REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2
MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 1
Measure T Bond Program Office
2565 Goodwin Avenue, Redwood City, CA 94061
phone: 650.482.2840
ADDENDUM NO. 2
Date: August 27, 2018
Projects: McKinley Institute of Technology Measure T Phase 1 Modernization
Bid No. 180724DD
Owner: Redwood City School District
Measure T Bond Program Office
2565 Goodwin Avenue
Redwood City, CA 94061
The following revisions and/or clarifications shall be made to the bidding requirements and
contract documents including, but not limited to, the subsequent addenda, if any. Bid
submissions shall reflect all addenda revisions and/or clarifications and each bidder shall
acknowledge this addendum on Document 00 41 13 Bid Form and Proposal.
All bidding requirements and contract documents shall apply to this addendum as originally
indicated in the applicable portions of the contract documents, unless otherwise modified by
this addendum.
Attachments:
Attachment No. 1: Spencer Associates Addendum No. 2
Attachment No. 2: Pre-Bid RFI No. 1
Attachment No. 3: Pre-Bid RFI No. 2
Attachment No. 4: Pre-Bid RFI No. 3
Attachment No. 5: Pre-Bid RFI No. 4
I. PROJECT MANUAL REVISIONS
Item No. 1 Engineer’s Estimate
Reference: Document 00 11 16 Notice to Bidders
Description: The engineer’s estimate for this project shall be revised to $3,455,000.
Item No. 2 Guard Rail Infill Panels
Reference: Section 00 52 Metal Railings
Description: 1. Add the following to section 2.01:
“H. Welded Steel Grillework: Manufacturer: Grating Pacific,
Inc., 3651 Sausalito Street, Los Angeles, California 90720. Toll
Free 800-321-4314. Phone 562-598-4314. Fax 562-598-2740.
Website www.gratingpacific.com. E-mail
a. Welded Steel Grillework: “Coda Architectural”
“Opus30”.
1. Infill Panel Material: Steel, ASTM A 1011.
2. Banding Material: Steel.
a. Flat Bars: ASTM A 36 or A 1011
REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2
MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 2
Measure T Bond Program Office
2565 Goodwin Avenue, Redwood City, CA 94061
phone: 650.482.2840
b. Angles and Channels: ASTM A 36
c. Tubing: ASTM A 500
3. Grid: Rectangular
4. Main Bars: 1 inch by 1/8 inch (25 mm by 3 mm).
5. Cross Bars: Round, 3/16 inch (5-mm) diameter.
6. Spacing, Center-to-Center:
a. Main Bars: 1-5/8 inches (42 mm).
b. Cross Bars: 5-3/16 inches (132 mm).
7. Weight: 3.1 pounds per square foot.
8. Recycled Content: 20 percent.
9. Finish: Galvanized”
See attached AOR response.
Item No. 3 Drinking Fountains
Reference: Section 22 00 00 Plumbing
Description: 1. Add the following paragraph as section 2.01 D.
“D. Drinking Fountain
1. Manufacturer: Elkay
2. Type: Bottle Filling Station & Versatile B-Level ADA
Cooler Non-Filtered Non-Refrigerated Stainless
3. Model: EZSTLDDWSVRSK”
See attached AOR response.
II. DRAWING REVISIONS
Item No. 1 Urinal Screen Detail
Reference: Sheet A10.1 Interior Details
Description: See clarification drawing CD-A1 for new urinal screen detail 14.
Item No. 2 Resilient Flooring
Reference: Sheet A2.5 Floor Plan Building A 1st Floor West
Description: Note 3 change to “Install resilient flooring”.
Item No. 3 Security Camera Scope Deletion
Reference: Sheet E0.1 Symbol Legend, General Notes and Abbreviations,
Sheet E3.1 Electrical Plan Building A 1st Floor East and
Sheet E3.2 Electrical Plan Building A 1st Floor West
Description: Scope for replacement of existing security cameras with new shall be
deleted. See attached reissued plan sheets.
Item No. 4 Revised Electrical Plans
Reference: Sheet E3.5 Electrical Plan Buildings B, C, D, E & H
Description: Added clarifications to existing data outlets to be replaced in Buildings
B, C, D, E, and H as shown on drawing. See attached reissued plan
sheet.
REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2
MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 3
Measure T Bond Program Office
2565 Goodwin Avenue, Redwood City, CA 94061
phone: 650.482.2840
III. REQUESTS FOR INFORMATION
Item No. 1 Drinking Fountain Clarification:
Questions per RFI No. 1 from O.C. McDonald Company, Inc.: 1. The following drawings call for removal and installation of new drinking
fountain. None shown on mechanical drawings. Please clarify. a. Drawing A2.2, Key Note 8 b. Drawing A2.3, Key Note 5 c. Drawing A2.4, Key Note 5 d. Drawing A2.6, Key Note 8 e. Drawing A2.7, Key Note 8 f. Drawing A2.8, Key Note 8
2. Reference Drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on
A5.1 or mechanical drawings.
Answers per Spencer Associates (AOR):
1. On the Architectural Drawings, the demolition notes and floor plan notes are
repeated on each sheet. On demolition plans, key note 5 is called out to
remove existing drinking fountains on sheets A2.1 and A2.3. For floor plans,
key note 8 is called out on the plan only on sheets A2.5 and A2.7. These
sheet numbers correspond to existing drinking fountains to be replaced in
Building A West on the first and second floors. The drinking fountain model is
being added in this addendum. See item I.B.1. Mechanical drawing M2.1
shows the first floor drinking fountain. The second floor drinking fountain is
not shown on the mechanical drawings. Refer to sheet A2.3 and A2.7 for
location. See attached RFI/response.
2. Drawing A5.1, key note 12 references a urinal screen. The detail reference is
14/A10.1. This detail was missing, and has been added in this addendum. See
item II.A.1.
Item No. 2 Guard Rail Infill Panel Clarification
Question per RFI No. 2 from Rodan Builders, Inc. – Per sheet A8.4 it calls for OPUS 30 infill
panels for the guard rails, this is typical throughout. However, in the specifications it calls
for cable railing. There are also no specifications for the OPUS 30 panels. Please advise.
Answer – Refer to Section II. Project Manual Revisions Item No. 2 of this addendum. See
attached RFI/response.
Item No. 3 Data Cabling Clarifications
Questions per RFI No. 3 from Rodan Builders, Inc.:
1. On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new
Cat6, however there are no outlets shown for this work. We need to know
how many cables we are supposed to replace in all of these rooms.
2. In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace
existing Cat5 with new Cat6, however in all of these rooms, it is only showing
two outlets in the rooms. Are we to figure on just two one cable locations in
all these rooms, or is there more required?
3. For the open triangle data symbol, are we to assume that this is a single Cat6
cable outlet or are more required at each of these outlets?
REDWOOD CITY SCHOOL DISTRICT ADDENDUM NO. 2
MCKINLEY INSTITUTE OF TECHNOLOGY MEASURE T PHASE 1 MODERNIZATION Page 4
Measure T Bond Program Office
2565 Goodwin Avenue, Redwood City, CA 94061
phone: 650.482.2840
Answers per Spencer Associates (AOR):
1. See attached revised drawing E3.5.
2. There shall be replacement of (2) existing single-jack data outlets and the
associated cabling in each classroom. All other existing cabling and data
outlet plates to be removed. In other areas, such as offices or conference
rooms, replace number of outlets as indicated on drawings. Exact location of
each outlet on existing wiremold to be verified in field. Note that as indicated
on drawings, new Cat. 6 or Cat. 6A shall be provided to new data outlets at
new locations throughout the classrooms, as noted on drawings. (Sheet notes
#13, 14, 15 on E3.3. Other sheets similar). Typical classroom data outlet
provisions, are (2) existing to be replaced on existing wiremold, (2) high on
wall, (2) on ceiling for Wireless Access Point, (1) at +46” AFF adjacent to
entry door for VoIP telephone system, as shown for each classroom on
drawings E3.1 through E3.4.
3. Per E0.1, the data symbol is a single Cat. 6 cable outlet, except where shown
with subscript # to indicate additional jacks. Note that most data outlets are
installed in existing wiremold, as shown on drawings.
Item No. 4 Material Clarification / Installation Coordination
Question per RFI No. 4 from JB Jordan & Associates – In Part 2 – Products, Tandus carpet
tile is specified, but I do not see a finish schedule included in the architectural plans. Will
the flooring be going in a different phase?
Answer – There is no carpet flooring in this project. Refer to Section III. Drawing Revisions
Item No. 2 of this addendum. See attached RFI/response.
End of Addendum No. 2
ADDENDUM #2 ISSUED AUGUST 27, 2018
REDWOOD CITY SCHOOL DISTRICT
MEASURE T PHASE 1 MODERNIZATION
MCKINLEY INSTITUTE OF TECHNOLOGY 400 DUANE STREET
REDWOOD CITY, CALIFORNIA 94062
DSA File No: 41-22 DSA Application No.: 01-117248
SPENCERASSOCIATES
Architects & Planners 1121 San Antonio Road, Suite C201
Palo Alto, CA 94303(650) 965-7000
Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District
8/27/2018 Addendum #2
2
I. PROJECT MANUAL CHANGES:
a. Section 05 52 00 – Metal Railings
1. Add the following to section 2.01:
“H. Welded Steel Grillework: Manufacturer: Grating Pacific, Inc., 3651 Sausalito Street, Los Alamitos, California 90720. Toll Free 800-321-4314. Phone 562-598-4314. Fax 562-598-2740. Website www.gratingpacific.com. E-mail [email protected].
a. Welded Steel Grillework: “Coda Architectural” “Opus30”. 1. Infill Panel Material: Steel, ASTM A 1011. 2. Banding Material: Steel.
a. Flat Bars: ASTM A 36 or A 1011. b. Angles and Channels: ASTM A 36. c. Tubing: ASTM A 500.
3. Grid: Rectangular. 4. Main Bars: 1 inch by 1/8 inch (25 mm by 3 mm). 5. Cross Bars: Round, 3/16-inch (5-mm) diameter. 6. Spacing, Center-to-Center:
a. Main Bars: 1-5/8 inches (42 mm). b. Cross Bars: 5-3/16 inches (132 mm).
7. Weight: 3.1 pounds per square foot. 8. Recycled Content: 20 percent.” 9. Finish: Galvanized.
b. Section 22 00 00 – Plumbing 1. Add the following paragraph as section 2.01 D.
“D. Drinking Fountain 1. Manufacturer: Elkay 2. Type: Bottle Filling Station & Versatile B-Level ADA Cooler Non-Filtered Non-
Refrigerated Stainless 3. Model: EZSTLDDWSVRSK”
II. DRAWING CHANGES:
A. ARCHITECTURAL:
1. Sheet A10.1 – Interior Details:
a. See clarification drawing CD-A1 for new urinal screen detail 14.
2. Sheet A2.5 – Floor Plan Building A 1st Floor West: a. Note 3 change to “Install resilient flooring”.
Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District
8/27/2018 Addendum #2
3
B. ELECTRICAL: 1. Sheet E0.1 (reissued):
a. Revised camera symbol description to indicate camera location only as shown on drawing.
2. Sheet E3.1 (reissued): a. Revised sheet notes 12 and 15 to remove security cameras from scope of work, and to
provide cabling and rough-in only to existing / future camera locations as shown on drawing.
3. Sheet E3.2 (reissued): a. Revised sheet notes 9 and 12 to remove security cameras from scope of work, and to
provide cabling and rough-in only to existing / future camera locations as shown on drawing.
b. Deleted sheet note 19.
4. Sheet E3.5 (reissued): a. Added clarifications to existing data outlets to be replaced in Buildings B, C, D, E, and H
as shown on drawing.
III. CONTRACTOR QUESTIONS: 1. Question: The following drawings call for removal and installation of new drinking fountain.
None shown on mechanical drawings. Please clarify. a. Drawing A2.2, Key Note 8 b. Drawing A2.3, Key Note 5 c. Drawing A2.4, Key Note 5 d. Drawing A2.6, Key Note 8 e. Drawing A2.7, Key Note 8 f. Drawing A2.8, Key Note 8
Response: On the Architectural Drawings, the demolition notes and floor plan notes are repeated on each sheet. On demolition plans, key note 5 is called out to remove existing drinking fountains on sheets A2.1 and A2.3. For floor plans, key note 8 is called out on the plan only on sheets A2.5 and A2.7. These sheet numbers correspond to existing drinking fountains to be replaced in Building A West on the first and second floors. The drinking fountain model is being added in this addendum. See item I.B.1. Mechanical drawing M2.1 shows the first floor drinking fountain. The second floor drinking fountain is not shown on the mechanical drawings. Refer to sheet A2.3 and A2.7 for location.
2. Question: Reference drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on A5.1 or mechanical drawings. Response: Drawing A5.1, key note 12 references a urinal screen. The detail reference is 14/A10.1. This detail was missing, and has been added in this addendum. See item II.A.1.
Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District
8/27/2018 Addendum #2
4
3. Question: Per sheet A8.4 it calls for OPUS 30 infill panels for the guard rails, this is typical throughout. However, in the specifications it calls for cable railing. There are also no specifications for the OPUS 30 panels. Please advise. Response: See addendum item I.a.1.
4. Question: On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new Cat6, however there are no outlets shown for this work. We need to know how many cables we are supposed to replace in all of these rooms. Response: See attached revised drawing E3.5.
5. Question: In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace existing Cat5 with new Cat6, however in all of these rooms, it is only showing two outlets in the rooms. Are we to figure on just two one cable locations in all these rooms, or is there more required? Response: There shall be replacement of (2) existing single-jack data outlets and the associated cabling in each classroom. All other existing cabling and data outlet plates to be removed. In other areas, such as offices or conference rooms, replace number of outlets as indicated on drawings. Exact location of each outlet on existing wiremold to be verified in field.
Note that as indicated on drawings, new Cat. 6 or Cat. 6A shall be provided to new data outlets at new locations throughout the classrooms, as noted on drawings. (Sheet notes #13, 14, 15 on E3.3. Other sheets similar). Typical classroom data outlet provisions, are (2) existing to be replaced on existing wiremold, (2) high on wall, (2) on ceiling for Wireless Access Point, (1) at +46” AFF adjacent to entry door for VoIP telephone system, as shown for each classroom on drawings E3.1 through E3.4.
6. Question: For the open triangle data symbol, are we to assume that this is a single Cat6 cable
outlet or are more required at each of these outlets? Response: Per E0.1, the data symbol is a single Cat. 6 cable outlet, except where shown with subscript # to indicate additional jacks. Note that most data outlets are installed in existing wiremold, as shown on drawings.
7. Question: In Part 2 – Products, Tandus carpet tile is specified, but I do not see a finish schedule included in the architectural plans. Will the flooring be going in a different phase? Response: There is no carpet flooring in this project. See addendum item II.A.2.a.
Measure T Phase 1 Improvements McKinley Institute of Technology Redwood City School District
8/27/2018 Addendum #2
5
8. Question: Have we made any room on the camera spec? I see that there are a couple ptz’s on the spec sheet for this one, which would not be a direct replacement of the fixed domes that are already there. Is the spec still calling for the ptz’s? Response: Security cameras are no longer in contract. See addendum item II.B items 1-3 above for associated work.
IV. ENCLOSURES:
1. Architectural Clarification Drawing CD-A1. 2. Electrical Drawings E0.1, E3.1, E3.2, and E3.5 (Reissued).
END OF ADDENDUM #2
Page 1 of 1
August 2, 2018 OCM Bid #18-168
Redwood City School District (RCSD)Measure T Bond Program Team2565 Goodwin AvenueRedwood City, CA 94061 E-Mail: [email protected]
Kyle Cell: (510) 459-1809Attn: Kyle Brower E-Mail: [email protected]: Ola Gbadamosi E-Mail: [email protected]
Re: RCSD Orion/North Star/McKinley Modernizations
Subj.: OCM RFI #01
To Whom It May Concern:
Orion Alternate School:1. Drawing C1.1, Key Note 5 Gas Pipe Re-Routing – Please indicate the extent of the work since
this gas line connects to furnaces shown on M2.10.
North Star Academy:1. Drawing A2.1, Key Note 11 and A2.3, Key Note 8 – Replacing plumbing fixtures, none shown
on mechanical and plumbing drawings. Please clarify.
McKinley Institute of Technology:1. The following Drawings call for removal and installation of new drinking fountain. None
shown on mechanical drawings. Please clarify.
a. Drawing A2.2, Key Note 8b. Drawing A2.3, Key Note 5c. Drawing A2.4, Key Note 5d. Drawing A2.6, Key Note 8e. Drawing A2.7, Key Note 8f. Drawing A2.8, Key Note 8
2. Reference Drawing A5.1, Key Note 12 and Detail 14/A1.01. None shown on A5.1 ormechanical drawings.
Thank you for the opportunity to present our RFI for the above-reference project. Should you haveany questions, please contact the undersigned.
Respectfully submitted,O.C. McDonald Co., Inc.
Ray SheikProject Coordinator
From: Gary Chen <[email protected]> Date: Tue, Aug 7, 2018 at 10:25 AM
Subject: OR-NSA-MIT Bid question To: "[email protected]" <[email protected]>
Hello,
Per sheet A8.4 it calls for OPUS 30 infill panels for the guard rails, this is typical throughout. However, in the specifications it calls for cable railing. There are also no specifications for the
OPUS 30 panels. Please advise.
Thank you,
Gary Chen — Sr. Project Manager
859 Cowan Rd. Burlingame, CA 94010
Office: (650) 508-1700 Cell: (650) 863-9240
Bid Fax: (650)508-1705 Gen. Fax: (650) 508-1708
www.rodanbuilders.com
From: Gary Chen [mailto:[email protected]] Sent: Wednesday, August 15, 2018 2:32 PM To: Kyle Brower <[email protected]> Cc: Olakunle Gbadamosi <[email protected]> Subject: OR-NSA-MIT Data questions Hello Kyle, I have another clarification request.
McKinley school.
1. On plan sheet E3.5 sheet note #7 is states to replace existing Cat5 with new Cat6, however there are
no outlets shown for this work. We need to know how many cables we are supposed to replace in a ll of
these rooms.
2. In addition, on plan sheets E3.1-E3.4 same sheet note #7 states to replace existing Cat5 with new
Cat6, however in all of these rooms, it is only showing two outlets in the rooms. Are we to figure on just
two one cable locations in all these rooms, or is there more required?
3. For the open triangle data symbol, are we to assume that this is a single Cat6 cable outlet or are more
required at each of these outlets? Thank you, Gary Chen — Sr. Project Manager
859 Cowan Rd. Burlingame, CA 94010
Office: (650) 508-1700 Cell: (650) 863-9240
Bid Fax: (650)508-1705 Gen. Fax: (650) 508-1708
www.rodanbuilders.com
RFI # 1
TO: DATE: August 13, 2018
PROJECT: McKinley Institute of Technology
ARCHITECT: Spencer Associates
ATTENTION: SPECIFICATION SECTION: 09 68 13 Carpet Tile Flooring
RFI SENT FOR:
COMMENTS:
SIGNED:
RFI RESPONSE:
EXPLANATION:
SIGNED:
Ola Gbadamosi
In Part 2- Products, Tandus carpet tile is specified, but I do not see a finish schedule included in the
architectural plans. Will the flooring be going in a different phase?
Michaela Barney
Redwood City USD
DATE OF RESPONSE:
REQUEST FOR INFORMATION
Operations / Administration:P.O. Box 3629 Eureka, CA 95502Ph. 707-442-6423 Fax 707-444-0272CA Contractor License 955247DIR nr. 1000001320
MATERIAL CLARIFICATION
INSTALLATION COORDINATION
SUBMITTAL INFORMATION
INSTALLATION SCHEDULE
APPROVAL TO PROCEED
CHANGE ORDER REQUIREMENT
PROCEED AS NOTED BELOW
SUBMIT ADDITIONAL INFORMATION
PROCEED AS PER ATTACHED
SUBMIT CHANGE ORDER QUOTE
PROCEED WITHOUT CHANGE
REVISIONS FORTHCOMING