Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda...

30
Addendum to the Environmental Impact Assessment September 2017 Project Number: 47381-001 SRI: Mahaweli Water Security Investment Program Tranche 1 and 2 Upper Elahera Canal Project Annexes 5 to 8 Prepared by Ministry of Mahaweli Development and Environment with the assistance of Program Management, Design and Supervision Consultant (Joint Venture Lahmeyer International GmbH – GeoConsult ZT GmbH) for Democratic Socialist Republic of Sri Lanka and the Asian Development Bank. This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Transcript of Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda...

Page 1: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Addendum to the Environmental Impact Assessment

September 2017 Project Number: 47381-001

SRI: Mahaweli Water Security Investment Program

Tranche 1 and 2 Upper Elahera Canal Project Annexes 5 to 8

Prepared by Ministry of Mahaweli Development and Environment with the assistance of Program Management, Design and Supervision Consultant (Joint Venture Lahmeyer International GmbH – GeoConsult ZT GmbH) for Democratic Socialist Republic of Sri Lanka and the Asian Development Bank. This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any

designation of or reference to a particular territory or geographic area in this document, the

Asian Development Bank does not intend to make any judgments as to the legal or other status

of any territory or area.

Page 2: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant

ANNEX 5: MAPS INCLUDED IN THE TEXT TO

IMPROVE THE READABILITY

Ministry of Mahaweli Development and Environment

Mahaweli Water Security Investment Program

SUPPLEMENTARY INFORMATION RELATED

TO INFRASTRUCTURE DESIGN CHANGES FOR THE UEC VOLUME 1:

EIA UPDATED FOR TRANCHE 1 AND TRANCHE 2 COMPONENTS

Page 3: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

65+

500

65+

000

62+500

60+000

57+500

55+000

52+500

50+000

47+500

45+000

42+500

40+000

37+500

35+000

32+500

30+000

27+509

25+00

0

22+50

0

20+000

17+500

15+000

12+500

10+000

7+500

5+000

2+500

0+000

55+600

17+700

3+860

Ka

laO

ya

Ya

nO

Ki r

iO

ya

M

orago lla

Oy

a

Talk

ote

oy

a

Ka

lu

G

ang

a

Am ban

Ga

ng

a

Ru pp

eEla

Eri g

eo

ya

Malw

at u

Oy

a

Aba nGanga

Dam

bulu

Oya

Ma

ha

we

liG

anga

Halmilla Oya

Kongetiya Oy a

Ha

ba

ran

a O

ya

Heerati Oy

a

HURULU WEWA

FEEDER CANAL (HFC)

ELAHERA MINNERIYA YODA ELA

(EMYE)

EXISTING BOWATENNA

TUNNEL

SIGIRIYA WEWA

PAHALA TALKOTE WEWA

MUSEUM

ARCHAEOLOGICAL RESERVE

NORTH WESTERN PROVINCE

DIVERSION CANAL (NWPC)

UPPER ELAHERA CANAL

MWSIP TRANCHE 3 - M ANANKATTIYA

MAHAKANADARAWA DIVERSION CANAL

UEC - ICB-6

MWSIP TRANCHE 3

(55+600 TO 65+500 km)

UEC - ICB-5

MWSIP TRANCHE 2

(27+509 TO 55+600 km)

UEC - ICB-2A

UEC - ICB-4

MWSIP TRANCHE 3

(17+700 TO 27+509 km)

UEC - ICB-1

MWSIP TRANCHE 1

(0+100 TO 3+860 km)

KMTC - ICB-2B

MWSIP TRANCHE 2

(0+000 TO 8+850 KM)

OUTLET TRIFURCATION

STRUCTURE

1. MAHAKANADARAWA

2. HURULUWEWA

3. NCP CANAL

8+85

0

0+00

0

KALU GANGA MORAGAHAKANDA

TRANSFER CANAL (KMTC)

MWSIP TRANCHE 2

(3+860 TO 17+700 km)

UEC - ICB-3

MORAGAHAKANDA RESERVOIR

KALU GAN GA RESERVOIR

KONGETIYA RESERVOIR

MADETHTHA WEWA

BOGAHA WEWA

WASGAMUWA EXTENSION

PROPOSE D ELEPH ANT CORRIDOR

WASGAMUWA NATIONAL PARK

MINNERIYA-G IRITALE NATURE RESERVE

MINNERIAYA NATIONAL PARK

KAUD ULLA MINNERIYA NATIONA L PARK

SIGIRIYA SANCTUARY

ANGAM MADILLA NAT IONAL PARK

SOMAWATHIYA NATIONAL PARK

GIRITALE NR

ELAHARA GIRITALE SANCT UARY

KAUD ULLA NATIONA L PARK

KAHALA - PALLEKALE SANCTUARY

POLONNARUWA SANCTUARY

RIT IGALA SANCT UARY

FLOOD PLAINS NATIONAL PARK

HURULU FOREST RESERVE

PALWEHERA FOREST RESERVE

INAM ALUWA FOREST RESERVE

PALLE KELE FOREST RESERVE

KAHALLA FOREST RESERVE

CHUNDANKAD U FOREST RESE RVE

GORAKADOLA FOREST RESERVE

PALLE KELE FOREST RESERVE

KAUD ULLA WEWA

KALA WEWA

PARAKRAM A SAMUD RA

MINNERIYA WEWA

HURULU WEWA

BALALU WEWA

KANDALAM A TANK

ERU WEWA

GIRITALE WEWA

DEWAHUWA WEWA

NALANDA RESERVOIR

DAMBULU OYA RESERVOIR

MANANKATTIYA WEWA

BOWATH ENNA RESERVOIR

WEMED ILLA RES

NACH CHAD UWA WEWA

HABARANA WEWA

HIRIWADUNNA WEWA

PAH ALA TALKOTE WEWA

SIGIRIYA WEWA

HING URU WEWA

ANDIYAGALA TANK

NAU LA

YAK ALLA

GAL OYA

YAK KURE

NEW TOWN

BAKAMUNA

GIRITALE

SIRIP URA

HABARAN A

ALUT OYA

SIGIRIYA

DAMBULLA

HETTIPOLA

PALLEGAMA

MADATUGAM A

KAHALAGALA

DIYABEDUM A

GAN EWALPOLA

PALU GASWEWA

AN GAM EDILLA

POLON NARUWA

TALAKOLAWELA

KAL INGANU WARA

KAWUDUPELELLA

PADIKARAM ADU WA

GALOYA J UNCTION

ATTHANAKADAWALA

RATTOTAYA(TRACT 7)

£¤A6

£¤A11

£¤A9

£¤ B3

4

£¤ B3

8

£¤B64

£¤B63

£¤A9

¬«C

¬«H

¬«E

¬«D1

180000 190000 200000 210000 220000

26

00

00

27

00

00

28

00

00

29

00

00

30

00

00

31

00

00

32

00

00

33

00

00

34

00

00

±

Legend

"/ Town / Village

Exis ting Power Stat ion

Proposed Power Station

Poposed Canal Data

UEC -ICB-1

UEC -ICB-2A

UEC -ICB-3

UEC -ICB-4

UEC -ICB-5

UEC-ICB-6

UEC -ICB-2B

Exis ting Irrigat ion Canal

Exis ting Irrigation Tunnel

Road - Class A

Road - Class B

Railway

River / Stream

Exis ting Tank / Reservoir

Reservoir Under Cons truction

Hom e Garden

Forest Reserve

National Park

Nature Peserve

Sanctuary

Stric t N ature Reserve

Proposed F orest Corridor

Mahaweli Systems

UV A PRO VI N CE

NO R TH CEN TRA L P RO VI N CE

NO R THER N PRO V IN CE

SO U TH ERN P RO VI N CE

EA S TERN PR OV I NC E

CENTR AL PR O VI N CE

NO R TH WES TERN PR O VI N CE

WESTER N PRO V IN CE

SA BA RA GA M U WA PRO V IN C E

0 4.5 92.25Kilometers

General Layout Plan for Upper Elahera Canal (UEC)

Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 4: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

%2

%2%2

%2

%2

%2

TUNNE L PORTAL & PE RMA NE NT D ISPOSAL SIT E (3.0 ha)

DIS POSA L S ITE & TUNNEL PORTALNE AR 1+ 00 KM OF KM TC - 2.0 ha

TUNNE L PORTAL &DIS POSA L S ITE

TUNNE L 2 (L= 6.04 km)

TUNNE L 1

CONTRA CTOR S TE MPORARY CA M P & DIS POSA L S ITE -D P3

AVA ILABLE ACCESS FROMKA LU G ANGA SIT E

LOCAT ION A

LOCAT ION B

LOCAT ION C

PROPOSED DISPOSAL SIT E - DP1(Present Kalu G anga Crushing Pla nt)

¬«d

¬«c¬«b

¬«a

¬«2

To Hettipola

ToE

lahe

ra

TUNNE L PORTAL &DIS POSA L S ITE

¬«e

¬«f

AQUEDUCT NO 2LE L OYA

AQUEDUCT NO 1

TUNNE L 2

¬«DP1

¬«DP2

¬«DP3

Hattota Amuna

¬«3

¬«1

¬«4

¬«4

BRIDG E 1

CONTRA CTOR S T CAM P, ENG INEE R S OF FICE & D ISPOSAL A REA -DP2

¬«4

PE RMA NE NT ACCESS ROAD TO TUNNE L NO 2 OUT LET

BRIDG E 2

Ka m

bara

wa

Gan

ga

KALU GANGA RESERVOIR

MORAGAHAKANDA RESERVOIR

Leloya

Leloya

Guruwela

Gonawela

Weliwita

Kahagala

Kahagala

Teligama

Pitawala

Pitawala

Kahagala

Pallegama

Pallegama

Dagiwilla

Amunuwela

Wellewela

Telgamuwa

Paremulla

Metihakka

Kambarawa

Dasgiriya

Telgamuwa

Rawanagama

Pottatwela

Galgedewala

Pubbarawela

Hulandoruwa

Puwakpitiya

Pottatawela

Pottotawala

Mahalakotuwa

IIIukkumbura

Bellgodahela

IIIukkumbura

Mahalakotuwa

Patanegedara

Kirinaidagala

Hattota Amuna

Kukulamalpota

Dulgahapatana

Dambagahamada

Karagahatenna

Nainlaginagala

Kabaragoyamada

Kabaragaha Ela

Hunukotuwebemma

Bambaragahawela

Weliwaranagolla

Millagahapatana

Maha Ela Dammantenna

Puwakpitiyadammantenna

Dasgiriya

Pottatwela

He

wan

aEla

Lel Oy a

Atamb agaha E la

Bam

ba r a

gol l a

Ela

Akk

ar ahedi ya

Ela

Kum buk golleEl a

N ikawatura O

ya

Ka ra mana Oya

Ma

Oy

a

Na

r an

ga

muw

aO

ya

Ha

ttota

Am

un

e E

la

Rankeliya Ela

19750 0 20000 0 20250 0 20500 0 20750 0 21000 0

2600

0026

2500

2650

0026

7500

±General Layout of KMTC - Access Roads, Contractor s Camp, Disposal Sites

LegendPlase-n ames

Tributory / Stream

Exist ing Acce ss Roa d

Exist ing Acce ss Roa d to be Im proved

Proposed Access Road

Road to b e Dive rted

Aq ueduct

Open Canal

Tunnel

Reservoir - Under Con struction

Home Gardens

Canal / Ela

Tank (Wo rkin g)

River

Pa ddy

Forest

Chena

Grassland

Scrub

Rock

Road - Class A

Road - Class B

Jeep or Cart Track

Othe r Plantation

Tank (Abandoned)

From

Mat

a le

0 1.5 30.75Kilometers

Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 5: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

^^ ^

^ ^ ^

^

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

"T

"T

"T

"T

#0

#0

#0

3+9803+50

0

3+000

2+500

2+000

1+500

1+000

0+500

0+00

0

AmbanGanga

Ela

hera

Anicu

t

ElaheraM inner iya Yoda Ela

A

UEC-ICB-1

MWSIP TRANCHE 1

(0+000 TO 3+860 km)

EXISTING BUND

PROPOSED BUND

EXTENSION

PROPOSED ACCESS ROAD

UEC-ICB-3

MWSIP TRANCHE 2

(3+860 TO 17+700 km)

DISPOSAL SITE

Elehera Giritale Sanctuary

Proposed Elephant Corridor

PREVIOUS CANAL TRACE

Disposal Site

Contractor's Camp

Contractor's Yard

KONGETIYA RESERVOIR

MORAGAHAKANDA RESERVOIR

Elahera

Talagoda

WEWAMANA

Talagoda

Talagoda

Minipura

Welankatuwa

Galwetikanda

MORAGAHAKANDA

Attaragallewa

19

75

00

20

00

00

202500 205000

27

75

00

280000

±

LEGEND

!. Village Name

"T Archeological Sites

Road Class B

Minor-Jeep Trac

Bund Road

Foot Path

^ Existing E lephant Fence

River /Tributarie

Major Contour

Minor Contour

Reservoir Under Construction

Forest - Uncla ssified

Home Garden

Marsh

Other cultivation

Paddy

Plantation area

Rock

Scrub land

Stream

Tank Abandoned

Tank Working

Cut & Cover Circular Conduit

Cut & Cover Rectangular Conduit

Rectangular Open Canal

Trapezodial Open Canal

0 1 20.5Kilometers

DATA SOURCE: - 1:10,000 LAND USE PLAN DEPARTMENT OF SURVEY SRI LANKA

Landuse Plan for Upper Elehera Canal - UEC-ICB-1

Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 6: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

57

+5

00

55

+0

00

52

+5

005

0+

00

047

+5

004

5+

00

042

+5

004

0+

00

037

+5

003

5+

00

032

+5

003

0+

00

0

27+509

25+000

55

+6

00

39

+5

00

!.

"/

")")

_̂#0

"/

")")

"/

"/

"/

"/

"/

"/

"/

From Dambulla

To Trincomalee

To

Po

lon

naru

wa

Fro

m G

anew

alp

ola

UEC - ICB-2A

MWSIP TRANCHE 2

(27+509 TO 55+600 km)

Contract Package

UEC - ICB-4

Contract Package

UEC - ICB-5

To Padikaramaduwa

From Bakamuna

To

Girita

le

MC

SC

AS

NSS

NPT4

SPT3

DPN-01

DPN-02

DPN-03

DPS-03

DPS-02

DPS-01

MINNERIAYA NATIONAL PARK

KAUDULLA M INNERIYA NATIONAL PARK

SIGIRIYA SANCTUARY

ELAHARA GIRITALE SANCTUARY

MINNERIYA-GIRITALE NATURE RESERVE

GIRITALE NRANGAMM ADILLA NATIONAL PARK

KAUDULLA NATIONAL PARK

Gal Oya

Habarana

Sigir iya

Diyabeduma

Palugaswewa

Galoya Junct ion

Atthanakadawala

HURULU FOREST RESERVE

INAMALUWA FOREST RESERVE

PALWEHERA FOREST RESERVE

PALWEHERA FOREST RESERVE

19

50

00

19

50

00

20

00

00

20

00

00

20

50

00

20

50

00

21

00

00

21

00

00

300000

300000

305000

305000

310000

310000

315000

315000

320000

320000

325000

325000

±

0 2.5 51.25Kilometers

Tunnel 3

Tunnel 4

General Layout of UEC-ICB-2A

DATA SOURCE: - 1:50,000 LAND USE PLAN DEPARTMENT OF SURVEY SRI LANKA

Date: 2017-06-27

Legend

"/ Town / Vi llage

#0 Main Cam p

!. Sub Cam p

_̂ Tunnel Porta ls

"/ Perm anent Dis pos al S ite

") Tem por ary Dispos al S ite

_̂ Ac cess S haft ( AS )

Rai lway

Propos ed A cc es s Road

Cut & Cover Ci rc u lar C ondui t

Cut & Cover Rec tangular Conduit

Tr apez odia l Open Canal

Tunnel - NATM

Tunnel T BM

Easting (m) Northing (m)

MC Main camp 196,871 324,614

SC Sub Camp 207,614 297,282

DPS-01 Permanent Disposal & Crushing Plant 207,870 299,459

DPS-02 Temporary Disposal 208,373 300,786

DPS-03 Temporary Disposal & Batching Plant 206,900 300,914

SPT3 Southern Portal of Tunnel 3 205,381 299,894

AS Access (And Temp. Ventilation) Shaft 201,225 310,677

NSS Northern Start Shaft & Main Working Area 197,156 324,833

NPT4 Northern Portal of Tunnel 4 196,317 325,627

DPN-01 Temporary Disposal 196,942 324,876

DPN-02 Temporary Disposal 197,292 324,879

DPN-03 Permanent Disposal 195,688 323,860

Designation Name of Location

Coordinates

Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 7: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

à

à#0

#0

#0#0#0#0#0

#0

#0#0

#0 #0#0

0+0

00

0+250

0+500

0+7

50

1+0

001+2

50

1+5

00

1+7

50

2+000

2+2

50

2+500

2+750

3+000

3+2

50

3+500

3+750

4+000

4+250

4+3

38

27+000

27+500

28+000

SPT3 Tunnel No 3 Southern Portal

Elahera

Min

neri

yaYo

daEla

DPS-01 Permenant Disposal &

Crusher Plant Area (4.8 ha)

Tunnel No 3 (NATM)

Proposed Access Road

!.

Termination of Existing

Grid Power Supply

DPS-02 Temporary

Disposal Area (5.0 ha)

DPS-03 Temporary Disposal &

Proposed Batching Plant Area (3.0 ha)

From

B

akam

una

ToG

irita

le

Start

of UEC-IC

B-2A

at 27+509 km

Contract Package

UEC - ICB-4

EB - 01

PBB-01

SSA6

SSA2

SSA4

SSA1

SSA5

SSA3

Pekkulama

Dambulukele

Gravelkanda

Sigiripitiya

Radevupitiya

Radevupitiya

Unakatuwayaya

Attanakadawala

Divulpitiyeyaya

Electrified Fence

Attanakadawala (Part)

205500 206000 206500 207000 207500 208000 208500 209000

29

90

00

29

95

00

30

00

00

30

05

00

30

10

00

30

15

00

Layout Plan for UEC-ICB-2A - Sourthern Portal with Access Road

±Legend

"/ Village Name

à Exist ing Br idge (EB-01)

#0 Exist ing Pipe Culvert

à Proposed Baelly Br idge (PBB-01)

Cut & Cover Circular Conduit

Tunnel - NATM

Minor-Jeep Track

Bund Road

Foot Path

River /Tr ibutarie

Major Contour

Minor Contour

Chena

Irrigation Canal

Forest - Unclassified

Home Garden

Marsh

Paddy

Scrub land

Stream

Building

Proposed Access Road

SA1 - Asphalt Road Type a3

SA2 - Gravel Road Type g2

SA3 - Gravel Road Type g1

SA4 - Gravel Road Type g4

SA5 - Gravel Road Type g1

SA6 - Gravel Road Type g2 & g3

DATA SOURCE: - 1:10,000 LAND USE PLAN DEPARTMENT OF SURVEY SRI LANKA (YEAR OF DATA - 2009)

0 0.25 0.50.125Kilometers

Date: 2017-06-27Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 8: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

"/

"/

"/

"/

"/

"/

"/

"/

"/

"/

53+000

53+500

54+000

54+500

55+0

00

55+500

#0

#0

#0

#0

#0

#0

#0à

#0

"/

#0

#0

#0

#0 !.

Termination of Existing

Grid Power Supply

Northern Start Shaft of

Tunnel No 3 & 4

Northern Portal of Tunnel No 4

55+400 km

55+60

0End o

f UEC-IC

B-2

A

Temporary Working area for

Tunnel No 4

Tunnel No 3 (TBM)

Access Road

Tunnel No 4

(NATM)

Tunnel No 4

(NATM)

E

Fro

mP

alu

gasw

ew

a A

B

D

C

DPN-01DPN-02

DPN-03

8 km

9 km

Eppawala

Achiriyagama

Mahameegaswewa

195500

195500

196500

196500

197500

197500

32

35

00

32

35

00

32

45

00

32

45

00

32

55

00

32

55

00

Layout Plan for UEC-ICB-2A Tunnel No 3 & 4 Portals with Access Roads

±

DATA SOURCE: - 1:10,000 LAND USE PLAN DEPARTMENT OF SURVEY SRI LANKA (YEAR OF DATA - 2009)

0 0.3 0.60.15Kilometers

Date: 2017-06-27

ID Area Description Area (ha)

Contractor's Office

Worker's Quarters

Segment Factory

Segment Stock Yard

Batching Plant

B Main Site 5.01

C Stilling Pond 0.95

D Employer's/ Engineer's Office/Accommodation 1.80

E Temporary Working area for Tunnel No 4 1.50

DPN-01 3.54

DPN-02 3.98

DPN-03 1.39

A

Proposed Disposal Sites

Site Establishment

8.19

Mahaweli Water Security Investment Program (MWSIP) Program Management, Design and Supervision Consultant (PMDSC)

Page 9: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant

ANNEX 6 : SUMMARY OF COMMUNITY

CONSULTATION

Page 10: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant Annex 6-1

Awareness program for the community in UEC-ICB-2A Access road

Mahawali Water Security Investment Program

Date -: 2016. 11.08

Venue -: Konduruwawa Village, Community Centre

Number of Participants -: 40 (Attendance Sheet attached)

Matters Discussed

Resettlement Specialist

She Explained what is Mahawali Water Security Investment Program and its main goal and objectives,

how it is implementing and what is the responsibility of the community in konduruwawa. They are not

beneficiaries of the Upper Alahara Canal Project. This Village road is developing to get the access for the

tunnel 2A.

O e e er of the parti ipa ts poi ted out if they do ’t have a y e efit of the proje t they have chance to rehabilitate the road in the village through this program. Because they are using a damaged

road for the access their houses and paddy area. This road is rehabilitating from this project. And also

they have opportunity to widening the bridge over the Yoda Canal. After rehabilitating this bridge, the

people are able to use this bridge as two ways path.

In addition to that she explained the GRC Mechanism implement in the MWSIP for the social safeguard

of the community and further told it is communication canal to express their grievances.

Resettlement officer and Communication Office

They explained addressing the gathering we have regular communication with the community in this

area and the community can inform any grievances related to rehabilitation of this road.

Senior Engineer

He explained the technical requirement of the rehabilitation of this road. At that time one of the

participants asked when moving the vehicle here and there the environment will be polluted due to dust

and heavy vehicle. He explained further, all the necessary action will be taken to minimize and evacuate

environment pollution. And also he told the safety is the first in this project. Because this is most

concentrated for the safeguard of the community.

Page 11: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant Annex 6-2

List of participants

SN Name GN Division DS Division

1 Martin Lemasooriya Konduruwewa Elahera

2 AjithSamantha Konduruwewa Elahera

3 Konduruwewa Elahera Elahera

4 Konduruwewa Elahera Elahera

5 E.M.Abeyratne Konduruwewa Elahera

6 G.G.S.Malkanthi Konduruwewa Elahera

7 B.G.Premadasa Konduruwewa Elahera

8 N.G.Podimenike Konduruwewa Elahera

9 M.M.Jayaratna Konduruwewa Elahera

10 M.M.G.R.Jayaratna Konduruwewa Elahera

11 E.W.H.Kumarihamy Konduruwewa Elahera

12 K.G.R.Sisirakumara Konduruwewa Elahera

13 Konduruwewa Elahera Elahera

14 P.T.S.Jayaratna Konduruwewa Elahera

15 Konduruwewa Elahera Elahera

16 P.G.Anuraratna Konduruwewa Elahera

17 M.M.P.Sisirakumara Konduruwewa Elahera

18 E.D.G.Chandrawathi Konduruwewa Elahera

19 A.M.R.Wijeratne Konduruwewa Elahera

20 K.M.Ajith Konduruwewa Elahera

21 W.G.S.R.Gunaratna Konduruwewa Elahera

Page 12: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant

ANNEX 7: REFERENCE TO NCR LOCATIONS

Ministry of Mahaweli Development and Environment

Mahaweli Water Security Investment Program

SUPPLEMENTARY INFORMATION RELATED

TO INFRASTRUCTURE DESIGN CHANGES FOR THE UEC VOLUME 1:

EIA UPDATED FOR TRANCHE 1 AND TRANCHE 2 COMPONENTS

Page 13: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Annex 7: Reference to NCR Locations

PR – Proposed Reserve, FR – Forest Reserve, S – Sanctuary, NP – National Park, NR – Nature

Reserve, OSF – Other State Forest, SNR – Strict Nature Reserve, NHWA – National Heritage

Wilderness Area, CF – Conservation Forest

Location No Name Status District

19 Ayagama PR Ratnapura

24 Badullakele FR Matara

28 Bambarabotuwa FR Ratnapura

37 Beraliya (Akuressa)) PR Galle and Matara

38 Beraliya (Kudagala) PR Galle

39 Bibilehela PR Badulla and Monaragala

62 Darakulkanda PR Galle

65 Dediyagala FR Galle and Matara

66 Degadaturawa PR Kalutara

68 Delgoda PR Ratnapura

69 Dellawa PR Galle and Matara

70 Delmella Yatagampitiya PR Kalutara

71 Delwela PR Ratnapura

77 Diyadawa FR Matara

78 Doluwakanda PR Kurunegala

79 Dotalugala PR Kandy and Matale

80 Dunkanda PR Kurunegala

82 Elagomuwa PR Matale

96 Gal Oya PR Polonnaruwa

101 Galgiriyakanda PR Kurunegala

112 Gilimale-Eratne PR Ratnapura

113 Giritale PR Polonnaruwa

120 Habarakada PR Galle

129 Haycock FR Kalutara

136 Hinna PR Anuradhapura

138 Horagala-Paragala OSF Matara

144 Inamaluwa PR Matale

147 Ingiriya FR Kalutara

160 Kahalla FR Anuradhapura

161 Kahalla-Pallekele S Anuradhapura and Kurunegala

166 Kalugala PR Kalutara

173 Kandawattegoda PR Galle

175 Kantale FR Trincomale

178 Kanumuldeniya FR Hambantota and Matara

Page 14: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Location No Name Status District

184 Karawita PR Ratnapura

186 Katagamuwa S Hambantota

187 Kataragama S Monaragala

191 Kelani Valley FR Kegalle

192 Kelani Valley PR Nuwara Eliya

201 Kirinda Mahayayakele FR Matara

205 Kobahadunkanda PR Ratnapura

208 Kombala-Kottawa PR Galle

217 Kudumiriya PR Ratnapura

237 Madunagala FR Hambantota

253 Malambure FR Galle

256 Manapaya PR Kurunegala

263 Masmullekele FR Matara

269 Meegahatenna PR Kalutara

274 Messana PR Ratnapura

277 Mihintale FR Anuradhapura

279 Minneriya PR Polonnaruwa

280 Minneriya-Giritale S Polonnaruwa

281 Minneriya-Giritale Block 1 NR Polonnaruwa

288 Morahela FR Ratnapura

289 Morapitiya-Runakanda PR Kalutara

293 Mulatiyana FR Matara

298 Nahiti Mukalana FR Ratnapura

303 Nakiyadeniya PR Galle

315 Nelukeliya Mukalana PR Kalutara

318 Neugalkanda PR Kurunegala

329 Oliyagankele FR Matara

333 Padawiya PR Anuradhapura

335 Pallegama-Himbiliyakada PR Matale

336 Pallekele FR Kurunegala

343 Panilkanda FR Matara

369 Polgahakanda FR Galle

376 Potawa PR Matale

384 Rajawaka PR Ratnapura

388 Rammalakanda FR Hambantota and Matara

390 Ranwaragalakanda PR Kalutara

392 Ravana Ella S Badulla

395 Ritigala SNR Anuradhapura

Page 15: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Location No Name Status District

398 Ruhuna Block 1 NP Hambantota

400 Ruhuna Block 3 NP Monaragala

401 Ruhuna Block 4 NP Monaragala

407 Sellankandal PR Puttalama

410 Sigiriya S Polonnaruwa and Matale

414 Sinharaja NHWA Galle, Matara and Ratnapura

432 Tibbutukanda PR Ratnapura

438 Uda Walawe NP Monaragala and Ratnapura

442 Udawattakele S Kandy

453 Viharekele FR Matara

455 Walankanda FR Ratnapura

456 Walawe Basin FR Ratnapura

458 Wanniyagama PR Puttalama

459 Waratalgoda PR Ratnapura

460 Wasgomuwa Lol 1 NP Polonnaruwa and Matale

463 Wedakanda PR Anuradhapura

464 Wedasitikanda FR Hambantota and Monaragala

471 Welihena FR Matara

476 Wewelkandura PR Ratnapura

486 Yagirala PR Kalutara

487 Yagirala FR Kalutara

489 Yakdessakanda PR Kurunegala

497 Kalubowitiyana OSF Matara

498 Kurulugala OSF Matara

499 Silverkanda OSF Matara

500 Derangala OSF Matara

501 Aninkanda OSF Matara

502 Medirigiriya Tulana OSF Polonnaruwa

504 Masimbula PR Ratnapura

505 Tawalama OSF Galle

506 Tiboruwakota OSF Galle

507 Homadola OSF Galle

508 Hindeinattu OSF Galle

509 Auwegalakanda OSF Galle

511 Bambarawana OSF Galle

512 Vellihallure OSF Kalutara

522 Knuckles CF Kandy and Matale

526 Keulakada Wewa OSF Hambantota

Page 16: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Location No Name Status District

528 Asantanakanda OSF Ratnapura

530 Appalagala OSF Ratnapura

531 Kudagoda OSF Ratnapura

532 Talawegoda OSF Ratnapura

533 Mulgama OSF Ratnapura

534 Galleletota OSF Ratnapura

535 Kuragala OSF Ratnapura

536 Hapugala OSF Ratnapura

537 Narangattahinna OSF Ratnapura

538 Gallegodahinna OSF Ratnapura

539 Hataramune OSF Ratnapura

541 Kabarakalapatana OSF Ratnapura

545 Handapan Ella OSF Ratnapura

547 Paragala OSF Ratnapura

549 Alutwelawisahena OSF Ratnapura

550 Kiribatgala OSF Ratnapura

551 Usgala OSF Kegalle

560 Galboda OSF Matale

561 Opalagala OSF Matale

562 Sacombe OSF Matale

567 Amsawagama OSF Matale

568 Beliyakanda OSF Matale

569 Etabendiwela OSF Matale

570 Tottawelgola OSF Matale

Page 17: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

Program Management, Design and Supervision Consultant

ANNEX 8: STAKEHOLDER CONSENT LETTERS

(8A – 8F)

Ministry of Mahaweli Development and Environment

Mahaweli Water Security Investment Program

SUPPLEMENTARY INFORMATION RELATED

TO INFRASTRUCTURE DESIGN CHANGES FOR THE UEC VOLUME 1:

EIA UPDATED FOR TRANCHE 1 AND TRANCHE 2 COMPONENTS

Page 18: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 19: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 20: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

My No.: 5/4/3/Kaluganga Sanwardhana-2017

Divisional Forest Office

Mathale

2017.06.13

Project director (UEC)

Moragahakanda Kaluganga Development Project,

Moragahakanda, Kongahawela.

Upper elahera Canal Project

Approval for the components of Kaluganga-Moragahakanda Tunnel (KMTC) Near Moragahakanda

Reservoir

This refers to your letter No. PD/UEC/ENV06-A1/17, dated 2017.05.03 addressed to me with copies to

other officials, on the above subject.

02. Accordingly, the approval is granted for expansion of the access road subject to the following

conditions, considering that there is no alternative route to reach the proposed 09 Km long tunnel, which

is a part of the Kaluganga Development Project.

01. A manned security check point should be established at the Pottetawela entrance point to the

proposed access road to prevent entering unpermitted personnel and to maintain a register of

personnel enter in to the proposed access road for scrutinizing by officers of this department.

02. Provide a list of officers and laborers engage for the road development with extent of time they

will stay in the reserve, in advance of commencing the work.

03. Not obstructing and polluting the water ways.

04. Undertake the development activities without causing any adverse impacts to the ecosystem

(fauna & flora) in the area.

Divisional Forest Officer

Mathale

Signature and Stamp

(Stamp: Ashoka Bandara Herath

Divisional Forest Officer

Mathale)

Copy:

Range Forest Officer/ Laggala – For information and supervision of the work.

Page 21: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 22: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 23: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

LETTER HEADING

Forest Department

Head Office: Sampathpaya, P.O. Box. 3, Baththaramulla, Sri Lanka. Telephone: 2866631/2; 2875540 Fax: 94-1 2866633

E-mail:[email protected]

My No.: FD/EC&M/EIA/ID/UEC/2012 You No.: Date: 2017.09.12

Eng. N. A. Sisira Kumara

Program Director & Additional Secretary

Upper elahera Canal Project

UEC Project - Approval for the components of Kaluganga-Moragahakanda Tunnel (KMTC) Near

Moragahakanda Reservoir

This refers to your letter No. MMDE/MWSIP/PMU/Env/UECP/Gen dated 2017.09.08 on the above subject.

02. The Divisional Forest Office of Mathale has already granted approval by his letter No. 5/4/3/Kaluganga

Sanwardhana- , dated . . ; for the e pa sio of the se tio e of the proposed a ess road from Pottatawela to the Tunnel no. 02.

03. Please be informed that the Forest Department has no objection for the construction of road section

sho as f o the given map su je t to o tai i g appro al for adde du to E iro e tal I pa t Assess e t ; si e the proposed road se tio , hi h slightl de iate fro the a ess road gi e i the original EIA due to practical reasons, is located within the same forest reserve that was studied and

included in the approved EIA.

(Signature)

Mahinda Senawirthna

Conservator of Forests

(Environment Conservation & Management)

For Conservator General of forests

Copy:

i. Divisional Forest Office/ Mathale - For information please

ii. Zonal Deputy Conservator of Forests - For information please

Central-Uva Zone

Page 24: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 25: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

LETTER HEADING

NAULA PRADESHIYA SABHAWA

Office: 066-2246275

Fax: 066-2246275

My No.: CPC/NPS/DO/3/3/Podu You No.: Date: 2017.03.14

Project Director

Upper Elahera Canal Project

Project Office

Mahaweli Authority of Sri Lanka

Madatugama

Approval for the components of Kaluganga-Moragahakanda Tunnel (KMTC) Near Moragahakanda

Reservoir Upper Elahera Canal Project

This refers to your letter No. PD/UEC/ENV/06-A/282 dated 2017.03.09 on the above subject.

02. Accordingly herewith inform that we have no objection for road expansion without felling of trees for

implementation of the Project.

(Signature)

Secretary

Pradheshiya Sabhawa

Naula

(Stamp: P.H.M. Upul Priyadarshana

Secretary

Pradheshiya Sabhawa

Naula)

Page 26: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 27: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 28: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of

LETTER HEADING

Forest Department

Head Office: Sampathpaya, P.O. Box. 3, Baththaramulla, Sri Lanka. Telephone: 2866631/2; 2875540 Fax: 94-1 2866633

E-mail:[email protected]

Considering that the delays to Project progress to be minimized

as mentioned in their letter, please send me the list of trees to

be removed and extend necessary assistance for the Project

Officials to carry out initial constructions until the aforesaid

approval is obtained by Mahaweli Authority of Sri Lanka.

My No.: FD/EC&M/EIA/ID/UEC/2012 You No.: Date: 2017.09.12

Eng. N. A. Sisira Kumara

Program Director - Upper elahera Canal Project

Additional Secretary (Watrer Resource Projects) - MMDE

Clarification on Request for Releasing of Land for Construction of Deviated section (from km 3+000 to

3+860) of ICB-1 (from km 0+000 to 3+860) under the Upper Elahera Canal Project of MWSIP

This refers to your letter No. MWSIP/PMU/07/02-VI dated 2017.05.19 on the above subject.

02. Accordingly, it is noticed that the proposed deviated (about 689 m long) section falls within the forest

reserve located inside the Elahera-Girithale Sanctuary.

Hence, you are kindly informed to obtain approval from the Central Environmental Authority and submit

us, since the proposed deviation differs from the canal trace given in the approved environmental Impact

Assessment Report.

(Signature)

Mahinda Senawirthna

Conservator of Forests

(Environment Conservation & Management)

For Conservator General of forests

Copy:

Divisional Forest Office/ Trincomale -

Page 29: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of
Page 30: Addendum to the Environmental Impact Assessment · PDF filearchaeological reserve ... nalanda reservoir dambulu oya reservoir ... data source: - 1:10,000 land use plan department of