MDOT SHA District 3
Access/Utility/Sidewalk/Special Event Permit
Planned Lane Closure Update for
Prince George’s and Montgomery Counties
for the Period Starting September 4
(Additional lane closure times and hours may be necessary to expedite
all phases of work to keep all projects on schedule; all work performed
weather permitting. Real-time traffic information available at
www.md511.org or 1-855-466-3511.)
Montgomery County
• Purple Line related utility work-for information on construction
activities, schedules and other updates, please visit
www.purplelinemd.com/construction. For immediate construction
concerns, please email us at [email protected] or call the
construction hotline at 240-424-5325.
•Washington Gas asphalt work at various locations in Montgomery
County through late summer 2020. (Contact: Kevin Bates, 571-327-
6656) (UP) (3234)
• MD 28 (Darnestown Road) at MD 124 (Quince Orchard Road).
Water main installation. Single lane closures and north side sidewalk
closures, overnight, Tuesday through Friday 9 p.m. 5 a.m. through
summer 2020. (Contact: Ed Duafala, 202-689-9309) (UP)
• MD 28 (Montgomery Avenue) between Wisconsin Avenue and
Waverly Street. Utility work. Eastbound full lane closures, Monday
through Friday 9 a.m. to 5 p.m. through summer 2020. Jones Bridge
Road will be utilized as one of the detours. (Contact: Anna Nazarova
at [email protected] or 202-437-2702) (UP)
• MD 97 (Georgia Avenue) from Reedie Drive to Price Avenue.
Verizon lambert work. Northbound single lane closures, overnight, 9
p.m. to 5 a.m. Sunday through Thursday through summer 2020.
(Contact: Carl Scheider, 443-750-0653) (UP) (SHA-3-MO-3232-18)
• MD 97 (Georgia Avenue) from Hewitt Avenue to Ralph Road. WSSC
water main replacement. Southbound double lane closures Monday
through Friday 24 hours a day through summer 2020. (Contact: Carlos
Costa, 240-462-8788) (UP)
• MD 108 (Olney Laytonsville Road) at 3415 Olney Laytonsville Road.
Sidewalk and WSSC sewer upgrades. 24/7 sidewalk closures on MD
108 from MD 97 (Georgia Avenue) to the Courts at Olney Commercial
Complex through late summer 2020. (Contact: Geremy Chelius, 631-
827-2838) (UP)
• MD 115 (Muncaster Mill Road) from Redland Road to Jacob Court.
Instillation of DIP and tie-in’s. Eastbound double lane closures,
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through fall 2020.
(Contact: Bijan Haghtalab, 301-933-2249) (UP)
• MD 118 (Germantown Road) from Aircraft Drive to I-270 Exit Ramp.
Pavement Improvements. Southbound single lane closures, 9 a.m. to 3
p.m. and 8 p.m. to 6 a.m. Saturday through Sunday through summer
2020. (Contact: James Kisner, 240-372- 1733) (UP)
•MD 185 (Connecticut Avenue) southbound and I 495 outer loop of the
beltway at various locations. Drainage, slope repair, concrete, and
asphalt work. Single lane closures Sunday through Saturday 24 hrs
through summer 2020. (Contact: Ryan Graham, 301-252-3574)
(MO1865177) (UP)
• MD 187 (Old Georgetown Road) from Executive Boulevard to
Nicholson Lane. Verizon conduit installation. Northbound and
southbound triple lane closures Sunday through Thursday, overnight, 9
p.m. to 5 a.m. through summer 2020. (Contact: Kyle Kern, 301-343-
5493) (UP) (MO-006-19-DO)
• MD 187 (Old Georgetown Road) from Auburn Avenue to Old
Georgetown Road. Sewer Main Replacement. Southbound single lane
closures overnight 9 p.m. to 5 a.m. through fall 2020. (Contact: Paul
Callahan, 301-304-2008) (UP) (SHA-3-MO-029620)
• MD 187 (Old Georgetown Road) from Executive boulevard to Tilden
Lane. Water valve replacement. Southbound single lane closure,
overnight, 9 p.m. to 5 a.m. Friday through Saturday through summer
2020. (Contact: Leroy Bright, 202-580-9776) (UP) (SHA-3-3235-18)
• Intersections at MD 187 (Old Georgetown Road) and Commerce Lane
and MD 187 (Old Georgetown Road) and Woodmont Avenue. Bruce
and Merrilees slotted conduit installation and water valve operation.
Northbound single lane closures overnight from 9 p.m. to 5 a.m. and
during the day 9 a.m. to 3 p.m. Sunday through Thursday through
summer 2020. (Contact: Joe Fowler (day shift supervisor) 443-299-
7235; George Covert (night shift supervisor) 724-714-9763) (UP)
(MO8695285)
• MD 190 (River Road) from Gary Road to Chapel Road. Water main
replacement. Eastbound single lane closures, overnight, 9 p.m. to 5
a.m. Sundays through summer 2020. (Contact: Will Kennedy, 785-
341-8760) (UP) (MO-1097-18)
• MD 190 (River Road) at Keokuk Street. Emergency PEPCO work.
Eastbound and westbound single lane closures, 24 hours a day, Monday
through Friday through summer 2020. (Contact: Tami Watkins, 202-
872-3590, [email protected]) (UP)
• MD 190 (River Road) at MD 189 (Falls Road). WSSC excavation to
repair valve. Eastbound single lane closure, overnight, 10 p.m. to 5
a.m. Thursday through Friday through summer 2020. (Contact: Tim
Riddle, 301-575-7953) (UP) (3-3235-18)
• MD 192 (Metropolitan Avenue) from 10542 Metropolitan Avenue to
10500 Saint Paul Street. Utility Upgrade installation. Full closures
with local access only through late summer 2020. (Contact: Paul
Lavanish, 334-221-3225, [email protected]) (UP)
• MD 193 (University Boulevard West) from MD 586 (Veirs Mill Road)
to Valley View Avenue. Building demolition. Westbound single lane
closures and sidewalk closures, 7 a.m. to 4 p.m. Monday through Friday
through late summer 2020. (Contact: Steve Lukaczer, 240-627-9431)
(AP) (SHA-3-MO-0889-19-DO)
• MD 193 (Greenbelt Road) at Cherrywood Lane. Sewer manhole
repair. Westbound double lane closures, overnight, 9 p.m. to 5 a.m.
Monday through Friday through fall 2020. (Contact: Carlton Barnes,
410-206-6031) (UP) (3-3235-18)
• MD 198 (Fort Mead Road) at Layfayette Road. Water main
installation. Eastbound and westbound triple lane closures, overnight,
Monday through Friday, 9 p.m. to 5 a.m. through summer 2020.
(Contact: Hossein Pezeshkan, 301-933-2249) (UP) (PG-0033-18)
• MD 320 (Piney Branch Drive) from Barron Street to Kodiak Drive.
Rod and underground ID placement. Eastbound single lane closures,
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer
2020. (Contact: James Curtin, 301-356-3893) (UP) (SHA-3-MO-
0096-20)
• MD 355 (Rockville Pike) between Cedar Lane and Jones Bridge Road.
Montgomery County BRAC project. Weekdays between 9 a.m. and 3
p.m., overnight Sunday through Thursday 8 p.m. to 5 a.m. and
occasional weekend lane closures, Friday at 8 p.m. through Monday at 5
a.m. through late 2021. The dedicated right turn lane on westbound
Jones Bridge Road to northbound Rockville Pike will be closed 24/7
through summer 2020. (Contact: Frank Kingsley, MCDOT BRAC
Coordinator [email protected], 240-372-
9949)
• MD 355 (Rockville Pike) from Tuckerman Lane to I-495. Inspection
of aerial utilities. Northbound and southbound double lane closures,
overnight, Sunday through Thursday 9 p.m. to 5 a.m. through summer
2020. (Contact: Raymond Boissonneault, 410-227-6122) (UP) (MO-
1198-19-DO)
• MD 355 (Rockville Pike) from South of King Charles Way to Pooks
Hill Road. WMATA work. Southbound single lane closure at
WMATA track access point, overnight, 9 p.m. to 5 a.m., Saturday
through Sunday through summer 2020) (Contact: Wardell Brown,
202-304-8380) (UP) (13-AD-MO-040-15)
• MD 355 (Rockville Pike) from Beall Avenue to Veirs Mill Road.
Innerduct placement between existing Verizon manholes.
Southbound single lane closures Sunday through Thursday, overnight, 9
p.m. to 5 a.m. through summer 2020. (Contact: Carl Schneider, 443-
750-0653) (UP) (MO-1070-18)
• MD 355 (Rockville Pike) from Pookes Hill Road to Tuckerman Lane.
WMATA work. Northbound and southbound single lane closures,
overnight, 9 p.m. to 5 a.m. Monday through Friday through late summer
2020. (Contact: Dustin Schicpp, 443-466-7742) (UP)
• MD 355(Rockville Pike) from Church Street to Veirs Mill Road.
Directional Boring Operation. Northbound and southbound double
lane closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday
through summer 2020. (Contact: Wayne Bradshaw, 301-748-7828)
(SHA-3-MO-0902) (UP)
• MD 355 (N Frederick Avenue) from Chestnut Street to Montgomery
Avenue. Verizon lambert work. Northbound double lane closures,
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer
2020. (Contact: Randy Belmont, 301-356-2524) (UP) (3-3232-18)
• MD 355 (N Frederick Avenue) from MD 117 (West Diamond Avenue)
to North Westland Drive. Sanitary sewer pipe work. Northbound and
southbound double lane closures, overnight, 9 p.m. to 5 a.m. Monday
through Friday through fall 2020. (Contact: Jacob Levine, 443-850-
5523) (UP) (SHA-3-MO-0103-19)
• MD 355 (N Frederick Avenue) at Odendhal Avenue. Paving tie-ins at
interestions of Whetstone Drive and Frederick Avenue. Northbound
double lane closures, overnight, 9 p.m. to 5 a.m. Monday through Friday
through fall 2020. (Contact: Bijan Haghtalab, 301-933-2249) (UP)
(SHA-3-MO-1126-15)
• MD 355 (N Frederick Road) from W Guide Drive to E Guide Drive.
Verizon work. Northbound single lane closures, overnight, 9 p.m. to 5
a.m. Sunday through Thursday through summer 2020. (Contact: Carl
Schneider, 443-750-0653) (UP) (SHA-3-MO-3232-18)
• MD 355 (S Frederick Avenue) from Cedar Avenue to Frederick
County line. Deep inlet cleaning. Northbound and southbound double
lane closures, overnight, 9 p.m. to 5 a.m. Monday through Friday
through summer 2020. (Contact: Floyd Ford, 443-734-4317) (UP)
(437P31421)
• MD 355 (S Frederick Avenue) from Deer Park Road to North
Westland Drive. Sanitary sewer work. Southbound double lane
closures, overnight, 6 p.m. to 5 a.m. Monday through Friday through fall
2020. (Contact: Jacob Levine, 443-850-5523) (UP) (SHA-3-MO-
0103-19)
• MD 355 (North Frederick Road) project related utility work at
various locations along entire roadway. Northbound and southbound
single lane closures, overnight, 7 p.m. to 6 a.m. Monday through Friday
through summer 2020. (Contact: Jose Sandoval, 301-599-1008)
(UR4MO536)
• MD 355 (Frederick Road) from Cool Brooke Lane to Stringtown Road.
Water line installation and tie-in. Northbound and southbound double
lane closures, overnight, Sunday through Thursday 9 p.m. to 5 a.m.
through summer 2020. (Contact: Dominic Pope, 410-833-9822) (UP)
(SHA-3-MO-0891-19-DO)
• MD 355 (Frederick Road) from Greenbrook Road to Millstone Manor
Lane. Placing maintenance of traffic/traffic markings. Northbound
and southbound single lane closures, overnight, 7 p.m. to 5 a.m. Monday
through Saturday through summer 2020. (Contact: John Carver, 410-
984-0637) (AP) (09-AP-MO-002-17)
• MD 355 (Frederick Road) from Shady Grove Road to Paramount
Drive. Verizon work. Southbound single lane closures, overnight, 9
p.m. to 5 a.m. Sunday through Thursday through summer 2020.
(Contact: Carl Schneider, 443-750-0653) (UP) (SHA-3-MO-3232-18)
• MD 355 (Rockville Pike) at Rosemont Drive. Waterline
replacement. Northbound left and center lane closures and southbound
left turn lane closures (only close two lanes in one direction at a time),
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer
2020. (Contact: Carlos Batista 703-929-2114) (UP) (MO0004-17)
• MD 355 (Rockville Pike) from Tuckerman Lane to Grosvenor Lane.
Verizon work. Northbound single lane closures, overnight, 9 p.m. to 5
a.m. Sunday through Thursday through late summer 2020. (Contact:
Carl Schneider, 443-750-0653) (SHA-3-MO-3232-18) (UP)
• MD 355 (Rockville Pike) from Park Lane to Beall Avenue. Test
pitting for utilities. Northbound lanes and shoulder closure, overnight,
9 p.m. through 5 a.m. Sunday through Thursday through summer 2020.
(Contact: Michael Markis 571-437-1201) (UP) (MO0149-18)
• MD 355 (Frederick Avenue) at Rosemont Drive. Water line
replacement. Southbound single lane closures, overnight, 9 pm to 5 am
Sunday through Thursday through summer 2020. (Contact: Carlos
Batista, 703-929-2114) (UP) (MO-0004-17)
• MD 355 (Wisconsin Avenue) at 7900 Wisconsin Avenue. Installation
of new crosswalks and sidewalks. West sidewalk and single right lane
closure on Wisconsin Avenue between Chase Avenue and Maple
Avenue through fall 2020. (Contact: James Herbert, 202-590-7352,
[email protected]) (UP)
• MD 355 (Wisconsin Avenue) at Montgomery Avenue. Utility related
asphalt work. Northbound and southbound single lane closures,
overnight, 8 p.m. to 5 a.m. through fall 2020. (Contact: Chris
Fairbanks, 240-398-9109) (UP) (3235)
• MD 355 (Wisconsin Avenue) between MD 187 (Old Georgetown
Road) and Montgomery Avenue. Crane operation. Single southbound
lane closure, overnight, 9 p.m. to 9 a.m. Saturday through Sunday
through summer 2020. (Contact: Shon Thomas, 240-302-3099) (AP)
• MD 355 (Wisconsin Avenue) from 7351 Wisconsin Avenue to 7359
Wisconsin Avenue. Access permit related work. Right turn lane and
sidewalk closure through summer 2020. All pedestrian traffic will be
directed through overhead protection located in the turn lane. (Contact:
Chris Smith, [email protected], 301-321-3202) (AP)
• MD 355 (Wisconsin Avenue) from Commerce Lane to Middleton
Lane. Long term sidewalk and curb lane closures through summer 2020.
(Contact: Alex Paschalides, 410-365-4466) (UP) (MO-0896-18-DO)
• MD 355 (Wisconsin Avenue) between Elm Street and Bethesda
Avenue. Carr Properties building construction. Southbound single
right lane closures through winter 2019. Sidewalk closures from Elm
Street to 7220 Wisconsin Avenue through summer 2020. (Contact:
David Chaconas, 202-303-3089) (AP)
• MD 355 (Rockville Pike) from Edmonston Drive to Talbot Street.
Aerial Crossing work. Full northbound and southbound lane closures,
overnight, Sunday through Thursday 9 p.m. to 5 a.m. through summer
2020. (Contact: Randy Belmout 301-356-2524) (UP) (MO0487-18)
• MD 355 (Rockville Pike) from Wilson Drive to South Drive.
Roadway Construction. Southbound double lane and shoulder
closures, overnight, from 9 p.m. to 5 a.m. Sunday through Thursday
through summer 2020. (Contact: Sara McAllimer 301-974-2478)
(AP) (MO040-15)
•MD 355 (Frederick Road) at Brink Road. Private/commercial
intersection reconstruction project. Intermittent single lane closures
on both roads with a flagging operation, weekdays, Monday through
Friday, 9 p.m. to 3 p.m. through summer 2020. (Contact: Mark
Levendusky, Beazer Homes, 301-356-7909,
[email protected]) (09 AP MO 002 17)
•MD 355 (Frederick Road) from West Old Baltimore Road to Brink
Road. Aerial road crossing and shoulder work. Southbound and
northbound double lane closures, overnight, Monday through Friday 9
p.m. to 5 a.m. through summer 2020. (Contact: John Leshinski, 301-
305-3474) (UP) (MO-0703-18)
•MD 355 (Frederick Road) from MD 124 (Montgomery Village
Avenue) to Christopher Avenue. Air vacuum utility test pits.
Northbound double lane closures, overnight, 9 p.m. to 5 a.m. Sunday
through Thursday through summer 2020. (Contact: David Padgett,
443-378-8838) (UP) (MO-0176-19)
•MD 355 (Frederick Road) from Central Avenue to Peony Drive.
Sanitary sewer rehabilitation. Northbound and southbound double
lane closures, overnight, Sunday through Thursday 9 pm to 5 am
through summer 2020. (Contact: Jacob Pierce, 301-325-0678) (UP)
(MO-1034-15)
• MD 355 (Wisconsin Avenue) at Rosemont Drive. Water line
replacement. Southbound double lane closures, overnight, 9 p.m. to 5
a.m. through summer 2020. (Contact: Carlos Batista 703-929-2114)
(UP) (MO0004-17)
• MD 355 (Rockville Pike) from Beall Avenue to Veirs Mill Road.
Innerduct placement between existing Verizon manholes.
Southbound single lane closures, Sunday through Thursday, overnight, 9
p.m. to 5 a.m. through summer 2020. (Contact: Carl Schneider, 443-
952-7009) (UP) (MO-1070-18)
• MD 650 (New Hampshire Avenue) from Madre Street to Tunis Road.
Aerial pipe placement. Northbound and southbound triple lane
closures, overnight, 9 p.m. to 5 a.m. Sunday through Thursday 9 p.m. to
5 a.m. through summer 2020. (Contact: Ronneshia Sheriff, 240-320-
5535) (UP) (SHA-MO-0199-20)
• MD 650 (New Hampshire Avenue) at Poplar Avenue. Sewer manhole
rehabilitation. Northbound double lane closures, overnight, 10 p.m. to
5 a.m. Sunday through Thursday through summer 2020. (Contact:
Alvan Smith, 301-204-4480) (UP) (SHA-3-3235-18)
• MD 650 (New Hampshire Avenue) from US 29 (Columbia Pike) to E
Randolph Road. PEPCO overhead utility maintenance. Northbound
double lane closures, overnight, 9 p.m. to 5 a.m. Sunday through
Thursday through fall 2020. (Contact: Ingrid Reyes, 240-355-2031)
(UP) (SHA-3-3221-18)
• US 29 (Colesville Road) from MD 97 (Georgia Avenue) to Mansion
Drive. Verizon lambert work. Northbound single lane closures,
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer
2020. (Contact: Carl Schneider, 443-750-0653) (UP) (SHA-3-MO-
3232-18)
• US 29 (Colesville Road) from Spring Street to Fenton Street. Tie-in’s
at intersections of Fenton Street and Spring Street and Colesville
Road. Northbound and southbound double lane closures, overnight, 9
p.m. to 5 a.m. Monday through Wednesday late summer 2020.
(Contact: Bijan Haghtalab, 301-300-8535) (UP) (SHA-3-MO-0017)
• US 29 (Colesville Road) at Spring Street. Pepco underground repair
work. Southbound single lane closures 9 a.m. to 3 p.m. Saturdays
through late summer 2020. (Contact: Tami Watkins, 202-872-3590,
[email protected]) (UP)
• US 29 (Colesville Road) at Fenton Street. Bus pad work.
Northbound single lane closures, overnight, 9 p.m. to 5 a.m. Sunday
through Thursday through summer 2020. (Contact: Mike Hagan, 301-
252-0970) (UP) (18-AP-MO-013-19)
• US 29 (Colesville Road) from Granville Drive to Brewster Avenue.
WSSC water work. Multi lane closures, overnight, 9 p.m. to 5 a.m.
Monday through Friday through summer 2020. (Contact: Enrrique
Lopez, 240-564-5243) (UP)
• US 29 (Colesville Road) from Spring Street to MD 97 (Georgia Avenue). Full lane closures, 9 a.m. to 5 p.m. and 9 p.m. to 5 a.m. Saturday through Sunday through summer 2020. WSSC
work. (Contact: Melanie Deggins, 301-206-8192) (UP) (UR4PG854)
• I-270 from ramp 5 I-270 southbound to Ramp 4 I-270 northbound.
Aerial duct overlash. Northbound and southbound full lane closures 12
a.m. to 12:20 a.m. Sundays through summer 2020. (Contact: Derek
Thomas, 443-277-2589) (MO-0096-17) (UP)
• I-270 at MD 28. Cable crossing for a utility project. Northbound
and southbound 15-minute full lane closures Mondays starting at 12 a.m.
through summer 2020. Maryland State Police will be on site to assist.
(Contact: Derek Thomas, 443-277-2598) (UP)
• I-270 at MD 28 (Montgomery Avenue) from southbound Ramp 5 to
Northbound Ramp 4. Aerial duct overlash. 20-minute full lane
closures starting at 12 a.m. Monday through Friday through summer
2020. (Contact: Derek Thomas, 443-277-2589) (UP) (MO-0096-18)
• I-270 from MD 28 (Montgomery Avenue) to I-370. Geotechnical
Drilling Investigation. Northbound single lane closures, overnight, 9
p.m. to 5 a.m. Monday through Thursday through summer 2020.
(Contact: Ryan Laver, 717-441-2218) (UP) (SHA-3-MO-1093-19-DO
Prince George’s County
• MD 193 (Enterprise Road) from Kings Valley Drive to MD 214
(Central Avenue). PEPCO Upgrading poles from wood to steel.
Eastbound and westbound multi lane closures Monday through Friday,
overnight, 1 a.m. to 5 a.m. through summer 2020. (Contact: Monica
Kangas, 443-715-2148) (UP) (PG-0532-18)
• MD 193 (Greenbelt Road) from University Boulevard to Rhode Island
Avenue. PEPCO overhead work. Westbound single lane closures
Saturday through Sunday, overnight, 9 p.m. to 5 a.m. through summer
2020. (Contact: John Keller, 301-599-6600) (UP) (3-3221-18)
• MD 201 (Kenilworth Avenue) from MD 410 (East-West Highway) to
Riverdale Road. Gas main replacement. Northbound double lane
closures, overnight, from 9 p.m. to 5 a.m. through summer 2020.
(Contact: Albert Lawrence, 571-359-2436) (UP) (3234-18)
• MD 201 (Kenilworth Avenue) from Sunnyside Avenue to Bever Dam
Road. Aerial Road Crossing. Northbound and southbound double lane
closures, overnight, 1 a.m. to 5 a.m. Sunday through Thursday through
summer 2020. Maryland State Police will be on site to assist. (Contact:
James Curtin, 301-356-3893) (UP) (SHA-3-PG-0840-19)
• MD 201 (Kenilworth Avenue) from the intersection of US 1 and Ikea
Center Boulevard for 200 feet northbound. Hopkins and Wayson, Inc.
construction work. Sidewalk closures through summer 2020.
(Contact: Preston King 443-404-3927) (AP) (PG-028-16)
• MD 201 (Kenilworth Avenue) from MD 193 West (Greenbelt Road) to
MD 193 East (Greenbelt Road). Fiber optic cable installation along
aerial poles. Eastbound and westbound triple lane closures, overnight, 1
a.m. to 5 a.m. Wednesday through Thursday through summer 2020.
(Contact: Heather Zanti, 443-715-2148) (UP) (SHA-3-PG-0126-20)
• MD 201 (Kenilworth Avenue) from Patterson Street to Riverdale
Road. Sewer work. Southbound single lane closures, overnight,
Sunday through Thursday 9 p.m. to 5 a.m. through summer 2020.
(Contact: Larry Brown, 240-416-5445) (UP) (SHA-3-3235-18)
• MD 202 (Landover Road) from Matthew Henson Avenue to Prospect
Street. Utility pole replacement. Eastbound single lane closures,
overnight, 9 p.m. to 5 a.m. Monday through Friday through summer
2020. (Contact: Alston Pryor, 410-490-6818) (SHA-3-PG-0811-19)
(UP)
• MD 202 (Landover Road) at Arena Drive. Milling and paving.
Southbound single lane closures, overnight, 9 p.m. to 5 a.m. Sunday
through Thursday through summer 2020. (Contact: Matt
Goldsborough, 301-609-3896) (UP) (PG-0201-19)
• MD 202 (Landover Road) on ramp from westbound MD 214 (Central
Avenue). Utility wire pull. Full closure of the ramp, overnight, Sunday
through Monday through summer 2020. A detour will be in place that
will direct motorists from northbound MD 202 onto Campus Way South
for access to MD 202. (Contact: Heather Zanti, 443-715-2148) (UP)
(SHA-3-PG-0529-18) (UP)
• MD 212 (Riggs Road) at Amherst Road. Gas line replacement.
Northbound and southbound double lane closures, overnight, 9 a.m. to 5
a.m. Sunday through Thursday through summer 2020. (Contact:
Albert Lawrence, 571-359-2436) (UP) (SHA-3-PG-0621-18)
• MD 212 (Riggs Road) from Metzerott Road to MD 410 (East-West
Highway). Rodding underground conduit. Northbound and
southbound single lane closures, overnight, Sunday through Thursday 9
p.m. to 5 a.m. through summer 2020. (Contact: James Curtin, 301-
356-3893) (UP) (SHA-3-3232-19)
• MD 212 (Riggs Road) from Norton Road to Red Top Road. Placing
aerial pipe. Eastbound and westbound triple lane closures, overnight, 9
p.m. to 5 a.m. Sunday through Thursday through summer 2020.
(Contact: Ronneshia Sheriff, 240-320-5535) (UP) (SHA-3-PG-1191-
19)
• MD 212 (Riggs Road) at Beechwood Road. Gas replacement.
Northbound and southbound double lane closures, overnight, 9 p.m. to 5
a.m., Sunday through Thursday through late summer 2020. (Contact:
Bradley Swint, 571-220-2452) (UP) (SHA-3-PG-0074-19)
• MD 212 (Powder Mill Road) from Glenmore Drive to Beltsville Drive.
Water main installation. Southbound double lane closures Monday
through Friday 9 a.m. to 3 p.m. and overnight, Monday through Friday,
8 p.m. to 5 a.m. through summer 2020. (Contact: Douglas Ayala 240-
533-6223) (UP) (PG-0592-16)
• MD 214 (Central Avenue) from Gentry Lane to Stanton Drive.
Upgrading wood poles with new steel poles. Eastbound and westbound
triple lane closures, overnight, 1 a.m. to 5 a.m. Monday through Friday
through summer 2020. (Contact: Monica Kangas, 443-715-2148)
(UP) (PG-0532-18)
• MD 214 (Central Avenue) from Shady Glen Drive to Addison Road.
Utility pole upgrade work. Eastbound and westbound full lane
closures Monday through Friday, overnight, 1 a.m. to 5 a.m. through
summer 2020. (Contact: Monica Kangas, 443-715-2148) (UP) (PG-
0532-18)
• MD 214 (Central Avenue) to Harry S Truman Drive over I-495
(Capital Beltway). Construction of aerial utilities. Full beltway
closures for 20-minute periods, overnight, from 5 p.m. to 1 a.m. through
summer 2020. (Contact: Cheikh Goumbala, 301-669-7526) (UP)
(PG-0285-18)
• MD 295 (Baltimore-Washington Parkway) ramps at MD 295 and I-495
intersections. Mill and pave. Full ramp closures, overnight, Monday
through Sunday 9 p.m. to 5 a.m. through summer 2020. (Contact:
Chad Brown, 703-371-5009) (693C7-19-C-000018)
• MD 337 (Allentown Road) at Suitland Road. Installation of electric
conduit. Eastbound and westbound multi lane closures, overnight,
Monday through Sunday through summer 2020. (Contact: Rich
Rapolla, 301-444-8181) (UP) (SHA-3-PG-1075-18)
• MD 337 (Allentown Road) at Suitland Road. Utility mill and overlay.
Northbound and southbound multi lane closure 5 a.m. to 7 p.m. Saturday
through Sunday through summer 2020. (Contact: Adam Allen, 240-
304-8773) (UP) (SHA-3-PG-1075-18)
• MD 337 (Allentown Road) at I-95 (exit ramp 9). Red light camera
power conduit work. Southbound single lane closures, overnight, 9:30
p.m. to 4:30 a.m. Thursday through Monday through summer 2020.
(Contact: Gary Panclone, 202-498-4280) (UP) (BW313MB3)
• MD 4 (Pennsylvania Avenue) at Suitland Parkway. Gas line
construction. Northbound and southbound double lane closures,
overnight, 9 p.m. to 5 a.m. Sunday through Thursday through summer
2020. (Contact: Albert Lawrence, 571-359-2436) (SHA-3-PG-0897-
17) (UP)
• MD 410 (East-West Highway) from Baltimore Avenue to 44th Place.
Rodding conduits. Eastbound double lane closures, overnight, Sunday
to Thursday 9 p.m. to 5 a.m. through fall 2020. (Contact: Ronneshia
Sheriff, 240-320-5535) (UP) (SHA-3-3232-20)
• MD 414 (Oxon Hill Road) from Livingston Road to John Hanson
Lane. PEPCO utility work. Eastbound single lane closures, overnight,
9 p.m. to 5 a.m. through summer 2020. (Contact: John Keller, 301-
599-6600) (UP) (SHA-3-3221-18)
• MD 450 (Annapolis Road) from 62nd Avenue to 64th Avenue. Gas
main replacement. Westbound multi-lane closures, overnight, 9 p.m.
to 5 a.m. Sunday through Thursday through summer 2020. (Contact:
Rick Stewart, 301-638-7690) (UP) (SHA-3-PG-1017-18)
• MD 501 (Chillum Road) from Burgess Road to Sargent Road.
Private/commercial resurfacing. Single and double eastbound and
westbound lane closures, overnight, Sunday through Thursday, 9 p.m. to
5 a.m. through summer 2020. (Contact: Elmer Sosa, 703.906.4602)
(AP/UP/WGL 3234)
• MD 650 (New Hampshire Avenue) from Ray Road to Eastern Avenue.
Underground transmission line installation. Northbound multi-lane
closures, overnight, Monday through Friday 8 p.m. to 6 a.m. through late
summer 2020. (Contact: [email protected] or 1-833-227-4743)
(UP) (SHA-3-PG-0375-20)
• MD 704 (Martin Luther King Jr. Highway) from Lottsford Vista Road
to MD 450 (Annapolis Road). Storm drain installation. Double lane
closures in both directions and sidewalk closures, Monday through
Friday 9 a.m. to 5 p.m. through summer 2020. (Contact: Juan
Machado, 301-852-3642) (UP) (12appg03718)
• MD 704 (Martin Luther King Jr. Highway) from MD 450 (Annapolis
Road) to Business Parkway. Storm drain installation. Eastbound and
westbound multi lane closures, overnight, 9 p.m. to 5 a.m. Monday
through Friday through summer 2020. (Contact: Osmin Ramirez, 703-
329-2989) (UP) (12APPG03718)
• US 1 (Baltimore Avenue) from Hollywood Road to Lackawanna
Street. Private/commercial asphalt work. Single northbound and
southbound lane closures, overnight, Sunday through Thursday, 9 p.m.
to 5 a.m. through summer 2020. (Contact: Bill Stutzman,
443.468.2555) (AP) (PG-025-14)
• US 1 (Baltimore Avenue) from Berwyn House Road to Quebec Street.
Sewer work. Southbound single lane closures, overnight, Sunday
through Thursday 9 p.m. to 5 a.m. through summer 2020. (Contact:
Larry Brown, 240-416-5445) (UP) (2-25-2020)
• US 1 (Baltimore Avenue) at Contee Road. Private/commercial
paving work. Single and double southbound lane closures, overnight,
Sunday through Thursday, 8 p.m. to 5 a.m. through summer 2020. (AP)
• US 1 (Baltimore Avenue) from Madison Street to Riverdale Road.
Gas main replacement. Northbound double lane closures, overnight, 7
p.m. to 5 a.m. Sunday through Thursday through fall 2020. (Contact:
Bradley Swint, 571-220-2452) (UP) (SHA-3-PG-0842-19)
• US 1 (Baltimore Avenue) between College Avenue and Melbourne
Place. Verizon utility relocation work. Northbound and southbound
double lane closures Sunday through Thursday 8 p.m. to 11 a.m.,
Monday through Friday 10:00 a.m. to 4:00 p.m., Sunday through
Thursday 7:00 p.m. to 6:00 a.m., and 24 hours a day Saturday through
Sunday through summer 2020. (Contact: Keith Davis, 703-546-0734)
(UR4PG624)
• US 1 (Baltimore Avenue) between MD 193 (University Boulevard)
and Lakeland Road. Gas main replacement. Northbound and
southbound single lane closures, overnight, 7 p.m. to 6 a.m. through
summer 2020. (Contact: Don Weller, 571-364-2048) (PG-0919-18)
• US 1 (Baltimore Avenue) from Lakeland Road to Cherry Hill Road.
Rodding conduits. Northbound single lane closures, overnight,
Monday through Thursday 9 p.m. to 5 a.m. through summer 2020.
(Contact: Lakia Harrison, 443-477-2241) (UP) (SHA-3-PG-0152-20)
• US 1 (Baltimore Avenue) from Arundel Place to Crittenden Street.
Gas main installation. Northbound single lane closures, overnight, 9
p.m. to 5 a.m. Monday through Friday through summer 2020. (Contact:
Rick Stewart, 301-638-7693) (UP) (PG-1021-18)
• US 1 (Baltimore Avenue) between MD 198 (Gorman Avenue/ Fort
Meade Road) and Bowie Road. Sidewalk repair operation.
Northbound far left lane on US 1 and sidewalk will be closed through
summer 2020. A flagging operation and signage will direct motorists
and pedestrians. (Contact: Eric Sugrue 703-323-1424) (AP) (PG-
0660-18-DO)
• US 1 (Baltimore Avenue) at IKEA Center Boulevard. Water and
sewer installation. Northbound and southbound triple lane closures
Monday through Friday, overnight, 9 p.m. to 5 a.m. through summer
2020. (Contact: Todd Slacum, 443-250-4414) (UP) (14APPAD2816)
• US 1 (Rhode Island Avenue NW) from Farragut Street to Gallatin
Street. Sewer house connection repair. Northbound and southbound
multi lane closures, overnight, from 9 p.m. to 5 a.m. Monday through
Friday through summer 2020. (Contact: Hossein Pezeshkan, 301-379-
5074) (UP) (PG-0721-18)
• US 1 (Washington Boulevard) from Main Street to Prince George’s
Street. New water service installation. Southbound double lane
closures, overnight, from 9 pm to 5 am Tuesday through Thursday
through summer 2020. (Contact: Roger Hunter, 240-625-6469) (UP)
(PG-0744-18)
• US 1(Baltimore Avenue) from IKEA Way to Edgewood Road.
Clipping wire above I-495. Northbound and southbound single lane
closures Monday through Friday, overnight, 10 p.m. to 5 a.m. through
summer 2020. (Contact: Claudio Santos, 717-728-6634) (UP) (3PG-
0877-18)
• US 1 (Baltimore Avenue) at I-495. Bridge Deck patching.
Southbound double lane closure, overnight, 9 p.m. to 5 a.m. Sunday
through Thursday through summer 2020. (Contact: Fredy Esquivel,
240-480-8441) (AX0647314)
• US 50 (John Hanson Highway) from exit ramp to MD 3 northbound to
on ramp from Melford Drive to MD 3 northbound. Slope failure
improvements. Eastbound single lane closures, overnight, Sunday
through Saturday 9 p.m. to 5 a.m. through summer 2020. (Contact:
Bob Knutson, 443-986-1175)
• US 301 (Crain Highway) at the MD 214 ramps
Patching/milling/paving. Northbound and southbound single lane
closures, overnight, 9 p.m. to 5 a.m. Sunday through Friday through
summer 2020. (Contact: William Certeza, 410-977-9101) (UP)
(UR4PG837)
• US 301 (Crain Highway) from Queen Bridge Road to Central Avenue.
Verizon utility repair. Northbound and southbound full lane closures,
overnight on weekends through summer 2020. (Contact: David Belisle,
410-746-7404) (3230) (UP)
• US 301 (Crain Highway) at Village Drive W. Excavation for gas
work. Southbound double lane closures 24 hours a day 7 days a week
through summer 2020. (Contact: Greg Jensen, 910-303-1548) (UP)
(SHA-3-PG-0403)
• I-95 at MD 212 (Riggs Road) Overhead camera replacement.
Double eastbound lane closures, overnight, from 9 p.m. through 5 a.m.
through summer 2020. (Contact: Mo Gould 443-783-3088) (UP)
(1913)
• I-95/I-495 (Capital Beltway) outer loop ramp to US 1 (Baltimore
Avenue/X25). Private/commercial water line replacement project.
Intermittent single left and right lane closures, weekdays, 9 a.m. to 3
p.m. and overnight, Sunday through Thursday, 9 p.m. to 5 a.m. through
summer 2020. (UP) (835/PG0218-16)
• I-95/I-495 (Capital Beltway) from Stansfield Road to Sandy Spring
Road. Inspection of gas line under bridge. Northbound and
southbound double lane closures, overnight, Sunday through Tuesday
through late summer 2020. (Contact: Vincent Kauders, 410-590-
3906) (UP) (SHA-3-3202-18)
• I-95/I-495 (Capital Beltway) outer loop mile marker 0.00 to 1.0.
Paving operation. Northbound double lane closures, overnight, 9 p.m.
to 5 a.m. Sunday through Monday through summer 2020. (Contact:
Watler Sandoval, 571-216-0863) (UP) (08335-WWB BIMS)
• I-95/I-495 (Capital Beltway) Inner Loop at exits 36 and 33.
Inspection of WMATA bridge over I-495. Double right lane closures,
overnight, 9 p.m. to 5 a.m. Monday through Friday through summer
2020. (Contact: Dustin Schicpp, 443-466-7742) (UP)
• I-95/I-495 (Capital Beltway) at Exit 4A (Oxon Hill Road). Bridge
deck patching. Double left lane and right lane closure Sunday through
Friday, 9 p.m. to 5 a.m. through summer 2020. (Contact: Erik Gedoy,
240-426-0696) (UP) (AX0647314)
• I-95/I-495 (Capital Beltway) from MD 295 to MD 414. Pothole
repairs. Northbound and southbound double lane closures Monday
through Friday, overnight, 9 a.m. to 5 a.m. through summer 2020.
(Contact: Walter Sandoval, 571-216-0863) (UP) (08335-
WWBTAMS)