vol.I &II Feb.2000 Sep-2005 Permanent
4 4 Administrative Feb-2004 Oct-2005 Permanent
5 5 Construction of Field office Apr-2004 May-2004 Permanent
6 6Estimate of construction ofsecurity check post
2004 2004
Permanent
7 7Bill Copy Compound wall,&security service
Feb-2003 Mar-2005
Permanent
8 8Compound wall correspondencewith contractor
July-2002 Jan-2004
Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 15/58
9 9 Daily progress report 09.10.02 06.06.03 Permanent
10 10 Raw water pond 09.07.02 15.04.04 Permanent
11 11Progress review meeting on goingworks
23.12.02 29.05.04
Permanent
12 12Improve of Ramappana halla CDworks
June 2004 June 2004
Permanent
13 13Fixing barbed wire fencingcompound wall railway siding Oct.2002 Jan 2004
Permanent
Sl
No
File
NoSubject
Opening Date
of file
Closing Dateof file/ Running
file
Date of Transfer offile & Authority
whom transferred
Nature of filePermanent
/Temporary
Remarks
14 14 Minutes of meeting HOD & DCP 09.05.02 14.11.07 Permanent
15 15 Construction of compound wall 08.03.02 22.11.03 Permanent
16 16 DPR Unit-1 01.06.06 28.07.06 Permanent
17 17 DPR Unit-1 01.09.06 29.01.07 Permanent
18 18 Protocall 30.01.07 30.01.07 Permanent
19 19 DPR Unit-1 24.01.06 01.06.06 Permanent
20 20 DPR Unit-1 04.05.04 May-2005 Permanent
21 21Protection works of Ramappanhalla
08.07.04 23.08.04
Permanent
22 22 Fabrication & Erection status 13.09.05 14.11.05 Permanent
23 23 Invoice M/s BHEL 25.11.04 21.07.05 Permanent
24 24 Invoice M/s BHEL 04.10.05 22.04.08 Permanent
25 25 Invoice Breakup 11.08.05 28.02.07 Permanent
26 26 M/s BHEL Correspondence 19.01.06 02.06.06 Permanent
27 27 M/s BHEL Correspondence Nov.2006 May-2007 Permanent
28 28 M/s BHEL Correspondence May-2006 Sep-2006 Permanent
29 29 M/s BHEL Correspondence Aug-2002 Jul-2005 Permanent
30 30 M/s BHEL Correspondence Mar-2005 Mar-2006 Permanent
31 31 Construction of meeting Hall Apr.2004 June-2005 Permanent
Sl
No
File
NoSubject
Opening Date
of file
Closing Date of
file/ Running file
Date of Transfer of
file & Authoritywhom transferred
Nature of file
Permanent/Temporary
Remarks
32 32 Bore Hole Maralihalla Oct-2002 Jly-2003 Permanent
3333A
33B
Quality test report
Quality test report
May-2002
Mar-2004
May-2002
Mar-2004Permanent
34 34 FICHTNER Mar-06 Oct-06 Permanent
35 35 FICHTNER Oct-05 Apr-07 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 16/58
36 36 FICHTNER Aug-06 May-07 Permanent
37 37 FICHTNER Sep-05 Aug-06 Permanent
38 38 Weekly progress report Apr-05 May-06 Permanent
39 39 Weekly progress report Jly-06 Feb-07 Permanent
40 40 General Nov-03 Jly-07 Permanent
41 41 General May-04 Oct-07 Permanent
42 42 DPR Structural 01.07.06 01.04.08 Permanent
43 43 Internal Audit Jan-03 Mar-08 Permanent
44 44 Internal Audit observations Sep-01 Feb-2004 Permanent
45 45 SNC RA Bill Supplementary 28.7.08 28.7.08 Permanent
46 46 SNC RA Bill Supplementary 17.06.08 17.06.08 Permanent
47 47 SNC Escalation Bill 28.11.08 28.11.08 Permanent
SlNo
FileNo
SubjectOpening
Date of file
Closing Date
of file/ Runningfile
Date of Transfer of file
& Authority whomtransferred
Nature of file
Permanent/Temporary
Remarks
48 48 Progress Highlights input 17.10.06 20.11.06 Permanent
49 49 Progress Highlights input 17.06.06 17.06.06 Permanent
50 50 Budget annual plan 08.10.02 18.01.08 Permanent
51 51 Office note TPI QUEST 28.01.06 24.11.06 Permanent
52 52 Office note release of payment 30.06.06 11.08.06 Permanent
53 53 House Keeping 13.03.08 19.03.09 Permanent
54 54 M/s BHEL Str. Correspondence 30.12.05 25.02.09 Permanent
55 55 M/s QUEST RABill 29.03.05 26.03.09 Permanent
56 56 Construction of QC Lab 20.09.02 15.04.08 Permanent
57 57 Apprentice Training 07.03.05 10.10.08 Permanent
58 58 M/s BHEL Correspondence 30.05.06 07.10.08 Permanent
Name of the Office : EXECUTIVE ENGINEER (Civil-6) RUNNING FILES
Address : BELLARY THERMAL POWER STATION, KUDATHINI-583152, BELLARY DISTRICT
Sl
No
File
NoSubject
Opening Date
of file
Closing Date
of file/ Runningfile
Date of Transfer of file
& Authority whomtransferred
Nature of file
Permanent /
Temporary
Remarks
1 1 Agreement Sept 2007 Permanent
2 2 FQP Structural Aug.2008 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 17/58
3 3 FQP Civil 21.08.08 Permanent
4 4 Enclosure to drawing 31.12.07 Permanent
5 5 Correspondence with accounts 26.12.03 Permanent
6 6 Internal Audit 24.03.01 Permanent
7 7 Technical Audit 19.09.07 Permanent
8 8M/s BHEL Civil worksCorrespondence
23.10.07
Permanent
9 9M/s BHEL Str. worksCorrespondence
30.08.06
Permanent
10 10 Inter office Correspondence 29.12.08 Permanent
11 11 Office note Mar 2010 Permanent
12 12 Memo, circulars 09.10.07 Permanent
13 13 Tender notification 10.11.08 Permanent
14 14 Estimate PW Basis Mar 2010 Permanent
Sl
No
File
NoSubject
Opening Date
of file
Closing Dateof file/ Running
file
Date of Transfer of file& Authority whom
transferred
Nature of filePermanent
/Temporary
Remarks
15 15 PW Agreement Mar 2010 Permanent
16 16 Estimate Tender Works Mar 2010 Permanent
17 17 Agreement Tender Works Mar 2010 Permanent
18 18 Quality control Correspondence 19.06.08 Permanent
19
19
Quality control monthly test
reports VOL-I
VOL-II
06.05.08
08.01.1004.12.09
Permanent
20 20 Minutes of meeting H.O. 13.11.07 Permanent
21 21 CMG Meeting 22.12.03 Permanent
22 22 CMG Proposals Mar 2010 Permanent
23 23 Third party Inspection R.A.Bill 04.03.09 Permanent
24 24Third party Inspection Correspondence (
M/s Shantala )26.08.08
Permanent
25 25 House Keeping 13.03.08 Permanent
26 26 Accident 12.08.06 Permanent
27 27 Safety Correspondence 22.09.06 Permanent
28 28Short term tender,
Construction of Store room TW22.01.09
Permanent
29 29 M/s SNC Correspondence 22.04.08 Permanent
30 30 M/s SNC Bills 19.02.08 Permanent
31 31 M/s SNC Escalation Bills 06.03.09 Permanent
32 32Material Indent MGP, PI, Stationary &Furniture
27.08.02 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 18/58
SlNo
FileNo
SubjectOpening Date
of fileClosing Date offile/ Running file
Date of Transfer offile & Authority
whom transferred
Nature of filePermanent/Temporary
Remarks
33 33 T& P Account & Sub-store 08.03.06 Permanent
34 34 Imp rest Account 26.03.03 Permanent
35 35 Leave CL/RH 24.03.07 Permanent
36 36 Attendance /Shift/Extra wages 20.03.08 Permanent
37 37 M/s BHEL Drawdown schedule 22.05.08 Permanent
38 38 BUDGET Capital & Revenue 02.09.08 Permanent
39 39 Training 14.04.08 Permanent
4040A
40B
MD’s Programme10.04.08
Permanent
41 41 Telephone/ Mobile/proforma bill 07.06.05 Permanent
42 42 Contractor’s PF Details 10.10.05 Permanent
43 43 Legal cases 25.03.08 Permanent
44 44 SR amendments 20.03.07 Permanent
45 45 Protocol Unit-II 28.05.08 Permanent
46 46Daily Progress report Vol-I
Vol-II
30.06.08
01.09.0931.08.09 Permanent
47 47CEC-BT /Daily Progress report-I
VOL-II
28.08.08
01.11.0930.10.09
Permanent
48 48 Bar bending schedule 13.06.08 Permanent
49 49 Drg. & Doc. Transmittal note 05.07.08 Permanent
50 50 Extra file 27.02.08 Permanent
SlNo
FileNo
SubjectOpening Date
of fileClosing Date offile/ Running file
Date of Transfer of file& Authority whom
transferred
Nature of filePermanent
/Temporary
Remarks
51 51 Contractor’s Reg.No. 13.07.02 Permanent
52 52 Apprentice training Jan-2008 Permanent
53 53General Vol-I
Vol-II
29.10.07
16.12.0817.11.08
Permanent
54 54 Materials receipts certificates 30.06.08 Permanent
55 55 Right to information 19.01.09 Permanent
56 56 Karnaataka rajya pathra 16.10.07 Permanent
57 57 Estimate/TS 23.06.09 Permanent
58 58 GOK/Transparency PP act 14.10.08 Permanent
59 59M/s BHEL Invoice for civil &str.works
17.01.09
Permanent
60 60DPR Structural U-II Vol-I
Vol-II
16.02.09
17.02.1016.02.10
Permanent
61 61 Reinforcement & Str. Steel TC’s 06.09.08 Permanent
62 62 M/s SNC Passed Bills 05.05.08 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 19/58
63 63 Geological Note 24.02.09 Permanent
64 64 Handing over protocol 21.01.09 Permanent
65 65 Up gradation Toilet 22.10.08 Permanent
66 66 Record notes H.O. 01.12.08 Permanent
6767A
67B
Corrs.ERA Works
Quality test results15.06.09 Permanent
SlNo
FileNo
SubjectOpening Date
of fileClosing Date offile/ Running file
Date of Transfer of file
& Authority whomtransferred
Nature of file
Permanent/Temporary
Remarks
68 68N¯P¯Áwµ w®lµš®©±wµ²°ºu®p/Œµ¶š®w®±é
03.05.07
Permanent
69 69 Weekly progress report 18.06.09 Permanent
70 70 M/s RCL 24.12.08 Permanent
71 71 Painting of bottom ash hopper 05.08.09 Permanent
72 72 Constr. Of Box culvert TW 01.06.09 Permanent
73 73 Constr. Of Dwarf wall TW 28.10.09 Permanent
74
74
Construction.. Of Store room nearESP-TW
11.11.09
Permanent
75 75 Construction.. of TR Track-TW 29.08.09 Permanent
76 76 EPC Rubble account 25.10.07 Permanent
77 77 Correspondence M/s BHEL Unit-I 09.05.08 Permanent
78 78 Rectification of bottom ash hopper 05.08.09 Permanent
79 79Collecting, conveying, and disposing off
The ash, debris unit-I PW basis06.08.09
Permanent
80 80 Str. steel & reinforcement steel MTC’s 15.04.09 Permanent
81 81 Quality records Unit –II civil Nov.08 28.04.09 Permanent
82 82 Quality records Unit –I civil Nov.08 28.04.09 Permanent
83 83 Quality records Unit –II civil Dec.08 28.04.09 Permanent
SlNo
FileNo
SubjectOpening Date
of fileClosing Date offile/ Running file
Date of Transfer of file& Authority whom
transferred
Nature of filePermanent
/Temporary
Remarks
84 84 Quality records Unit –I civil Dec.08 28.04.09 Permanent
85 85 Quality records Unit –I civil Jan.09 28.04.09 Permanent
86 86 Quality records Unit –I civil Jan.09 28.04.09 Permanent
87 87 Quality records Unit –I civil Sep.08 20.04.09 Permanent
88 88 Quality records Unit –I civil Oct.08 20.04.09 Permanent
89 89 Quality records Unit –II civil Sep.08 20.04.09 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 20/58
90 90 Quality records Unit –II civil Oct.08 20.04.09 Permanent
91 91 Quality records Unit –II civil May.09 19.06.09 Permanent
92 92 Quality records Unit –II civil Jun.09 18.07.09 Permanent
93 93 Quality records Unit –II civil July.09 11.08.09 Permanent
94 94Quality records Unit –II civil Apr.09-
July.0915.09.09
Permanent
95 95Quality records Unit –II Structural Nov.&Dec-08
17.12.09
Permanent
96 96Quality records Unit –II Structural Oct.08& Nov.08
03.12.09
Permanent
97 97Quality records Unit –II Structural Dec.08
& Jan.0909.03.10
Permanent
KARNATAKA POWER CORPORATION Ltd.
List of Files and Records Under Section 4(1) (a) of the Right to information Act - 2005
Name of the Office : Executive Engineer Civil - 9
Address : O/o Executive Engineer ( C) -9, BTPS, Kuduthini - 583 152, Bellary District.
SlNo
File No. SubjectOpening date of
File
Closingdate of
file/Running
file
Date ofTransfer of
file &Authority
whomtransferred
Nature of filePermanent /Temporary
Remarks
1 2 3 4 5 6 7 8
1 EEC9/BT/Ware HouseConstruction ofWare House No.2
_ Permanent
b) Vol-1 07.02.2008 24.04.2009 _ Permanent
c) Vol-2 4.12.2009 Running _ Permanent
2 EEC9/BT/Raising of C.WRaising ofCompound.Wall &Extension of C.W
22.02.2007 29.01.2010 _ Permanent
3 EEC9/BT/Pantry roomConstruction ofPantry room
19.04.2007 31.10.2007 _ Permanent
4 EEC9/BT/CA SiteCA SiteKuv empunagar
05.02.2008 1.09.2009 _ Permanent
5 EEC9/BT/Gen. General file _ Permanent
a) Vol-1 29.12.2004 07.04.2007 _ Permanent
b) Vol-2 05.05.2007 16.06.2008 _ Permanent
c) Vol-3 17.06.2008 06.08.2009 _ Permanent
d) Vol-4 07.08.2009 Running _ Permanent
6 EEC9/BT/Ash Pond
Construction ofAsh pond(Correspondencefile with SEC-3
03.09.2005 02.02.2007 _ Permanent
7 EEC9/BT/Security check postConstruction ofSecurity checkpost
_ Permanent
a) Vol-1 08.02.2008 22.01.2009 _ Permanent
b) Vol-2 15.09.2009 Running _ Permanent
8 EEC9/BT/Est.Establishmentfile
_ Permanent
Vol-1 22.02.2006 25.05.2007 _ Permanent
Vol-2 04.08.2007 19.01.2009 _ Permanent
Vol-3 31.01.2009 11.04.2009 _ Permanent
9 EEC9/BT/VIP G.H VIP Guest House 16.09.2006 06.02.2009 _ Permanent
10 EEC9/BT/Daily Prog.Daily progressreport 07.10.2005 30.11.2006 _ Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 21/58
11 EEC9/BT/Q.CQuality ControlVol-1
20.07.2005 06.09.2006 _ Permanent
Vol-2 17.10.2006 26.06.2007 _ Permanent
12EEC9/BT/Vehicle parkingshed
Construction ofVehicle ParkingShed
06.11.2004 18.09.2008 _ Permanent
13 EEC9/BT/Ash PondCorrespondenceswith D.Y. Uppar
01.09.2005 23.08.200518.10.200605.10.2009
_ Permanent
14 EEC9/BT/Ash pondConstruction ofAsh pond
_ Permanent
a) Vol-1 05.01.2005 03.04.2006 _ Permanent
b) Vol-2 03.04.2006 04.05.2007 _ Permanent
c) Vol-3 27.02.2007 27.03.2008 _ Permanent
15 EEC9/BT/House keeping House keeping _ Permanent
a) Vil-1 25.10.2004 08.05.2006 _ Permanent
b) Vol-2 05.07.2006 27.07.2007 _ Permanent
c) Vol-3 10.08.2007 23.03.2009 _ Permanent
d) Vol-4 16.04.2009 Running _ Permanent
16 EEC9/BT/MF Master File 30.11.2007 29.01.2008 _ Permanent
17 EEC9/BT/Main entrance gate
a) HastaConsultency-Main entrancegate
10.05.2007 30.03.2009 _ Permanent
EEC9/BT/Main entrance gate
a) HastaConsultency-Main entrancegate
7.05.2007 27.11.2009 _ Permanent
EEC9/BT/Main entrance gatec) Work slip andEIRL-Mainentrance gate
25.10.200713.09.200710.11.200928.06.2008
_ Permanent
18 EEC9/BT/Maint. Ash PondAnnualmaintenance ofAsh pond- Vol-1
06.06.2008 23.06.2009 _ Permanent
Vol-2 29.07.2009 Running _ Permanent
19 EEC9/BT/Temp. Office bldg.Construction oftemporary officeblock
14.04.2004 13.12.2006 _ Permanent
20 EEC9/BT/Watch.T.Construction ofWatch TowerNo.1 Vol-1
13.09.2007 17.06.2008 _ Permanent
Vol-2 25.06.2008 05.03.2010 _ Permanent
21 EEC9/BT/NIT
Notification (NIT)Vol-1
10.02.2006 15.01.2009 _ Permanent
Vol-2 11.02.2009 Running _ Permanent
22 EEC9/BT/Ash PondAsh pond - OKCards
28.02.2006 13.03.2006 _ Permanent
23 EEC9/BT/Ap.billsAsh pond - billscopies
29.03.2006 28.07.2006 _ Permanent
24 EEC9/BT/CMG CMG 08.03.2004 01.02.2010 _ Permanent
25 EEC9/BT/IA Internal Audit 08.02.2006 Running _ Permanent
26 EEC9/BT/JungleJungle clearanceVol-1
27.02.2007 03.07.2007 _ Permanent
Vol-2 19.11.2008 19.12.2008 _ Permanent
27 EEC9/BT/Improv ements.Improv ementalworks
12.7.2007 30.09.2009 _ Permanent
28 EEC9/BT/Budget Budget Vol-1 22.09.2005 05.03.2010 _ Permanent
Vol-2 06.03.2010 Running _ Permanent
29 EEC9/BT/HelipadConstruction ofHelipad
18.06.2008 02.02.2009 _ Permanent
30 EEC9/BT/OHCOccupationalHealth Center
19.01.2007 28.07.2009 _ Permanent
31 EEC9/BT/GardenMaintenance ofGardenDCF/KPCL
31.07.2008 08.02.2010 _ Permanent
32 EEC9/BT/PaintingPainting toThimmalapur 12.05.2009 08.01.2010 _ Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 22/58
office block
33 EEC9/BT/Maint. Office bldg.Maintenance ofoffice buildingVol-1
26.09.2007 24.04.2009 _ Permanent
Vol-2 15.09.2009 10.03.2010 _ Permanent
34 EEC9/BT/Renov ationRenov ation ofToilets
21.10.2008 21.10.2009 _ Permanent
35 EEC9/BT/Junglea)Jungleclearancestatement-SEC-3
27.02.2007 01.02.2008 _ Permanent
EEC9/BT/Jungleb)Jungleclearance insideBTPS plant
29.12.2006 01.01.2008 _ Permanent
36 EEC9/BT/Serv ice RoadFormation ofServ ice road ontop of Ash pond
26.06.2009 Running _ Permanent
37 EEC9/BT/WPRWeeky progressreport
03.03.2008 Running _ Permanent
38 EEC9/BT/Contract labour
ContractorLabour - ( S®±rÙSµ N¯ï±ÁN®Š®x‡®±ºq®äo î®±q®±Ù Š®u®Ûry®u®Ûr)
05.03.2009 Running _ Permanent
39 EEC9/BT/ColonyResidentialcolony 21.05.2009 Running _ Permanent
40 EEC9/BT/Assets Assets file 23.08.2007 Running _ Permanent
41 EEC9/BT/Spreading of muck
Spreading ofexcav ated muck@ D/S of Ashpond in reach-3area
25.02.2009 24.07.2009 _ Permanent
42EEC9/BT/Ash pondLongitudinal drain
Longitudinaldrain and PVCchute for ashpond open drain@ D/S of Ashpond
12.02.2009 21.10.2009 _ Permanent
43 EEC9/BT/Septic tankSeptic tank andsoak pit to VIPGuest House
07.07.2008 22.01.2009 _ Permanent
44 EEC9/BT/Aluminium partitionAluminiumpartition
16.02.2007 23.05.2008 _ Permanent
45 EEC9/BT/SoakpitSoak pit toKudathinimeeting hall
22.12.2005 11.2.2008 _ Permanent
46 EEC9/BT/Cleaning v ents
Cleaning of Ventsof compound wall& RamappanaHalla exit & inlet
18.12.2009 Running _ Permanent
47 EEC9/BT/Indent Indent file 13.04.2005 Running _ Permanent
48 EEC9/BT/Q.C.lab
Modification toODY control roomto accommodateQ.C.Lab
11.12.2009 03.03.2010 _ Permanent
49 EEC9/BT/Temp.adv anceTemporaryadv ance
17.03.2006 Running _ Permanent
50 EEC9/BT/Portico
Construction ofPortico toThimmalapuroffice building
09.11.2009 Running _ Permanent
51 EEC9/BT/Ladies rest roomConstruction ofLadies RestRoom
26.09.2008 Running _ Permanent
52 EEC9/BT/Septic tank
Construction ofSeptic tank toThimmalapuroffice block.
21.5.2008 17.07.2009 _ Permanent
53 EEC9/BT/precast tiles
Laying of precastconcrete tilesaround RODM-Unit - I
13.10.2009 15.03.2010 _ Permanent
54 EEC9/BT/TechnicalTechnical file Vol-1
_ Permanent
Vol-2 13.12.2005 02.04.2009 _ Permanent
55EEC9/BT/Modfitn. Officebldg.
Modification toQ.C. Office
11.08.2005 29.03.2008 _ Permanent
56 EEC9/BT/Approch roadApproach road toKudathinimeeting hall
09.02.2007 23.05.2007 _ Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 23/58
57 EEC9/BT/Pitching
Prov idingpitching to U/sface ofembankment ofAsh pond inreaches of 4 & 5
16.07.2009 Running _ Permanent
58 EEC9/BT/Ash pondAsh pond workslip
07.12.2006 14.06.2008 _ Permanent
59EEC9/BT/Temp. approachRUB
Temporaryapproach road toRUB
20.12.2007 Running _ Permanent
60 EEC9/BT/Purchase materialsVIP Guest housepurchase ofmaterials
24.09.2007 Running _ Permanent
61EEC9/BT/Temp. officecomplex
Temporary officecomplex
06.11.2004 28.04.2005 _ Permanent
62 EEC9/BT/E-procurement E-procurement 20.02.2010 Running _ Permanent
63 EEC9/BT/Parking shedParking shednear technicalbuilding at BTPS
27.11.2009 Running _ Permanent
64 EEC9/BT/FencingProv iding fencingto Hydrogen gascylinder room
18.11.2009 Running _ Permanent
65 EEC9/BT/SR S.R. file 11.07.2008 Running _ Permanent
66 EEC9/BT/Repairs
Repair works oftemporary shedfor coal testingroom near Unit - I,PTP at BTPS
15.11.2009 31.10.2010 _ Permanent
67 EEC9/BT/GLSR
Alterations toGLSR tanks forusing water toRODM plant @BTPS
11.03.2010 Running _ Permanent
68 EEC9/BT/Rate analysisApprov ed rateanalaysis
12.06.2008 Running _ Permanent
69 EEC9/BT/DP switch
Construction ofDP switch forHSD bunk @BTPS
02.09.2008 23.01.2010 _ Permanent
70 EEC9/BT/GLRCC
Construction ofGLRCC watertank near VIPguest house
28.08.2007 03.09.2009 _ Permanent
71 EEC9/BT/PartitionPartition andconstruction ofwater closets
19.02.2006 13.09.2007 _ Permanent
72 EEC9/BT/Temp.approach
Temporaryapproach by theside compoundwall
03.02.2006 06.10.2006 _ Permanent
73 EEC9/BT/Formation roadFormation oftemporaryperipheral road
21.02.2007 18.06.2008 _ Permanent
74 EEC9/BT/Env ironmentUnit -IIEnv ironment file
21.02.2007 11.04.2007 _ Permanent
75 EEC9/BT/Plugging of v entsPlugging of v entsin the compoundwall
19.05.2006 19.03.2009 _ Permanent
76 EEC9/BT/Comparativ eComparativ estatement
30.09.2004 27.04.2005 _ Permanent
77 EEC9/BT/Misc.Miscelleneousworks
27.06.2005 12.01.2007 _ Permanent
78 EEC9/BT/Pre- fabricatedPre-fabricated hutnear coalhandling plant
11.12.2006 17.07.2008 _ Permanent
79 EEC9/BT/Sanction estimateSanctionedestimate
08.11.2004 29.09.2005 _ Permanent
80 Unit-II 04.09.2006 11.01.2008 _ Permanent
81 EEC9/BT/Foundn.Foundation forpre-fabricatedwork
31.01..2006 16.10.2006 _ Permanent
82 EEC9/BT/SiteSite Co-ordinationmeeting
18.02.2005 01.12.2007 _ Permanent
83 EEC9/BT/Remov al of silt
Remov al of siltand improv ementto Rammappannahalla
04.01.2005 23.02.2007 _ Permanent
84EEC9/BT/Contractregistration
Contractorsregistrationcertificate.
24.01.2005 24.07.2007 _ Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 24/58
85 EEC9/VIPVIP guest houseand dormitory
25.08.2006 19.12.2007 _ Permanent
86 EEC9/BT/Boundry ston Boundary stones 27.02.2006 26.12.2005 _ Permanent
KARNATAKA POWER CORPORATION LIMITED
BELLARY THERMAL POWER STATION
LIST OF FILES AND RECORDS
NAME OF THE OFFICE : SUPERINTENDING ENGINEER(CIVIL-2)
ADDRESS: KPCL, BTPS, KUDATHINI - 583 152
ESTABLISHMENT SECTION
SL.NO.
FILE NO. SUBJECT
OPENINGDATE OF
FILE
CLOSINGDATE OF
FILE/RUNNINGFILE
DATE OFTRANSFER OF
FILE &AUTHORITY
WHOMTRANSFERRED
NATURE OF FILEPERMANENT/TEMPORARY
REMARKS
1 SEC2/Q2A Attendance 15.07.2004 Running
2SEC2/Q2A/ A/cs
AccountVolume-I
06.03.2004 19.04.2007
Volume-II
19.04.2007 Running
3 SEC2/P1N1 Apprenticeship 31.03.2006 Running
4 SEC2/P1A/ Assests Assets and liabilities 27.02.2006 Running
5 SEC2/P1Q2 (CR) Confidential 23.06.2004 Running
6 SEC2/R1HO H.O. Circular 14.05.2008 Running
7 SEC2/P1O/ Gn Circular (General)Volume-I
24.07.2004 19.09.2005
Volume-II
17.07.2004 29.11.2007
8 SEC2/P2D Disciplinary 09.05.2008 Running
9 SEC2/P1K Electricity Bills 11.04.2005 Running
10 SEC2/P1G Extra wages 23.09.2009 Running
11 SEC2/P1H Festival Advance 20.07.2004 Running
12 SEC2/Q2P2 Founders Day 25.06.2005 Running
13 SEC2/P1A/Information
Information 08.09.2006 Running
14 SEC2/P1A/Kannada Kannada BalakeyaVaradi
01.12.2004 Running
15 SEC2/P1ALL Land looser File 24.08.2006 Running
16 SEC2/P1F Leave FileVolume-I
07.08.2004 07.12.2006
Volume-II
02.04.2009 Running
17 SEC2/Q2F Medical Bill 01.07.2004 Running
18 SEC2/PO/ Misc Miscellaneous 31.03.2007 Running
19 SEC2/A5B Stationery & Materials 09.02.2005 Running
20 SEC2/Q2A Shift Allowance 15.07.2004 Running
21 SEC2/P2C Shakthi Kreede 05.01.2006 Running
22 SEC2/A7E Safety / Accident 18.11.2006 Running
23 SEC2/P1G Service / Increment 28.10.2006 Running
24 SEC2/P2B Training & Deputation 21.08.2006 Running
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 25/58
25 SEC2/Q2D TA Bill 26.06.2004 Running
26 SEC2/ T&P T&P File 09.06.2003 Running
27 SEC2/P1E Transfer FileVolume-I
14.07.2004 16.06.2007
Volume-II
30.06.2007 Running
28 SEC2/A1W Telephone 22.07.2004 Running
29 SEC2/A2BVehicleAdvance/HBA/Computer
08.11.2004 Running
30 SEC2/P2G Voluntary Exit Scheme 21.06.2005 Running
31 SEC2/WFWork force/Workallocation
26.07.2004 Running
S E (C-2)
Name of the office : Executive Engineer Civil - 3
Address : Office of the EEC-3, KPCL, BTPS, Kuduthini 583152, Bellary.
Sl.No.
FileNo.
Name of Work
Openingdate offile
Closingdate offile /
running
Date oftransfer offile &
authoritywhomtransferred
Nature offilePermanent/
Temporary
Remarks
1 1 Site Grading in plant area ofBTPS
18.02.02 22.07.03 P WorkCompleted
2 2 Construction of RCC ground
level service reservoir of BTPSnear Kudathini
27.06.02 03.02.04 P Work
Completed
3 3 Providing water supply pipe linefrom Daroji tank to tank ofBTPS including pump sets and
its accessories etc. andoperation and runningmaintenance and security of thesystem for a period of one year.
23.09.02 12.11.08 P WorkCompleted
4 4 Tender Notification 30.12.02 Running P
5 5 Supply, fabrication andinstallation of 2 nos. of Modular
field office of BTPS
20.05.03 24.02.04 P WorkCompleted
6 6 Providing submersible pump tothe proposed bore wells andinter connecting these borewells to the existing Daroji
construction water lineconnecting GLSR at BTPS.
09.08.03 31.03.04 P WorkCompleted
7 7 Establishment of 66/11 KVsubstation for constructionpower supply to BTPS
16.12.03 27.09.05 P WorkCompleted
8 8 Providing and supplying 8 nos.
hume pipe house encasing ofcasing pipe and cleaning of twobore wells at BTPS
24.12.03 27.07.04 P Work
Completed
9 9 Monitoring cum supply of pumpoperator cum maintenancework of construction water
02.01.04 31.03.04 P WorkCompleted
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 26/58
scheme at BTPS
10 10 Up keeping of Bunk office andModular field office at BTPS
24.03.04 21.04.05 P WorkCompleted
11 11 Construction occupation Health
centre at BTPS site
01.04.04 25.02.05 P Work
Completed
12 12 Maintenance and monitoring ofsubmersible pumps forconstruction water supply atBTPS.
19.04.04 23.03.06 P WorkCompleted
13 13 Attendance 16.09.04 Running P
14 14 Construction of quality control
lab/office at BTPS site
01.05.04 15.10.05 P Work
Completed
15 15 Construction of Canteenbuilding at BTPS site
14.05.04 03.03.08 P WorkCompleted
16 16 Providing submersible pump toproposed bore wells of BTPSplant (2nd phase)
27.05.04 10.12.05 P WorkCompleted
17 17 Earth work in bank and cutting
and construction of majorbridges for Railway siding andMarshalling yard works.
26.10.04 02.08.07 P Work
Completed
18 18 Monitoring cum supply of pumpoperator cum maintenance
work of construction waterscheme at BTPS
30.03.05 06.09.06 P WorkCompleted
19 19 Work of laying, joining, testingand commissioning of MS pipeline 134 mm dia - subletting of
works of crossing of HLC
23.04.05 20.01.06 P WorkCompleted
20 20 Establishment volume I to IV 06.05.05 01.04.10 P WorkCompleted
21 21 Internal Audit 08.07.05 10.12.09 P WorkCompleted
22 22 Permanent way works includingsignal and telecommunication
system and Marshalling yardworks.
23.08.05 20.11.08 P WorkCompleted
23 23 Providing Construction watersupply from Daroji tank toBTPS plant site includingoperation running maintenance
& security system
01.11.05 17.03.06 P WorkCompleted
24 24 Construction of internal roadsof 7.5 m of carriage way wideupto and including blacktopping, RC drains and CD
works, Kerb etc. Package-I.
08.02.06 11.03.10 P WorkCompleted
25 25 Construction of peripheralroads of 5.0m (3.5 m carriage
way) wide upto and includingWBM, RC drains and oneRCC box bridge etc.,Package-III.
08.02.06 08.09.07 P WorkCompleted
26 26 Monitoring cum supply of pump
operator cum maintenancework of construction waterscheme at BTPS
17.03.06 16.06.07 P Work
Completed
27 27 Providing concrete apron dwarfwall for oil siding lines for broadgauge Railway siding and
Marshalling yard works ofBTPS.
26.07.06 03.12.08 P WorkCompleted
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 27/58
28 28 Providing construction watersupply from Daroji tank toGLSR at BTPS including
operation & running ofmaintenance and securitysystem.
14.09.06 03.09.09 P WorkCompleted
29 29 Monitoring cum supply of pumpoperator cum maintenancework of construction water
scheme at BTPS
20.02.07 08.07.08 P WorkCompleted
30 30 Providing drainagearrangements for Boiler EDTAcleaning from CST tank to pitnear Ramapahahalla along 20
N road.
13.06.07 10.08.07 P WorkCompleted
31 31 Jungle clearance betweencompound wall and RCCdrains all along the peripheralroad within BTPS plant.
26.12.07 20.01.10 P WorkCompleted
32 32 Construction of yard master
building near RSMY at BTPS
16.05.08 08.08.09 P Work
Completed
33 33 Monitoring & maintenance ofconstruction water supply atBTPS plant for the year 2008-09
29.03.08 20.06.09 P WorkCompleted
34 34 Construction water supply fromDaroji tank to GLSR at BTPSplant. 2008-09
29.03.08 31.03.10 P WorkCompleted
35 35 Construction and upgradationof existing single lane peripheralto double lane road of 5.0 Mwide each carriageway bywidening the existing 3.5M
wide peripheral road to 5.0M ,providing 1.50M wide medianin between the existing andproposed 5.0 m lanes, upto andincluding black topping, drains
and cross drainage (Pipe/Boxculver) works, Kerbs and oneRCC box bridge.
23.05.08 10.09.09 P WorkCompleted
36 36 Construction of Internal roadsof 7.5 M (Carriage way) wide
in power house area upto andincluding black topping, drains& cross drainage (Pipe/Boxculverts works Kerb, etc.-Package-V
23.05.08 11.12.09 P WorkCompleted
37 37 Construction of Internal roadsof 7.5M (CW) wide in RO/DMplant CW pump house aroundswitch yard and along 20Nupto & including black topping
drains, cross drainage(Pipe/Box culverts) works kerb- Package-VI.
23.05.08 Running P Work is inprogress.
38 38 Construction of Temporarybuilding for coal sample testingnear yard Master building
24.06.08 28.04.09 P WorkCompleted
39 39 Providing and spreadingMurrum to peripheral roadfrom new entrance gate to mainsecurity check post. Trial pipesalong balance peripheral road
and proposed approach roadfrom 300E to RW MCCbuilding.
16.07.08 25.11.08 P WorkCompleted
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 28/58
40 40 Providing concrete pavementfor internal roads in 220/400KV switch yard area at BTPS.
09.08.08 22.07.09 P WorkCompleted
41 41 Providing guard stone to
existing peripheral road atBTPS.
26.09.08 30.05.09 P Work
Completed
42 42 Attending through packing,boxing and alignment forsmooth function of BG railway
track at BTPS
26.09.08 31.03.10 P WorkCompleted
43 43 Construction of cross over nearRUB at BTPS.
26.09.08 20.02.10 P WorkCompleted
44 44 Carrying out road cleaning andallied civil works inside BTPSplant in view of inaugural
function. Preparation of area forvehicle parking and catering infront of BTPS plant.
20.10.08 28.11.08 P WorkCompleted
45 45 Jungle clearance, removal offallen muck/Soil on road sideand cleaning of drains along
Internal & peripheral roads atBTPS. 2008-09
29.11.08 02.06.09 P WorkCompleted
46 46 Providing painting to Kerbstones of Internal roads andbridges across Ramappanahalla
inside BTPS plant.
20.01.09 25.01.09 P WorkCompleted
47 47 Sinking of additional bore wellsfor water supply arrangementsto RODM plant at BTPS.
18.02.09 03.09.09 P WorkCompleted
48 48 Monitoring & maintenance ofconstruction water supply at
BTPS plant for the year 2009-10
23.03.09 Running P Work is inprogress.
49 49 Dismantling and shifting of 50HP pump sets and motor, DGset, MS pipes, Panel boardsand other accessories from
Daroji pump house to BTPSplant.
07.05.09 31.03.10 P WorkCompleted
50 50 Sinking of some moreadditional bore wells for watersupply arrangements to RODMplant at BTPS.
18.05.09 30.03.10 P WorkCompleted
51 51 Carrying out road cleaning and
allied civil works inside BTPSplant in view of foundationstone laying ceremony of Unit-III.
22.05.09 29.07.09 P Work
Completed
52 52 Reconditioning of damagedtongue rails of 1 in 8 1/2 turnout
with curved switches.
04.06.09 20.01.10 P WorkCompleted
53 53 Jungle clearance, removal offallen muck/Soil on road sideand cleaning of drains alongInternal & peripheral roads at
BTPS for the year 2009-10
11.08.09 Running P Work is inprogress.
54 54 Asphalting to the existing singlelane WBM peripheral road of3.5M wide carriage way atBTPS.
28.10.09 Running P Work is inprogress.
55 55 Routine packing, Boxing and
alignment of sleepers etc. of BG
18.11.09 Running P Work is in
progress.
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 29/58
Railway track of RS&MY at
BTPS
56 56 Construction of pathwaysbetween rail tracks ofMarshalling yard at BTPS.
16.12.09 Running P Work is inprogress.
Executive Engineer Civil -3
Name of the Office : SUPERINTENDING ENGINEER CIVIL– I/ BTPS, KUDATHINI.
Address : KPCL/BTPS KUDATHINI – 583152.
Sl
No
FileNo
SubjectOpening
Date of File
Closingdate of file/
Running
Date of Transferof File & Authoritywhom transferred
Nature of FilePermanent/Temporary
Remarks
1.1 Geo Technical 13.01.2005 Running Permanent
2. 2Building works/field office- VOL-I
VOL-II
19.03.2002
12.04.2008
03.08.2004
Running Permanent
3.5
Maralihalla water supply works/water analysis.
10.02.2003 Running Permanent
4. 5A Water supply from Narayanapur 20.01.2009 Running Permanent
5.6 Estimate/Tender correspondence 23.11.2006 Running Permanent
6. 7 DCPL/Bank Guarantee 21.05.2002 26.08.2004 Permanent
7.8
Miscellaneous works general - -VOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
19.03.2002
21.06.2002
Feb-2004
19.06.2006
24.08.2006
05.07.2007
23.05.2007
April-2004
06.11.2006
Running
Permanent
8.8A
Miscellaneous works Technical.VOL-I
- VOL-II
24.08.2005
01.08.2006
16.08.2006
Running Permanent
9.10 Land acquisition 23.04.2003 Running Permanent
10.12
Quality control correspondence/Test results
23.06.2006 Running Permanent
11.12A
Quality control Monthly report.VOL-I
- VOL-II
30.05.2006
11.09.2009
01.08.2009
Running Permanent
12. 14
Tender notification - VOL-I
- VOL-II
- VOL-III
- VOL-IV
19.06.2006
19.01.2006
30.05.2008
29.12.2009
03.11.2006
14.06.2008
29.12.2009
Running
Permanent
13.15
Weekly progress reports- VOL-I
- VOL-II
08.01.2008
17.10.2008
11.05.2009
Running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 30/58
14.18
Circulars / Memo VOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
- VOL-VI
- VOL-VII
24.05.2002
03.06.2002
24.05.2002
12.06.2002
13.10.2006
11.01.2008
02.09.2009
29.06.2007
31.07.2007
12.02.2007
16.06.2008
20.12.2008
02.09.2009
Running
Permanent
15.19 Quarry / Geologist 18.05.2002 Running Permanent
16. 20
Schedule of Rates/ Data rates
VOL-I
- VOL-II
28.07.2002
08.11.2002
24.02.2006
Running Permanent
17.21
Project co-ordinator PC(BTPS)correspondence.
21.03.2002 Running Permanent
18.22 Marshalling Yard / side grading 25.06.2002 Running Permanent
19. 23Store VOL-I
- VOL-II
09.07.2002
15.05.2008
02.05.2007
Running Permanent
20. 24 Budget / Annual plan 26.09.2006 Running Permanent
21.25 Accounts wing 26.01.2006 Running Permanent
22.26 Confidential 06.06.2002 Running Permanent
23. 27Introduction ltrs / Brochers /literatures
28.06.2002 20.10.2004 Permanent
24. 28Internal Audit VOL-I
- VOL-II
21.09.2002
05.08.2008
16.06.2008
Running Permanent
25. 28A Technical Audit. 24.01.2009 Running Permanent
26.29
Water supply Daroji Tank toBTPS
02.06.2006 Running Permanent
27.30
Construction of RCC GLSR at
BTPS21.03.2002 28.02.2007 Permanent
28. 32Estimates sent to AdministrativeApproval
03.10.2008 Running Permanent
29. 33Registration of contractors VOL-I
- VOL-II
22.01.2006
18.07.2006
15.05.2006
Running Permanent
30. 34 Technical sanction / Estimates 20.01.2009 Running Permanent
31.35
Comparative statements/Negotiation/ LOA
05.03.2007 Running Permanent
32.36
Minutes of TCM/HOD/CMG etcVOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
14.02.2005
23.06.2007
20.11.2006
26.08.2008
04.01.2007
18.07.2007
28.08.2008
06.05.2008
19.01.2009
Running
Permanent
33.37
Submersible pump VOL-I
- VOL-II
22.01.2005
20.02.2003
15.05.2006
Running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 31/58
34. 39 Chain linking 03.12.2003 Running Permanent
35.40 BHEL –Correspondence-U-I 08.12.2003 Running Permanent
36.41 Hume pipe house (Bore well ) 03.01.2004 08.01.2004 Permanent
37. 43
Electrical sub station – VOL-I
- VOL-II
25.04.2002
25.06.2004
05.11.2004
05.06.2004 Permanent
38.44 Daily progress report 03.01.2006 20.05.2006 Permanent
39.45 Up keepings 17.04.2004 11.10.2004 Permanent
40.46
Railway siding /Marshalling yardVOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
07.01.2004
08.07.2005
11.10.2005
20.06.2005
16.06.2006
20.12.2004
11.10.2005
21.08.2006
23.12.2006
Running
Permanent
41.46A
Expansion of BTPS existing
RSMY18.05.2009 Running Permanent
42. 47 Inspection report 06.07.2004 Running Permanent
43.48 Computerized Billing 13.08.2004 17.12.2004 Permanent
44.49
Safety Measures/security – VOL-I
- VOL-II
05.03.2002
19.07.2004
02.09.2006
Running Permanent
45.50 HLC 12.08.2004 Running Permanent
46. 51 Architectural Design . 25.08.2004 Running Permanent
47.52 Occupational Health center . 21.08.2004 Running Permanent
48.53 Tele fax ./ Telephon Bills 10.04.2002. 05.07.2007 Permanent
49. 54 Site co – ordination meeting . 18.08.2004 10.05.2007 Permanent
50.55
Weekly progress (ED BTPS).VOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
- VOL-VI
07.01.2006
140th Week
132th week
176th Week
164th Week
152th Week
08.12.2007
163rd week
204th Week
210th Week
183th Week
175th
Weeks
Permanent
51.56 Cooling Tower . 15.09.2004 22.12.2004 Permanent
52. 58
Maralihalla – Construction works58B, 58M, 58R, 58W(R.S.SHETTY & Co.)
– VOL-I
VOL-II
15.10.2004
13.08.2008
25.10.2005
Running Permanent
53.59 BTPS-II stage correspondence. 23.11.2004 Running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 32/58
54. 60Covering Letter of drawings(Except BHEL).
10.11.2004 Running Permanent
55.61 Coal handling plant . 12.11.2004 Running Permanent
56.63
Contract Management.CMG
VOL-I
- VOL-II
- VOL-III
03.02.2009
10.09.2009
11.03.2010
03.09.2009
04.03.2010
Running
Permanent
57.65
Construction of High level Bridgeat Maralihall (Gammon IndiaLimited).
04.03.2009 Running Permanent
58.66
RSMY-Permanent way works
(M/s.PJB).11.02.2008 Running Permanent
59. 68Records Notes of Discussion./SCM
09.07.2005 Running Permanent
60.69 Monthly Progress . 08.02.2005 12.08.2006 Permanent
61.70 Bank Guarantee. 28.10.2005 Running Permanent
62. 71 Monthly progress review meeting . 05.02.2006 Running Permanent
63.72 PW- EEC-3 Daily progress . 31.01.2006 24.01.2007 Permanent
64. 74Road and Drains . VOL-I
- VOL-II
14.02.2006
08.01.2007
22.01.2008
Running Permanent
65. 75
Attendence & Leave + Joiningreport
VOL-I
- VOL-II
- VOL-III
- VOL-IV.
22.05.2002
17.06.2002
08.01.2005
15.02.2008
03.07.2007
17.07.2007
13.06.2007
Running
Permanent
66.76 Kannada Monthly report . 06.10.2005 Running Permanent
67.77
T.A.Bills. . VOL-I
- VOL-II
07.06.2002
05.09.2008
16.06.2007
Running Permanent
68.78 U-II- BHEL orrespondence. 30.07.2009 Running Permanent
69. 79 Workslip and extension of time. 06.03.2006 Running Permanent
70. 80
U-II- Daily progress reports ofCEC .
VOL-I
- VOL-II
07.01.2008
09.01.2010
11.01.2010
Running Permanent
71.80A
U-II-Daily progress reports of
EE(C)-1022.09.2008 Running Permanent
72. 81 U-I- Cooling Tower[(SEC-2) 11.08.2004 21.11.2006 Permanent
73.81A U-II-Cooling Tower 05.07.2008 Running Permanent
74. 82 U-I- Chimney[(SEC-2) 17.04.2004 26.06.2007 Permanent
75.82A U-II- Chimney 15.10.2008 Running Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 33/58
76.83 U-II- General Correspondence. 13.01.2009 Running Permanent
77.84 Priya Const. Correspondence 06.02.2009 Running Permanent
78.85
Legal cases and appeal of Landloosers.
24.07.2008 Running Permanent
79.86 U-I- CW P. House Corresp [(SEC-2) 21.03.2005 18.05.2007 Permanent
80.86A U-II- CW P. House Corresp 15.04.2009 Running Permanent
81. 87 U-II R.O.D.M. Plant 14.07.2009 Running Permanent
82.88 ¸ÀÄvÉÆÛÃ¯É 04.12.2006 Running Permanent
83.89
Notification VOL-I
- VOL-II
30.08.2002
28.11.2006
24.01.2007
Running Permanent
84.90 U – III Correspondence. 29.05.2009 Running Permanent
85 91
M/F VOL-I
- VOL-II
- VOL-III
- VOL-IV
- VOL-V
16.07.2002
16.11.2005
10.02.2005
13.02.2008
16.12.2009
22.12.2005
06.09.2006
29.11.2006
16.12.2009
Running
Permanent
86 92 Office furnature 28.03.2002 20.06.2007 Permanent
87 94 ºÉZÀÄѪÀj ªÉÃvÀ£À 16.11.2002 11.05.2007 Permanent
88 95 Advance lone 14.03.2002 11.10.2006 Permanent
89 96 Apprentice 19.07.2005 12.04.2007 Permanent
90 97 NSC income tax 30.07.2004. 28.05.2007 Permanent
91 98 M,R.Bills 18.06.2002 17.07.2007 Permanent
92 99 New thermal 01.08.2007 10.08..2007 Permanent
93 100 Charge list 16.11.2002 Running Permanent
94 101 KTPP Act 08.11.2006 13.11.2006 Permanent
95 102 Tour training program 05.12.2005 24.09.2004 Permanent
96 103U-I-Technical MiscellaneousCorrespondence. (From –SEC-2)
20.05.2005 17.10.2007 Permanent
Files from SEC- 4
Sl
No
File
NoSubject
Opening
Date of File
Closingdate of file/
Running
Date of Transferof File & Authoritywhom transferred
Nature of FilePermanent/Temporary
Remarks
Water supply pipe line works – M/s
MCC
Transferred from
SEC-4 on 16.07.08
11/58 C
Water supply pipe line works ofMaralihalla to BTPS correspondence
(bounded book)
VOL-IA
26.04.2004
29.03.2005 Permanent
2 2/58 C - do – (bounded book) VOL-IIA 02.06.2005 29.07.2005 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 34/58
3 3/58 C - do – (bounded book) VOL-IB 29.03.2005 17.05.2005 Permanent
44/58 C
- do – (bounded book) VOL-IIB01.08.2005 05.10.2005 Permanent
5 5/58 C
Water supply pipe line works of
Maralihalla to BTPS correspondence
VOL-IIIB 02.12.2005 17.03.2008
Permanent
66/58 C
Maralihalla correspondence (BoundedBook) VOL-I
10.06.2005 23.09.2004 Permanent
77/58 C
Maralihalla general correspondence(Bounded Book) VOL-II
05.07.2005 13.03.2006 Permanent
8 8/58 CWater supply pipe line works fromMaralihalla to BTPS VOL-III
10.02.2006 08.03.2008 Permanent
99/58 C
Water supply pipe line works fromMaralihalla to BTPS VOL-IV
07.10.2005 18.11.2005 Permanent
1010
Water supply pipe line works
correspondence with M/s MCC afterrescinding of contract.
02.06.2006 24.01.2007 Permanent
1111/58B
Procurement of welded MS pipescorrespondence with M/s welspunGujarath Stahl Roheren Ltd., BharuchGujarat.
21.09.2004 13.06.2007 Permanent
Water supply pipe line (Balance
works) – M/s GIL
Transferred from
SEC-4 on 16.07.08
12 12MS Pipe line correspondence file VOL-I
24.04.2006 03.11.2006 Permanent
1313
MS Pipe line correspondence fileVOL-II
03.11.2006 28.06.2007 Permanent
1414 MS Pipe line correspondence file VOL-III 09.07.2007 26.06.2008 Permanent
15 15 MS Pipe line correspondence fileVOL-IV 02.12.2005 15.05.2008 Permanent
1616 Pipe line ROU correspondence fileVOL-I 18.11.2005 09.11.2006 Permanent
17 17 Pipe line ROU correspondence file VOL-II 23.11.2006 04.06.2007 Permanent
18 18 Pipe line ROU correspondence file VOL-
III14.06.2007 06.06.2008 Permanent
19 19Constitution of committee forrectification measures for usage of 79
Nos. pipes (office file)
19.05.2006 30.05.2006 Permanent
Construction of civil works atMaralihalla – M/s RSS
Transferred from
SEC-4 on 16.07.08
20 20/58AInternal correspondence (BoundedBook) VOL-IA
10.11.2004 22.05.2005 Permanent
21 21/58AInternal correspondence (BoundedBook) VOL-IB
27.06.2005 30.08.2005 Permanent
22 22/58A General correspondence VOL-I 16.05.2005 03.04.2006 Permanent
23 23/58A General correspondence VOL-II 06.04.2006 17.03.2007 Permanent
24 24/58A General correspondence VOL-III 08.03.2007 28.06.2008 Permanent
25 25/58AM/s. R S Shetty EIRL file (Ordinary file)VOL-I
21.01.2006 Running Permanent
26 26/58ASanction estimates inrespect of EEC-10
VOL-I16.01.2007 06.12.2007 Permanent
27 27/58ASanction estimates inrespect of EEC-10
VOL-II08.06.2007 04.06.2008 Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 35/58
28 28/58ABalance works of pump house – VOL-Isanctioned estimates VOL-II
28.08.2002
10.04.2008
29.03.2008
13.06.2008 Permanent
Construction of foundation forElectrical substation –M/s SrinivasaConstruction.
Transferred from
SEC-4 on 16.07.08
29 29 correspondence file 05.01.2006 29.03.2008 Permanent
3030 Minutes of 114th EIRL meeting (office
file)17.02.2007 25.01.2008 Permanent
Balance works of approach bridge &
high level bridge – M/s GIL.
Transferred fromSEC-4 on 16.07.08
31 36 correspondence VOL-I 24.08.2005 04.08.2005 Permanent
32 37 correspondence VOL-II 30.05.2006 31.01.2008 Permanent
33 38 Daily progress report. 02.05.2006 18.04.2007 Permanent
34 39 Internal audit report correspondence. 28.03.2006 11.06.2008 Permanent
35 40 Technical audit. 18.07.2007 23.05.2008 Permanent
36 41 Quality control test report Vol I & II. 08.05.2006 06.05.2006 Permanent
37 42 Budget (Ordinary file) 21.06.2006 15.04.2008 Permanent
38 43 PCMG (Box file) 30.06.2006 27.06.2008 Permanent
39 44 Meeting (Ordinary file) 02.05.2006 20.06.2008 Permanent
40 45Registration of contractors ( ordinaryfile)
04.12.2006 05.05.2008 Permanent
41 46 Tender notification. 10.05.2006 25.06.2008 Permanent
42 47 House keeping (ordinary file) 02.11.2007 16.11.2007 Permanent
43 48 EPC correspondence (ordinary file). 08.12.2006 23.06.2008 Permanent
44 49 EPC unit-2 works (ordinary file). 09.01.2007 23.06.2008 Permanent
45 50Bank Guarantee –correspondenceletters (ordinary file).
13.10.2006 04.06.2008 Permanent
46 51 Weekly progress report. 24.04.2006 25.08.2006 Permanent
47 52 Weekly progress report. 13.02.2007 18.09.2007 Permanent
48 53 Weekly progress report. 04.09.2006 05.02.2007 Permanent
49 54 Weekly progress report. 24.09.2007 18.06.2008 Permanent
50 55Handing over of Mini hydel scheme filesto SE(Ele) ADPH
30.11.2007 28.12.2007 Permanent
51 56 Unit-2 works 27.02.2008 21.05.2008 Permanent
52 57 Correspondence General. 15.03.2008 26.05.2008 Permanent
53 24 Budget Annual plan 30.10.2004 06.09.2006 Permanent
54 59 General 30.04.2008 21.05.2008 Permanent
55 62 Construction water supply 29.09.2004 04.08.2005 Permanent
56 63
Drawal of (45mgd+45mgd) From
Krishna River To M/s JSW steel Ltdand KPCL
26.06.2007 Running Permanent
57 05 Maralihalla water supply scheme 22.11.2003 21.02.2004 Permanent
NAME OF THE OFFICE : CE(C)BTPS(Previously CE(C)-1/BTPS and CE(C)-2BTPS)
ADDRESS : BTPS/Kuduthini.
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 36/58
Sl.
No.
File No Subject Opening
Date of File
Closing
Date of file/
Running file
Date of
Transfer of
File &
Authority
whom
transferred
Nature of File
Permanent/
Temporary
Remarks
1 H.O.General Memos &Circulars
30.05.2000 02.08.2000 Permanent
2 -do- -do- 27.06.2001 12.09.2001 -do
3 -do- -do- 31.08.2002 20.01.2003 -do-
4 -do- -do- 20.04.2002 01.07.2002 -do
5 -do- -do- 27.06.2001 Aug-2001 -do-
6 -do- -do- 18.01.2003 01.04.2003 -do
7 -do- -do- 03.04.2003 09.06.2003 -do-
8 -do- -do- 06.06.2003 11.08.2003 -do
9 -do- -do- 27.08.2003 14.10.2003 -do-
10 -do- -do- 08.07.2001 04.11.2003 -do
11 -do- -do- 31.08.1996 28.05.2004 -do-
12 -do- -do- 04.03.2004 12.08.2004 -do
13 -do- -do- 15.04.2005 16.11.2005 -do-
14 -do- -do- 22.05.2001 01.12.2009
(Running
File)
-do
15 -do- 03.12.2005 19.11.2008 -do-
16 -do- 09.09.2008 (Running
File)
-do-
1 CEC Q2F &
CEC Q2D
MR Bills &TA Bills
07.05.2002 27.11.2002 Permanent
2 -do- -do- 27.12.2002 21.02.2003 -do-
3 -do- -do- 18.06.2002 22.07.2004 -do-
4 -do- -do- 24.04.2003 15.07.2004 -do-
5 -do- -do- 07.07.2004 03.05.2007 -do-
6 CEC Q2F MR Bills 25.05.2005 05.10.2009 -do-
6(a) -do- -do- 05.05.2005 19.08.2009 -do-
7 -do- -do- 23.10.2009 (Running) -do-
1 CE(C)BT P1A GeneralFile
27.01.2003 28.10.2003 -do-
2 -do- -do- 20.40.2002 16.06.2004 -do-
3 -do- -do- 26.04.2002 24.06.2004 -do-
4 -do- -do- 06.12.2003 22.07.2004 -do-
5 -do- -do- 15.12.2003 26.10.2004 -do-
6 -do- -do- 16.04.2005 07.04.2007 -do-
7 -do- -do- 16.07.2004 04.08.2008 -do-
8 -do- -do- 18.05.2007 11.03.2009 -do-
9 -do- -do- 27.08.2004 23.02.2010 -do-
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 37/58
1 CE(C)BT P1F Leave File 09.03.2002 23.01.2003 -do-
2 -do- -do- 25.01.2003 22.10.2003 -do-
3 -do- -do- 10.11.2003 24.07.2004 -do-
4 -do- -do- 24.07.2004 28.12.2004 -do-
5 -do- -do- 27.04.2005 10.08.2006 -do-
6 -do- -do- 18.08.2006 24.03.2007 -do-
7 -do- -do- 30.04.2007 10.10.2008 -do-
8 -do- -do- 12.03.2005 17.12.2008 -do-
9
10
-do-
-do-
-do-
-do-
20.08.2008
20.01.2010
03.03.2010
(Running)
1 CE(C)P2D TransferFiles
08.06.2004 03.12.2004 -do
2 -do- -do- 31.03.2005 14.11.2005 -do-
3 -do- -do- 20.12.2004 15.12.2005 -do-
4 -do- -do- 15.05.2006 03.03.2007 -do-
5 -do- -do- Jan-05 15.12.2008 -do-
6 -do- -do- 16.11.2005 31.12.2008 -do-
7 -do- -do- 05.05.2006 30.11.2009 Permanent
8 -do- -do- 28.05.2004 (Running
File)
-do-
1 CE(C)P2B TrainingFiles
22.07.2004 05.01.2009 -do-
2 -do- -do- 02.04.2004 10.12.2009 -do-
3 -do- -do- 02.04.2004 02.03.2010
(Running
File)
-do-
1 CE(C)Telephone
TelephoneFiles
01.03.2004 20.03.2008 -do-
2 -do- -do- 03.08.2004 24.11.2008 -do-
2A -do- -do- 27.04.2005 05.04.2007 -do-
3 -do- -do- 27.02.2004 (Running
File)
-do-
1 CE(C)Q2D TA Bill Files 15.07.2002 17.11.2005 -do-
2 -do- -do- 25.05.2004 29.02.2008 -do-
3 -do- -do- 29.01.2009 (Running
File)
-do-
4 -do- -do- 28.04.2005 17.01.2008 -do-
1 CE(C)Q2I OfficeImprest Files
1998 1999 -do-
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 38/58
2 -do- -do- 1999 2000 -do-
3 -do- -do- 1999 2000 -do-
4 -do- -do- 2000 2001 -do-
5 -do- -do- 2000 2001 -do-
6 CE(C)Q2I OfficeImprest
Files
21.02.2002 10.03.2002 -do-
7 -do- -do- 31.01.2001 10.10.2002 -do-
8 -do- -do- 01.04.2003 16.07.2004 -do-
9 -do- -do- 12.06.2006
Telephone bills
paid out of
imprest
22.08.2007 -do-
10 -do- -do- 03.08.2004 08.09.2007 -do-
11 -do- -do- 03.08.2005 07.03.2008 -do-
12 -do- -do- 17.03.2007 17.07.2008 -do-
13 -do- -do- 24.06.2006 (Running
File)
-do-
1 CE(C)BTPSœµX®±Ï îµ
°q®w®
ExtraWagesFiles
12.12.2002 18.03.2005 -do-
2 -do- -do- 18.05.2005 09.04.2007 -do-
3 -do- -do- 10.01.2003 05.12.2008 -do-
4 -do- -do- 15.12.2008 (Running
Files)
-do-
1 CE(C)BTPSP1A
Assets &Liabilities
File
20.02.2006 (Running
File)
-do-
1 CE(C)BTPSP1L
NOC File 27.07.2006 07.01.2009
(Running
File)
-do-
1 CEC(BTPS)P1F
HTC File 27.09.2006 07.01.2010 -do-
1 CEC(BT)P1A Attendance 15.03.2005 22.01.2005 -do-
2 -do- -do- 19.04.2005 15.05.2007 Permanent
3 -do- -do- 02.03.2005 15.02.2010
(Running)
-do-
1 CE(C)BT P1A Shift Allowance File 07.07.2006 18.02.2010
(Running)
-do-
1 A1P2G VRS-Correspondence &Super Annuation File
24.04.2004 03.10.2008
(Running)
-do-
1 †i z1H Apprentice & LandLoosers Training File
06.11.2006 23.03.2010
(Running)
-do-
1 BT A7F Theft Case File 2006 (Running) -do-
1 ›C(›)†i z1H Bl®¢q®u®ªå N®w®Ýl®„¯ǵ‡®± Aw®±Ç¯Õw®
22.08.2002 04.03.2010
(Running)
-do--
1 CEC P1E Work Allocation 19.03.2002 (Running) -do-
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 39/58
1 ›C(›)†i z1› Disciplinary File &Service Confirmation
05.08.2004 (Running) -do-
1 ›C(›)†i z1H Founders Day Celebration File
07.07.2004 (Running) -do-
1 ›C(›)†i N®²ã2 › Computer Loan 07.06.2002 (Running) -do-
1 BT P1F Incharge arrangement 20.04.2005 (Running) -do-
1 CEC P1G &CEC P1A
Stagnation Increment &PADS
04.06.2066 27.01.2010
(Running)
-do-
1 CE(C)BTPSA5D
Furniture File 08.02.2002 02.11.2002 -do-
2 -do- -do- 11.11.2002 June-2004 -do-
3 -do- -do- 09.06.2004 (Running) -do-
1 CBQ3C Vehicle Advance File 02.12.2003 06.1.2.2008 -do-
1 CEC A5E Uniform cloth & Shoes/Safety Shoes File
09.07.2002 16.10.2009
(Running)
-do-
1 CEC PI Purchase Indent File 14.05.2005 (Running) -do-
Name of the Office: EEC-4 /SE(c)3/CE(C)BT
Address: Bellary Thermal Power Station, Kudathini.
SlNo
FileNo.
Subject
Openingdate of File
Closingdate of
file/runningfile
Date ofTransfer of
file &Authority
whomtransferred
Nature ofFile
Permanent/Temporary
Remarks
1 1 Sewage Treatment Plant (U-1) –Correspondence and drawings
08.03.07
Running Aug 09
EE(c)10
Permanent
2 2 Letters pertaining to constructiondrawings – U-2
04.07.09
Running All files openednewly
Permanent All filesopened newlyconsequent toformation ofnew divisionEE(c) -4
3 3 Attendance Extracts and LeaveApplications
16. 07.09 Running _,, _ Permanent _,, _
4 4 Imprest/Temporary Advance 06.08.09 Running _,, _ Permanent _,, _
5 5 Material Indents, Gate Passes andPurchase Indent
07.08.09Running _,, _ Permanent _,, _
6 6 Establishment 08.08.09 Running _,, _ Permanent _,, _
7 7 Daily Progress Reports – EEC-4 12.08.09 Running _,, _ Permanent _,, _
SlNo
FileNo.
Subject
Openingdate of File
Closingdate of
file/runningfile
Date ofTransfer of
file &Authority
whomtransferred
Nature ofFile
Permanent/Temporary
Remarks
8 8 Quality Control – Test Reports U-2 30.08.09 Running _,, _ Permanent _,, _
9 9 Record Notes of discussions – progress Running Files opened Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 40/58
review of U-2 31.08.09 newly
10 10 General 01.09.09 Running _,, _ Permanent _,, _
11 11 RODM Plant Building U-2 -Correspondence
14.09.09 Running_,, _ Permanent _,, _
12 12 Tender Notifications 14.10.09 Running _,, _ Temporary _,, _
13 13 Budget And Annual Plan 15.10.09 Running _,, _ Permanent _,, _
14 14 Environment Clearance 21.10.09 Running _,, _ Permanent _,, _
15 15 Effluent Treatment Plant – As builtdrawing
27.10.09 Running _,, _ Permanent _,, _
16 16 Pipe Rack PR-5 (U-2) -Correspondence
29.10.09 Running _,, _ Permanent _,, _
SlNo
FileNo.
Subject
Openingdate of File
Closingdate of
file/runningfile
Date ofTransfer of
file &Authority
whomtransferred
Nature ofFile
Permanent/Temporary
Remarks
17 17 Pre-Treatment Plant U-2 -Correspondence
14.12.09Running
Permanent _,, _
18 18 Daily Progress Report Copies fromCEC and SEC
15.12.09 Running _,, _ Permanent _,, _
19 19 Confidential Letters 19.02.10 Running _,, _ Permanent _,, _
20 20 L2 Net work Schedule (U-2) Running _,, _ Permanent _,, _
Files Pertaining to BTPS - Unit-1 works:
SlNo
FileNo.
Subject
Openingdate of File
Closingdate of
file/runningfile
Date ofTransfer of
file &Authority
whomtransferred
Nature ofFile
Permanent/Temporary
Remarks
1 1 RODM building drawings Closed Aug 09
EE(c)10
Permanent Work hasbeen
completed
2 2 Neutralization Pit – Drawings Closed Aug 09
EEC10
Permanent _,, _
3 3 Effluent Treatment Plant - Drawings Closed Aug 09
EE(c)10
Permanent _,, _
4 4 RODM - Correspondence Closed Aug 09
EE(c)10
Permanent _,, _
5 5 Pre-Treatment Plant - Correspondence Closed Aug 09
EE(c)10
Permanent _,, _
6 6 Filter shed & Filter water tank –protocols and correspondence
Closed Aug 09
EE(c)10
Permanent _,, _
7 7 CPU – Regeneration building –protocols & correspondence
Closed Aug 09
EE(c)10
Permanent _,, _
Name of the Office : EEC-10
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 41/58
Address : Karnataka Power Corporation Limited
Bellary Thermal Power Station
Kuduthini-583152
EPC WORK FILES of Unit 1 and Unit 2
SlNo
FileNo Subject
OpeningDate offile
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure offilePermanent/Temporary
Remarks
1 1 EEC-10 General New-1 01.06.08 26.02.09 - Parmanent Closed
2 2 EEC-10 General New-2 27.02.09 15.02.10 - Parmanent Closed
3 3 EEC-10 General New-3 25.09.09 Running - Parmanent -
4 4 EPC-Unit-2-General 01.08.08 Running - Parmanent -
5 5 EPC-Unit-2-Progress Reports, Vol-I 10.09.08 24.10.09 - Parmanent Closed
6 6 EPC-Unit-2-Progress Reports, Vol-II 16.03.09 25.10.09 - Parmanent Closed
7 7 EPC-Unit-2-Progress Reports, Vol-III 27.10.09 03.03.10 - Parmanent Closed
8 8 EPC-Unit-2-Progress Reports, Vol-IV 04.03.10 Running - Parmanent -
9 9 EPC-Unit-2-CHIMNEY-correspondance 01.07.08 Running - Parmanent -
SlNo
FileNo
SubjectOpeningDate offile
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure offilePermanent/Temporary
Remarks
10 10 EPC-Unit-2-CHIMNEY-Protocals 30.08.08 Running - Parmanent -
11 11EPC-Unit-2-Cooling Tower-correspondance
10.10.08 Running - Parmanent -
12 12 EPC-Unit-2-Cooling Tower-Protocals 15.01.09 Running - Parmanent -
13 13EPC-Unit-2-Cooling Tower-Pourcards-Vol-I
Jul-09 Jul-09 - ParmanentSubmitted
by GIL
14 14EPC-Unit-2-Cooling Tower-Pourcards-Vol-II
Aug-09 Aug-09 - ParmanentSubmitted
by GIL
15 15EPC-Unit-2-Cooling Tower-Pourcards-Vol-III
Oct-09 Oct-09 - ParmanentSubmitted
by GIL
16 16EPC-Unit-2-Cooling Tower-Pourcards-Vol-IV
Nov-09 Nov-09 - ParmanentSubmitted
by GIL
17 17EPC-Unit-2-Cooling Tower-QualityDocument-Vol-I Mar-09 Mar-09 - Parmanent
Submittedby BHEL
18 18EPC-Unit-2-Cooling Tower-QualityDocument-Vol-II
Apr-09 Apr-09 - ParmanentSubmittedby BHEL
19 19EPC-Unit-2-Cooling Tower-QualityDocument-Vol-III
May-09 May-09 - ParmanentSubmittedby BHEL
20 20EPC-Unit-2-Cooling Tower-QualityDocument-Vol-IV
Jun-09 Jun-09 - ParmanentSubmittedby BHEL
21 21EPC-Unit-2-Cooling Tower-QualityDocument-Vol-V
Jul-09 Jul-09 - ParmanentSubmittedby BHEL
22 22EPC-Unit-2-Cooling Tower-QualityDocument-Vol-VI
Aug-09 Aug-09 - ParmanentSubmittedby BHEL
Sl FileOpening
ClosingDate of
Date ofTransfer offile &
Naure offile
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 42/58
No No Subject Date offile
file/Runningfile
Authoritywhomtransferred
Permanent/Temporary
Remarks
23 23EPC-Unit-2-Cooling Tower-QualityDocument-Vol-VII
Sep-09 Sep-09 - ParmanentSubmittedby BHEL
24 24EPC-Unit-2-Cooling Tower-QualityDocument-Vol-VIII
Oct-09 Oct-09 - ParmanentSubmittedby BHEL
25 25EPC-Unit-2-Cooling Tower-QualityDocument-Vol-IX
Nov-09 Nov-09 - ParmanentSubmittedby BHEL
26 26EPC-Unit-2-Cooling Tower-ShellProfile-Post Concrete
27.07.09 19.02.010 - Parmanent Closed
27 27 EPC-Unit-2-QC 08.05.09 04.02.10 - Parmanent Closed
28 28EPC-Unit-2-CW Pump House-Correspondance
22.10.08 Running - Parmanent -
29 29EPC-Unit-2-CW Pump House-Protocals
01.06.09 Running - Parmanent -
30 30EPC-Unit-2-CW & ACW Pipeline-Correspondace
01.8.08 Running - Parmanent -
31 31EPC-Unit-2-CW & ACW Pipeline-Protocals
01.10.08 Running - Parmanent -
32 32EPC-Unit-1-CW Pipeline fabrication &Erection Protocals (1)
25.09.05 30.01.06 - Parmanent Closed
33 33EPC-Unit-1-CW Pipeline fabrication &Erection Protocals (2)
15.02.06 11.03.06 - Parmanent Closed
34 34EPC-Unit-1-CW Pipeline fabrication &Erection Protocals
31.12.05 18.08.07 - Parmanent Closed
35 35EPC-Unit-1-CW Channel, Fore Bay &Pump House Vol I
23.07.05 12.12.07 - Parmanent Closed
SlNo
FileNo
SubjectOpeningDate offile
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure offilePermanent/Temporary
Remarks
36 36 EPC-Unit-1-CW Pump House Vol II 16.11.06 05.09.07 - Parmanent Closed
37 37 EPC-Unit-1-CW Channel Pour Cards 24.09.05 02.11.05 - Parmanent Closed
38 38EPC-Unit-1-CW Pipeline Work ThirdParty
03.03.05 10.08.07 - Parmanent Closed
39 39 EPC-Unit-1-CWP Protocals 06.01.06 19.01.06 - Parmanent Closed
40 40 EPC-Unit-1-CWP Protocals IRs 04.03.06 24.03.06 - Parmanent Closed
41 41 EPC-Unit-1-CWP Protocals IR Reports 02.02.06 10.02.06 - Parmanent Closed
42 42EPC-Unit-1-Sangha Erectors & RABProtocals
06.02.06 25.02.06 - Parmanent Closed
43 43 EPC-Unit-1-Colling Tower Vol I 13.09.04 22.06.06 - Parmanent Closed
44 44 EPC-Unit-1-Colling Tower Vol II 05.08.06 17.03.07 - Parmanent Closed
45 45 EPC-Unit-1-Colling Tower General - - - Parmanent Closed
46 46 EPC-Unit-1-Colling Tower Protocals 13.10.04 12.04.06 - Parmanent Closed
47 47 EPC-Unit-1-Standard File - - - Parmanent Closed
48 48 Pipe & Cable Rack-Unit1 12.09.06 09.03.07 - Parmanent Closed
Sl FileSubject
OpeningDate of
ClosingDate offile/
Date ofTransfer offile &
Naure offile
Remarks
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 43/58
No No file Runningfile
Authoritywhomtransferred
Permanent/Temporary
49 49 HOD Meeting 25.03.06 12.10.07 - Parmanent Closed
50 50 Budget File 03.07.07 18.01.08 - Parmanent Closed
51 51 Circular Memo 26.08.04 19.01.08 - Parmanent Closed
52 52 DM Make up Water Pump House 20.07.05 06.03.07 - Parmanent Closed
53 53 Brick Test Protocals 28.06.06 04.04.07 - Parmanent Closed
54 54 Tender Notification 30.09.04 14.01.08 - Parmanent Closed
55 55 Wier House Correspondance 21.07.05 02.05.08 - Parmanent Closed
56 56 DM Water Storage Tank 18.11.05 23.05.06 - Parmanent Closed
57 57 Wiegh Bridge 17.01.07 27.02.07 - Parmanent Closed
58 58 Weekly Progress Reports 18.07.08 16.01.09 - Parmanent Closed
59 59 ETP- CMB 09.05.07 23.07.08 - Parmanent Closed
60 60 Field Quality Plan (FQP) 21.08.08 18.09.08 - Parmanent Closed
61 61 Balance Works Unit-1 19.02.08 12.05.08 - Parmanent Closed
SlNo
FileNo
SubjectOpeningDate offile
ClosingDate offile/Runningfile
Date ofTransfer offile &Authoritywhomtransferred
Naure offilePermanent/Temporary
Remarks
62 62 QC Report 01.01.08 11.03.08 - Parmanent Closed
63 63 BHEL Correspondance Vol-I 16.04.05 19.01.07 - Parmanent Closed
64 64 BHEL Correspondance Vol-II 22.11.06 03.10.08 - Parmanent Closed
65 65 BHEL Correspondance Vol-III 06.10.08 Running - Parmanent -
66 66 Alluminium Partition Were House 22.06.09 23.12.09 - Parmanent Closed
67 67 Miscelaneous Estimates 11.08.09 Running - Parmanent -
EEC-10
NON – EPC WORKS – MARALIHALLA WATER SUPPLY SCHEME (From 0.00 km to 14.80 km) -
Name of the Office : EXECUTIVE ENGINEER(Civil-10)
Address : BELLARY THERMAL POWER STATION, KUDATHINI-583152, BELLARY DISTRICT
SlNo
FileNo
SubjectOpening
Date of file
ClosingDate of file/
Runningfile
Date of Transferof file &
Authority whomtransferred
Nature of filePermanent/Temporary
Remarks
1 1 Attendance extract 18.04.05 02.07.07 Permanent CLOSED
2 2Implementation of safetymeasures
08.07.05 24.10.05 Permanent CLOSED
3 3TTA bills, TA bills, Electricity /Medical reimbursement bills, 09.05.05 05.09.08 Permanent CLOSED
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 44/58
Shoe bills, Uniform bills
4 4 Imprest Account 16.07.05 22.09.07 Permanent CLOSED
5 5Contractor's RegistrationCertificates
31.08.05 03.04.06 Permanent CLOSED
6 6 Land Acquisition 22.12.05 09.01.06 Permanent CLOSED
7 7EL Encashment, Leaveapplications
07.05.05 07.12.07 Permanent CLOSED
8 8 Delegation of Powers 13.03.06 12.04.06 Permanent CLOSED
9 9 Log extract of vehicle 29.06.05 30.01.06 Permanent CLOSED
10 10Account - GeneralCorrespondence
01.07.05 28.04.08 Permanent CLOSED
11 11 Accounts - Internal Audit 18.06.05 Permanent RUNNING
12 12 MCC - PF file 14.10.05 16.01.06 Permanent CLOSED
13 13 IS – Codes 24.10.04 24.10.04 Permanent CLOSED
SlNo
FileNo
SubjectOpening
Date of file
ClosingDate of file/
Runningfile
Date of Transferof file &
Authority whomtransferred
Nature of filePermanent/Temporary
Remarks
14 14Joining reports, Relief Memosetc.,
05.04.05 14.08.07 Permanent CLOSED
15 15 Representation / Petition File 04.04.05 14.12.05 Permanent CLOSED
16 16 Administration – General 17.01.05 24.03.06 Permanent CLOSED
17 17 Administration – General 21.07.05 24.07.07 CLOSED
18 18 Administration – General 21.08.07 12.12.08 CLOSED
19 19Contract management group -Proceedings andcorrespondence
04.02.05 16.01.07 Permanent CLOSED
20 20AEE(C)-10 – Generalcorrespondence
25.06.08 26.02.09 Permanent CLOSED
21 20B -- do -- Volume – 2 27.02.09 11.02.10 Permanent CLOSED
22 20C -- do -- Volume – 3 17.02.10 Permanent RUNNING
23 21Payment of rental charges forthe office building atGangavathi
08.04.05 26.12.07 Permanent CLOSED
24 22Kampli Sugar factorycorrespondence file
0106.07 14.12.07 Permanent CLOSED
25 23Circulars, Memo, SR, Interoffice letters.
05.04.05 11.08.06 Permanent CLOSED
26 24 Minutes of Meetings 22.12.04 07.03.06 Permanent CLOSED
27 25 TECHNICAL – GENERAL Permanent CLOSED
28 26ADaily / Weekly / MonthlyProgress Reports 05.03.05 03.06.06 Permanent CLOSED
29 26B --do-- 29.06.05 06.12.05 Permanent CLOSED
30 26C --do-- 22.07.06 10.02.07 Permanent CLOSED
31 27 Site Co-ordination Meetings 23.05.05 28.11.06 Permanent CLOSED
32 28 Tender notifications 23.07.04 16.05.06 Permanent CLOSED
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 45/58
33 29 Office Note 14.07.05 03.03.06 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date ofTransfer of file
& Authoritywhom
transferred
Nature of filePermanent/Temporary
Remarks
34 30 Office Note 19.07.06 19.07.06 Permanent CLOSED
35 31 QC - General correspondence 08.02.07 12.05.08 Permanent CLOSED
36 32 -- do -- 08.04.05 07.09.06 CLOSED
37 33QC - OK cards for CA / FA /Embankment layers.
21.02.05 01.07.06 Permanent CLOSED
38 34 -- do -- 12.03.05 28.05.05 Permanent CLOSED
39 35 -- do -- 23.12.05 13.01.06 Permanent CLOSED
40 36 -- do -- 30.06.06 07.08.06 Permanent CLOSED
41 37QC - Test reports on materialslike cement and steel etc.,
04.02.05 10.12.05 Permanent CLOSED
42 38 -- do -- 26.11.04 16.03.07 Permanent CLOSED
43 39 QC – monthly test reports 15.04.05 13.02.06 Permanent CLOSED
44 40 -- do -- 20.09.04 07.09.07 CLOSED
45 41 Technical Correspondence 26.04.05 09.11.05 Permanent CLOSED
46 42Geological Report of pipelineworks
24.04.07 24.04.07 Permanent CLOSED
47 43RT / UT Reports of pipelineworks 25.04.05 18.05.05 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
48 44 Technical circulars 20.12.04 20.10.05 Permanent CLOSED
49 45 Technical Audit file 16.03.05 Permanent RUNNING
50 46Budget, Annual plan and HODmeetings file
21.01.06 19.12.09 Permanent RUNNING
51 47 Marlihalla discharge details Permanent RUNNING
52 48Correspondence with Electrical/ Mechanical division
20.07.06 26.08.08 Permanent RUNNING
53 49Geological report for MPH andconnected works /Correspondence
14.07.05 30.07.05 Permanent CLOSED
54 50MS pipe line works - Details ofpipeline laid in road crossings
29.05.06 29.05.06 Permanent CLOSED
55 51Maralihalla Pump house (MPH)- Land records / cropcompensation
14.11.02 07.01.05 Permanent CLOSED
56 52 -- do -- Volume – 2 26.10.05 03.02.10 Permanent RUNNING
57 53Land compensation paid byM/s.GIL
08.11.07 08.11.07 Permanent CLOSED
Construction of civil works likeweir, fore bay, pump house,
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 46/58
58 54A
electrical sub-station, approachbridge, cause way and nalaprotection work etc., atMaralihalla - Agency: M/s.R.S.Shetty & Co. -Correspondence file - Volume-1
06.09.04 21.06.05 Permanent CLOSED
SlNo
FileNo Subject
OpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
59 54B -- do -- Volume – 2 03.05.05 30.09.06 Permanent CLOSED
60 54C -- do -- Volume – 3 01.10.06 06.11.06 Permanent CLOSED
61 54D -- do -- Volume – 4 16.12.06 04.08.09 Permanent CLOSED
62 54E -- do -- Volume – 5 04.03.06 01.07.09 Permanent RUNNING
63 55Submitted RA bills of M/s. RSS& Co.
25.03.05 22.02.08 Permanent CLOSED
64 56Passed RA bills of M/s. RSS &Co.
26.03.05 29.01.07 Permanent RUNNING
65 57
Advance payment (80%) -towards reinforcement steeland structural steel to M/s.RSS & Co.
05.05.06 13.05.06 Permanent CLOSED
66 58 EIRL – M/s. RSS & Co. 06.05.05 13.07.05 Permanent CLOSED
67 59 -- do -- 16.03.06 07.08.06 Permanent CLOSED
68 60 -- do -- 03.06.06 03.06.06 Permanent CLOSED
69 61 -- do -- 10.11.05 13.12.06 Permanent CLOSED
70 62 -- do -- 03.08.06 22.07.09 RUNNING
71 63Maralihalla Pump house -Claims of M/s RSS & Co.
27.04.06 12.11.08 Permanent RUNNING
72 64 -- do -- 02.11.06 22.11.06 CLOSED
73 65 Workslip – M/s. RSS & Co. 30.06.05 27.05.06 Permanent CLOSED
74 66 -- do -- 03.09.05 03.03.10 Permanent RUNNING
75 67Drilling boreholes for approachbridge at Maralihalla
06.12.04 16.10.06 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
76 68A
Balance civil works ofapproach bridge to MPH (DeckPortion) and construction ofhigh level bridge acrossMaralihalla - Agency M/s. GIL -Correspondence file
30.03.05 08.09.06 Permanent CLOSED
77 68B -- do -- Volume – 2 14.03.06 28.03.09 Permanent CLOSED
78 68C -- do -- Volume – 3 30.11.06 02.03.10 RUNNING
79 69Submitted / Passed RA bills ofM/s. GIL
27.10.05 22.07.08 Permanent RUNNING
80 70 EIRL - M/s.GIL 18.01.07 26.08.08 Permanent RUNNING
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 47/58
81 71
Construction of Civil works likefoundations for towers,electrical equipment ,transformers, cable ducts , oilpit and other associated worksof 110 / 6.6KV electrical sub-station for MPH- Agency M/s.Srinivasa Constructions.
10.01.06 30.12.09 Permanent RUNNING
82 72
Laying, jointing, testing, andcommissioning of MS pipelineof 1321mm OD fromMaralihalla stream to BTPS -Agency M/s.MCC, Ahmedabad-Correspondence.
09.08.06 09.08.06 Permanent RUNNING
83 73 --do-- 12.01.06 12.01.06 Permanent RUNNING
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
84 74 --do-- 05.10.05 23.01.06 Permanent RUNNING
85 75 --do-- 31.12.05 07.04.06 Permanent RUNNING
86 76 --do-- 28.04.05 23.01.06 Permanent RUNNING
87 77 --do-- 27.04.05 14.11.05 Permanent RUNNING
88 78 Submitted RA bills of M/s. MCC 28.04.05 23.03.06 Permanent CLOSED
89 79 Passed RA bills of M/s. MCC 18.05.05 12.01.06 Permanent RUNNING
90 80Legal Notice of M/s.MCC /Para wise compliance
31.07.06 16.03.07 Permanent RUNNING
91 81Workslip - M/s. MCC,Ahmedabad
03.04.05 28.01.06 Permanent RUNNING
92 82 EIRL - M/s. MCC, Ahmedabad 30.07.05 19.08.05 Permanent CLOSED
93 83 --do-- 17.10.05 17.10.05 Permanent RUNNING
94 84Non payment of dues fromM/s.MCC to Sub-agencies /Private parties.
11.05.05 02.01.06 Permanent RUNNING
95 85
Laying, jointing, testing, andcommissioning of MS pipelineof 1321mm OD fromMaralihalla stream to BTPS -Third party inspection -Correspondence .
05.05.05 27.07.06 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
96 86
Construction of Civil works likefore bay, pump house,electrical sub-station, approachbridge etc., for Maralihallawater supply scheme – Subletting of portion of workpertaining to pump house andfore bay to Sri. Ameer Amja,Contractor , Lingsugur.
25.11.05 25.06.06 Permanent CLOSED
97 87Providing water supply schemeto Danapur village.
20.08.07 08.03.08 Permanent CLOSED
Works entrusted in and around
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 48/58
98 88 Maralihalla pump house onpiece work system
24.07.07 10.06.08 Permanent CLOSED
99 89A
Laying, jointing, testing, andcommissioning of MS pipelineof 1321mm OD fromMaralihalla stream to BTPS –(Balance works) – Agency M/s.GIL Volume - 1
29.05.06 07.05.07 Permanent CLOSED
100 89B --do—Volume – 2 16.01.07 16.02.10 Permanent RUNNING
101 90Submitted RA bills of M/s. GIL(Pipeline work)
02.06.06 28.11.07 Permanent RUNNING
102 91 --do-- 31.05.06 20.06.07 Permanent RUNNING
103 92Passed RA bills of M/s.GIL(Pipeline work)
3.08.07 10.02.08 Permanent RUNNING
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
104 93ROU from Right bank of TBriver to Vijayanagar canal(Kalyani Brothers land)
14.12.05 03.04.08 Permanent CLOSED
105 94ROU from Belagodahal toKampli cross road
10.10.06 04.04.07 Permanent CLOSED
106 95ROU from Kampli- Belagodahalcross road to Kampli – Kottalcross road (Kampli Byepass)
14.12.05 16.01.08 Permanent CLOSED
107 96
ROU from Kampli – Kottalcross road to Kampli –Kudathini cross road (BehindSugar factory)
26.04.05 22.09.07 Permanent CLOSED
108 97ROU from Kampli sugar factoryto Metri yard
30.04.05 30.03.07 Permanent CLOSED
109 98 --do-- 22.07.06 22.01.07 Permanent CLOSED
110 99 --do-- 25.11.06 07.07.09 Permanent CLOSED
111 100
Part payment released to M/s.MCC towards procurement ofreinforcement steel and detailsof reinforcement steel issued toM/s. GIL.
06.03.06 30.11.07 Permanent RUNNING
112 101 --do-- 07.03.05 29.06.09 Permanent RUNNING
113 102ROU payment / Cropcompensation
25.04.05 25.04.05 Permanent CLOSED
114 103 --do-- 08.02.06 04.07.09 Permanent CLOSED
115 104Providing aluminium partition toMPH
06.01.07 22.03.07 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
116 105
Providing MS fabricatedgratings to Man holes, gateopenings and hand rails tobalcony in fore bay area atMPH.
20.06.07 14.07.07 Permanent CLOSED
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 49/58
117 106Extension to RCC retainingwall on Upstream side of weirat MPH
13.08.07 06.06.08 Permanent CLOSED
118 107Extension to RCC retainingwall on Down stream side ofweir at MPH
09.02.08 30.01.10 Permanent CLOSED
119 108
Construction of Hume pipeculvert 900mm dia (3 rows) onright side of Maralihalla streamat Ch. 518.00m near Electricalsub-station of MPH
24.11.07 02.02.08 Permanent CLOSED
120 109
Providing vitrified tiles flooringto Electrical bay and granolithicflooring to pump bay and repairbay of MPH
04.08.07 15.04.08 Permanent CLOSED
121 110
Construction of security checkpost at Maralihalla nearapproach bridge of pumphouse.
25.12.06 15.02.07 Permanent CLOSED
122 111
Providing, supplying anderection of Mano rail andextension of crane girder beamat MPH
07.01.08 16.01.10 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
123 112
Providing MS fabricated ladder,2-wheeler parking space andRCC under ground water tankto Security check post atMaralihalla
20.06.07 26.06.07 Permanent CLOSED
124 113
Providing chain link meshfencing to the road fromSecurity check post toApproach bridge and electricalsub-station area of MPH
16.05.07 31.08.07 Permanent CLOSED
125 114
Design, providing, fabricatingand erection of escape gateand concrete to nitch of weir atMPH
07.05.08 18.07.08 Permanent CLOSED
126 115Back filling behind retainingwall on upstream side of weir atMPH
07.05.08 22.07.08 Permanent CLOSED
127 116
Providing PCC pavement,concrete mortar filling to drystone pitching alround sub-station area and on either sideof approach bridge at MPH
14.01.08 02.05.08 Permanent CLOSED
128 117
House keeping of MPH,electrical sub-station, approachbridge and security check postat MPH for Four months duringthe year 2007-08.
15.11.07 15.11.07 Permanent CLOSED
SlNo
FileNo Subject
OpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
Dosing and leveling the
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 50/58
129 118approach road for crossingnala at right side of Maralihallaat ch.518.00m near electricalsub-station of MPH
26.11.07 26.11.07 Permanent CLOSED
130 119
Manufacture and supply of 72Nos. cast steel air releasevalves required for MS pipelinefrom MPH to BTPS – AgencyM/s. Shree Balaji Industries,Calcutta
03.02.06 27.06.06 Permanent CLOSED
131 110
Raw water supply pipeline fromMPH to BTPS – functioningand maintenance of pipelineand leakage in ARV.
05.05.08 30.03.10 Permanent RUNNING
132 111Works executed in MPH during2009-10
18.07.09 02.03.10 Permanent RUNNING
133 112Construction of RCC weirbetween pump house wall andbund at Maralihalla
13.12.07 Permanent RUNNING
134 113Providing concrete pavementroad from Security check postto approach bridge at MPH
02.07.07 07.08.08 Permanent CLOSED
135 114 Details of ROU payments 05.11.07 29.10.07 Permanent CLOSED
136 115Technical correspondencepertaining to MS pipeline in TBriver works.
06.06.05 09.01.06 Permanent CLOSED
SlNo
FileNo
SubjectOpeningDate of
file
ClosingDate of file/
Runningfile
Date of Transferof file & Authoritywhom transferred
Nature offile
Permanent/Temporary
Remarks
137 116
Providing MS fabricatedstaircase (2 Nos) for chargingspring breakers in electricalsub-station at MPH.
26.05.07 13.12.07 Permanent CLOSED
138 117Correspondence regardingadditional mobilization advanceto M/s. MCC for pipeline works
12.05.05 17.09.05 Permanent RUNNING
139 118Grouting pump (4th & 5th)
foundation with non-shrinkgrout GP-2 mix at MPH
22.02.07 21.06.07 Permanent CLOSED
140 119Hydraulic test reportspertaining to the MS pipelineworks from MPH to LLC.
25.10.07 25.11.07 Permanent RUNNING
141 120Providing asphalting toapproach roads of high levelbridge across Maralihalla
02.11.09 Permanent RUNNING
142 121
Repairing of Air release valvesand man holes all alongpipeline from MPH to BTPSplant site for the period fromOctober – 09 to March-10.
08.09.09 Permanent RUNNING
143 122
Providing BBM parapet andscreed concrete to Electricalbay roof and floor concrete togate bay, header pipe area atMPH.
31.10.07 23.04.08 Permanent CLOSED
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 51/58
Name of the Office : Executive Engineer No – 7
SlNo
FileNo
SubjectOpeningDate of file
Closing Dateof file/Running file
Date ofTransfer offile &Authoritywhomtransferred
Naure offilePermanent/Temporary
Remarks
1 1 Raw Water Pond [I to XI ] 01.09.2005 Running file Permanent
2 2 Raw Water Pond - IInd Stage 01.09.2007 Running file Permanent
3 3 Work Slip & EIRL 01.02.2006 31.02.2006 - Permanent
4 4 Restoration of RWP - Reach - 2 01.05.2008 31.08.2008 Permanent
5 5 General 21.01.2009 Running file Permanent
6 6 Attendence 01.04.2008 Running file Permanent
7 7 Tender Notification 02.09.2008 Running file Permanent
8 8 Quality Control Running file Permanent
9 9 Bill Copies 25.09.2009 Running file Permanent
10 10 KUWS & DB SR 20.12.2004 Running file Permanent
11 11 Grouting Pump 03.02.2005 Running file Permanent
12 12 COT OK card of Reach - 1 31.03.2006 Running file Permanent
13 13 Budget 14.09.2004 Running file Permanent
14 14 Records of Trainee 30.04.2005 17.10.2008 Permanent Closed file
15 15 Miscellanies 11.02.2006 Running file Permanent
16 16 IA & AG Audit 20.07.2007 Running file Permanent
17 17 Imprest/Sub Store 20.02.2010 Running file Permanent
18 18 Water Levels of RWP 06.07.2009 Running file Permanent
19 19 Pressure relief of RWP 05.07.2007 Running file Permanent
20 20 T.A. Bills, Medical Bills 19.12.2007 Running file Permanent
21 21 Meeting & Tour Program 09.06.2007 Running file Permanent
22 22 Annual Plan 19.08.2004 Running file Permanent
23 23 Circular File 19.06.2006 Running file Permanent
24 24 T&P & Assets 05.04.2007 Running file Permanent
25 25 Accounts correspondence withDGM(F)/BT 13.05.2002 Running file Permanent
26 26 Raw Water Pond Boat Running file Permanent
27 27 Raw Water Pond Video Coverage 26.08.2004 Running file Permanent
28 28 Bank Guarantee 08.05.2008 Running file Permanent
29 29 Piece works File 28.06.2008 Running file Permanent
30 30 Estimates File 16.12.2005 29.06.07 Permanent Closed file
31 31 U/s protection file 20.08.2008 09.02.2009 Permanent Closed file
32 32 Maintenance of RWP 26.08.2008 19.11.2008 Permanent Closed file
33 33 Providing Pitching & Steps 25.05.2008 31.12.2009 Permanent Closed file
34 34 Construction of Annex Building 09.01.2009 Running file Permanent
35 35 Progress review meeting file 17.08.2008 Running file Permanent
36 36 Monthly report 01.09.2008 Running file Permanent
37 37 CMG File 08.09.2008 Running file Permanent
38 38 Royalty file 16.07.2008 Running file Permanent
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 52/58
39 39 Price Qty , bill escalation 13.09.2005 Running file Permanent
40 40 Indent 20.05.2008 Running file Permanent
41 41 Weekly progress report 17.03.2009 Running file Permanent
42 42 Chainlink fencing around WareHouse 22.01.2009 06.08.2009 Permanent Closed file
43 43 Construction of Refreshmentroom at CHP in BTPS 15.01.2009 26.10.2010 Permanent Closed file
44 44 Levelling grading and pavementaround ware house 18.05.2009 Running file Permanent
45 45 Construction compound wallnear HLC 07.12.2009 Running file Permanent
KARNATAKA POWER CORPORATION LIMITED
BELLARY THERMAL POWER STATION
LIST OF FILES AND RECORDS
NAME OF THE OFFICE : SUPERINTENDING ENGINEER(CIVIL-2)
ADDRESS: KPCL, BTPS, KUDATHINI - 583 152
UNIT-1 BOX FILES TECHNICAL SECTION
SL.NO. FILE NO. SUBJECT
OPENINGDATE OF
FILE
CLOSINGDATE OF
FILE/
RUNNING
FILE
DATE OFTRANSFER OF
FILE &AUTHORITY
WHOMTRANSFERRED
NATURE OFFILE
PERMANENT/TEMPORARY REMARKS
1 SEC2/CT Cooling Tower Handed overto SE(C-4)
2 SEC2/A PUR All purpose file Volume-I 20.02.05 14.09.05
Volume-II 18.02.06 12.03.07
Volume-III 06.02.07 Running
3 SEC2/A/c /PF Accounts/PF Amount 06.03.04 19.04.07
4 SEC2/AHP Ash handling system Volume-I 18.10.05 31.07.06
Volume-II 15.03.06 30.11.06
Volume-III 30.11.06 03.10.07
Volume-IV 24.10.07 Running
5 SEC2/CHP CPCHP/CHS/Coal pile DecantationTank
Volume-I 12.01.05 19.06.06
Volume-II 21.06.06 14.03.08
Volume-III 28.11.07 Running
6 SEC2/Chi Chimney 25.02.08 Handed overto SE(C-4)
7 SEC2/CWPHCWPH, Channel Raw water,Booster PH,CW Sump & MCCBuilding/Foam PH & All PH
Handed overto SE(C-4)
8 SEC2/CE Lt CE Office Letter Volume-I 18.10.05 16.05.06
Volume-II 20.05.06 28.12.06
Volume-III 17.10.06 03.12.06
9 SEC2/CHP ConyCHP-Belt Conveyor, Trestles,Galleries
03.05.05 13.04.07
10 SEC2/Estimate Estimate Volume-I 10.03.04 23.07.04
Volume-II 06.08.04 10.12.04
11 SEC2/EPC W EPC works Volume-I 18.08.04 15.10.05
Volume-II 06.01.06 08.04.06
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 53/58
Volume-III 20.04.06 10.08.06
Volume-IV 19.10.05 27.11.07
Volume-V 23.08.06 13.01.07
Volume-VI 30.03.07 Running
12 SEC2/FQP QAPField quality plan & QualityAssurance plan
Volume-I 10.03.06 31.05.04
Volume-II 22.07.06 16.10.06
13 SEC2/MOMMinutes of meeting in Bangalore/New Delhi/Chennai
05.03.04 27.02.07
14 SEC2/Misc Miscellaneous File 21.02.04 28.08.08
15 SEC2/NIT Notification & Tender Volume-I 04.02.04 16.03.06
Volume-II 04.04.06 24.03.08
Volume-III 04.03.08 04.12.08
Volume-IV 30.09.06 Running
16 SEC2/QC RQuality Control TestReport/Monthly Test Reportfrom QC
Volume-I 05.03.04 15.12.06
Volume-II 09.01.06 07.12.06
Volume-III 08.01.07 06.12.08
Volume-IV 12.01.09 Running
17 SEC2/QUEST QUEST (3rd Party Inspection) Volume-I 30.01.04 03.12.08
Volume-II 06.11.07 Running
18 SEC2/RODMRO-DM Plant & Filter shed ,Rawwater pump house
Handed overto SE(C-4)
19 SEC2/PHStation building/PH/Fuel oiltank/Fuel oil PH/Tech. bldg./HFOunloading PH
Volume-I 09.07.04 03.04.05
Volume-II 15.04.05 28.09.05
Volume-III 04.10.05 26.06.06
Volume-IV 26.04.06 21.05.07
Volume-V 11.09.06 19.10.07
Volume-VI 26.02.09 Running
20 SEC2/ODY Switch Yard Volume-I 25.02.05 29.09.05
Volume-II 08.10.05 18.04.06
Volume-III 10.08.06 Running
21 SEC2/RND
Site co-ordination meeting &compliance
Volume-I 26.03.04 25.01.06
Volume-II 07.02.06 03.07.06
Volume-III 16.09.06 03.12.08
Volume-IV 22.05.08 Running
22 SEC2/PRMProgress review meeting inBangalore
Volume-I 22.01.04 06.12.08
Volume-II 09.02.09 Running
23 SEC2/WRMWeekly Review Meeting inKudathini Meetinghall/Minutes/Nukkad meeting
01.06.04 15.03.07
24 SEC2/WR Weekly report SEC-2 to CEC-2 Volume-I 02.12.05 19.05.06
Volume-II 26.05.06 24.08.06
Volume-III 01.09,.06 22.12.06
Volume-IV 29.12.06 06.07.06
Volume-V 14.07.07 18.08.08
25 SEC2/MF Master File 10.04.04 20.07.07
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 54/58
26 SEC2/TECH Technical Volume-I 31.08.07 25.08.09
Volume-II 12.09.09 Running
UNIT-I ORDINARY FILES
1 SEC2/AW/DG Air Washer & DG Room Building 14.11.05 Running
2 SEC2/AC &VS AC & Ventilation System 23.02.04 29.03.06
3 SEC2/Amend Amendments (FQP) 20.03.04 Running
4 SEC2/Am/DDSAmendments of contractagreement / DDS
30.06.04 "
5 SEC2/Broch Brochures/Literatures 29.03.04 "
6 SEC2/BG Bank Guarantee 30.03.04 "
7 SEC2/Bud/AP Budget /Annual plan Volume-I 20.12.03 22.01.07
Volume-II 03.01.08 Running
8 SEC2/BoilerBoiler/boiler hydro test/seal airfan foundation light up
Volume-I 30.06.04 24.04.07
Volume-II 20.01.09 Running
9 SEC2/MBBBowl Mill, Mill & Bunker bay, MillHS rejection
23.05.05 29.08.07
10 SEC2/BOP BOP(EEC-4) Handed overto SE(C-4)
11 SEC2/Mun Qtr Munirabad Quarters 07.08.07 Running
12 SEC2/Corr BHEL Correspondence with BHEL Volume-I 09.03.04 23.03.07
Volume-II 01.06.07 14.08.08
Volume-III 18.08.08 27.08.09
Volume-IV 24.05.07 Running
13 SEC2/Com Compound wall 24.01.03 29.09.04
14 SEC2/Com DrgCompound wall with geologicDrawing
09.03.04 29.07.05
15 SEC2/CMG CMG/PCMG 11.03.10 Running
16 SEC2/VendorsContractors registration &vendors
23.03.04 26.12.06
17 SEC2/CW CW pipe line, CW fore bay Handed overto SE(C-4)
18 SEC2/Clarifier Clarifloculator (PT plant) Handed overto SE(C-4)
19 SEC2/Condenser Condenser 21.03.05 Running
20 SEC2/CST/DMSCondensate storage tank/DMStank
Handed overto SE(C-4)
21 SEC2/CPU CPU Regeneration building. Handed overto SE(C-4)
22SEC2/Con
Agreement
Contract agreement betweenBHEL,SNC for unit-1
29.01.03 Running
23 SEC2/CH Compressor house 09.03.06 "
24 SEC2/CHP TH CHP-Track Hopper 03.05.05 "
25 SEC2/CHP SCR CHP-Stacker Reclaimer 28.03.05 "
26 SEC2/CHP W T CHP-Wagon Tippler 04.01.06 "
27 SEC2/CHP JNT CHP-Junction Tower 19.09.05 "
28 SEC2/Cr H CHP-Crusher House 03.07.05 "
29 SEC2/Pent H CHP-Pent house 25.08.05 "
30 SEC2/CHP T BCHP-Tunnel, Bunker, Pressureventilation system, stack pile &garland drain.
13.10.05 "
31 SEC2/E RH CHP-Emergency Reclaimer 17.08.05 "
32 SEC2/CHP Tr H CHP-Transfer House 14.10.05 "
SEC2/CHP B
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 55/58
33 Shed CHP-Bulldozer Shed 11.08.05 "
34 SEC2/CHP S ECHP-Structural Steel ,Erection &Fabrication
26.10.05 "
35 SEC2/CHP MCC CHP-MCC room 02.06.06 "
36 SEC2/Drg Drawing covering letters Volume-I 15.04.06 27.07.06
Volume-II 06.07.06 14.03.06
Volume-III 16.01.07 31.03.08
Volume-IV 03.04.08 Running
37 SEC2/Del Pow Delegation of Power 16.03.06 "
38 SEC2/Ele Electrical 26.02.04 14.07.06
39 SEC2/ESP ESP Control Room, APH washpump house
28.01.05 Running
40 SEC2/ ED Ltr ED office letter 19.04.05 "
41 SEC2/FS/PHFire Station/Clarifier/PumpHouse/Clarifier Fire WaterStorage Tank
Handed overto SE(C-4)
42 SEC2/FR/FOFurniture Requirement/FinancialOpinions
31.03.04 Running
43 SEC2/FPS Fire Protection System 25.10.05 "
44 SEC2/FuelFuel Oil Handling System /HFOUnloading PH
11.07.06 "
45 SEC2/Geo TechGeo Technical Investigation forUnit-1
26.07.04 "
46 SEC2/HOD RM HOD Review Meeting 09.09.04 15.03.07
47 SEC2/Hot W Hot well make up boiler fill PH 21.07.05 Running
48 SEC2/IDS/IDF ID system (Boiler & ESP, Boiler &CHY) /ID fan Foundation
19.05.05 "
49 SEC2/LAS Land Army Sintex 12.03.04 "
50 SEC2/E Mail Letters through Email 27.03.04 "
51 SEC2/ Net Work L-1 & L-2 Network 23.02.04 "
52 SEC2/M D S Mix Design Studies 22.03.04 "
53 SEC2/MPR Monthly Progress Report 05.10.04 23.01.06
54 SEC2/Mech Mechanical 29.03.05 Running
55 SEC2/Meet F Meeting File 21.01.04 "
56 SEC2/OC/FOS Oil Canal & Fuel Oil System 09.11.05 "
57 SEC2/P & MiscPrinter & Miscellaneous & NameBoards/CD ROM Motorala SetPhotos
15.06.04 "
58 SEC2/PR/CRPipe Rack, Cable Rack & Pipinglayout
24.01.06 02.11.07
59 SEC2/PTP/PHPT Plant/Chlorine Contact Sump& PH/Sludge Sump/STP/SodiumStore Shed/ETP/OHT
Handed overto SE(C-4)
60 SEC2/QC Quality Control Correspondence 16.04.04 Running
61 SEC2/R H/R DRamanppana Halla, Roads,Drains, Storm water
Volume-I 10.09.04 03.11.07
Volume-II 27.10.09 Running
62 SEC2/R A Rate Analysis 04.05.04 "
63 SEC2/RSMY Railway Siding & MarshallingYard
31.12.05 "
64 SEC2/SS /ARSafety & Security/AccidentReport
19.07.04 "
65 SEC2/SR SR (Schedule of Rates) 20.12.04 "
66 SEC2/ST/ST Service Tax & Sales Tax 12.01.05 "
67 SEC2/SS FE Structural Steel, Fabrication &Erection of Power House, Mill & 11.02.07 08.12.07
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 56/58
Bunker Bay & CHP
68 SEC2/SWOT Service Water Over Head Tank Handed overto SE(C-4)
69 SEC2/Tr Yard Transformer yard 21.03.05 Running
70 SEC2/TCM Technical Committee Meeting 17.07.07 "
71 SEC2/Tech Au Technical Audit 16.03.05 "
72 SEC2/WH Ware House Handed overto SE(C-4)
73 SEC2/WS Workshop 28.11.04 "
74 SEC2/WPR WPR of Structural Steel 18.04.06 16.08.06
75 SEC2/LC/DTLocomotive Shed / DecantationTank
29.08.06 Running
76 SEC2/IA Internal Audit Volume-I 22.09.03 19.03.08
Volume-II 23.05.06 Running
77 SEC2/BILL Bills/recovery/invoices Volume-I 10.03.07 28.04.08
Volume-II 17.06.08 Running
78 SEC2/Paint Painting 24.02.07 "
79 SEC2/M S S Materials/Stores/Scrap 28.04.04 "
80 SEC2/Rain Rainfall Details 05.10.07 "
81 SEC2/EIRL Extra Item Rate 21.07.08 "
82 SEC2/T Drg Transfer of Drawings 08.02.08 "
83 SEC2/WPR Env Weekly Progress Report (Env.) Handed overto SE(C-4)
84 SEC2/Env Environment Correspondence 23.06.08 Running
85 SEC2/A P MCC Aluminum Partition MCC-2 12.07.08 "
86 SEC2/J C Jungle Clearance 29.07.08 "
87 SEC2/HO T H.O (Technical) 02.05.08 "
88 SEC2/E R/B Excavated Rubbles/Boulders 24.12.05 "
89 SEC2/Poll Pollution 30.07.07 "
90 SEC2/C SNC Correspondence with SNC 07.02.05 "
91 SEC2/D & CDisposing & Cleaning ofExcavated Muck
23.03.09 "
92 SEC2/S / PW Service/Potable Water 13.10.08 "
93 SEC2/H Keep House Keeping 22.09.08 "
94 SEC2/Daroji Daroji 05.09.08 "
95 SEC2/Aff P Afforestation /Afforest Program 26.07.08 "
96 SEC2/Ven Vendor Approval 08.01.04 "
97 SEC2/F AshCollection of Dry Fly Ash (M/sRain Commodities Ltd)
24.12.08 "
98 SEC2/Grievance Grievance of the contractors 24.11.09 "
99 SEC2/Est CHP Estimate for coal handling office 16.04.09 "
100 SEC2/Mc BECL Mcnally BECL 29.01.10 "
101 SEC2/Contractor Contractor Rules /Details ofoutsource &persons
21.10.05 "
102 SEC2/PCC PavePCC Pavement for balanceportion of coal stack area
13.01.10 "
103 SEC2/CS TankConstruction of Settling Tanknear Rampana Halla
23.10.09 "
104 SEC2/SS HRProviding & fixing SS Handrail toTechnical Buildings
19.12.09 "
105 SEC2/B AH Bottom Ash Hopper 06.08.09 "
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 57/58
106 SEC2/B Culvert Box Culvert near Mill reject area 13.01.09 "
107 SEC2/Cess Cess Act, Work Slip, EIRL 31.07.08 "
108 SEC2/LDLiquidated damage ( L D ) drawdown schedule
30.06.06 "
109 SEC2/S Room Store Room 20.11.09 "
110 SEC2/Lev/DepLeveling & Depression filling ofthe area
10.07.08 "
111 SEC2/RCC ProRCC Protection wall all aroundLBS - CHP area
23.07.09 "
112 SEC2/ DW BAHConstruction of Dwarf Wall toBottom Ash Hopper
29.10.09 "
113 SEC2/S BuiLConstruction of Coal SamplingBuilding
30.12.09 "
114 SEC2/UCB Up gradation of toilets in UCB 22.10.08 "
115 SEC2/e-ProcurTender Notification (Digitalcertificates-e procurement)
17.02.10 "
116SEC2/BTPSColony
BTPS Colony 05.01.10 "
S E (C-2)
KARNATAKA POWER CORPORATION LIMITED
BELLARY THERMAL POWER STATION
LIST OF FILES AND RECORDS
NAME OF THE OFFICE : SUPERINTENDING ENGINEER(CIVIL-2)
ADDRESS: KPCL, BTPS, KUDATHINI - 583 152
UNIT-2 BOX FILES TECHNICAL SECTION
SL.NO.
FILE NO. SUBJECT
OPENINGDATE OF
FILE
CLOSINGDATE OF
FILE/
RUNNING
FILE
DATE OFTRANSFER OF
FILE &AUTHORITY
WHOMTRANSFERRED
NATURE OFFILE
PERMANENT/TEMPORARY REMARKS
1SEC2/DPRBHEL D.P.R from BHEL
11.10.08 Running
2 SEC2/Meet Meeting at site 05.05.09 "
3SEC2/MeetBLG
Meeting at Bangalore & otherplaces
12.11.08 "
4 SEC2/Env Environmental Correspondence 17.11.08 "
5 SEC2/CHP CHP 04.11.09 "
ORDINARY FILES
1 SEC2/DRG Drawings Volume-I 22.12.07 27.01.09
Volume-II 30.01.09 09.03.10
Volume-III 03.03.10 Running
2 SEC2/BHELC BHEL Correspondence Volume-I 16.11.07 18.04.09
Volume-II 24.04.09 Running
3 SEC2/Q C Quality Control 19.06.08 "
4 SEC2/EPC W EPC works 06.07.07 "
5SEC2/L NetW L-1/L-2 Network
31.03.09 "
6 SEC2/BG/I BG/Invoices 22.05.08 "
7 SEC2/Geo Geo Technical works 10.03.07 "
8 SEC2/DPRC6 D. P. R. EE (C ) -6 Volume-I 02.06.08 30.03.09
5/14/2014 New Page 1
http://www.karnatakapower.com/LOF_BTPS_CEC.ASP 58/58
Volume-II 19.07.09 09.12.09
Volume-III 10.12.09 05.03.10
Volume-IV 11.03.10 Running
9 SEC2/DPRCE Daily Progress Report (C.E) Volume-I 28.07.08 28.08.09
Volume-II 01.09.09 23.02.10
Volume-III 26.02.10 Running
10 SEC2/S S Structural Steel Details 25.10.07 "
11 SEC2/T P I Third party inspection 26.08.08 "
12 SEC2/U2 C Unit-2 Correspondence 05.01.08 "
13 SEC2/C SNC Correspondence with SNC 03.06.08 "
14 SEC2/Ten Tender Correspondence 05.10.09 "
15 SEC2/FQP FQP 21.08.08 "
16 SEC2/Rain Rain fall Details 03.04.08 "
17 SEC2/Mat Materials (stores) 06.10.07 "
18 SEC2/SW Status of works from ED BTPS 20.06.09 "
19 SEC2/DFACollection of Dry Fly Ash (M/sMuril Industrials Ltd)
26.10.09 "
20 SEC2/DPRC5 D. P. R. EE (C ) -5 24.09.09 "
21 SEC2/Boil Boiler 02.12.08 "
22 SEC2/PR/CR Pipe Rack & Cable Rack 09.03.10 "
23 SEC2/Bud/AP Budget/Annual Plan 04.01.10 "
UNIT-3 ORDINARY FILES
1 SEC2/EPC W EPC works 28/30.7.07 Running
2 SEC2/GeoTech Geo Technical works
04.10.07 "
3 SEC2/BHEL BHEL Correspondence 06.01.09 "
4 SEC2/Ten Tender 11.06.09 "
5 SEC2/U3 BTPS UNIT - 3 site Grading 11.06.09 "
6 SEC2/Env C Environmental Correspondence 06.10.09 "
7 SEC2/HO H. O. ( Technical ) 22.10.09 "
8 SEC2/P Hear Public Hearing 14.03.09 "
9 SEC2/Daroji Daroji ( Bear sanctuary) 12.12.08 "
10 SEC2/IdenIdentification of areas forstorage of BHEL materials
04.12.09 "
S E (C-2)