Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request for Bid See original specification packet for addresses THIS ADDENDUM IS ISSUED TO MODIFY, EXPLAIN OR CORRECT THE ORIGINAL DRAWINGS AND SPECIFICATIONS AND IS HEREBY MADE PART OF THE CONTRACT DOCUMENTS. THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE ADDENDUM RECEIPT SCHEDULE, WHICH WAS INCLUDED IN THE ORIGINAL DOCUMENT PACKAGE. Vendors are required to read entire addendum to determine requirements affecting their contract. Addendum #4 This addendum is for the following; to indicate that Brown County reserves the right to accept or reject all or just selected structures that are being bid to provide call-in information for the bid opening at 2:00pm CST on Tuesday, February 2, 2021 to answer questions received for the project Bid Opening Call-In Information: Bid opening will be conducted via call-in with listen only mode. Bidders wishing to call-in and listen as bids are opened and read aloud must dial 1-415-655-0003 and when prompted enter access code 178 356 4486. Bid opening will start at 2:00pm. It is recommended to call in at least 5 minutes prior to start. Bid prices will be read aloud twice for each vendor submitting a bid. Reminder: All bids must either be mailed, or hand delivered and received by 2:00pm CST on Tuesday, February 2, 2021. Hand delivered or mailed bids are to be sent or brought to the County Clerk, 305 E Walnut Street, Room 120, Green Bay, WI 54301. Bids received after 2:00pm will not be opened. Questions Received: See following 26 pages for responses Numbers submitted on Attachments A (Proposed Schedule of Values) & D (Stipulated Sum) are the numbers that will be read aloud at the bid opening. BID DUE DATE 2/2/21 BY 2:00 P.M. CST

Transcript of Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of...

Page 1: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

Addendum #4 Project #2399

Construction of Multiple Buildings at South Landfill Port & Resource Recovery

January 20, 2021 Request for Bid

See original specification packet for addresses THIS ADDENDUM IS ISSUED TO MODIFY, EXPLAIN OR CORRECT THE ORIGINAL DRAWINGS AND SPECIFICATIONS AND IS HEREBY MADE PART OF THE CONTRACT DOCUMENTS. THIS ADDENDUM MUST BE ACKNOWLEDGED ON THE ADDENDUM RECEIPT SCHEDULE, WHICH WAS INCLUDED IN THE ORIGINAL DOCUMENT PACKAGE.

Vendors are required to read entire addendum to determine requirements affecting their contract.

Addendum #4 This addendum is for the following;

• to indicate that Brown County reserves the right to accept or reject all or just selected structures that are being bid

• to provide call-in information for the bid opening at 2:00pm CST on Tuesday, February 2, 2021 • to answer questions received for the project

Bid Opening Call-In Information: Bid opening will be conducted via call-in with listen only mode. Bidders wishing to call-in and listen as bids are opened and read aloud must dial 1-415-655-0003 and when prompted enter access code 178 356 4486. Bid opening will start at 2:00pm. It is recommended to call in at least 5 minutes prior to start. Bid prices will be read aloud twice for each vendor submitting a bid. Reminder: All bids must either be mailed, or hand delivered and received by 2:00pm CST on Tuesday, February 2, 2021. Hand delivered or mailed bids are to be sent or brought to the County Clerk, 305 E Walnut Street, Room 120, Green Bay, WI 54301. Bids received after 2:00pm will not be opened. Questions Received: See following 26 pages for responses Numbers submitted on Attachments A (Proposed Schedule of Values) & D (Stipulated Sum) are the numbers that will be read aloud at the bid opening.

BID DUE DATE

2/2/21 BY 2:00 P.M. CST

Page 2: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

Page 3: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

o

o

Page 4: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request
Page 5: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

MasterSpec 3/19 (R 12/19 R1)

ATTACHMENT A -PROPOSED SCHEDULE OF VALUES

Project #20070 - Brown County South Landfill

004373 - 1

January 20, 2021

ATTACHMENT A - PROPOSED SCHEDULE OF VALUES

PART 1 - GENERAL

1.1 BID SUPPLEMENT

ITEM OF WORK VALUE

(including overhead and profit)

Mobilization $__________________________

General Conditions $__________________________

Scale House Concrete Foundations and Slabs $__________________________

Masonry $__________________________

Misc. Steel and Handrails $__________________________

Metal Wall Panel /Standing Seam Roof $__________________________

Wood Frame Construction/Trusses $__________________________

Carpentry and Millwork $__________________________

HM Doors, Frames, and Hardware $__________________________

Aluminum Storefronts & Glazing $__________________________

Gypsum Board Systems $__________________________

Acoustical Tile Ceilings $__________________________

Flooring (LVT and Vinyl Base) $__________________________

Painting $__________________________

Specialties $__________________________

Plumbing $__________________________

HVAC $__________________________

Electrical $__________________________

SCALE HOUSE SUBTOTAL $__________________________

Page 6: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

MasterSpec 3/19 (R 12/19 R1)

ATTACHMENT A -PROPOSED SCHEDULE OF VALUES

Project #20070 - Brown County South Landfill

004373 - 2

January 20, 2021

Maintenance Building Concrete Foundations and Slabs $__________________________

Pre-Engineered Metal Building $__________________________

Masonry and Precast Plank $__________________________

Misc. Steel and Handrails $__________________________

Carpentry and Millwork $__________________________

HM Doors, Frames, and Hardware $__________________________

Section Overhead Doors/and Operators $__________________________

Aluminum Storefronts & Glazing $__________________________

Gypsum Board Systems $__________________________

Acoustical Tile Ceilings $__________________________

Flooring (LVT/ Carpet and Vinyl Base) $__________________________

Ceramic Tile (Walls and Floors) $__________________________

Resinous Floor Coatings $__________________________

Painting $__________________________

Specialties $__________________________

Plumbing $__________________________

Air Systems $__________________________

HVAC $__________________________

Electrical $__________________________

MAINTENANCE BUILDING SUBTOTAL $__________________________

Page 7: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

MasterSpec 3/19 (R 12/19 R1)

ATTACHMENT A -PROPOSED SCHEDULE OF VALUES

Project #20070 - Brown County South Landfill

004373 - 3

January 20, 2021

Storage Building Concrete Foundations $__________________________

Pre-Engineered Metal Building $__________________________

Misc. Steel $__________________________

Electrical $__________________________

STORAGE BUILDING SUBTOTAL $__________________________

END OF DOCUMENT 004373

Page 8: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

MasterSpec 3/19 (R 12/19 R1)

ATTACHMENT D – BID FORM

Project #20070 - Brown County South Landfill

004113 - 1

January 20, 2021

ATTACHMENT D -BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT)

PART 1 - GENERAL

1.1 BID INFORMATION

A. Bidder: ____________________________________________________.

B. Prime Contract: GENERAL CONSTRUCTION

C. Project Name: Brown County South Landfill.

D. Project Location: 1258 County Road IL, Town of Holland.

E. Owner: Brown County Resource Recovery.

F. Brown County Project Number: 2399.

G. Architect: Performa, DePere, WI 54115

H. Architect Project Number: 20070.

1.2 CERTIFICATIONS AND BASE BID

A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having

carefully examined the Procurement and Contracting Requirements, Conditions of the

Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by

Performa and Architect's consultants, having attended the mandatory pre-bid meeting,

and being familiar with all conditions and requirements of the Work, hereby agrees to

furnish all material, labor, equipment and services, including all scheduled allowances,

necessary to complete the construction of the above-named project, according to the

requirements of the Procurement and Contracting Documents, for the stipulated sum of:

1. ___________________________________________________________ Dollars

($________________________________).

Alternate #1 – Addressable Fire Alarm System ($__________________________).

Alternate #2 – Concrete Hardener ($__________________________).

END OF DOCUMENT

Page 9: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

CONC. MASONRY UNIT

GYPSUM BOARD

BATT INSULATION

ROUGH LUMBER

PLYWOOD

PRECAST CONCRETE

ALUMINUM

BRICK

COMPACTED FILL

CONCRETE DRIVES,

APRONS, ETC.

POURED CONCRETE

IN SECTION

RIGID INSULATION

FINISHED WOOD

STEEL

UNDISTURBED SOIL

A

X

ROOM NAME

101

NORTH ARROW

EXISTING COLUMN GRID

CENTERLINE

NEW COLUMN GRID

CENTERLINE

EXISTING ELEVATION

REFERENCE

NEW ELEVATION

REFERENCE

SOIL BORING

ROOM NUMBER

DOOR NUMBER

1

1

1

1

A1.1

REVISION NUMBER

WINDOW TAG

WALL TYPE

DETAIL OR SECTION

NUMBER

SHEET ON WHICH DETAIL

OR SECTION IS DRAWN

SECTION CUT REFERENCE

ELEVATION REFERENCE

SCALE = 1" = 1'-0"

X

AX.X

DETAIL NUMBER

AND SCALE

1

A1.1

ENLARGED PLAN OR

DETAIL REFERENCE

EXISTING TO BE

REMOVED

SYMBOLS

MATERIALS

1

A1.1

1

A1.1

101

PLAN NOTE1

PT-1 FINISH TAG

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

1 1/2" = 1'-0"

1/2

0/2

02

1 1

0:0

6:3

5 A

M

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

TS1.1

11/30/20

20070

TIT

LE

SH

EE

T,

SH

EE

T I

ND

EX

LOCATION MAP

PROJECT

LOCATION

BROWN COUNTY LANDFILL - MAINTENANCE BUILDING

BROWN COUNTY, WI

www.performainc.com

124 N. BROADWAY P.O. BOX 5156 DE PERE, WISCONSIN 54115

920-336-9929 FAX: 920-336-2899

PROJECT TEAM

SHEET INDEX

ARCHITECTURAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

AS1.1 MAINTENANCE BUILDING SITE PLAN 1 BID / CONSTRUCTION 11/30/20

A1.1 MAINTENANCE BUILDING FLOOR PLANS 3 ADDENDUM-004 01/20/21

A1.2 MAINTENANCE BUILDING ROOF PLAN 2 STATE REVIEW

COMMENTS

12/11/20

A2.1 DOOR SCHEDULE 1 BID / CONSTRUCTION 11/30/20

A2.2 DOOR DETAILS 1 BID / CONSTRUCTION 11/30/20

A3.1 EXTERIOR ELEVATIONS 1 BID / CONSTRUCTION 11/30/20

A4.1 BUILDING SECTIONS 1 BID / CONSTRUCTION 11/30/20

A4.2 WALL SECTIONS 2 STATE REVIEW

COMMENTS

12/11/20

A4.3 WALL SECTIONS 2 STATE REVIEW

COMMENTS

12/11/20

A5.1 ENLARGED STAIR PLANS 3 ADDENDUM-004 01/20/21

A6.1 EXTERIOR WINDOWS & DETAILS 1 BID / CONSTRUCTION 11/30/20

A7.1 REFLECTED CEILING PLANS 3 ADDENDUM-004 01/20/21

A8.1 ENLARGED PLANS & INTERIOR ELEVATIONS 3 ADDENDUM-004 01/20/21

A9.1 FIRST FLOOR FINISH PLAN 3 ADDENDUM-004 01/20/21

A9.2 FINISH SCHEDULE 3 ADDENDUM-004 01/20/21

PROJECT MANAGER

MECHANICAL

PLUMBING JULI SIMONET

SAMEER MATTA

PAUL JANSSEN

STRUCTURAL NICK GRAHL

ELECTRICAL FOLLY TEKO-AHATEFOU

PROJECT ARCHITECT PAUL JANSSEN

TITLE SHEET

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

TS1.1 TITLE SHEET, SHEET INDEX 3 ADDENDUM-004 01/20/21

TS1.2 MOUNTING HEIGHTS AND ACCESSIBILITY REQUIREMENTS 1 BID / CONSTRUCTION 11/30/20

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2S

TA

TE

RE

VIE

W C

OM

ME

NT

S1

2/1

1/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

STRUCTURAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

SN1.1 STRUCTURAL GENERAL NOTES 1 BID / CONSTRUCTION 11/30/20

S1.0 FOUNDATION PLAN 3 ADDENDUM-004 01/20/21

S1.1 SLAB PLAN 3 ADDENDUM-004 01/20/21

S1.2 FRAMING PLAN 1 BID / CONSTRUCTION 11/30/20

S1.3 ROOF FRAMING PLAN 1 BID / CONSTRUCTION 11/30/20

S2.1 FOUNDATION SCHEDULES AND DETAILS 3 ADDENDUM-004 01/20/21

HVAC

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

HN1.1 HVAC ABBREVIATIONS AND SYMBOLS 1 BID / CONSTRUCTION 11/30/20

H1.1 HVAC DUCTWORK FLOOR PLANS 1 BID / CONSTRUCTION 11/30/20

H1.2 HVAC PIPING FLOOR PLANS 1 BID / CONSTRUCTION 11/30/20

H4.1 HVAC ENLARGED & SECTION PLANS 1 BID / CONSTRUCTION 11/30/20

H4.2 HVAC SECTIONS & ELEVATIONS 1 BID / CONSTRUCTION 11/30/20

H5.1 HVAC SCHEDULES 2 STATE REVIEW

COMMENTS

12/11/20

H6.1 HVAC DETAILS 1 BID / CONSTRUCTION 11/30/20

H6.2 HVAC DETAILS 1 BID / CONSTRUCTION 11/30/20

ELECTRICAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

EN1.1 ELECTRICAL ABBREVIATIONS AND SYMBOLS 1 BID / CONSTRUCTION 11/30/20

E1.1 FIRST FLOOR & MEZZANINE LIGHTING PLAN 1 BID / CONSTRUCTION 11/30/20

E2.2 FIRST FLOOR AND MEZZANINE EGRESS LIGHTING PLAN 1 BID / CONSTRUCTION 11/30/20

E3.1 FIRST FLOOR & MEZZANINE POWER AND SYSTEMS PLAN 3 ADDENDUM-004 01/20/21

E5.1 ELECTRICAL SCHEDULES 1 BID / CONSTRUCTION 11/30/20

E5.2 PANEL SCHEDULES 1 BID / CONSTRUCTION 11/30/20

E6.1 ELECTRICAL DETAILS 1 BID / CONSTRUCTION 11/30/20

ES1.1 ELECTRICAL SITE PLAN 1 BID / CONSTRUCTION 11/30/20

PLUMBING

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

P1.1 FOUNDATION / FIRST FLOOR PLUMBING PLAN 3 ADDENDUM-004 01/20/21

P1.2 MEZZANINE FLOOR PLUMBING 1 BID / CONSTRUCTION 11/30/20

P2.1 SOIL, WASTE, AND VENT ISOMETRICS 1 BID / CONSTRUCTION 11/30/20

P2.2 WATER DISTRIBUTION ISOMETRICS 1 BID / CONSTRUCTION 11/30/20

P2.3 COMPRESSED AIR AND PRESSURE WASHER ISOMETRICS 1 BID / CONSTRUCTION 11/30/20

P3.1 PLUMBING FIXTURE & EQUIPMENT SCHEDULE AND DETAILS 1 BID / CONSTRUCTION 11/30/20

LUBE OIL PIPING - FOR REFERENCE ONLY

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

LO1.1 LUBE OIL SYSTEMS 1 BID / CONSTRUCTION 11/30/20

LO1.2 LUBE OIL PIPING SYSTEMS ISOMETRIC 1 BID / CONSTRUCTION 11/30/20

LIFE SAFETY

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

LS1.0 LIFE SAFETY INFORMATION 1 BID / CONSTRUCTION 11/30/20

Page 10: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

UP

UP

24

12

12

12

UP

114D

125'-8"

90'-6"

123'-6"

90'-6"

JIB CRANE

VEHICLE BAY 9

3'-3" 8'-0" 6'-1 1/2" 8'-0" 6'-2 3/8" 6'-0" 3'-6 1/8" 6'-0" 8'-10" 3'-4" 6'-0" 22'-0" 3'-3"

9'-3"

8'-0

"9'-6"

3'-4"

1'-2"

3'-4"1

'-8"

12'-0

"5'-0

"20

'-0

"5'-0

"20

'-0

"5'-0

"20

'-0

"2'-5"

2'-5"

20

'-0

"5'-0

"20

'-0

"5'-0

"20

'-0

"5'-0

"20

'-0

"28'-3"

2

A4.2

LANDFILL

TECH

111

MECHANICS

SHOP

112

CORRIDOR

110

LANDFILL

MANAGER

102

OPEN OFFICE

101BREAK ROOM

104

JANITORS

CLOSET

105

STORAGE &

SERVICE

BAYS

113

VEHICLE BAY 1

VEHICLE BAY 2

VEHICLE BAY 3

VEHICLE BAY 4 VEHICLE BAY 5

VEHICLE BAY 6

VEHICLE BAY 7

VEHICLE BAY 8

5

A4.2

1

A4.2

3

A4.2

4

A4.2

6

A4.3

5

A4.3

4

A4.3

2

A4.3

1

A4.3

3

A4.3

4

A4.1

3

A4.1

1

A4.1

2

A4.1

SEE SHEET A5.1

SEE SHEET A5.1

6

5

4

3

2

1

A B C D

CLOSET

103

113B

114A

104

113A

102

105

114B

110C 110B

110A

111B

111A

112D

112C

112B

112A

103

113F

113E

113D

113C

114C

114D

114E

114F

114G

STORAGE &

SERVICE

BAYS

114

2

2

1

1

1

3

4

3 3

5

11'-7"

8'-3 5

/8"

9'-0

"5'-11

"7'-3"

9'-11

"6"

17'-11

"8"

24'-10

"8"

8" 20'-0" 8"

26'-4"

67'-1

3/8"

11'-6 5/8" 15'-8"

18'-0

"7'-5 1

/4"

3'-4"

27'-9 7/8" 21'-4" 3'-4" 35'-10 1/8"

SEE SHEET A8.1

SEE SHEET A8.1

A2.1

4

101

24'-3" 3'-4" 35'-4" 3'-4" 24'-3"

7'-1 9/16" 11'-7 1/16" 8'-6"

19'-3 1/2"

9'-11

"6'-4"

18'-6"

7'-0

"21'-10

3/8"

3'-4"

2"

4

8'-0 3/8"

9'-11

"6'-4"

19'-4"

6'-4"

21'-9"

3'-4"

30

'-2"

A8.1 J

2

DS

DS

DS

DS

DS

DS

A8.1

H

BB

B

A A

3

8"

8"

8"

8"

1'-4"

24'-0

"25'-0

"25'-0

"25'-0

"24'-0

"1'-4"

1'-4"

24'-0

"25'-0

"25'-0

"25'-0

"24'-0

"1'-4"

7" 28'-8" 20'-8" 40'-0" 7"

2'-5"

F.E.C F.E.C

F.E.C

1'-6 3

/4"

3

OPEN TO BELOW

14'-8 3

/8"

6"

9'-0

"

67'-3 3

/8"

OPEN TO BELOW

2

A4.2

STORAGE

MEZZANINE /

MECHANICALS

201

CONFERENCE

ROOM

203

CORRIDOR

200

5

A4.2

1

A4.2

3

A4.2

4

A4.2

6

A4.3

5

A4.3

4

A4.3

2

A4.3

1

A4.3

3

A4.3

4

A4.1

3

A4.1

1

A4.12

A4.1

6

5

4

3

2

1

A B C D

203

201

3

5

5

4

5

5

SEE SHEET A8.1

6'-0" 6" 13'-6"

IT CLOSET

204

204

20234

4

5 4

5

4

4

1

A8.1

G

1

ø 40

'-0"

10'-0" 9'-0 1/8"10'-0"

C C

6'-0" 3'-6 1/8" 6'-0"

6'-0

"28'-0

"

18'-7"

6'-0

"

4

4

4

4'-0

"4'-0

"4'-0

"4'-0

"

6

6

6"

6"

6"

8"

8"

SWING GATE

A5.1 5

F.E.C

FLOOR PLAN GENERAL NOTES

A. ALL GYPSUM BOARD WALLS ARE TO BE WALL TYPE #1

UNLESS NOTED OTHERWISE.

B. INTERIOR WALL DIMENSIONS ARE TO FINISH FACE OF

GYPSUM BOARD UNLESS DETAILED OR NOTED OTHERWISE

C. EXPOSED COLUMNS SHALL BE GROUND AND/OR SANDED

SMOOTH TO REMOVE ALL DRIPS/DEFECTS BEFORE FINISH

COAT

D. GENERAL CONTRACTOR SHALL PROVIDE WOOD

BLOCKING AND BACKING FOR ALL CASEWORK. BACKING

HEIGHTS TO BE SUBMITTED BY CASEWORK SUPPLIER FOR

COORDINATION WITH OTHER TRADES

E. COORDINATE SIZE AND LOCATIONS OF ANY AND ALL

LOUVERS AND WALL OPENINGS WITH MECHANICAL,

ELECTRICAL, AND PLUMBING SUBCONTRACTORS

F. COORDINATE FURRING OF METAL BUILDING MEMBERS IN

FINISHED AREAS WITH FINAL METAL BUILDING DESIGN. ALL

METAL BUILDING COMPONENTS IN THE FRONT HOUSE AREA

TO BE FINISHED WITH MTL STUDS AND GYP BOARD.

G. ALL EXPOSED STEEL FRAMING TO BE FACTORY PRIMED

AND PAINTED. SEE SPECIFICATIONS.

H. GC TO PROVIDE BLOCKING FOR ALL ELECTRICAL PANELS

AND EQUIPMENT

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

1/8" = 1'-0"

1/2

0/2

02

1 7

:55

:51

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

A1.1

11/30/20

20070

MA

INT

EN

AN

CE

BU

ILD

ING

FL

OO

R

PL

AN

S

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLANSCALE: 1/8" = 1'-0"

MEZZANINE FLOOR PLAN

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

FLOOR PLAN NOTES

1 PLYWOOD BACKER BOARD INSTALLED BY GC ON ALL WALLSIN THIS SPACE 8'-0" AFF. 3/4" FIRE TREATED PLYWOOD

PAINTED WHITE/LIGHT IN COLOR TO BE USED.

2 SP020 STANDARD MODEL VEHICLE LIFT BY OWNER.COORDINATE FINAL LOCATION WITH GC AND OWNER PRIOR

TO INSTALLATION.

3 HANDLING SYSTEMS MODEL 351 THREE TON HOISTJIB CRANEOR EQUAL BY OWNER. SEE STRUCTURAL DRAWINGS FOR

REQUIRED FOOTING SIZING. 360 DEGREES OF MOVEMENT

AND ACCESS TO THE MEZZANINE. COORDINATE WITH

MEZZANICE EQUIPMENT, DUCTWORK AND PIPING

4 REMOVABLE ULINE SAFETY GUARDRAILS (MODEL # H4977)WITH SWING GATES OR EQUAL (MODEL # H-5616). SEE

STRUCTUAL FOR CONNECTION DETAIL TO PRECAST SLAB

Page 11: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

B

A5.1

2

B

3'-4"

1'-0" (20) TREADS @ 11" = 18'-4" 1'-0"

OPEN OFFICE

101

A

A5.1

5

B C

4'-6" (20) TREADS @ 11" = 18'-4" 1'-0"

3'-4"

MECHANICS

SHOP

112

FIRST FLOOR100'-0"

MEZZANINE112'-0"

T/O FOUNDATION104'-0"

1'-0"(20) TREADS @ 11" = 18'-4"1'-0"

RETURN HANDRAIL TO

WALL (TYP)

1 1/2" O.D. PIPE HANDRAIL

NOTE: SEE FINISH PLANS FOR

PAINT

(21)

RIS

ER

S @

6 7

/8" = 1

2'-0

"

3'-0

" TYP

A5.1

2

A5.1

1

A5.1

3

SEE STRUCTURAL

DRAWINGS FOR

STRINGER SIZE

FIRST FLOOR100'-0"

MEZZANINE112'-0"

T/O FOUNDATION104'-0"

4'-6"(20) TREADS @ 11" = 18'-4"1'-0"

RETURN HANDRAIL TO

WALL (TYP)

1 1/2" O.D. PIPE HANDRAIL

3'-0

" TYP.

3'-0

" TYP.

6"NOTE: SEE FINISH PLANS FOR

PAINT

SEE STRUCTURAL DRAWINGS FOR

LANDING DETAIL

ALL STEEL STAIR COMPONENTS

BY MANUFACTURER

(21)

RIS

ER

S @

6 7

/8" = 1

2'-0

"

4

A5.1

SEE STRUCTURAL

DRAWINGS FOR

STRINGER SIZE

1/4" THICK BRG. PLATE

WELD 12 GA. STRINGER

TO BRG PLATE

SEE STRUCTURAL

FOR PRECAST EDGE

CONDITION

BASE ANCHOR FOR STRINGER

SHALL BE HIDDEN FROM VIEW

BY LOCATING BETWEEN

STRINGERS

PROVIDE 1/4"

THICK END

PLATE

SEE FINISH SCHEDULE

FOR STAIR FINIHES

CHANNEL SECTION STRINGERS

- SEE FRAMING PLANS FOR

SIZES. PAINT EXPOSED

SURFACES

12 GA. STEEL

TREADS & RISERS

CONCRETE FILL

CARRIER BARS

11" MAX

7" M

AX

SEE FINISH SCHEDULE

FOR STAIR FINISHES

MEZZANINE112'-0"

1 1/2" O.D. STD

PIPE GUARDRAIL

PRECAST SLAB AND

RAILING CONNECTION

-SEE STRUCTURAL DWGS.

3'-6"

1'-9"

1'-9"

1 1/2" O.D. STD

VERTICAL PIPE

*GUARDRAIL TO BE

REMOVABLE

6'-0" TYPICAL ULINE SPACING (H-4977) 6'-0" SWING GATE OPENING

4

A5.1

ULINE MODEL # H-5616 SWING GATE

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/2

0/2

02

1 7

:55

:55

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

A5.1

11/30/20

20070

EN

LA

RG

ED

ST

AIR

PL

AN

S

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE: 1/4" = 1'-0"

ENLARGED STAIR PLAN

SCALE: 1/4" = 1'-0"

ENLARGED STAIR PLAN

SCALE: 1/2" = 1'-0"

A5.1

B

OFFICE STAIR

SCALE: 1/2" = 1'-0"

A5.1

A

MEZZANINE STAIR

SCALE: 1 1/2" = 1'-0"

A5.1

3

STRINGER TO LANDING

SCALE: 1 1/2" = 1'-0"

A5.1

2

STRINGER TO SLAB DETAIL

SCALE: 1 1/2" = 1'-0"

A5.1

1

TREAD & RISER DETAIL

SCALE: 1 1/2" = 1'-0"

A5.1

4

GUARDRAIL SECTIONSCALE: 1 1/2" = 1'-0"

A5.1

5

TYPICAL GUARDRAIL

3

Page 12: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

3

B C

LOCKER

ROOM

115

ADA SHOWER

ROOM

109

SHOWER

ROOM

108

CORRIDOR

110

WOMENS

107

A8.1A

A8.1 B

B

A

G

F

B

A

G

A

H

A8.1 C

107

108

109

B

H

H

A8.1A

SIM

4'-9 3

/8"

4 7

/8"

3'-0

"3'-0

"4 7

/8"

4'-9 1

/8"

F

J

F

J

K

4

A8.1

3'-0" 4'-5"

4'-6" 6'-4 3/4"

6 7/8"

9'-11

"6'-10

1/8"

1

3

3

1

1

1

K

3'-0" 4'-5"

3

3

1

3'-0

"

ED C

2

C

A8.1 D

ED

C

F

A

MENS

106

106

8'-4 3

/4"

7'-1 1/4" 6 7/8"4'-6 3

/4"

3'-10

"

BH

2

C

A8.1 E

A

B

C

DE F

H

7'-7 3

/8"

5'-7" 6 7/8"

3'-10

"3'-9 3

/8"

1 1/

2"

2'-8 1

/2"

V.I.F

.

2'-0

"2'-6"

1'-8"

2'-10

"

8'-8 7/8"

2'-8"

SS-1

PL-1

PL-1

2'-6" 2'-6" 2'-6" 1'-3"

EP-1

PFT-1

6"

6'-0

"

PT-4

A

C

EQ EQ

2'-10

"

6'-0

"

6"

EP-1

WT-1

PT-4

A

C

F

D

EQ EQ

6"

6'-0

"

EP-1

WT-1

PT-4

AG

WT-1

K

PT-4

1 1/

2"

2'-8 1

/2"

2'-10

"

6'-7"

SS-1

PL-1

WT-1

A

C

6'-6"

EQ EQ

PL-1

SS-14"

1 1/

2"

2'-4 1

/2"

4"

3'-0" 3'-0" 3'-0" 1"

ML-1

TOILET AND BATH ACCESSORIES

A = MIRROR (24"x36")

- BRADLEY MODEL 781-2-2436

B = SOAP DISPENSER

- BRADLEY MODEL 6A00

C = GRAB BAR (36" LONG)

- BRADLEY MODEL 812-2

D = GRAB BAR (42" LONG)

- BRADLEY MODEL 812-2

E = VERTICAL GRAB BAR (18" LONG)

- BRADLEY MODEL 812-2

F = TOILET TISSUE DISPENSER -

- BRADLEY MODEL 5224

G = SHOWER CURTAIN ROD - BOBRICK B-207

H = PAPER TOWEL - BRADLEY MODEL 252

J = ROBE HOOK - BOBRICK B-6727

K = ADA SHOWER SEAT - BOBRICK B-5193

TOILET AND BATH NOTES:

1. PROVIDE TOILET ACCESSORIES AS SHOWN ON THIS SHEET

AND IN SCHEDULE ABOVE OR APPROVED EQUAL

2. ALL BLOCKING REQUIRED FOR SUPPORT OF GRAB BARS AND

TOILET ROOM ACCESSORIES SHALL BE PROVIDED BY

THE GENERAL CONTRACTOR

3'-3"

3'-6"

2'-3"

A B F

2'-10

"

C, D

3'-4"

1'-6"

E H

4'-0

"

G

6'-6"

V.I.F.

SOLID SURFACE

COUNTERTOP W/

BACKSPLASH

HARDWOOD DRAWER

SIDES AN BACK W/

PLYWOOD BOTTOM

PLASTIC LAMINATE

DRAWER AND

DOOR FRONTS

MELAMINE

SHELVES W/ ADJ.

METAL STANDARDS

TOE SPACE

VINYL BASE BY

FLOORING CONTR.

2'-0"

SEE E

LEV

ATIO

N4"

3"

4"

SEE E

LEV

ATIO

N

1'-0"

PLASTIC LAMINATE

CABINET BACKING

MALAMINE SHELVES W/

ADJ. METAL STANDARDS

PLASTIC LAMINATE

DOOR FRONTS

SOLID SURFACE

COUNTERTOP W/

BACKSPLASH

PLASTIC LAMINATE

DOOR FRONTS

TOE SPACE

VINYL BASE BY

FLOORING CONTR.

SEE E

LEV

ATIO

N4"

3"

4"

1'-6"

4'-0

"

J

J

WT-1WT-1

PT-4PT-4

EP-1

6'-0

"6"

MOVEABLE LAMINATED

MAPLE BENCH

BENCH SUPPORT AND

TRIM BY BENCH

SUPPLIER

SEE ROOM FINISH

PLANS FOR

FLOOR FINISH

1 1/

4"

1'-4 1

/4"

9 1/2"

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/2

0/2

02

1 7

:55

:58

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

A8.1

11/30/20

20070

EN

LA

RG

ED

PL

AN

S &

IN

TE

RIO

R

EL

EV

AT

ION

S

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE: 1/4" = 1'-0"

LOCKER ROOM AREA

SCALE: 1/4" = 1'-0"

MENS RESTROOM

SCALE: 1/4" = 1'-0"

MEZZANINE TOILET

EAST ELEVATION

(BREAK ROOM 104)J

EAST ELEVATION

(MENS 106)D

EAST ELEVATION

(WOMENS 107)B

WEST ELEVATION

(SHOWER ROOM 109)A

NORTH ELEVATION

(CONFERENCE ROOM 203)G

EAST ELEVATION

(TOILET 202)E

OPEN OFFICE CASEWORKH

LOCKER ROOM ELEVATIONC

TOILET ACCESSORY ELEVATIONS

SCALE: 1" = 1'-0"

A8.1

1

LOWER UNITSCALE: 1" = 1'-0"

A8.1

3

UPPER CABINETSCALE: 1" = 1'-0"

A8.1

2

LOWER UNIT

NORTH ELEVATION

(SHOWER ROOM 109)F

SCALE: 1" = 1'-0"

A8.1

4

LOCKER ROOM BENCH DETAIL

3

3

3

3

Page 13: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

UP

UP

114D

24

12

12

12

114D

FINISH PLAN LEGEND:

FLOORING TRANSITION

FLOORING INSTALLATION DIRECTION

FINISH PLAN NOTES:1. FINISHES TO BE OF THE SAME PRODUCTION RUN.

2. PROVIDE TRANSITION STRIPS AND THRESHOLDS AS REQUIRED. METAL

EDGE STRIP: SCHLUTER SCHIENE. UTILIZE AT LVT TO CARPET FLOORING

TRANSITION AND AT LVT TO PORCELAIN TILE FLOORING TRANSITION AS

NEEDED. ARCHITECT TO APPROVE. PROVIDE APPROPRIATE THICKNESS

SIZE OF SCHLUTER TRANSITION STRIP FROM LVT TO EPOXY FLOORING.

ARCHITECT TO APPROVE.

3. FINISH LOCATIONS AND START/STOP POINTS TO BE REVIEWED WITH

ARCHITECT IN FIELD PRIOR TO INSTALLATION.

4. FLOOR TILE JOINTS SHALL MATCH WALL TILE JOINTS, UNLESS NOTED

OTHERWISE. REVIEW JOINT WIDTH WITH ARCHITECT PRIOR TO

INSTALLATION.

5. COORDINATE ALL FLOOR DRAIN LOCATIONS WITH FLOOR TILE

INSTALLER.

6. METAL EDGE STRIP: SCHLUTER SCHIENE, BRUSHED STAINLESS STEEL,

EXPOSED EDGE MATERIAL. UTILIZE ON ALL TILE WALL BASE AND

EXPOSED WALL TILE VERTICALLY AND HORIZONTALLY.

7. SEE SHEET A8.1 FOR INTERIOR ELEVATIONS.

8. REFERENCE CEILING PLAN FOR CEILING MATERIAL LOCATION.

9. ALL MATERIALS SHALL BE APPLIED IN ACCORDANCE WITH

MANUFACTURER'S SPECIFICATIONS FOR THE PARTICULAR SURFACE.

10. SAMPLES OF ALL FINISHES SHALL BE SUBMITTED TO THE ARCHITECT

FOR APPROVAL PRIOR TO PURCHASING.

11. ALL EXISTING FLOORING/SLAB SHALL BE PROPERLY PREPARED TO

RECEIVE NEW FLOOR FINISH.

12. PAINT ALL WALLS SCHEDULED USING A THREE COAT PAINT SYSTEM.

ONE PRIME COAT AND TWO FINISH COATS.

13. PROVIDE ALL NECESSARY BLOCKING.

14. ALL GYPSUM BOARD WALLS TO BE PROPERLY TAPED (MIN. 3

COATS), SANDED, & PREPARED TO LEVEL 4 FINISH (PER GA-216).

15. EXPOSED ELECTRICAL PANELS TO BE PAINTED SAME COLOR AS WALL

THEY ARE ON.

16. ALL STAIR RAILS AND STRINGERS TO BE PAINTED PT-3.

17. DOUBLE HOLLOW METAL DOORS LEADING TO MECANICS SHOP 112, AND

LADFILL TECH 111 WILL BE PAINTED PT-3

18. ROOMS TO HAVE TYPICAL BELOW FINISH DESIGNATION AS INDICATED

BELOW, UNLESS OTHERWISE NOTED.

WALL FINISH

BASE

FLOOR FINISH

PT-1

B-1

CPT-1

FLOOR FINISH LEGEND:

CPT-1

PFT-1

LVT-1

EP-1

MENS

106

SHOWER

ROOM

108

WOMENS

107

LANDFILL

TECH

111

MECHANICS

SHOP

112

CORRIDOR

110

LANDFILL

MANAGER

102

OPEN OFFICE

101

BREAK ROOM

104

ADA SHOWER

ROOM

109

JANITORS

CLOSET

105

STORAGE &

SERVICE

BAYS

113

CLOSET

103

STORAGE &

SERVICE

BAYS

114

PT-1

B-1

LVT-1

PT-1

B-1

LVT-1 PT-4

EP-1

PT-2

PT-2

PT-4

EP-1

PT-4

EP-1

PT-4

EP-1

PT-4

EP-1

PT-3

SC

WT-1

WT-1

WT-1

PT-4

EP-1

WT-1

SC

WS-1

WS-1

WS-3 WS-3 WS-3 WS-3

PT-3

WT-1

PT-1

SC

PT-1

SC

PT-1

SC

PT-1

PT-1

RB-1

WT-1

STORAGE

MEZZANINE /

MECHANICALS

201

CONFERENCE

ROOM

203

CORRIDOR

200 TOILET

202

PT-1

B-1

CPT-1

PT-1

B-1

LVT-1 PT-4

PTB-1

PFT-1

PT-2

IT CLOSET

204

PT-1

B-1

SC

WT-1

WS-3 WS-3

SC

PT-1

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/2

0/2

02

1 7

:56

:01

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

A9.1

11/30/20

20070

FIR

ST

FL

OO

R F

INIS

H P

LA

N

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE: 1/8" = 1'-0"

FIRST FLOOR FINISH PLANSCALE: 1/8" = 1'-0"

MEZZANINE FLOOR PLAN FINISH PLAN

3

Page 14: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

1/2

0/2

02

1 7

:56

:01

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

and

fill

Ma

inte

na

nce

BLD

G_

AR

CH

_2

02

0_C

ase

yH

elm

.rvt

3

CPH PJ

A9.2

11/30/20

20070

FIN

ISH

SC

HE

DU

LE

FINISH SCHEDULETYPE MARK DESCRIPTION MANUFACTURER PRODUCT COLOR FINISH/ INSTALLATION SIZE COMMENT

CEILING

ACT-1 ACOUSTIC CEILING TILE ARMSTRONG (OR USG EQUAL) ULTIMA 1942 WHITE 9/16" WHITE GRID, BEVELED TEGULAR 2' X 2'

ACT-2 ACOUSTIC CEILING TILE ARMSTRONG (OR USG EQUAL) ULTIMA HEALTH ZONE 1936 WHITE 9/16" WHITE GRID, BEVELED TEGULAR 2' X 2' BATHROOMS

GWB GYPSUM WALL BOARD - - PT-1 - - -

FLOORING

CPT-1 CARPET TILE J&J FLOORING FOUNDRY 1829 CO-OP 2084 INSTALL ASHLAR 24"X24" AS NOTED

EP-1 EPOXY FLOORING WITH 6" EPOXY COVE BASE FLOROCRETE SLX OR EQUAL FLOROCRETE SLX OR EQUAL TBD INSTALL PER MANUFACTURERSRECOMMENDATIONS

- -

LVT-1 LUXURY VINYL TILE MILLIKEN TWIST TWS67-58 INSTALL STRAIGHT STACKED 18"X18" -

PFT-1 PORCELAIN FLOOR AND WALL TILE CERAMIC TILEWORKS DOWNTOWN ECRU INSTALL 1/3 OFFSET 12"X24" BATHROOMS

RB-1 RUBBER STAIR TREADS AND RISERS TARKETT HAMMERED TEXTURE WITH RISER (HNTR) (OREQUAL)

BURNT UMBER 63 - - OPEN OFFICE STAIR TO MEZZ

SC SEALED CONCRETE - - - - - -

MILLWORK

PL-1 PLASTIC LAMINATE FORMICA PLASTIC LAMINATE TAUPE WALNUT 5787-NG (NATURALGRAIN)

- - AS NOTED

SS-1 SOLID SURFACE CORIAN SOLID SURFACE NEUTRAL CONCRETE 4" SOLID SURFACE BACKSPLASH - AS NOTED

MISCELLANEOUS

ML-1 METAL LOCKERS ASI (OR EQUAL) TRADITIONAL SINGLE TIER LOCKERS - 18"W X72"H

CHARCOAL #23 VENTED METAL LOCKERS 18" WIDE LOCKERS INCLUDE 4" ENCLOSED BASE

SS-2 SOLID SURFACE WINDOW SILL CORIAN SOLIDS SURFACE BONE - - SOLID SURFACE AT ALL WINDOW SILLS

WS-1 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2390 (OR EQUAL) OYSTER/PEARL: WHITE (FASCIA &BRACKET)

%OPEN: 5 - AS NOTED

WS-2 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2360 (OR EQUAL) OYSTER/PEARL: WHITE (FASCIA &BRACKET)

%OPEN: 10 - AS NOTED

WS-3 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2410 (OR EQUAL) OYSTER/PEARL: WHITE (FASCIA &BRACKET)

%OPEN: 3 - AS NOTED

WALL

PT-1 PAINT - GENERAL SHERWIN WILLIAMS - REPOSE GREY SW7015 - - -

PT-2 PAINT SHERWIN WILLIAMS - HAMMERED SILVER SW2840 - - -

PT-3 PAINT SHERWIN WILLIAMS - CITYSCAPE SW7067 - - -

PT-4 PAINT SHERWIN WILLIAMS EPOXY PAINT REPOSE GREY SW7015 - - -

WT-1 WALL TILE CERAMIC TILEWORKS DOWNTOWN ECRU INSTALL 1/3 OFFSET 12"X24" ALL WALLS OF ROOM 109 AND 109 INCLUDING SHOWERSTALL TO BE TILED FROM EPOXY BASE, UP 6'. SEE

ELEVATIONS; TOLIET 202 TO RECIEVE WALL TILE ON ONE

WALL, SEE ELEVATION.

WALL BASE

B-1 VINYL WALL BASE TARKETT TRADITIONAL WALLBASE BURNT UMBER 63 - 4" AS NOTED

PTB-1 PORCELAIN TILE WALL BASE CERAMIC TILEWORKS DOWNTOWN ECRU CAP TOP OF BASE WITH SCHLUTER TRIM PIECE 6" -

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

3

3

Page 15: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

FOUNDATION PLAN NOTES

1. FINISHED FLOOR EL. = 100’-0” (UNLESS NOTED OTHERWISE)

• SEE DETAILS 1/S2.1 & 2/S2.1 FOR SLAB CONSTRUCTION DETAILS

2. “T/FTG = XXX’-X”” INDICATES TOP OF CONCRETE FOOTING

• T/FTG. = 96’-0”, TYPICAL UNLESS NOTED OTHERWISE

3. “T/WALL = XXX’-X”” INDICATES TOP OF CONCRETE WALL ELEVATION

4. "F-X" INDICATES SPREAD FOOTING. SEE FOUNDATION SCHEDULE ON S2.1

FOR SIZE AND REINFORCEMENT

5. "WF-X" INDICATES CONTINUOUS WALL FOOTING. SEE FOUNDATION

SCHEDULE ON S2.1 FOR SIZE AND REINFORCEMENT.

• "F.S." INDICATES WALL FOOTING STEP. SEE DETAIL 11/S2.1 FOR

REINF. AND SEE PLAN FOR STEP ELEVATIONS

6. "P-X" INDICATES CONCRETE PIER. SEE PIER TYPES ON SHEET S2.1 FOR

TOP OF CONCRETE PIER ELEVATIONS AND PIER REINFORCEMENT.

7. W-X = C.I.P. CONCRETE WALL

• SEE SCHEDULE ON S2.1 FOR WALL REINFORCEMENT

• SEE DETAILS 4/S2.1 THRU 6/S2.1 FOR TYP. WALL CONSTRUCTION

• SEE DETAIL 9/S2.1 FOR R/F AROUND OPENINGS IN FOUNDATION

WALL AND FOOTINGS

8. MW-X = STRUCTURAL MASONRY WALL

SEE SCHEDULE ON S2.1 FOR WALL REINFORCEMENT

9. COORDINATE THE LOCATION OF EMBEDDED/RECESSED ELECTRICAL

BOXES WITH ELECTRICAL OR ARCHITECTURAL DRAWINGS

10. AT ALL RE-ENTRANT CORNERS, PROVIDE (2) #5 x 5’-0” LONG DIAGONAL

BARS PLACED AT MID-DEPTH OF SLAB

11. FLOOR FLATNESS AND LEVELNESS: SEE SPECIFICATIONS FOR SPECIFIC

GUIDELINES REQUIRED FOR THIS CONCRETE FLOOR SLAB.

12. COORDINATE EXACT LOCATIONS OF PLUMBING DRAINS W/ PLUMBING

AND ARCHITECTURAL DRAWINGS. COORDINATE EXTENT OF PITCHED

SLABS W/ PLUMBING AND ARCHITECTURAL DRAWINGS

13. PROVIDE 3 1/2" CONCRETE HOUSE KEEPING PADS AT MECHANICAL

EQUIPMENT AS REQUIRED ON MECH. OR ARCH. DRAWINGS REINFORCE

WITH 1 1/2#/CY OF MICRO-SYNTHETIC FIBER REINFORCING (OR MATCH

TYPICAL FLOOR SLAB REINFORCING). SEE DETAIL 3/S2.1.

14. ALL FOUNDATIONS TO BE CONFIRMED BY FOUNDATION ENGINEER

AFTER RECEIPT OF FINAL METAL BUILDING DRAWINGS AND REACTIONS.

FOUNDATIONS ARE SUBJECT TO CHANGE UNTIL THIS TIME.

2

1

3

4

5

6

A B C D

24'-0

"25'-0

"25'-0

"25'-0

"24'-0

"

HSS4X4X5/16

WF-1

MW-3

WF-1

MW-3

28'-8" 20'-8" 3'-8" 36'-4"

10

S2.1

T/WALL = 104'-0"

P-4

F-2

P-1 SIM.

F-1P-1F-1

P-4 OPP.F-2

P-3

F-3

P-2

F-3

P-3

F-3

P-2

F-3

P-3

F-3

P-3

F-2

P-2

F-3

P-2

F-2

P-3 SIM.

F-2

P-2 SIM.

F-2

F-1

P-1 SIM.

P-1

F-1

F-1

F-1

F-5

T/P = 99' - 0" T/P = 99' - 0"

T/P = 99' - 0"

T/P = 99' - 0"

T/P = 99' - 0"

T/FTG = 99' - 0"

T/P = 99' - 0"

T/P = 99' - 0"

T/FTG = 98' - 8"

T/P = 99' - 0"T/P = 99' - 5"

4"4"

18

S2.1

T/WALL = 99'-0", TYP.

TYP.

T/P = 99' - 5"

T/WALL = 104'-0"

T/FTG = 99' - 5"

BP-1

F-1

T/P = 99' - 5"

T/P = 99' - 5"

T/P = 99' - 5"

W-4

W-1

T/WALL = 99'-5", TYP.

T/WALL = 104'-0" MW-3

MW-1

MW-4

WF-1

WF-1

WF-2

MW-4

W-2

T/WALL = 99'-5"

W-1, TYP.

13

S2.1

W-2

W-3, TYP.

18" BOLLARD FOUND., TYP.

- SEE DETAIL 17/S2.1

1'-1"

89'-4"

S2.1

20

12'-8"

4'-4"

20

'-8"

4'-4"

20

'-8"

4'-4"

20

'-8"

9"

T/FTG = 99' - 0"

24'-0" 3'-4" 2'-8" 30'-0" 2'-8" 3'-4" 24'-0"

T/WALL = 104'-0"

W-4, TYP.

T/WALL = 101'-0"

W-1

VERIFY LIFT FOUND.

W/ SUPPLIER

VERIFY JIB/CRANE

FOUND. W/ SUPPLIER

T/WALL = 101'-0"

T/WALL = 100'-0"

9'-2"

9'-6"

8'-0

"9'-0

"

W-1

W-1

3'-0" 8'-0" 6'-0" 8'-2" 6'-2"

T/WALL = 100'-0"

W-1

6'-0" 3'-7" 6'-0"

WF-1

2'-5 1/8" 6'-4" 3'-4" 5'-8 7/8" 22'-8" 2'-8"

T/WALL = 99'-0"

W-3

T/WALL = 104'-0"

W-4

WF-1

T/FTG = 99' - 0"

8

S2.1

125'-2"

BR

AC

ED

BAY

BR

AC

ED

BAY

10'-4"

MW-4MW-4WF-2 WF-2

21

S2.1

DOOR JAMB TUBE BY

P.E.M.B. ENGINEER - TYP.

T/WALL = 104'-0"

W-2

T/WALL = 104'-0"

W-2

T/WALL = 101'-0"

W-1

T/WALL = 101'-0"

W-1

T/WALL = 104'-0"

W-4

T/WALL = 104'-0"

W-4

T/WALL = 104'-0"

W-4

T/WALL = 104'-0"

W-4

4'-0

"4'-0

"

F.S. F.S.

F.S.

4'-0" 4'-0"

4'-0

"4'-0

"

11

S2.1

COORDINATE BOLLARD

LOCATIONS W/ CIVIL

22

S2.1

3

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/1

9/2

02

1 8

:46

:40

AM

C:\

Re

vit T

em

p\2

00

70 -

BC

SO

UT

H L

AN

DF

ILL

MA

INT

EN

AN

CE

BL

DG

_S

TR

UC

TU

RA

L_2

02

0_m

ike

l@pe

rfo

rma

inc.c

om

.rvt

3

MDL NJG

S1.0

11/30/20

20070

FO

UN

DA

TIO

N P

LA

N

SCALE: 1/8" = 1'-0"

FOUNDATION PLAN

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

3D-ISOMETRIC

Page 16: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

2

1

3

4

5

6

A B C D

24'-0

"25'-0

"25'-0

"25'-0

"24'-0

"

12" BONDED CONCRETE SLAB

5" BONDED OVERLAY W/

55#/CY STEEL FIBERS +

7" BASE SLAB W/

#5 @ 18" O.C., E.W.

OVER 12" MIN.

COMPACTED GRANULAR FILL

OVER COMPACTED SUB BASE

F.F.E. = 100'-0"

SEE NOTES FOR ADDITIONAL

DETAILS

28'-8" 20'-8" 40'-0"

89'-4"

123'-0

"

5" SLAB-ON-GRADE

REINF. W/ 6X6 W4XW4

W.W.F.

OVER VAPOR RETARDER

OVER COMPACTED BASE

T/SLAB EL. = 100' - 0"

7" SLAB-ON-GRADE

REINF. W/ 6X6 W4XW4

W.W.F.

OVER COMPACTED BASE

T/SLAB EL. = 100' - 0"

(2) #5 CONT. @ PERIMETER

(2)

#5 C

ONT. @

PER

IMETER

(2)

#5 C

ONT. @

ED

GE

(2) #5 CONT. @ PERIMETER

(1) #5 HAIRPIN (2) #5 HAIRPIN

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

18

S2.1

(2) #5 HAIRPIN(1) #5 HAIRPIN

TYP.

(1) #5 HAIRPIN

(2)

#5 C

ONT. @

ED

GE

(1) #5 HAIRPIN

(2)

#5 C

ONT. @

PER

IMETER

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

(2)

#6 H

AIR

PIN

(2) #5 HAIRPIN

13

S2.1

7" APR

ON S

LAB

-SEE

12/S2.1 F

OR

R/F/ D

ETAIL

S

7" APRON SLAB - SEE

12/S2.1 FOR R/F/ DETAILS

12" APR

ON S

LAB

-SEE

16/S2.1 F

OR

R/F/ D

ETAIL

S

8

S2.1

T/DRAIN = 99' - 11" TYP.

7

S2.1

(2) #5 HAIRPIN

TYP.

4'-0" MIN.

(2)

#5 C

ONT. @

ED

GE

(2) #6 CONT.

(2) #6 CONT.

(2) #6 CONT.

(2) #6 CONT.

(2) #6 CONT. (2) #5 CONT.

FLOOR TRANSITION

BETWEEN 7" & 12" SLABS

3

3

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

1/8" = 1'-0"

1/1

9/2

02

1 8

:46

:40

AM

C:\

Re

vit T

em

p\2

00

70 -

BC

SO

UT

H L

AN

DF

ILL

MA

INT

EN

AN

CE

BL

DG

_S

TR

UC

TU

RA

L_2

02

0_m

ike

l@pe

rfo

rma

inc.c

om

.rvt

3

MDL NJG

S1.1

11/30/20

20070

SL

AB

PL

AN

SCALE: 1/8" = 1'-0"

SLAB PLAN

1. SEE DETAILS 1/S2.1 - 4/S2.1 FOR TYPICAL SLAB CONSTRUCTION

DETAILS.

2. CENTER DRAINS IN OPENINGS WHEN SHOWN ADJACENT TO OVERHEAD

DOORS.

3. VERIFY DRAIN LOCATIONS AND ELEVATIONS W/ PLUMBING PRIOR TO

CONSTRUCTION.

SLAB PLAN NOTES

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

Page 17: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

#4 BENT DOWEL AT 12" O.C.

TYP. AT PERIMETER OF

SLAB. DRILL 2" INTO

FLOOR SLAB AND GROUT

W/ EPOXY GROUT

3 1

/2"

EL. = SEE PLAN

T/SLAB

#4 AT 12" O.C. EA. WAY

CENTERED IN SLAB

3/4" CHAMFER (TYP.)

ROUGHEN TO 1/4" AMPLITUDE

- THOROUGHLY CLEAN AND

APPLY EPOXY BONDING

AGENT PRIOR TO POURING

HOUSEKEEPING PAD

12"

6"LAP SPLICE - SEE GENERAL NOTES

CLASS 'B' TENSION

LAP S

PLIC

E -

SEE G

ENER

AL N

OTES

CLASS 'B

' TENSIO

N

CORNER BAR TO BE

SAME SIZE AND SPACING

AS HORIZ. WALL R/F -

WIRE SECURELY TO

HORIZ. BARS

CONT. HORIZ. WALL R/F

W/ STD. 90 DEG. HOOK

AT END

NOTE:

NO VERT. WALL CONST.

JOINT PERMITTED WITHIN

5'-0" OF CORNER

DOUBLE MAT CONDITION SHOWN -

FOLLOW INTENT FOR SINGLE MAT

CONDITIONS, WHERE APPLICABLE

2' - 0" N.T.S.

CONTINUOUS KEYED JOINT

WALL R/F TO BE

CONTINUOUS THRU

JOINT

SINGLE MAT CONDITION SHOWN -

FOLLOW INTENT FOR DOUBLE MAT

CONDITIONS, WHERE APPLICABLE

CONT. HORIZ. WALL R/F

W/ STD. 90 DEG. HOOK

AT END

NOTE:

NO VERT. WALL CONST.

JOINT PERMITTED WITHIN

5'-0" OF INTERSECTION

HORIZ. WALL

R/F

EL. = SEE PLAN

T/SLAB

EL. = SEE PLAN

T/FOOTING

MASONRY WALL -SEE PLAN

FOR SIZE AND SPACING

FOR VERT. R/F IF REQUIRED

SLAB-ON-GRADE

- SEE PLAN

SEE CONCRETE FOOTING

SCHEDULE FOR SIZE AND R/F

PLAN

SEE

7" 5"

1/8" WIDE x 1 1/4"

DEEP SAW CUT

EL. = SEE PLAN

T/SLAB

COMPACTED GRANULAR FILL

VAPOR RETARDER

CONTROL JOINT SPACING:

5" THICK SLAB: 10' TO 12' O.C.

>6" THICK SLAB: 12' TO 15' O.C.

SLAB-ON-GRADE

- SEE PLAN FOR

THICKNESS & REINF.

PROVIDE TOOLED EDGES

EACH SIDE W/ 1/8" RADIUS

EL. = SEE PLAN

T/SLAB

COMPACTED GRANULAR FILL

VAPOR RETARDER

3/4" DIA. x 1'-2" LONG

SMOOTH DOWELS W/

SLEEVE AT 12" O.C. OR

3/8" PLATE DOWEL W/

SLEEVE AT 18" O.C.

SLAB-ON-GRADE

- SEE PLAN FOR

THICKNESS & REINF.

(2) #5 x (SLOPE DIM. + 2(S) EA. END)

IN ADDITION TO THE TYPICAL

FOUNDATION WALL R/F

T = THICKNESS OF FTG.

S = HEIGHT OF STEP

1' - 6" TYP.

1

2

(2' -

0" M

AX.)

'S'

'S'

'T'

(4' - 0" MIN.)

2(S)

FOOTING R/F

WHERE REQ'D ON PLAN

EL. = SEE PLAN

T/FOOTING

EL. = SEE PLAN

T/FOOTING

EL. = SEE PLAN

T/FOOTING3" C

LR.

3"

1' - 6"

1 1/2" CLR.

#3 TIES [PAIRS OF 2]

@ 14" O.C. +

(2) @ 4" O.C., TOP OF

PIER

T/WALL EL. = SEE PLAN

T/PIER EL. = SEE PLAN

(6) #7 VERT.

#5 HAIRPIN -

SLAB MID-DEPTH

WIND COLUMN

AND B.P. BY

OTHERS -

ANCHORS

SHOULD

EXTEND 8"

MIN.

INTO PIER (EL.

= 98'-9" TO

98'-4")

4'-0" MIN.

(4) 3/4" ANCHOR BOLTS,

MIN. - SPEC. BY P.E.M.B. ENGEXTEND (2) EXT. PIER VERT. BARS

TO TOP OF C.I.P. WALL

2" M

IN.

8"

2"

1'-4"

NOTCH FOR

SLAB

BEARING, EL. =

99'-0" [NOT

REQ. @ SIM.]

@ S

IM.

1'-6"

EL. = SEE PLAN

T/SLAB

8"

EL. = SEE PLAN

T/FOOTING

SEE PLAN FOR

FOUNDATION

WALL R/F

SEE ARCH FOR PERIMETER

INSULATION REQUIREMENTS

SEE FOUNDATION PLAN FOR

FOOTING SIZE AND R/F

SLAB-ON-GRADE

- SEE PLAN

COMPACTED

GRANULAR FILL

PLAN

SEE

UNLESS NOTED ON PLAN

5'-0" TYP.

#4 BENT DOWEL AT 12" O.C.

#5 x 5'-0" LG.

DOWELS AT 12" O.C.

#5 BARS AT

12" O.C. EA. WAY

2'-0"

CHAMPER SLAB EDGE

TO MEET APRON PITCH

1'-3" TO WALL @ SIM.

2' - 0"

T/WALL EL. = 104'-0"

RIGID FRAME COLUMN

AND B.P. BY OTHERS -

ANCHORS SHOULD

EXTEND 8" MIN. INTO

PIER (EL. = 98'-4")

1 1/2" CLR.

(8) #8 VERT.

#3 TIES @ 16" O.C. +

(2) @ 4" O.C., TOP OF

PIER [SETS OF 2]

T/PIER EL. = 99'-0"

#5 HAIRPIN - EA. WAY

AT SLAB MID-DEPTH

4'-0" MIN.

8"

1'-4"

2"

4'-0" MIN.2" CLR

. O

F C

OL.

NOTCH FOR

SLAB

BEARING, EL.

= 99'-0"

FOUNDATION PLAN100' - 0"

D

5"

7"

CLR

.

3"

(2) #5 CONT. @ PER.

#5 HAIRPIN, E.W., TYP.

5" BONDED OVERLAY

- SEE PLAN

7" STRUCTURAL SLAB

- SEE PLAN FOR R/F

L4x4x1/4 ANGLES - CONT.

THROUGH OPENINGS

1/2"x4" HEADED STUDS @

24" O.C., MAX.

1/2" EXPANSION MAT.

SEE PLAN FOR WALL &

FOOTING R/F

6" 4"

1'-5" TO WALL @ SIM.

2' - 0"

T/WALL EL. = SEE PLAN

RIGID FRAME COLUMN

AND B.P. BY OTHERS -

ANCHORS SHOULD

EXTEND 8" MIN. INTO

PIER (EL. = 98'-9")

1 1/2" CLR.

(8) #8 VERT.

#3 TIES @ 16" O.C. +

(2) @ 4" O.C., TOP OF

PIER [SETS OF 2]

T/PIER EL. = SEE PLAN

#5 HAIRPIN - EA. WAY

AT SLAB MID-DEPTH

4'-0" MIN.

8"

1'-6"

4'-0" MIN.2" CLR

. O

F C

OL.

(2) #5 T&B

OF OPENING

(2) #5 DIAGONAL

EACH CORNER

OF OPENING

1'-0" SQ. OPENING

OR LARGER

WALL REINF.

SEE PLAN

EL. = SEE PLAN

T/FOOTING

EL. = SEE PLAN

T/WALL

EL. = SEE PLUMBING

INVERT

SLEEVE AROUND PLUMBING

PROVIDE INSULATION

BETWEEN SLEEVE AND PIPE

"T"

MIN

.

"T"

1"

"D"

1"

1' - 0"SLEEVE DIM.

"D" + 2" 1' - 0"

FTG REINF

SEE PLAN

WHERE REQ'D

TRENCH REINF.

TO MATCH

FTG REINF

WHERE REQ'DEL. = SEE PLUMBING

INVERT

6"Ø SCH. 10 PIPE

FILLED WITH CONCRETE

(MOUNDED AT TOP)

1/2" JOINT FILLER WITH

SEALANT

PAVING OR CONC.

- SEE CIVIL AND

ARCHITECTURAL

DWGS.

4' - 0

"4' - 0

"

AROUND POST6" CLR., TYP.

NOTE:

FOR GUARDPOSTS ABOVE

FOOTINGS PROVIDE BASE

PLATE 1/2x10x10 W/ (4)

5/8"Ø EXP. BOLTS

BOLLARDS ON EXISTING SLAB:

SAW CUT 18" DIA. OR 18" SQ. OPENING

IN SLAB FOR BOLLARD BASE. POUR

CONCRETE FLUSH W/ SLAB. FILL SLAB

JOINT & PIPE JOINT W/ SEALANT

NOTE: ALL EXTERIOR

BOLLARDS TO BE 6"Ø

GALV. STEEL - PAINTED

1' -

0"

'B'

'N'

-

-

'Y'

'Y'

'X' 'X'

ANCHOR BOLT

'AB-1'

LEVELING NUT

SEE GENERAL NOTES

FOR OPTIONS IN STEEL

TYPES FOR ROD

HEX NUT AND

STD. WASHER

'Y'

'X'

BASE PLATE

'B-1'

1" MIN.

8" 1'-10"

1'-1"

8"

F.V.

2'-0"

F.V

.

2'-1"

1'-10

"

T/WALL EL. = SEE PLAN

4'-0" MIN.

T/PIER EL. = SEE PLAN

BOLLARD W/ B.P.

- SEE PLAN

#3 TIES @ 16" O.C. +

(1) WITHIN 4" OF TOP

OF PIER [SETS OF 3]

(12) #8 VERT.

6

A

1'-0

"

10"

MIN.1 1/2"

4'-0" MIN.

INTERIOR SLAB ON GRADE - SEE PLAN

FOR EL.

APRON SLAB - SEE PLAN FOR EL.

T/WALL EL. = 104'-0" TYP.

1/2"x8"x0'-10" GR. 36

PL. W/ (2) 3/4"x6"

HEADED STUDS -

EMBED IN POURED

SLAB FLUSH W/ T.O.S.

O.H. DOOR JAMB T.C. - BY P.E.M.B ENG.

#5 HAIRPIN AT SLAB (OVERLAY) MID DEPTH

6

FIRST FLOOR100'-0"

TYP.

6"

L4x3x1/4, CONT. - VERIFY

COMPATIBILITY W/ SELECTED

METAL WALL PANEL

SEE P

LAN

SEE ARCH. FOR TYP. WALL

CONSTRUCTION

EXPANSION MATERIAL

#5 AT 12" O.C. E.W.

MIN

.

1' -

6"

MIN.

1' - 0"

MIN.

4"

MIN

.

8"

COMPACTED GRANULAR

FILL BELOW SLAB

8"

(1) #5 CONT. BOTTOM

AROUND PERIMETER

#4 DWLS AT 18" O.C. E.W.

DIMENSIONS PER EQUIPMENT MFR.

EL. = SEE PLAN

T/SLAB

EL. = SEE PLAN

T/FOOTING

MASONRY WALL -SEE PLAN

FOR SIZE AND SPACING

FOR VERT. R/F IF REQUIRED

SLAB-ON-GRADE

- SEE PLAN

SEE CONCRETE FOOTING

SCHEDULE FOR SIZE AND R/F

PLAN

SEE

5"

1'-0

"

7"

5"

1" STEEL BAR GRATING

- BY PLUMBING CONTRACTOR

7 1/2" 5"

PLUMB.

SEE 5" 7 1/2"

PLUM

B

SEE

1' -

0"

EL. = SEE PLAN

FIN. FLOOR

FLOOR SLAB

- SEE PLAN

L1 1/2"x1 1/2x1/4

W/ 1/2" DIA. ANCH.

AT 48" O.C.

AT PERIMETER

#3 AT 12" O.C.

EACH WAY

1 1/2"

PLUMB.

SEE 1 1/2"

FOUNDATION PLAN100' - 0"

C

THICKEN SLAB

AT JOINT DETAIL

CONSTRUCTION JOINT

SEE 2/S2.1

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/1

9/2

02

1 8

:46

:42

AM

C:\

Re

vit T

em

p\2

00

70 -

BC

SO

UT

H L

AN

DF

ILL

MA

INT

EN

AN

CE

BL

DG

_S

TR

UC

TU

RA

L_2

02

0_m

ike

l@pe

rfo

rma

inc.c

om

.rvt

3

MDL NJG

S2.1

11/30/20

20070

FO

UN

DA

TIO

N S

CH

ED

UL

ES

AN

D

DE

TA

ILS

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE: 1" = 1'-0"

S2.1

3

HOUSEKEEPING PADSCALE: 1 1/2" = 1'-0"

S2.1

4

WALL CORNER R/FSCALE: 1 1/2" = 1'-0"

S2.1

5

WALL CONSTRUCTION JOINTSCALE: 1 1/2" = 1'-0"

S2.1

6

WALL CORNER R/F

SCALE: 1/2" = 1'-0"

S2.1

10

INTERIOR WALL DETAIL

SCALE: 1 1/2" = 1'-0"

S2.1

1

TYP. SLAB CONTROL JOINTSCALE: 1 1/2" = 1'-0"

S2.1

2TYP. 6" OR THICKER SLAB

CONSTRUCTION JOINT

SCALE: 1/2" = 1'-0"

S2.1

12

TYP. STEP FOOTING

SCALE: 1 1/2" = 1'-0"

S2.1

14

CONCRETE PIER - P1SCALE: 1/2" = 1'-0"

S2.1

13

STOOP AT O.H. DOORSSCALE: 1 1/2" = 1'-0"

S2.1

15

CONCRETE PIER - P2SCALE: 3/4" = 1'-0"

S2.1

18

SLAB DETAILSCALE: 1 1/2" = 1'-0"

S2.1

16

CONCRETE PIER - P3

SCALE: 1/2" = 1'-0"

S2.1

9

PLUMBING SLEEVE

SCALE: 1/2" = 1'-0"

S2.1

19

BOLLARD DETAIL

FOOTING SCHEDULE

TYPE

SIZE

THICKNESS REINFORCING REMARKSWIDTH LENGTH

F-1 3' - 0" 3' - 0" 10" (4) #5, E.W. BOT. DOWEL PIER R/F INTO FOOT.

F-2 7' - 0" 7' - 0" 12" (8) #5, E.W. TOP & BOT. DOWEL PIER R/F INTO FOOT.

F-3 5' - 0" 7' - 0" 12" #5 @ 12" O.C. E.W.,TOP & BOT. DOWEL PIER R/F INTO FOOT.

F-5 10' - 0" 10' - 0" 48" (11) #7, E.W., TOP & BOT. CONFIRM W/ CRANE MAN.

SCALE: 1 1/2" = 1'-0"

S2.1

17

CONCRETE PIER - P4

SCALE: 1 1/2" = 1'-0"

S2.1

20

DOOR JAMB DETAIL

STRUCTURAL WALL SCHEDULE

MARK MATERIAL THICKNESS VERT. R/F HORZ. R/F REMARKS

W-1 C.I.P. CONC. 8" #4 @ 48" O.C. (4) #4 CONT. CENTER R/F IN WALL

W-2 C.I.P. CONC. 8" #5 @ 48" O.C. (8) #4 CONT. PROVIDE #5 VERT. WITHIN 8" OFEND OF WALL SEGMENT

W-3 C.I.P. CONC. 10" #4 @ 48" O.C. (4) #4 CONT. PROVIDE #5 VERT. WITHIN 8" OFEND OF WALL SEGMENT

W-4 C.I.P. CONC. 8" TO 10" #5 @ 48" O.C. (8) #4 CONT. TRANSITION FROM 10" FROSTWALL TO 8" WALL @ 99'-0" TYP.

MW-1 CONC. MAS.UNIT

6" N/A N/A (2) #4 B.B. AT TOP COURSE -GROUT BELOW GRADE

MW-2 CONC. MAS.UNIT

6" #4 @ 56" O.C. #4 @ 48" O.C. HORZ. R/F MUST REMAINCONTINUOUS THROUGH C.J.

MW-3 CONC. MAS.UNIT

8" N/A N/A (2) #4 B.B. AT TOP COURSE -GROUT BELOW GRADE

MW-4 CONC. MAS.UNIT

8" #5 @ 24" O.C. N/A (2) #4 B.B. AT TOP COURSE -GROUT BELOW GRADE

SCALE: 1/2" = 1'-0"

S2.1

8

WALL DETAIL

SCALE: 1/2" = 1'-0"

S2.1

21

TYP. GENERATOR PAD DETAIL

SCALE: 1/2" = 1'-0"

S2.1

11

INTERIOR WALL DETAILSCALE: 3/4" = 1'-0"

S2.1

7

PLUMBING TRENCH

WALL FOOTING SCHEDULE

TYPE WIDTH THICKNESS REINFORCING REMARKS

WF-1 2' - 0" 10" (3) #4 LONG. DOWEL WALL R/F INTO FOOT.

WF-2 3' - 0" 10" (4) #4 LONG. DOWEL WALL R/F INTO FOOT.

SCALE: 3/4" = 1'-0"

S2.1

22

SLAB TRANSITION

3

Page 18: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

A. PIPE SIZES NOT INDICATED SHALL BE 3/4"Ø.

PLUMBING GENERAL NOTES:

A B C D

6

5

4

3

2

1

CONTINUED BY

SITE UTILITY

CONTRACTOR

DCW

DCWNS

DCW

S-1

2" UP TO

3" UP TO

MB-1

1 1/2" UP TO

EWC-1

2" UP TO

SH-1

1 1/2" UP TO

L-1

1 1/2" UP TO

L-1

2" UP TO

SH-1

CATCH BASIN

4" UP TO

TD-1

CATCH BASIN

4" UP TO

TD-1

CATCH BASIN

FCO

4" UP TO

SAN

SAN

4" UP TO

TD-1

FD-1

3" UP TO

FD-1

3" UP TO

1 1/2" UP TO

L-1

FD-1

3" UP TO

CATCH BASIN

2 1/2" CW.

UP

3/4" CW.

UP

4" UP TO

TD-1

SAN

SAN

CATCH BASIN

4" UP TO

TD-1

FCO

4" UP TO

3/4" CW.

UP

FCO

4" UP TO

SAN

FCO

4" UP TO

SAN

SAN

FCO

6" UP TO

4" UP TO

WC-1

4" W. UP

1 1/2" UP TO

L-1

1 1/2" V.

UP

FCO

6" UP TO

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"UP TO

WC-1

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

SAN

FCO

4" UP TO

SAN

SAN SAN

I.E. = 97' - 10 7/8"

I.E. = 97' - 7 3/8"

I.E. = 97' - 9"

I.E. = 97' - 4 5/8"

FCO

4" UP TO

I.E. = 98' - 8 3/8"

I.E. = 96' - 11 3/4"

I.E. = 96' - 10 1/4"

4"ø

(109 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"ø

(109 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"ø

(73 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"ø

(73 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"ø

(73 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

4"ø

(4 GPM)

CONTINUED BY

SITE UTILITY

CONTRACTOR

3" UP TO

FD-1

3" UP TO

FD-1 1 1/2" V.

UP

3" W UPSAN

I.E. = 96' - 5 1/2"

2" V. UP

2" V. UP

1 1/2" V.

UP1 1/2" V.

UP

2" V. UP1 1/2" V.

UP

1 1/2" V.

UP

1 1/2" V.

UP

WC-1

A B C D

6

5

4

3

2

1

CATCH BASIN

CATCH BASIN

MB-1

FD-1

L-1

L-1

FD-1

SH-1

L-1

L-1

SH-1

CATCH BASIN

COMPRESSED

AIR DROP

JANITORS CLOSET

105

BREAK ROOM

104

CORRIDOR

110

OPEN OFFICE

101LANDFILL

MANAGER

102

STORAGE &

SERVICE BAYS

113

LANDFILL TECH

111

MECHANICS SHOP

112

STORAGE &

SERVICE BAYS

114

WC-1

FD-1

TD-1

CATCH BASINFCO

CATCH BASINFCO

TD-1

WH-1

WH-1

WH-1

WH-1

EEW-1

EWC-1

TD-1

TD-1

TD-1

S-1

2

2

WCO4" W DN

3" V. UP

PRESSURE WASHER

CONTROLLER

EEW-1

HB-1

FCO

FCO

HR-1

HR-1

FCO

FCO

FCO

FCO

HR-2 HR-2

HR-2

HR-1HR-1

HR-1

HR-1

HR-1

VB-1

DB-1

DB-1

DB-1

DB-1

DB-1

DB-1

3

3

3

3

3

3

CO

FD-1

FD-1

HB-1

HB-1

WCO

3" UP TO

FD-1

4" W UP

1 1/4" CW UP

1 1/2" V.

UP

1 1/2" W, 1/2" CW, 3/4"

HW & 3/4" HWR UP TO

FLOOR ABOVE

1 1/2" W, 1/2" CW,

3/4" HW & 3/4"

HWR UP TO

FLOOR ABOVE

4" W DN

3" UP TO

SD-1

3" UP TO

FD-2

3" UP TO

SD-1

2" CW, 1 1/4" HW &

3/4" HWR TO TO

FLOOR ABOVE

2" V. UP

2" V. UP

2 1/2" CW UP

TO FLOOR

ABOVE

2 1/2"

CW DN

3/4" CW DN

1" HIGH PRESSURE

HOT WATER PIPING

ALONG WALL TO

FLOOR ABOVE

1" COMPRESSED AIR

PIPING ALONG WALL

TO FLOOR ABOVE

3

COORDINATE WITH CIVIL

PLANS COUNTY PROJECT #

2400 FOR CONTINUATION

OF UTILITY DESIGN

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

1/8" = 1'-0"

1/1

9/2

02

1 1

1:5

7:0

1 A

M

C:\

Re

vit T

em

p\2

00

70 -

BC

SO

UT

H L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

_P

LU

MB

ING

_2

020

_m

cka

ela

h.r

vt

3

JAS NR

P1.1

11/30/20

20070

FO

UN

DA

TIO

N / F

IRS

T F

LO

OR

PL

UM

BIN

G P

LA

N

SCALE: 1/8" = 1'-0"

FOUNDATION PLUMBING PLANSCALE: 1/8" = 1'-0"

FIRST FLOOR PLUMBING PLAN

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

#PLUMBING KEY NOTES

1 WATER PIPING UP TO MEZZANINE ABOVE.

2 DO NOT ROUTE WATER PIPING IN EXTERIOR WALL.

3 COORDINATE INSTALLATION OF DOWNSPOUT BOOT WITH DOWNSPOUT AT

THIS LOCATION.

Page 19: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

TT

TT

T

F

F

T

TT

CO

NO

²

TT

TT

T

CO

NO

²

NO

²C

O

G

1

1

1

1

1

1

1

1

2

3

7

9

8

1

JB

JB

13

JB

T

24

12

12

12

MB

JB

JB

JB

JB

JB

JB

JB

4

5

A A

11

10

JB

JB

6

12

JB

JB

JB

14

T

12

POWER PLAN GENERAL NOTES:

• ALL MEDIA BACK BOXES FOR DISPLAYS ARE DIAGRAMMATICALLY SHOWN. ACTUAL HEIGHT AND LOCATION SHALL BE COORDINATED WITH THE ARCHITECT AND OTHER DISCIPLINES' CONTRACTORS PRIOR TO ROUGH-IN.

• MC CABLE MAY BE UTILIZED WHERE ALLOWED BY THE NEC.

• ALL WORK SHALL COMPLY WITH NEC AS ADOPTED BY THE STATE AND THE AUTHORITY HAVING JURISDICTION.

• ALL DATA BOXES ARE TO BE DUAL GANG (DEEP) WITH SINGLE GANG RING AND TO HAVE 1" CONDUIT STUBBED TO CEILING FOR EACH LOCATION.

• ALL DATA AND ELECTRICAL BOXES AT 36 INCHES AFF (TO BOTTOM OF BOX) UNLESS NOTED OTHERWISE.

2

1

3

4

5

6

A B C D

MENS

106

JANITORS CLOSET

105

LANDFILL TECH

111

BREAK ROOM

104

L1 13GFI

L1 22GFI

L1 7GFI

REFRIG

LOCKER ROOM

110

SHOWER ROOM

109

OPEN OFFICE

101

STORAGE & SERVICEBAYS

114

MECHANICS SHOP

112

TOILET

107

L1 12GFI

L1 12GFI

SHOWER ROOM

108

L1 12GFI

L1 12GFI

L1 12GFI

OHL1 56,58

OHL1 53,55

OHL1 52,54

OHL1 68,70

OHL1 60,62

OHL1 61,63

OHL1 64,66

OHL1 65,67

LIFT(MOTOR WITH SHOCKWAVE)

L1 44,46

CRANEH2 21,23,25

RTU-1L1 45,47,49

SF-1L1 51

EDH-1L1 21,23

LANDFILL MANAGER

102

1

55

5

5

5

5

5

L1 26

L1 30

CLOSET

103

H1

T-1

L1

H2

L1 11L1 36

L1 36L1 11

L5 1,3WELDERS

T-2

UT

SB

LC

P1

L1 36

L1 11

7

7

5

L1 3

L1 12

L1 35

L1 38L1 39

L1 39

L1 38

L1 35

L1 35

L1 11 L1 11 L1 11

5

LOCKER ROOM

115

4

4

OHL1 57,59

L1 36

12' AFF2D204

2D204

2D204

2D204

2D204

2D2042D

204

2D204

2D204

2D204

12'

54" AFF 54" AFF

clg2D204

12' 12'

2D204

12'

1D204

2D204

1D204

T-3L

5

L5 2,4WELDERS

L5 6,8WELDERS

L5 5,7WELDERS

TOOLBOXL1 19

L1 14 L1 29

L1 28P. CL.

L1 27P. CL.

L1 33TOOLBOX

L1 26

L1 17ALARM PNL

35' -

0"

L1 35

L1 31

L1 31

L1 5clg

L1 20clg

L1 37

L1 37

T-4

L1 32

H2 15,17,19EUH-2

L1 16GFI

EWC-1

L1 37

AIR C. & DRYERH2 18,20,22

H2 12,14,16EUH-1

STORAGE & SERVICEBAYS

113

12

+10

'

+10

'

+10

'

+10

' AFF

13 13

L1 69

L1 69

L1 18

L1 18

L1 18L1 1

L1 1

L1 1

14

CT

CAM

CAM

2D204

2D204

CAM

CAM

CAM

CAM

CAM

15

15

15

15

15

15

1515

15

15

GEN TAPBOX

3

2

1

3

4

5

6

A B C D

STORAGE MEZZANINE/ MECHANICALS

201

CORRIDOR

200TOILET

202

CONFERENCE ROOM

203

IR-1

IR-2

IR-3

IR-4

IR-7

IR-5

IR-6

EF-1H2 9,11,13

EF-2L1 4

2 2

3 1D 1D

1D

DF-1H2 30,32,34

DF-2H2 27,29,31

IR-8

IR-7

EF-3L1 2

L1 6 L1 10

L1 6

L1 10

L1 6

L1 6

L1 10

L1 10

L1 10

L1 15 L1 15

L1 24 L1 24GFI

IT CLOSET

204

6

4

2D204

2D204

2D2042D

204

2D204

2D204

2D204

E3.1

3

L1 25

L1 25GFI

L1 9

L1 25L1 34

L1 9

L1 34

L1 34

EF-4SB 5

L1 50RCP-1

L1 48GWH-1

L1 8WS-1

L5 10PW-1

MAU-1H2 24,26,28

2

B

IT CLOSET

204

8

9

SB 4

SB 4

SB 3 SB 3

SB 1

SB 1

9

clg1D

204

SB 1

SB 2

SB 2

SB 2

18" AFF

42" AFF

66" AFF

RACK11

10

EF-4SB 5

16

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

MA

INT

EN

AN

CE

BU

ILD

ING

As indicated

1/2

0/2

02

1 9

:54

:40

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

ou

th L

an

dfill

Ma

inte

na

nce

BL

DG

_E

lectr

ica

l_2

020

_fo

ll yt.

rvt

3

FTA MM

E3.1

11/30/20

20070

FIR

ST

FL

OO

R

& M

EZ

ZA

NIN

E P

OW

ER

AN

D S

YS

TE

MS

PL

AN

POWER PLAN NOTES

1 VERIFY FINAL EQUIPMENT SPECIFICATIONS PRIOR TO INSTALLATION.FURNISH GFCI BREAKERS TO FEED EQUIPMENT. UNLESS OTHERWISENOTED, MOUNT RAISED RECEPTACLES IN THIS ROOM AT 48" AFF.

2 PROVIDE 1" CONDUIT FOR POWER, 1" CONDUIT FOR DATA AND 1-1/2"CONDUIT FOR AV STUBBED TO CEILING AREA FROM FLOOR BOX

3 INSTALL CHEF PAC 525 BACKBOX BEHIND DISPLAY AND 1-1/2" CONDUITSTUBBED TO CEILING FOR TV LOCATION. VERIFY MOUNTING HEIGHTSWITH A/V CONTRACTOR. COORDINATE FINAL CIRCUITING AND DATAREQUIREMENTS.

4 THE POWER OUTLETS SHALL BE INSTALLED WITHIN 36 INCHES OF THEOUTSIDE EDGE OF THE SINK, AND IT SHALL BE IN THE WALL ADJACENT TOTHE BASIN OR COUNTERTOP.

5 PROVIDE FUSED DISCONNECT CONNECTIONS TO MOTORIZED DOORCONTROLLER. COORDINATE CONTROLLER LOCATION AND BUTTON INFIELD.

6 PROVIDE TWIST LOCK RECEPTACLES ( NEMA L21-30R) 30A, 120/208V3PHASE.

7 ALL RAISED GFI RECEPTACLES SHALL BE MOUNTED AT 6" ABOVECOUNTERTOP (ABOVE SINK) OR 42" AFF.

8 PROVIDE (2) 2” CCONDUIT SLEEVES TO 1ST FLOOR CEILING FOR CABLEROUTING TO IT CLOSET

9 (2) 2” CONDUIT SLEEVES FOR CABLES ROUTING ABOVE CEILING.

10 PROVIDE (2) 2” CCONDUIT SLEEVES TO 1ST FLOOR CEILING FOR CABLEROUTING TO IT CLOSET

11 POWER OUTLETS ARE MOUNTED VERTICALLY NEXT TO THE RACK AT 18”AFF, 42”AFF AND 66” AFF RESPECTIVELY

12 WIRE TO HOLDING TANK CONTROL PANEL. PROVIDE 120V CONNECTIONAT SANITARY HOLDING TANK

13 ALL RECEPTACLES IN THIS AREA SHALL BE MOUNTED AT 3'-0" AFFUNLESS NOTED OTHERWISE.

14 ALL WELDING RECEPTACLES SHALL HAVE A DISCONNECT SWITCH ABOVERECEPTACLES LOCATION. (TYPICAL)

15 OWNER TO PROVIDE MOUNTING HARDWARE FOR SECURITY CAMERA,INSTALLED BY CONTRACTOR

16 PROVIDE 24-STRAND FIBER FROM SCALE HOUSE MDF.

#

SCALE: 1/8" = 1'-0"

FIRST FLOOR POWER AND SYSTEMS

PLANSCALE: 1/8" = 1'-0"

MEZZANINE POWER AND SYSTEMS PLAN

7

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

3A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE: 1/2" = 1'-0"

ENLARGED POWER

AND SYSTEMS PLAN

(ALL NOTES MAY NOT APPEAR ON THIS SHEET)

Page 20: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

Page 21: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

Page 22: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request
Page 23: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

CONC. MASONRY UNIT

GYPSUM BOARD

BATT INSULATION

ROUGH LUMBER

PLYWOOD

PRECAST CONCRETE

ALUMINUM

BRICK

COMPACTED FILL

CONCRETE DRIVES,

APRONS, ETC.

POURED CONCRETE

IN SECTION

RIGID INSULATION

FINISHED WOOD

STEEL

UNDISTURBED SOIL

A

X

ROOM NAME

101

NORTH ARROW

EXISTING COLUMN GRID

CENTERLINE

NEW COLUMN GRID

CENTERLINE

EXISTING ELEVATION

REFERENCE

NEW ELEVATION

REFERENCE

SOIL BORING

ROOM NUMBER

DOOR NUMBER

1

1

1

1

A1.1

REVISION NUMBER

WINDOW TAG

WALL TYPE

DETAIL OR SECTION

NUMBER

SHEET ON WHICH DETAIL

OR SECTION IS DRAWN

SECTION CUT REFERENCE

ELEVATION REFERENCE

SCALE = 1" = 1'-0"

X

AX.X

DETAIL NUMBER

AND SCALE

1

A1.1

ENLARGED PLAN OR

DETAIL REFERENCE

EXISTING TO BE

REMOVED

SYMBOLS

MATERIALS

1

A1.1

1

A1.1

101

PLAN NOTE1

PT-1 FINISH TAG

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

SC

AL

E H

OU

SE

1 1/2" = 1'-0"

1/2

0/2

02

1 8

:43

:20

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

outh

La

ndfill

Sca

le H

ouse

_A

RC

H_

20

20

_C

ase

yH

elm

.rvt

2

CPH PJ

TS1.1

11/30/20

20070

TIT

LE

SH

EE

T,

SH

EE

T I

ND

EX

LOCATION MAP

PROJECT

LOCATION

www.performainc.com

124 N. BROADWAY P.O. BOX 5156 DE PERE, WISCONSIN 54115

920-336-9929 FAX: 920-336-2899

PROJECT TEAM

SHEET INDEX

ARCHITECTURAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

AS1.1 SCALE HOUSE SITE PLAN 1 BID / CONSTRUCTION 11/30/20

A1.1 FLOOR PLANS 2 ADDENDUM-004 01/20/21

A2.1 DOOR SCHEDULE, DOOR TYPES, FRAME TYPES, WALL

TYPES

1 BID / CONSTRUCTION 11/30/20

A3.1 EXTERIOR ELEVATIONS 1 BID / CONSTRUCTION 11/30/20

A4.1 BUILDING SECTIONS 1 BID / CONSTRUCTION 11/30/20

A4.2 WALL SECTIONS 1 BID / CONSTRUCTION 11/30/20

A6.1 EXTERIOR WINDOWS, EXTERIOR DETAILS 1 BID / CONSTRUCTION 11/30/20

A8.1 INTERIOR ELEVATIONS & DETAILS 2 ADDENDUM-004 01/20/21

A9.1 FIRST FLOOR FINISH PLAN & SCHEDULE 2 ADDENDUM-004 01/20/21

PROJECT MANAGER

MECHANICAL

PLUMBING

STRUCTURAL

ELECTRICAL

PROJECT ARCHITECT

TITLE SHEET

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

TS1.1 TITLE SHEET, SHEET INDEX 2 ADDENDUM-004 01/20/21

TS1.2 MOUNTING HEIGHTS AND ACCESSIBILITY REQUIREMENTS 1 BID / CONSTRUCTION 11/30/20

BROWN COUNTY LANDFILL - SCALE HOUSE

BROWN COUNTY, WI

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2A

DD

EN

DU

M-0

04

01

/20/2

1

JULI SIMONET

SAMEER MATTA

PAUL JANSSEN

NICK GRAHL

FOLLY TEKO-AHATEFOU

PAUL JANSSEN

ELECTRICAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

EN1.1 ELECTRICAL ABBREVIATIONS AND SYMBOLS 1 BID / CONSTRUCTION 11/30/20

E1.1 SCALE HOUSE LIGHTING & POWER PLAN 1 BID / CONSTRUCTION 11/30/20

E5.1 ELECTRICAL SCHEDULES 1 BID / CONSTRUCTION 11/30/20

E6.1 ELECTRICAL DETAILS 1 BID / CONSTRUCTION 11/30/20

ES1.1 ELECTRICAL SITE PLAN 1 BID / CONSTRUCTION 11/30/20

PLUMBING

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

P1.1 PLUMBING FLOOR PLANS AND ISOMETRICS 1 BID / CONSTRUCTION 11/30/20

P3.1 PLUMBING FIXTURE & EQUIPMENT SCHEDULE AND DETAILS 1 BID / CONSTRUCTION 11/30/20

HVAC

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

HN1.1 HVAC ABBREVIATIONS AND SYMBOLS 1 BID / CONSTRUCTION 11/30/20

H1.1 FIRST FLOOR MECHANICAL PLAN 1 BID / CONSTRUCTION 11/30/20

H5.1 HVAC SCHEDULES 1 BID / CONSTRUCTION 11/30/20

H6.1 MECHANICAL DETAILS 1 BID / CONSTRUCTION 11/30/20

STRUCTURAL

SHEET NO. SHEET NAME

ISSUE/REVISION

NO. NAME DATE

S1.0 FOUNDATION PLAN 2 ADDENDUM-004 01/20/20

S1.1 FRAMING PLAN 1 BID / CONSTRUCTION 11/30/20

S2.1 FRAMING ELEVATIONS & SCHEDULES 1 BID / CONSTRUCTION 11/30/20

Page 24: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

24

12

RAM

P

5'-4" 14'-8" 5'-4"

5'-0"

7'-3 3/4"

7'-10

3/4"

6'-0

3/4"

6'-11

3/4"

34'-8"

25'-4"

12'-11

"21'-4"

8'-10

1/2"

9'-0

"2'-10

"3'-4"

5 1

/2"

2'-10

"4'-6"

2'-10

"

CONTROLS AREA

101

TOILET

102

MECH / STORAGE

103

TECH CLOSET

104

B

A4.1

A

A4.1

C

A4.1

A

A4.2

B

A4.2

F

A4.2

E

A4.2

D

A4.2

101

102

103

104

DS

DS

A6.1

1

A6.1

2

A6.1

3

A6.1

4

A6.1

5

C

A4.2

D

A4.1

1

1

1

1

F

E

B

D

C

A

18'-11 3/4" 6'-4 1/4"

25'-4"

12'-8 1/2"

23'-2 3/4"

11'-2 3

/4"

A8.1

C

A8.1

A

B

A8.1 G

1

F

D

E

1" /

12"

17

A6.1

17

A6.1

2

24'-4"

5'-11

3/4"

2

ACT-1

9'-0"

ACT-1

9'-0"

ACT-1

9'-0"

ACT-1

8'-6"

ACT-1

9'-0"

SOFFIT PANEL 12'-0"

ABOVE GRADE. (SEE WALL

SECTIONS)

REFLECTED CEILING SYMBOLS

= GYPSUM BOARD CEILING OR SOFFIT

= CEILING DIFFUSER

= RETURN/EXHAUST GRILLE

= LINEAR SLOT DIFFUSER

= 2x2 RECESSED LIGHT FIXTURE

= 2x4 RECESSED LIGHT FIXTURE

= STRIP LIGHT

= RECESSED CAN LIGHT

= EXIT LIGHT

= SPEAKER

FLOOR PLAN GENERAL NOTES

A. ALL GYPSUM BOARD WALLS ARE TO BE WALL TYPE #1

UNLESS NOTED OTHERWISE.

B. INTERIOR WALL DIMENSIONS ARE TO FINISH FACE OF

GYPSUM BOARD UNLESS DETAILED OR NOTED OTHERWISE

C. GENERAL CONTRACTOR SHALL PROVIDE WOOD

BLOCKING AND BACKING FOR ALL CASEWORK. BACKING

HEIGHTS TO BE SUBMITTED BY CASEWORK SUPPLIER FOR

COORDINATION WITH OTHER TRADES

D. COORDINATE SIZE AND LOCATIONS OF ANY AND ALL

LOUVERS AND WALL OPENINGS WITH MECHANICAL,

ELECTRICAL, AND PLUMBING SUBCONTRACTORS

1" /

12"

1

RAKE TRIM

RAKE TRIM

RAKE TRIM

RAKE TRIM

GUTTER

GUTTER

PIPE

PENETRATION

ROOF PLAN NOTES

A. COORDINATE ALL OPENINGS FOR MISC. VENTS, PIPING,

AND DUCTWORK WITH MECHANICAL AND ELECTRICAL

CONTRACTORS

ROOF SYSTEMS

STANDING SEAM METAL ROOF

- 5/8" GYP BOARD

- VAPOR BARRIER

- R-30 BATT INSULATION IN ATTIC

- WOOD TRUSS

- 1/2" SHEATHING

- UNDERLAYMENT

- STANDING SEAM METAL ROOF

1

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

SC

AL

E H

OU

SE

As indicated

1/2

0/2

02

1 8

:43

:17

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

outh

La

ndfill

Sca

le H

ouse

_A

RC

H_

20

20

_C

ase

yH

elm

.rvt

2

CPH PJ

A1.1

11/30/20

20070

FL

OO

R P

LA

NS

SCALE:

PLAN NORTH

1/4" = 1'-0"

FIRST FLOOR PLAN

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2A

DD

EN

DU

M-0

04

01

/20/2

1

SCALE:

PLAN NORTH

1/4" = 1'-0"

FIRST FLOOR RCP

SCALE:

PLAN NORTH

1/4" = 1'-0"

ROOF PLAN

FLOOR PLAN NOTES

1 PLYWOOD BACKER BOARD INSTALLED BY GC ON ALL WALLS

IN THIS SPACE 8'-0" AFF. 3/4" FIRE TREATED PLYWOOD

PAINTED WHITE/LIGHT IN COLOR TO BE USED.

2 1 1/2" O.D. STD WALL MOUNTED PIPE HANDRAIL

Page 25: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

1 1/

2"

3'-2 1

/2"

3'-4"

5'-0 1/2"4"8'-9 1/4"4"8'-9"

23'-2 3/4"

PL-1 SUPPORTS

2

A8.1

3

A8.1SS-1

B-12'-3 1

/2"

1 1/

2"

5'-4"

2'-3 1

/2"

1 1/

2"

3'-2"

1 1/

2"

1'-7"

1 1/

2"

MICROWAVE BY

OWNER

UNDERCOUNTER

REFRIGERATOR BY OWNER

1" 2'-6" 1"

2'-0"1"6'-6"

2'-5"

PL-1 END PANEL

PL-1 END PANEL

1

A8.1

SS-1

PL-1

SS-1

B-1 B-1

3

A8.1

3

A8.1

2'-1" 3'-2" 3'-10 3/4" 2'-1"

1 1/

2"

3'-2 1

/2"

3'-4"

1 1/

2"

2'-3 1

/2"

2'-5"

SS-1

SS-1

B-1

2

A8.1

PTB-1

G

2

PTB-1

C

PTB-1

A

E

D

F

PTB-1

3'-3"

2'-3"

A B F

2'-10

"

C, D

3'-4"

1'-6"

E G

4'-0

"

NOT USED

TOILET AND BATH ACCESSORIES

A = MIRROR (24"x36")

- BRADLEY MODEL 781-2-2436

B = NOT USED

C = GRAB BAR (36" LONG)

- BRADLEY MODEL 812-2

D = GRAB BAR (42" LONG)

- BRADLEY MODEL 812-2

E = VERTICAL GRAB BAR (18" LONG)

- BRADLEY MODEL 812-2

F = TOILET TISSUE DISPENSER -

- BRADLEY MODEL ???

G = PAPER TOWEL - BRADLEY MODEL 252

TOILET AND BATH NOTES:

1. PROVIDE TOILET ACCESSORIES AS SHOWN ON THIS SHEET

AND IN SCHEDULE ABOVE OR APPROVED EQUAL

2. ALL BLOCKING REQUIRED FOR SUPPORT OF GRAB BARS AND

TOILET ROOM ACCESSORIES SHALL BE PROVIDED BY

THE GENERAL CONTRACTOR

CONCEALED COUNTERTOP

SUPPORTS AS REQUIRED

SS-1 COUNTERTOP & SILL2'-5"

PL-1 END PANEL

PL-1 ADJUSTABLE

SHELVING

PL-1 BACK PANEL

MICROWAVE BY

OWNER

UNDERCOUNTER

REFRIGERATOR BY OWNER

2'-0"

1 1/

2"

1'-7"

1 1/

2"

3'-2"

PL-1 SUPPORT

CONCEALED COUNTERTOP

SUPPORTS AS REQUIRED

SS-1 COUNTERTOP1" 2'-0"

SEE E

LEV

ATIO

NS

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

SC

AL

E H

OU

SE

As indicated

1/2

0/2

02

1 8

:43

:18

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

outh

La

ndfill

Sca

le H

ouse

_A

RC

H_

20

20

_C

ase

yH

elm

.rvt

2

CPH PJ

A8.1

11/30/20

20070

INT

ER

IOR

EL

EV

AT

ION

S &

DE

TA

ILS

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2A

DD

EN

DU

M-0

04

01

/20/2

1

NORTH ELEVATION

(CONTROLS AREA 101)C

SOUTH ELEVATION

(CONTROLS AREA 101)A

WEST ELEVATION

(CONTROLS AREA 101)B

EAST ELEVATION

(TOILET 102)G

NORTH ELEVATION

(TOILET 102)F

SOUTH ELEVATION

(TOILET 102)E

WEST ELEVATION

(TOILET 102)D TOILET ACCESSORY ELEVATIONS

SCALE: 1" = 1'-0"

A8.1

2

COUNTERTOP DETAILSCALE: 1" = 1'-0"

A8.1

1

CASEWORK DETAILSCALE: 1" = 1'-0"

A8.1

3

COUNTERTOP DETAIL

Page 26: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

24

12

FINISH PLAN LEGEND:

FLOORING TRANSITION

FLOORING INSTALLATION DIRECTION

FINISH PLAN NOTES:1. FINISHES TO BE OF THE SAME PRODUCTION RUN.

2. PROVIDE TRANSITION STRIPS AND THRESHOLDS AS REQUIRED. METAL

EDGE STRIP: SCHLUTER SCHIENE. UTILIZE AT LVT PORCELAIN TILE

FLOORING TRANSITION AS NEEDED. ARCHITECT TO APPROVE.

3. FINISH LOCATIONS AND START/STOP POINTS TO BE REVIEWED WITH

ARCHITECT IN FIELD PRIOR TO INSTALLATION.

4. FLOOR TILE JOINTS SHALL MATCH WALL TILE JOINTS, UNLESS NOTED

OTHERWISE. REVIEW JOINT WIDTH WITH ARCHITECT PRIOR TO

INSTALLATION.

5. COORDINATE ALL FLOOR DRAIN LOCATIONS WITH FLOOR TILE

INSTALLER.

6. METAL EDGE STRIP: SCHLUTER SCHIENE, BRUSHED STAINLESS STEEL,

EXPOSED EDGE MATERIAL. UTILIZE ON ALL TILE WALL BASE AND

EXPOSED WALL TILE VERTICALLY AND HORIZONTALLY.

7. SEE SHEET A8.1 FOR INTERIOR ELEVATIONS.

8. REFERENCE CEILING PLAN FOR CEILING MATERIAL LOCATION.

9. ALL MATERIALS SHALL BE APPLIED IN ACCORDANCE WITH

MANUFACTURER'S SPECIFICATIONS FOR THE PARTICULAR SURFACE.

10. SAMPLES OF ALL FINISHES SHALL BE SUBMITTED TO THE ARCHITECT

FOR APPROVAL PRIOR TO PURCHASING.

11. ALL EXISTING FLOORING/SLAB SHALL BE PROPERLY PREPARED TO

RECEIVE NEW FLOOR FINISH.

12. PAINT ALL WALLS SCHEDULED USING A THREE COAT PAINT SYSTEM.

ONE PRIME COAT AND TWO FINISH COATS.

13. PROVIDE ALL NECESSARY BLOCKING.

14. ALL GYPSUM BOARD WALLS TO BE PROPERLY TAPED (MIN. 3

COATS), SANDED, & PREPARED TO LEVEL 4 FINISH (PER GA-216).

15. EXPOSED ELECTRICAL PANELS TO BE PAINTED SAME COLOR AS WALL

THEY ARE ON.

16. ROOMS TO HAVE TYPICAL BELOW FINISH DESIGNATION AS INDICATED

BELOW, UNLESS OTHERWISE NOTED.

WALL FINISH

BASE

FLOOR FINISH

PT-1

B-1

CPT-1

FLOOR FINISH LEGEND:

LVT-1 PFT-1

CONTROLS AREA

101

TOILET

102

MECH / STORAGE

103

TECH CLOSET

104

PT-1

B-1

SC

PT-1

B-1

LVT-1

PT-4

PTB-1

PFT-1

PT-1

B-1

SC

WS-2 WS-2

WS-1

WS-3

WS-3

WS-3

PT-2

WS-32

WS-1

2

2

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

SC

AL

E H

OU

SE

1/4" = 1'-0"

1/2

0/2

02

1 8

:43

:19

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

outh

La

ndfill

Sca

le H

ouse

_A

RC

H_

20

20

_C

ase

yH

elm

.rvt

2

CPH PJ

A9.1

11/30/20

20070

FIR

ST

FL

OO

R F

INIS

H P

LA

N &

SC

HE

DU

LE

SCALE:

PLAN NORTH

1/4" = 1'-0"

FIRST FLOOR FINISH

PLAN

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2A

DD

EN

DU

M-0

04

01

/20/2

1

FINISH SCHEDULETYPE MARK DESCRIPTION MANUFACTURER PRODUCT COLOR FINISH/ INSTALLATION SIZE COMMENT

CEILING

ACT-1 ACOUSTIC CEILING TILE ARMSTRONG (OR USG EQUAL) ULTIMA 1942 WHITE 9/16" WHITE GRID, BEVELED TEGULAR 2' X 2'

ACT-2 ACOUSTIC CEILING TILE ARMSTRONG (OR USG EQUAL) ULTIMA HEALTH ZONE 1936 WHITE 9/16" WHITE GRID, BEVELED TEGULAR 2' X 2' BATHROOMS

FLOORING

LVT-1 LUXURY VINYL TILE MILLIKEN TWIST TWS67-58 INSTALL STRAIGHT STACKED 18"X18" -

PFT-1 PORCELAIN FLOOR AND WALL TILE CERAMIC TILEWORKS DOWNTOWN ECRU INSTALL 1/3 OFFSET 12"X24" BATHROOMS

SC SEALED CONCRETE - - - - - -

MILLWORK

PL-1 PLASTIC LAMINATE FORMICA PLASTIC LAMINATE TAUPE WALNUT 5787-NG (NATURAL

GRAIN)

- - AS NOTED

SS-1 SOLID SURFACE CORIAN SOLID SURFACE NEUTRAL CONCRETE - - AS NOTED

MISCELLANEOUS

SS-2 SOLID SURFACE WINDOW SILL CORIAN SOLID SURFACE BONE - - SOLID SURFACE AT ALL WINDOW SILLS

WS-1 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2390 (OR EQUAL) OYSTER/PEARL: WHITE (FASCIA &

BRACKET)

%OPEN: 5 - -

WS-2 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2360 (OR

EQUAL)

OYSTER/PEARL: WHITE (FASCIA &

BRACKET)

%OPEN: 10 - AS NOTED

WS-3 WINDOW SHADES HUNTER DOUGLAS (OR EQUAL) PHIFER SHEERWEAVE - 2410 (OR EQUAL) OYSTER/PEARL: WHITE (FASCIA &

BRACKET)

%OPEN: 3 - -

WALL

PT-1 PAINT - GENERAL SHERWIN WILLIAMS - REPOSE GREY SW7015 - - -

PT-2 PAINT - NEUTRAL ACCENT SHERWIN WILLIAMS - HAMMERED SILVER SW2840 - - -

PT-3 PAINT - ACCENT SHERWIN WILLIAMS - CITYSCAPE SW7067 - - -

PT-4 PAINT - ACCENT SHERWIN WILLIAMS EPOXY PAINT REPOSE GREY SW7015 - - -

WALL BASE

B-1 VINYL WALL BASE TARKETT TRADITIONAL WALLBASE BURNT UMBER 63 - 4" AS NOTED

PTB-1 PORCELAIN TILE WALL BASE CERAMIC TILEWORKS DOWNTOWN ECRU CAP TOP OF BASE WITH SCHLUTER TRIM PIECE 6" BATHROOMS

Page 27: Addendum #4 Project #2399 Construction of Multiple …...Addendum #4 Project #2399 Construction of Multiple Buildings at South Landfill Port & Resource Recovery January 20, 2021 Request

FOUNDATION PLAN NOTES

1. FINISHED FLOOR EL. = 102’-0” (UNLESS NOTED OTHERWISE)

• SEE DETAILS 1/S2.1 & 2/S2.1 FOR SLAB CONSTRUCTION DETAILS

2. TOP OF FOOTING EL. = 96'-0" (UNLESS NOTED OTHERWISE)

3. “T/CONC. = XXX’-X”” INDICATES TOP OF CONCRETE WALL ELEVATION

T/CONC. = 102’-0”, TYPICAL UNLESS NOTED OTHERWISE

4. "WF-X" INDICATES CONTINUOUS WALL FOOTING. SEE FOUNDATION

SCHEDULE ON THIS SHEET FOR SIZE AND REINFORCEMENT.

5. "W-X" = C.I.P. CONCRETE WALL

CONCRETE FOUNDATION WALL REINFORCING:

• (2) #4 CONT. T&B IN STOOP/RAMP WALLS (W-1)

• (2) #5 CONT. T,B,& MID IN WALLS UP TO 16” TH. (W-2 THRU W-4)

BACKFILLED EA. SIDE - SEE DETAIL 5/S1.0

• PROVIDE #5 VERT. BAR(S) + DOWEL(S) AT 48” O.C. FROM FOOTING

TO WALL UNLESS SPECIFICALLY DETAILED OTHERWISE - CENTER (1)

BAR FOR WALLS 8" THICK OR LESS, PROVIDE (2) BARS FOR WALLS

10" OR THICKER

• SEE DETAILS 2/S1.0 THRU 4/S1.0 FOR TYP. WALL CONSTRUCTION

• SEE DETAIL 6/S1.0 FOR R/F AROUND OPENINGS IN FOUNDATION

WALL AND FOOTINGS

6. COORDINATE THE LOCATION OF EMBEDDED/RECESSED ELECTRICAL

BOXES WITH ELECTRICAL OR ARCHITECTURAL DRAWINGS

7. AT ALL SLAB RE-ENTRANT CORNERS, PROVIDE (2) #5 x 5’-0” LONG

DIAGONAL BARS PLACED AT MID-DEPTH OF SLAB

8. COORDINATE EXACT LOCATIONS OF PLUMBING DRAINS W/ PLUMBING

AND ARCHITECTURAL DRAWINGS. COORDINATE EXTENT OF PITCHED

SLABS W/ PLUMBING AND ARCHITECTURAL DRAWINGS

9. PROVIDE BOND BREAKER MATERIAL WHERE SLABS ABUT WALLS,

COLUMNS AND OTHER VERTICAL SURFACES.

10. COLD WEATHER CONCRETING: FOLLOW ACI 306 "COLD WEATHER

CONCRETING" WHEN FREEZING CONDITIONS APPLY OR MEAN DAILY

TEMPERATURE FALLS BELOW 40 DEG. F.

11. HOT WEATHER CONCRETING: FOLLOW ACI 305 "HOT WEATHER

CONCRETING" WHEN MAXIMUM DAILY TEMPERATURE EXCEEDS 85 F, OR

RAPID DRYING CONDITIONS EXIST; EVAPORATION RATE >.15LB/SF/HR

PER FIGURE 2.1.5 OF ACI 305.

12. CONCRETE SHALL BE DISCHARGED AT THE SITE WITHIN 1-1/2 HOURS

AFTER WATER HAS BEEN ADDED TO THE CEMENT AND AGGREGATES.

ADDITION OF WATER TO THE MIX AT THE PROJECT SITE WILL NOT BE

PERMITTED. ALL WATER MUST BE ADDED AT THE BATCH PLANT. SLUMP

MAY BE ADJUSTED ONLY THROUGH THE USE OF ADDITIONAL WATER

REDUCING ADMIXTURE OR HIGH RANGE WATER REDUCING ADMIXTURE.

13. CALCIUM CHLORIDE SHALL NOT BE PERMITTED. NO ADMIXTURES THAT

CONTAIN CALCIUM CHLORIDE WILL BE PERMITTED.

14. CONCRETE MIXES: THE FOLLOWING MAX AND MIN VALUES ARE TO BE

USED AS GUIDELINES FOR PROVIDING CONCRETE THAT MEETS THE

STRENGTH AND FINISH REQUIREMENTS OF THE CONCRETE FOR EACH USE.

EXACT VALUES OF EACH ARE TO BE DETERMINED BY THE SUPPLIER &

COORDINATED WITH THE CONCRETE CONTRACTOR AND GENERAL

CONTRACTOR (OR C.M.) FOR EACH SPECIFIC USE WITH THE GIVEN

CONDITIONS, ADMIXTURES, ETC.

NAME MIN. STRENGTH MAX AGG. SLUMP RNG. MAX W/C

FOOTINGS 3,000 PSI 1 1/2" 3 1/2" TO 6 1/2" 0.57

INT. S.O.G. 3,500 PSI 1 1/2" 2 1/2" TO 4" 0.50

WALLS, PIERS 4,000 PSI 3/4" 3 1/2" TO 5" 0.50

EXT. S.O.G. 3,500 PSI 3/4" 2 1/2" TO 4" 0.45

ALL OTHER 4,000 PSI 3/4" 3 1/2" TO 5" 0.45

TABLE NOTES:A. CONCRETE PERMANENTLY EXPOSED TO FREEZE / THAW CYCLES

SHALL BE AIR ENTRAINED FOR THE DESIGNATED AMOUNT WITH A

TOLERANCE OF PLUS OR MINUS 1-1/2%.

B. WALLS OR PIERS EXPOSED TO VIEW AND FREEZE / THAW ARE TO

HAVE 5% AIR ENTRAINMENT.

C. ALL OTHER CONCRETE USED ON THE PROJECT ONLY REQUIRE AIR

ENTRAINMENT IF IT IS PERMANENTLY EXPOSED TO FREEZE / THAW.

CONDITIONS VARY.

2 3 4

A

B

D

5'-4" 14'-8" 5'-4"

10'-2"

3'-2"

21'-4"

5'-9 3

/4"

5

S1.0

1

C

OUT-TO-OUT

25'-4"

13'-4"

5"

4"

8" TYP.

4" 8" TYP.

21'-4"

W-3

W-3

W-2

W-2

W-4

WF-2

WF-2

WF-2

WF-2

W-3WF-2

4" SLAB-ON-GRADE

REINF. W/ 6X6 W4XW4 W.W.F.

OVER VAPOR RETARDER

OVER COMPACTED BASE

T/SLAB EL. = 102' - 0"

W-1

W-1

T/CONC. = 102' - 0"

T/NOTCH = 101' - 4"

7

S1.0

WF-3

WF-1

T/CONC. = 101' - 4"

T/CONC. = 99' - 4"

1'-1"

1'-0"

W-2

WF-2

1'-4" 8"

12'-8"

C.J. TYP.

-SEE DETAIL (1/S1.0)

4'-4"

1/8" WIDE x 1 1/4"

DEEP SAW CUT

EL. = SEE PLAN

T/SLAB

COMPACTED GRANULAR FILL

VAPOR RETARDER

CONTROL JOINT SPACING:

4"-5" THICK SLAB: 10' TO 12' O.C.

>6" THICK SLAB: 12' TO 15' O.C.

SLAB-ON-GRADE

- SEE PLAN FOR

THICKNESS & REINF.

LAP SPLICE - SEE GENERAL NOTES

CLASS 'B' TENSION

LAP S

PLIC

E -

SEE G

ENER

AL N

OTES

CLASS 'B

' TENSIO

N

CORNER BAR TO BE

SAME SIZE AND SPACING

AS HORIZ. WALL R/F -

WIRE SECURELY TO

HORIZ. BARS

CONT. HORIZ. WALL R/F

W/ STD. 90 DEG. HOOK

AT END

NOTE:

NO VERT. WALL CONST.

JOINT PERMITTED WITHIN

5'-0" OF CORNER

2' - 0" N.T.S.

CONTINUOUS KEYED JOINT

WALL R/F TO BE

CONTINUOUS THRU

JOINT

CONT. HORIZ. WALL R/F

W/ STD. 90 DEG. HOOK

AT END

NOTE:

NO VERT. WALL CONST.

JOINT PERMITTED WITHIN

5'-0" OF INTERSECTION

HORIZ. WALL

R/F

FOUNDATION PLAN102' - 0"

2

8"

1'-1" @ W-3

1'-0"

TYP.

2'-0"

CLR.1 1/2"

#5 VERT. @ 48", E.F. -

TYP. FOR WALLS GREATER

THAN 10" THICK

(6) #5 BARS, HORZ., TYP.

SEE ARCH. FOR TYP.

WALL CONSTRUCTION

MAX

2'-0

"

FOOTING R/F - SEE PLAN

EXPANSION MATERIAL - TYP.

S.O.G. - SEE PLAN

10"

T/FTG.

96' - 0"

(2) #5 T&B

OF OPENING

(2) #5 DIAGONAL

EACH CORNER

OF OPENING

1'-0" SQ. OPENING

OR LARGER

WALL REINF.

SEE PLAN

EL. = SEE PLAN

T/FOOTING

EL. = SEE PLAN

T/WALL

EL. = SEE PLUMBING

INVERT

SLEEVE AROUND PLUMBING

PROVIDE INSULATION

BETWEEN SLEEVE AND PIPE

"T"

MIN

.

"T"

1"

"D"

1"

1' - 0"

SLEEVE DIM."D" + 2" 1' - 0"

FTG REINF

SEE PLAN

WHERE REQ'D

TRENCH REINF.

TO MATCH

FTG REINF

WHERE REQ'DEL. = SEE PLUMBING

INVERT

FOUNDATION PLAN102' - 0"

3 4

8"

(4) #4 BARS, HORZ.

TYP.

#5 @ 48" O.C., MAX.

1'-0" 4" 8"

4"

1'-0" 4"

4"

8"

1'-4"

10"

ADDED 4" NOTCH

FOR RAMP SLAB -

PITCH PER ARCH.

PLANS

2'-6"

#5 @ 48" E.F.

(6) #5 BARS, HORZ.

TYP.

T/FTG.

96' - 0"

2

CHK'DDRAWN

TIT

LE

DRAWING NO.

SCALEDATE

REV.PROJECT NO.

124 N

. B

RO

AD

WA

Y,

P.O

. B

OX

5156

DE

PE

RE

, W

ISC

ON

SIN

54115

PH

ON

E:

920-3

36-9

929

FA

X:

920-3

36-2

899

ww

w.p

erf

orm

ain

c.c

om

NO

.D

ES

CR

IPT

ION

DA

TE

BR

OW

N C

OU

NT

Y L

AN

DF

ILL

SC

AL

E H

OU

SE

As indicated

1/1

9/2

02

1 8

:39

:54

AM

C:\

Re

vit T

em

p\2

00

70

- B

C S

OU

TH

LA

ND

FIL

L S

CA

LE

HO

US

E -

_S

TR

UC

TU

RA

L_2

02

0_m

ike

l@p

erf

orm

ain

c.c

om

.rvt

2

MDL NJG

S1.0

11/30/20

20070

FO

UN

DA

TIO

N P

LA

N

SCALE:

PLAN NORTH

1/4" = 1'-0"

FOUNDATION PLAN

SCALE: 1 1/2" = 1'-0"

S1.0

1

TYP. SLAB CONTROL JOINTSCALE: 1 1/2" = 1'-0"

S1.0

2

WALL CORNER R/F

SCALE: 1 1/2" = 1'-0"

S1.0

3

WALL CONSTRUCTION JOINTSCALE: 1 1/2" = 1'-0"

S1.0

4

WALL CORNER R/F

1B

ID /

CO

NS

TR

UC

TIO

N1

1/3

0/2

0

2A

DD

EN

DU

M-0

04

01

/20/2

0

SCALE: 3/4" = 1'-0"

S1.0

5

WALL DETAIL

SCALE: 1/2" = 1'-0"

S1.0

6

PLUMBING SLEEVE

FOOTING SCHEDULE

TYPE

SIZE

THICKNESS REINFORCING REMARKSWIDTH LENGTH

WF-1 1' - 4" 10" (3) #4 LONG.

WF-2 2' - 0" 10" (3) #4 LONG.

WF-3 2' - 6" 10" (4) #4 LONG.

SCALE: 1/2" = 1'-0"

S1.0

7

WALL DETAIL