Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS
CONTRACT NO: 201632002
PROJECT NAME: Hadley Library Renovation ADDENDUM NO. 3 THE FOLLOWING shall become as fully a part of the above named drawings as if included and shall take full and complete precedence over anything stated or shown to the contrary. ACKNOWLEDGMENT: Process consistent with Project RFP 722-16P. Each bidder shall indicate in the place provided on the Form of Proposal acknowledgment of receipt of this Addendum. EACH AND EVERY BIDDER, subcontractor and material supplier shall be responsible for reading each and every item in this Addendum to ascertain the extent and manner it affects the work in which he is interested. No attempt is made to list Addendum items in chronological order or in conformity with the sections of the specifications or drawings to which they refer or which they affect. SPECIFICATIONS
1. Section 064116 Plastic-Laminate-faced Architectural Cabinets a. Part 2.2.B. Grade:- change “Premium” to “Custom Grade” b. Part 2.2.F. Type of Construction:- change “Face Frame” to “Frameless”
2. Section 075423 TPO Roofing a. Part 2.1.A.Basis of Design: Revise “1. Firestone UltraPly TPO” to “1. Johns Manville TPO” b. Part 2.2.F. Type of Construction:- change “Face Frame” to “Frameless”
3. Section 084113 Aluminum Framed Entrances and Storefronts a. Part 2.2. Manufactures: Add “B. Alternates” “1. Manko 2450 Series Thermally Broken”; “2. Efco,
Storefront System 403X; D500 Entrances” b. Part “3.2 Field Quality Control” Delete in its entirety
4. Section 102113 Phenolic-Core Toilet Compartments a. Revise to “Metal Toilet Compartments” b. Part 2.2.A. Revise to “Bradley Series 400 Sentinel”
5. Section 142400 Hydraulic Elevators a. Part 2.1.A.Basis of Design: Revise “1. Otis Elevator Hydrofit” to “1. Schindler 330A”; “2.
ThyssenKrupp Endura”
DRAWINGS ARCHITECTURAL:
A. Drawings – Graphic Changes (Noted as Delta 1 and clouded)
1. Sheet AD-100, refer to sketch ADD3-A01 a. Revised demolition notes at existing employee Breakroom
2. Sheet A-100, refer to sketch ADD3-A02 a. Extended wall at Staff space b. Revised stair gate note
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
3. Sheet A-600 a. Updated finish call outs on interior elevations, refer to sketch ADD3-A03 b. Updated finish notes on detail 8, refer to sketch ADD3-A03
4. Sheet A-700 a. Revised Door Schedule and Door Schedule General Notes, refer to sketch ADD3-A05 b. Revised callout on Elevation 9, refer to sketch ADD3-A06
5. Sheet A-800, refer to revised sheet A-800 a. Revised Toilet Accessory Schedule b. Added wall tile base to restroom elevations at Men’s, Women’s and Staff
6. Sheet A-900, refer to revised sheet A-900 a. Revised Finish Legend b. Revised Finish Plan c. Added note to Furniture Plan
DRAWINGS STRUCTURAL:
A. Drawings – Graphic Changes (Noted as Delta 1 and clouded)
1. Sheet S-004, refer to sketch ADD3-S01 a. Revised steel member sizes
2. Sheet S-006, refer to sketch ADD3-S02 a. Revised steel member sizes
3. Sheet S-008, refer to sketch ADD3-S03 a. Revised Detail 2
DRAWINGS PLUMBING:
A. Drawings – Written Changes
1. Sheet P-100 a. Added note to “First Floor Plumbing Plan” in southwest corner of Corridor 119. “Location of new
fire riser location serving 1st floor”
2. Sheet P-900 a. Plumbing Fixture Schedule” Delete text from Note #13. List as “Not Used”; b. Delete “Alternate List” from sheet.
ELECTRICAL:
A. Drawings – Written Changes
1. All Electrical Sheets: a. Replace all references to new and replaced data cable to be new Category 6A cable.
2. Sheet E-000
a. Add the following notes under COMMUNICATIONS SYSTEMS General Notes: 8. THE SUCCESSFUL IT CONTRACTOR WILL BE RESPONSIBLE FOR
IDENTIFYING, TERMINATING AND TESTING ALL NEW DATA DROPS.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
9. THE SUCCESSFUL IT CONTRACTOR WILL BE RESPONSIBLE FOR EXTENDING EACH DATA DROP FROM FLOOR/WALL FACE PLATES TO SYSTEMS FURNITURE.
10. EXISTING DATA RACK COMPONENTS WILL BE REMOVED AND REINSTALLED BY SUCCESSFUL IT CONTRACTOR AND COORDINATED WITH DPL IT. RETURN THIS EQUIPMENT TO DPL IT UNTIL TIME FOR RE-INSTALLATION.
11. CABLE JACKET COLORS WILL BE AS FOLLOWS: FOR ALL STAFF AREA DROPS USE GREEN OR BLUE. FOR ALL CUSTOMER SIDE DROPS USE ORANGE. FOR ACCESS CONTROL AND BUILDING AUTOMATION USE PURPLE. FOR ALL FIRE AND EMERGENCY SYSTEMS USE RED.
b. Remove COMMUNICATIONS SYSTEMS General Note #3 verbiage and replace with “NOT USED.”
3. Sheet E-100
a. Append the following to Basement Demolition Plan Detail Note #5 – “EXISTING DATA RACK COMPONENTS WILL BE REMOVED AND REINSTALLED BY SUCCESSFUL IT CONTRACTOR AND COORDINATED WITH DPL IT. RETURN THIS EQUIPMENT TO DPL IT UNTIL TIME FOR RE-INSTALLATION.”
b. Add a General Note “C” for each plan – “REMOVE EXISTING DATA AND TELEPHONE
CABLES, AS REQUIRED FOR DATA AND TELEPHONE CABLE REPLACEMENT. SEQUENCE WORK AND COORDINATE TIMING WITH OWNER TO MINIMIZE DOWNTIME ASSOCIATED WITH EACH TELEPHONE CABLE.”
4. Sheet E-200
a. Replace “SHALL BE PROVIDED BY TENANT COMMUNICATIONS SYSTEM VENDOR UNDER SEPARATE CONTRACT” with “SHALL BE PROVIDED AS PART OF THIS CONTRACT”. In Note 1, on Sheet E-200, under “SYSTEM FURNITURE SCHEDULE & CONNECTIONS”.
b. Revise First Floor Detail Note #4 to require Category 6A cable. c. Revise First Floor Detail Note #6 to require Category 6A cable. d. Append to First Floor Detail Note #6: “PROVIDE J-BOX AS REQUIRED TO SPLIT CONDUITS
TO MATCH CONDUIT CONFIGURATION OF POKE-THRU.” e. Revise First Floor Detail Note #7 to require a 1-1/2” conduit or size 1-1/4” or larger to match floor
box data conduit hub. f. Revise First Floor Detail Note #12 to require Category 6A cable. g. Append to First Floor Detail Note #17: “PROVIDE POWER RECEPTACLE AND DATA
OUTLET AT ELEVATION REQUIRED FOR WAP.” h. Revise First Floor Detail Note #25 so 1-1/4” conduit is used for (4) data drops, and 1” conduit is
used for (3) data drops. i. Revise First Floor Detail Note #33 to require Category 6A cable. j. Revise Basement Detail Note #19 to require Category 6A cable. k. Add a General Note “C” for FIRST FLOOR and BASEMENT plans – “REPLACE ALL
EXISTING DATA CABLES ON-SITE. CONTRACTOR IS NOT RESPONSIBLE FOR REPLACING CUT OFF CABLES (UP TO 35 CABLES). THE CONTRACTOR IS NOT RESPONSIBLE FOR THE TELEPHONE CABLES (UP TO 29 CABLES). THESE ARE SUPPLIED AND INSTALLED BY OWNER.”
l. Replace First Floor Detail Note #34 with “NOT USED.” m. Add requirements to First Floor Plan as required to install an Online Patron Access Catalog
(OPAC), including: i. Review architectural plans and coordinate location of power and data outlets to match
OPAC furniture installer’s instructions.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
ii. Provide a data outlet with (2) receptacles and a duplex power receptacle for the OPAC, coordinated with OPAC furniture. Circuit the power receptacle to Circuit 26 in Panel “LL2B”. Route power concealed through floor and wall to basement.
n. Data outlets in the following locations shall be revised to be (2) data receptacles, instead of (4). Ensure pullstring is included as per typical data outlet:
i. North Offices, Studies, and Conference Room. (Rooms 115, 114, 113, 112, 111.) ii. Community/Learning Plaza (Room 106).
iii. Staff Office (Room 116). iv. (5) Data outlets in south half of Open Library area, Room 110. (South of grid line #5). v. (3) Data outlets in area east of First Floor elevator access, west of gridline F.
o. Revise data outlet in Break Rm. 117 to have (2) data receptacles.
5. Sheet E-300 a. Delete (2) receptacles as referenced by Detail Note 34 near gridlines B and 4. Delete associated
homerun to LL2B-26. (Circuit LL2B-26 panel schedule description on E-400 will be revised by another addenda item.)
b. Revise Detail Note 8 to indicate “ALTERNATE #04” instead of “ALTERNATE #08”. c. Revise Detail Note 13 to indicate “ALTERNATE #03” instead of “ALTERNATE #04”.
6. Sheet E-400 a. Replace Panel “LL2B” panel schedule note 2 with “NOT USED. b. Replace reference to “E-101” with “E-200” at One-Line Diagram Detail Note #1 on Sheet E-400. c. Revise circuit LL2B-26 panel schedule description to be “PATRON ACCESS PC”
7. Sheet E-401 (No edits.) QUESTIONS AND ANSWERS Q1. What is the anticipated start and finish date for the Hadley Library project? A. Anticipated start is May 1, 2017. Anticipated finish is November 1, 2017. Q2. Please confirm that audio visual (A/V) and security/access control is provided by Owner. A. Security/access control and public address only. Audio-visual scope is part of GC scope. Q3. Please confirm whether door 010 is new or existing? A. New install. See revised “Door Schedule”. Q4. Can more detail be provided on aluminum gates shown on sheet A-100 at the stairwells? They are not shown
on enlarged details. A. “Provide metal gate with the following requirements: Top rail to be at 48” AFF; vertical members space so as not to allow passage of 4” dia. sphere; gate width and bottom rail to be designed so that no space between adjacent sides and floor will not allow passage of 4” dia. sphere.; provide gate latch on stair side of gate.” Q5. Please confirm if building permit fees are required to be paid by the General Contractor as indicated in
general note 14/G-001, does the City waive these fees for their own projects? A. Building Permit fees are required to be paid by the General Contractor. Q6. Is there a preferred fire alarm vendor? A. No – there is no preferred fire alarm vendor.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q7. Will PVC piping be acceptable for above grade drain, waste, and vent piping? A. PVC on above grade piping as specified above is acceptable because return air plenums do not reside in project. Ensure schedule 40 solid core is provided. Q8. There are alternates on MEP sheets that are not part of the bid form. A few examples are the plumbing
fixture schedule on P-900, note 8/E-300, and note 34/E-200. Please advise. A. P-900 “Plumbing Fixture Schedule” Delete text for Note #13 replace with “Not Used”; Delete
“Alternate List” E-200 “Detail Notes – First Floor” delete text for note #34 Alternate #5 and replace with “NOT USED”. E-300 “Detail Notes” Note 8 change “Alternate #08” to “Alternate #04” E-300 “Detail Notes” Note 13 change “Alternate #04” to “Alternate #03”
Q9. What is the existing roofing system manufacturer? Is it under warranty? A. Johns-Manville installed in 2010 by Alpine Roofing. Q10. Is there an environmental report for the building or any asbestos abatement required or anticipated? A. There is an environmental report for the building, however any asbestos abatement if required is
not part of the General Contractor scope. Q11. What is the proposed construction schedule and duration? A. See Q1. Selected Contractor to propose a construction schedule and duration. Q12. Can we bid Manko 2450 storefront as an equal? A. Refer to Substitution Request responses. Q13. In spec 084113, section 3.2.B calls for an undefined test on the storefront. Need definition of this test. A. Delete Part “3.2 Field Quality Control” in its entirety. Q14. Will all the shelving and books be removed prior to construction start? By whom? A. All shelving and books will be removed prior to construction start by the library. Q15. The plans call for all existing carpet to be removed, saved and reinstalled. Finish Plan General Note 4 on
Sheet A-900 call to supplement with new tiles as needed. There currently is NO carpeting under the existing shelves, this should be accounted for in the bid unless the owner has stock.
A. Carpet stock will be provided to the General Contractor. Existing carpet is installed with “Interface Tact-tiles” and should be reinstalled using the same method.
Q16. First Floor Demolition Plan, Detail Note 6 on Sheet E-100 calls to remove the existing Fire Alarm Control
Panel and replace with new. The New Panel is identified on Sheet E-200 Note 28. The existing FACP is capable of performing all the tasks required in Note 28. It does not need to be replaced. The library will have to furnish the programming lockout codes to enable. All work associated with devices required to be relocated or added will still have to be accomplished.
A. Agreed existing FACP to stay. The Library will furnish code(s) to successful bidder for reprogramming for the new floor plan. Q17. The old roofing membrane was manufactured by Johns Manville and installed in 2010. It has a 20-year
warranty and the tie-ins and new penetrations must be completed with Johns Manville materials and to meet their specifications to keep the warranty in effect. The specs for the new roof list the manufacturers as Carlisle or Firestone. We feel it would be beneficial to all to include Johns Manville as an approved manufacturer.
A. Johns/Manville approved.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q18. Is AWI Certification a deal breaker. A. Follow specifications. Q19. Can we switch grade to AWI Custom Grade? AWI states that Premium Grade is used for special projects
only, probably, because it is so expensive. Further AWI Custom Grade is the most commonly used. A. Part “2.2 Plastic-Laminate-faced Architectural Cabinets” item “B. Grade” change “Premium” to
“Custom Grade”. Q20. SSF-1 is a Pental Chroma Quartz: Although the surface is solid, it is not a solid surface, it is stone. We
prefer 3 CM as it is cheaper than 2 CM. Is that okay? A. Yes “Finish Legend” has been revised, refer to revised sheet A-900. Q21. SSF-2 is Corian TBD: Can we get a specification or merely a Price Code A, B, C or D to keep playing
field level? A. SSF-2 has been deleted, refer to revised sheet A-900. Q22. WD-1: Is used on the book drop, but do we know a species Can we assume it paints. This also applies to
the Chair Rail. There is not detail or finish to that. A. WD-1 has been added to “Finish Legend”, refer to revised sheet A-900
Book drop – refer to revised detail 8/A-600 Chair rail – refer to revised sheet A-900.
Q23. Can a soils report be provided? A. No. Q24. Is there a site visit scheduled or can there be access granted for construction? A. Site visit took place on January 4, 2017. Q25. Per note 11 on AD-100 we are to remove all existing carpet tiles and salvage for re-installation. Can more
information be provided on how the carpet tiles are installed? If tile carpet is glued down salvaging it is impossible. Please confirm if it is glued down, if it is to be replaced.
A. Existing carpet is installed with “Interface Tact-tiles” and should be reinstalled using the same method. Q26. Please confirm AWI fabricator and installer certification is required for specification section 064116 or can
this certification be waived? A. Follow specifications. Q27. Per 064116 Premium grade is to be provide and is very expensive. Can Custom grade be provided as it is
most common? A. Part “2.2 Plastic-Laminate-faced Architectural Cabinets” item “B. Grade” change “Premium” to
“Custom Grade”. Q28. Per A-900, SSF-1 is to be Chroma Quartz @ 1½” but Chroma Quarts only comes in ¾” & 1¼” please confirm
if 1¼” is acceptable. A. Yes “Finish Legend” has been revised, refer to revised sheet A-900. Q29. We assume full overlay flush cabinets as shown in the elevations, not pursuant to specification
section 064116, which conflicts. A. Part “2.2 Plastic-Laminate-faced Architectural Cabinets” item “F. Type of Construction:” change
“Face Frame” to “Frameless”.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q30. Some of the HSS Tube Steel parts for the new elevator framework are called out as HSS6x5x1/2. This size is not available with any of the local steel vendors. I checked (6) different sources and no one was able to provide a price. Is there another size which can be used?
A. Steel member sizes have been revised, refer to revised details on S-004, S-006 andS-008. Q31. Sheet #E-000 under “Communications Systems” #3 states EC to install Data & Telecommunication cable.
Sheet #E-200 under System Furniture Schedule & Connections. Note #1 states Telephone/Data cabling and devices shall be provided by tenant communications systems vendor under separate contract. Could you be more definite and/or exact with duties?
A. This Addenda Revises System Furniture Schedule & Connection Notes to clarify accordingly. Q32. On sheet # E-400 Detail note #1 refers to grounding bus bar detail on sheet # E-101, should that be sheet #
E-200? A. See Addenda edits for Sheet E-400, which has been adjusted accordingly. Q33. Sheet # E-200 first floor detail note #3 could you give the manufacture and model specs for the projector
screen and who would be supplying them? A. This equipment needs to be provided by the General Contractor:
Screen: Da-Lite Tensioned Contour Electrol #39153LS (45”x80”, screen HD Progressive 1.1, color white) Projector Panasonic PT-EZ770Z with ceiling mounting bracket
Q34. Who are the present fire protection and communication vendors? A. Integrated Safety Services, Matthew Foster is the service provider. Q35. I do not see any fire protection sprinklers on the drawings. Would it be correct to say that they are not
needed? A. Incorrect, sprinklers are required. Refer to sheet AC-100.
Fire sprinkler design is issued as a performance specification. Scope of design is described in Fire Protection General Notes listed on MP-001 as well as within specification 211000-1.02.
Q36. Is the current roof under warranty? If it is what contractor is the roof warrantied by? What type of roof is the
existing roof? A. Yes. Alpine Roofing installed a Johns Manville TPO roof in 2010 with a 20-year warranty. Any new
work needs to keep the warranty intact. Q37. What are the terms of the existing roofing warranty? When was the roof installed and is anyone currently
maintaining the current roofing warranty? A. See Above Q36 Q38. Per the Specifications 075423, 2.1 Manufacturers, 2.1.A.1.a Alternate Manufacture is Carlisle TPO. Can
Versico also be used the alternative manufacturer they are the same company just different labeling? A. No, Refer to Substitution Request responses. Q39. The documents state that we must replace each existing cable with a new cable (Note 33 on sheet E-200).
However, not all existing cables are shown on the drawings. At the site this morning we saw several existing locations that are not shown.
A. Scope includes removal all of the existing data/phone cable. Install new CAT-6A in all existing locations AND new locations.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q40. Are we to only install new cables for the outlet locations shown on the drawings or do we have to budget for replacing existing cables not shown?
A. Provide new cables in every location, new and existing. Q41. (Please note that there are ~ 54 data, 29 telephone, and 35 cut-off cables in the basement telecom closet.
Are all of these are to be replaced with new) A. Contractor is not responsible for replacing the 35 -"cut-off" cables, these are supplied and installed
by Owner. The contractor is not responsible for the 29 telephone cables. Contractor is responsible for ALL new data cabling the 54 existing. Contractor is responsible for removal of all abandoned telecom cables as per the Sheet E-000 General Notes.
Q42. Please provide the product specifications for SSF-2, TP-1, VCT-1 and LVT-1 A. “Finish Legend” and “Finish Plan” have been revised, refer to revised sheet A-900. Q43. Please confirm if the project is City or State tax exempt. A. The City is not tax exempt. Please check CCD website
https://www.denvergov.org/content/denvergov/en/treasury-division/business-taxes.html and with the State to be sure.
Q44. Please confirm the roof type (material). Is there currently a warranty on the roof restricting who can do
work on it? A. See Above Q36 Q45. Please let us know what roofing contractor installed the current roof? A. See Above Q36 Q46. Who will carry the special inspections cost for structural materials observations and testing? A. The City will. Q47. Can you please confirm who has the HVAC controls? A. Westover, who is the local Andover Representative Q48. Can you please confirm if there is a proprietary fire alarm contractor? A. There is no proprietary fire alarm contractor. Q49. Please confirm where the prevailing wage rates for Denver, CO can be found that should be used for this
project, or are they all contained in the project specifications? A. The prevailing wage rates that we will be using were attached in addenda #2 Q50. Is there a specified or preferred location that the new fire riser for the upper zone is expected to go through
the floor and feed the spaces? A. Sheet P-100 add note to first floor plan in southwest corner of Corridor 119. “Location of new fire
riser location serving 1st floor”. Q51. The fire riser will need to increase to a 4” pipe. The fire department may or may not require that the FDC
be upsized as well which would require additional sprinkler, concrete, brick and drywall work. We will assume this is necessary as the entire system should be brought to current NFPA code requirements. Please confirm.
A. Existing riser serving basement zone should stay same size except for minor adjustments at fire entry location. New zone for upper level should be 4” riser. It appears existing 6” core through foundation would allow upsize for 4” FDC. Fire protection contractor to confirm requirements during their design. Existing 4” fire entry and backflow is acceptable to remain.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q52. The specifications manufacturers for Elevators call for a Basis of Design: Otis Elevator – Hydrolift. Are other manufacturers acceptable?
A. Remove Otis Elevator from acceptable manufactures. Provide Elevator from one of the following: 1. Schindler 330A 2. ThyssenKrupp Endura
Q53. Please provide assumed construction start date for this project. A. See Q1 above. Q54. Per Alpine Roofing, the existing roofing membrane was manufactured by Johns Manville and installed by
Alpine in 2010. It has a 20-year warranty and the tie-ins and new penetrations must be completed with Johns Manville materials to meet their specifications to keep the warranty in effect. Should the project specifications be amended to list Johns Manville as the sole-source manufacturer?
A. See Q36 above and refer to specification revisions. Q55. Per Toilet Accessory Schedule, the sizes of framed mirrors G5 & G9 is to be determined by the Architect.
Please provide sizes for bid purposes. A. Sizes have been added refer to revised “Toilet Accessory Schedule”. Q56. Please confirm that fire suppression system is to be extended to provide coverage at main floor and that
adequate water pressure exists to extend the system. A. See Q51 Q57. Sheet E-000 indicates that GC is to solicit bid(s) from building owner’s designated fire alarm contractor.
Please provide contact information. A. There is no proprietary fire alarm contractor. Integrated Safety Services, Matthew Foster is the
service Provider. Q58. Is any additional equipment (transponder, etc.) required to bring the existing fire alarm system up to code? A. Replacement of existing equipment is anticipated as part of the FACP replacement. Additional
transponders, etc. are not anticipated, as this is not a new building, nor larger than 50,000 sq ft. Q59. Sheet E-000, Note #3, states that all data & telecommunications cabling shall be installed by EC using vendor
identified in specifications. It does not appear that vendor is identified. Please provide additional information. A. See response to Question #33. Q60. Is the IT scope of work part of the work scope or will that be handled directly by Owner’s vendor? A. All telecommunications infrastructure work is included in the scope. Q61. Sheet E-000, “Communication Systems”, Note #5 is incomplete. Please provide rest of information. A. Note 5 continues under the second column under “Communications Systems”. Q62. Please confirm any/all security work related to card readers, devices and/or programming will be by Owner. A. Confirmed Q63. The bid form and specifications note four (4) alternates. The drawings identify a total of six (6) alternates
between sheets G-001, E-300 & P-900. Please clarify which alternates we are to carry and adjust bid form(s) accordingly.
A. P-900 “Plumbing Fixture Schedule” Delete Note #13; Delete “Alternate List” E-200 “Detail Notes – First Floor” delete text for note #34 Alternate #5 and make “NOT USED.” E-300 “Detail Notes” Note 8 change “Alternate #08” to “Alternate #04” E-300 “Detail Notes” Note 13 change “Alternate #04” to “Alternate #03”.
Contract No. 201632002 ADD- #3 January 25, 2017 Hadley Library Renovation
Q64. Sheet AC-100, Detail 2 notes a draft curtain at stair. It does not appear that this detail exists elsewhere in the drawings and/or specifications. Please provide additional information for this detail.
A. Refer to detail 4/A-500 Q65. Please provide detail for the Aluminum Gate noted on A-100, Detail 1. A. “Provide metal gate with the following requirements: Top rail to be at 48” AFF; vertical members
space so as not to allow passage of 4” dia. sphere; gate width and bottom rail to be designed so that no space between adjacent sides and floor will not allow passage of 4” dia. sphere.; provide gate latch on stair side of gate.”
Q66. Is there a sole-source building controls contractor (HVAC) that is to be solicited for pricing? A. Yes, per specification section 230923 Part 2.01.B - Andover Continuum – Installed by Westover
Controls. Q67. Has an Environmental Study been performed on this facility? Is there any concern for asbestos and/or lead
paint? If so, is abatement by Owner? A. Yes. Any abatement if required will be by the Owner. Q68. Is there a detail that provides more information as to the construction and specifications for the overhead
sectional glass door and man door noted in Alternate #03? A. No Q69. Please confirm that no window treatments (blinds, shades, etc.) are required for this project. A. Confirmed. Q70. In the Bid Form packet, page BF-7, the Total Bid Amount is requested twice. Can the third line item on
this page be eliminated? A. No. Q71. Re: Furniture Shelving Notes on A-900. The notes state for the GC to coordinate the reuse of shelving
from other facilities as well as the quantity and type of shelves per shelving unit. The notes also state that new shelving will be provided and installed as part of a separate contract and that excess shelving will be removed by the Owner. The responsibilities/expectations of the GC is unclear.
A. All shelving and books will be removed prior to construction start by the library. All new shelving design and installation will be by the City’s Architect and City’s vendor.
Q72. Please clarify which shelving is new and what is existing and what it expected of the GC - if any labor will
be required for work other than the installation of the end panels, who’s responsibility it is to determine what shelving is needed and what is available at other facilities, who will ultimately be responsible to determine the quantity and type of shelves needed?
A. See Q71 above. MATERIAL APPROVAL AND SUBSTITUTIONS
Substitution 01: Insulation – InsulRoof insulation Rejected
Substitution 02: Johns Manville TPO roof assembly Approved, specification 075423 to list as Basis of Design: Johns Manville TPO
CBA
4
3
2
1
A-8009
A-800 3
2
5
4
6
7
8
SS-1
SS-1
Women's103
Men's104
Joint in tile,Re: 10/A600
5' -
6 3/
4"
5' -
1"
4' - 9"
2' -
6"2'
- 6"
2' -
6"
6' -
10"
5' -
1"2'
- 6"
7' -
1 3/
4"
4' - 9"
C1
C1
E1E2
E1
S1
E2
B1F3
B1F2
B1
S1
B1
B1A2
A3A1
A1
A3A2
1' -
6"3'
- 0"
2' -
0"2'
- 0"
1' - 6" New drinking fountains,Re: Plumbing
J1
R
J1Book Drop
102
1' - 5"
(E) heatingregister
2' -
6"
Level 1100' - 0"
B
2' -
10"
4' -
0"
E1
E2
G9
C1
S1
CT-2
PT-10
CTB-11
3 2
4' -
0"
G9 A1
B1
A3A2
C1E1
E2
PT-10
CT-2
TP-1TP-1
1' -
0"4'
- 0"
TP-1TP-1
CTB-11
Level 1100' - 0"
B
4' -
0"
PT-10
CT-2J1CTB-1
1
32
S1
(E) window to remain. Providetile trim at joints with tile wall.
4' -
0"
CT-2
PT-10
(E) heating register
CTB-1
1
Level 1100' - 0"
E1C1
4' -
0"
PT-10
CT-2
CTB-1
1
3 2
S1E2
4' -
0"
PT-10
CT-2
R
CTB-1
1
4' -
0"
PT-10
CT-2
J1
CTB-1
1
32
G9A1
A3A2 F2
B1 B1
E1
C1
B1
F3
2' -
10"
4' -
0"
PT-10
CT-2
TP-1TP-1TP-1
CTB-1
Level 1100' - 0"
9
C1
G5
E2
4' -
0"
2' -
10"
PT-10
CT-2E1
CTB-1
1
PL-1
COUNTER& 4" BACKSPLASH
G5
2' -
10"
4' -
0"
SSF-1
PT-10
CT-2E1
CTB-1
1
9
B1 F3
4' -
0"
PT-10
CT-2
E1
CTB-1
1
4' -
0"
PT-10
CT-2
E2F3
CTB-1
1
D
9
A-800
18
17
20
19F3
B1E2
C1
G5SSF-1
E1
ADD-0032
GENERAL DIMENSIONS FOR MOUNTING HEIGHTS:
PAPER TOWELDISPENSER
SANITARY NAPKINDISPOSAL
SURFACEMOUNTED SOAP
DISPENSER
MOP RACK
4' -
0" M
ax.
SANITARYNAPKIN
DISPENSER
6' -
0"
2' -
7" 4' -
5"
GRAB BARS
6" Clear
1' - 0" Max.
3' - 0"
3' - 6"
3' - 3"
WASTERECEPTACLE
DRINKINGFOUNTAIN
Ope
rabl
e Pa
rtsM
ax. 4
8" to
3' -
0" M
ax.
± 3'
- 6"
ADA STANDARD
A1
A3
A2
C1E1 E2
F2/3R
COAT HOOK/HOOK STRIP
5' -
0" M
in.-
5' -
9" M
ax. STANDARD
ADA
4' -
0" M
ax.
TOILET SINK URINAL
1' -
5"
1' -
5" M
in. -
1' -
7" M
ax
2' -
10"
1' - 3" Min.1' - 6"
1' -
10"
STANDARDADA
1' - 3" Min.
THERMOSTAT ORINTERCOM
Highest OperablePart of Control
4' -
0" M
ax.
2' -
10"
BABYCHANGINGSTATION
Top of CounterWhen Open
CHILD SEAT
1' -
2"
S1
J1
TOILET TISSUEDISPENSER
1' -
3" M
in. -
48"
Max
.
7" Min. - 9" Max.
B1
MIRROR
3' -
4"
To Bottom Edge ofReflecting Surface
G
3' -
8"
3' -
3"
2' -
9"
2' -
9"
3' -
3"
D
2
1
Typ.11"
11"
V.I.F.
4' - 0"
C3M a
C3M a
C3M a
(2) layers 5/8" gyp. boardon 7/8" hat channelsA-800
11
109A
(4) layers 1/4" flexiblegyp. board on 7/8" flexiblefurring channels to formcurved surfaces, typ.
B
Wrap gyp. board toalum. window fromjamb, head, sill
1
7/8" furringchannel
Backer rodand sealant
Aluminumstorefrontsystem
5/8" gyp. board
Wood shimsas needed
(E) window
(E) exterior wall
SHEET No.
PROJECTNo.
PRINCIPAL INCHARGE
PROJECTMANAGER
CHECKEDBY
All reports, plans, specifications, computer files, fielddata, notes and other documents and instrumentsprepared by the Architect as instruments of service
shall remain the property of the Architect. TheArchitect shall retain all common law, statutory andother reserved rights, including copyright thereto.
Delta Description Date Issued
1/20
/201
7 9:
58:1
8 AM
A-800
JW35040 DH
ENLARGED PLANS,INTERIOR
ELEVATIONS,MOUNTING HEIGHTS
& SCHEDULE
2017 HADLEY BRANCHLIBRARY
RENOVATION
01 September 2016
PERMIT, BIDDING &CONSTRUCTION SET
JW
1890 SOUTH GROVE ST.,DENVER, CO, 80219
1/4" = 1'-0"1 ENLARGED RESTROOM PLAN 1/4" = 1'-0"2 MENS RESTROOM - NORTH
1/4" = 1'-0"3 MENS RESTROOM - EAST
1/4" = 1'-0"4 MENS RESTROOM - SOUTH 1/4" = 1'-0"5 MENS RESTROOM - WEST
1/4" = 1'-0"6 WOMENS RESTROOM - NORTH 1/4" = 1'-0"7 WOMENS RESTROOM - EAST
1/4" = 1'-0"8 WOMENS RESTROOM - SOUTH 1/4" = 1'-0"9 WOMENS RESTROOM - WEST
Toilet Accessory Schedule
TypeMark Description Manufacturer Model Type Comments
A1 GRAB BAR - 36" Bobrick B-5806x36 6" Clear from face of adjacent wallA2 GRAB BAR - 42" Bobrick B-5806x42 1'-0" Max from face of adjacent wallA3 GRAB BAR - 18" Bobrick B-5806x18 Vertical Grab BarB1 SURFACE MOUNTED-TOILET TISSUE DISPENSER Georgia-Pacific Compact 56782 GC to provide blocking. O.F.C.I.C1 SURFACE MOUNTED SOAP DISPENSER Gojo GC to provide blocking. O.F.C.I.E1 SURFACE MOUNTED ROLL TOWEL DISPENSER Georgia-Pacific enMotion 59462 GC to provide blocking. O.F.C.I.E2 RECESSED WASTE RECEPTACLE Bobrick B-3644F2 PARTITION MOUNTED SANITARY NAPKIN DISPOSAL Bobrick Contura
Series-B-4354F3 SURFACE MOUNTED SANITARY NAPKIN DISPOSAL Bobrick Contura Series-
B-271G5 FRAMED MIRROR Bobrick B-290-2436 Etch proof coating applied prior to installation. Size: 24"w x 36"hG9 FRAMED MIRROR Bobrick B-290-7236 Etch proof coating applied prior to installation. Size: 72"w x 36"hJ1 CHILD PROTECTION SEAT, WALL MOUNTED Koala Kare KB102-00R SANITARY NAPKIN DISPENSER Bobrick B-43500S1 HORIZONTAL, WALL MOUNTED, CHANGING STATION Bobrick KB110-SSWM Surface mounted
1/4" = 1'-0"17 STAFF RR - EAST 1/4" = 1'-0"18 STAFF RR - SOUTH
1/4" = 1'-0"19 STAFF RR - WEST 1/4" = 1'-0"20 STAFF RR - NORTH
1/4" = 1'-0"16 ENLARGED STAFF RR PLAN 1/4" = 1'-0"MOUNTING HEIGHTS
1/4" = 1'-0"10 ENLARGED SOUND ROOM PLAN
3" = 1'-0"11 NEW WINDOW IN (E) WALL
1 Addendum 3 1/24/2017
1
REF.
DW
UP
(2) S-1T-6 (10) S-1
(4) T-7
(2) S-1T-4
(12) S-1T-1
S-4
S-4
S-4
T-15 T-3
T-3
(2) S-1T-4
(2) S-1T-4
(2) S-1T-6
T-3
(2) S-2T-9
(4) S-2T-9
T-3
S-1
(4) S-6T-10
(2) S-7T-11
S-8,9,10,11
(2) S-6(2) S-1T-12T-13
MISC-1
D-1
D-1
D-1
D-2
D-3
D-3
(2) T-4(4) S-1
S-13
DISP-1 DISP-1 DISP-1
T-8
(2) T-16
E
EE
E
E
E
exist.lockers
E
printrelease
copy
PAC
ECELDD YR1VWM
YR1E
DPI
REF.
DW
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
E
E
exist.lockers
E
printrelease
coin
copy
PAC
S1448GS1448G
S1448GS1448G
IS1424G IS1422G
S1448GS1448G
IS1424G
IS1424GIS1424G
CB48
CB4
8
RS93
RS93
RE96
RE96
CB4
8
CB48
EC
ECRS45
CB48
CB4
8
RS93
RS93
EC
ILDD
ILDD
ELDD
ILDD
ELD ELD
ILDD
ILDD
ELDD
9624 9624
9624
9624
4824
9624 9624
HE12
HE12
YR1C
MB
YR1C
MB
RCE
J54
DZ DY
DX
DZT
DZ DY
DX
DZT
OF
RCE
YR1VWM
YR1E
DPI
HE1
2HE1
2YR
1CMB
YR1C
MB
RCE
J54
DZDY
DX
DZT
DZDY
DX
DZT
OFRCE
J54
HE12
HE12
YR1C
MB
YR1C
MB
RCE
J54
DZ DY
DX
DZT
DZ DY
DX
DZT
OF
RCE
YR1VWM
YR1E
DPI
YR1C
C
︵10
︶
CB27
CB27
YR1C
C
︵10
︶
CB2
7CB2
7
CB6912H
CB6912H
CB6912H
YR1C
C
︵10
︶
CB27
CB27
CB6912H
J
HGF
11
10
EDCBA
9
8
7
6
5
4
3
2
1
Vestibule100
Idea Lab109
Open Library110
Conference111
Study112
Study113Office
114Office
115
Break117
Staff RR118
CommunityLearning Plaza
106
Closet108
Custodial105
Men's104
Women's103
Book Drop102
N.I.C.
Closet107
Corridor119 Staff
116
EARLY CHILDREN'S 4'-0"
LANGUAGES 5'-0"
FICTION5'-0"
PER
IOD
ICAL
S 7'
-0"
CHILDREN'S5'-0"
MEDIA 5'-0"
HO
LDS
7'-0
"
EARLYCHILDHOODLEARNING
CHILDREN'SMEDIA 4'-0"
YA 5'-0"
NEW BOOKS5'-0"
CHILDREN'S 4'-0"
NO
NFI
C 5
'-0"
REF.
SERVICEPOINT
SELF-CHECK
SECURESTORAGE
BOOKDROP
PRINTSTATION
BOOK BINS
NO
NFI
C 7
'-0"
FOR INFORMATION ONLY / BY OTHERS
Sound Room109A
Storage109B
Entry101
DISPLAYBOARD
1
FINISH LEGEND
CPT-1 (reuse (E) carpet)
CPT-2
CPT-3
(E) Ceramic Tile
CT-1
VCT-1
VCT-2
FRP
Chair RailPT-5
1
1
FINISH ABBREVIATIONSACT ACOUSTICAL CEILING TILEAP ACRYLIC PANELAWP ACOUSTICAL WALL PANELSCG CORNER GUARDCT CERAMIC TILECTB CERAMIC TILE BASECONC CONCRETECPT CARPET(E) EXISTINGFRP FIBERGLASS REINFORCED PANELGWB GYPSUM WALLBOARDHDWR HARDWARELAM HIGH PRESSURE LAMINATELTG LIGHTINGPT PAINTPLBG PLUMBINGRB RESILIENT BASERS ROLLER SHADESS SOLID SURFACETB TACKBOARDTP TOILET PARTITIONVCT VINYL COMPOSITION TILEWD WOOD (PANELS OR TRIM)WMT WALK-OFF MAT
Vestibule100
Idea Lab109
Open Library110
Conference111
Study112
Study113
Office114
Office115
Break117
Staff RR118
CommunityLearning Plaza
106
Closet108
Custodial105
Men's104
Women's103
Book Drop102
CT-1CT-1
CPT-1
N.I.C.
CT-1
CPT-1
Closet107
Corridor119 Staff
116
CPT-2
CPT-2CPT-2
CPT-2
CPT-2
CPT-2
(E) CT(E) CT
V.I.F.
V.I.
F. CPT-1
CPT-1
Water-resistant GWB & FRP-1behind sink, to 48" A.F.F.
FRP-1 to 48" A.F.F.
PT-2
PT-3
PT-3
PT-5
PT-14
PT-8, all walls this room(PT-8.1, 8.2, as noted)
PT-7
PT-4
Coordinate final locations ofaccent carpet tiles with Owner
PT-7
PT-9
Sound Room109AStorage
109B
Entry101
CPT-3
CPT-1
VCT-1
PT-5
FRP-1 to 48" A.F.F.full perimeter
1X6 WD-1 chair rail. Centerline at 33" A.F.F.
1x6 WD-1 chair rail.Centerline at 33"A.F.F.
1x6 WD-1 chair rail.Centerline at 33"A.F.F.
PT-14
CPT-1
VCT-2
VCT-1
PT-14 PT-14PT-14PT-14
PT-72' - 0"
CPT-1
1
1
SSF-1
SSF-1SSF-1 SSF-1
SSF-1
SSF-1
1
1
11
1 1
1
PT-41
PT-1, all existingcolumns, U.O.N.
1
Column, PT-2
Column,PT-4
1
Column, PT-9
1
8
ADD-A04
1
1
1
1
Stai
r 112
2
Stai
r 212
1
PT-8.2
PT-8.2
Green screen;coordinate w/ Owner
PT-8
.1
1x6 WD-1 chair rail.Centerline at 33"A.F.F.
1
1
SHEET No.
PROJECTNo.
PRINCIPAL INCHARGE
PROJECTMANAGER
CHECKEDBY
All reports, plans, specifications, computer files, fielddata, notes and other documents and instrumentsprepared by the Architect as instruments of service
shall remain the property of the Architect. TheArchitect shall retain all common law, statutory andother reserved rights, including copyright thereto.
Delta Description Date Issued
1/20
/201
7 12
:01:
47 P
M
A-900
JW35040 DH
FINISH FLOOR PLANS,SCHEDULES &
SIGNAGE
2017 HADLEY BRANCHLIBRARY
RENOVATION
01 September 2016
PERMIT, BIDDING &CONSTRUCTION SET
JW
1890 SOUTH GROVE ST.,DENVER, CO, 80219
1/8" = 1'-0"1 FURNITURE PLAN
Room Finish Schedule
No. NameFloors Walls Ceiling
CommentsFinish Base Finish Accent Finish
004 I/T (E) to remain (E) to remain (E) to remain (E) to remain Touch up paint at areas of removed or new work.005 Electric (E) to remain (E) to remain (E) to remain (E) to remain006 Mechanical (E) to remain (E) to remain (E) to remain (E) to remain007 Future TI (E) to remain (E) to remain (E) to remain (E) to remain008 Boiler (E) to remain (E) to remain (E) to remain (E) to remain Touch up paint at areas of removed or new work.009 Elev Machine Room (E) to remain (E) to remain N/A (E) to remain010 Storage (E) to remain (E) to remain N/A (E) to remain011 Fire Sprinkler (E) to remain (E) to remain N/A (E) to remain012 Stair - RB-1 PT-1 PT-11100 Vestibule CPT-3 RB-1 PT-1 PT-11101 Entry CPT-1 PT-1 PT-6 / PT-7102 Book Drop (E) to remain (E) to remain (E) to remain (E) to remain103 Women's CT-1 CTB-1 CT-2 / PT-10 PT-11104 Men's CT-1 CTB-1 CT-2 / PT-10 PT-11105 Custodial (E) to remain (E) to remain PT-1 FRP-1 (E) to remain Patch & repair existing flooring materials as needed.106 Community Learning Plaza VCT-2 / (E) to remain (E) to remain PT-1 / PT-9 PT-3 (E) to remain107 Closet (E) to remain (E) to remain PT-1 (E) to remain Patch & repair existing flooring materials as needed.108 Closet (E) to remain (E) to remain (E) to remain (E) to remain109 Idea Lab VCT-1 RB-1 PT-8 / PT-8.1 / PT-8.2 (E) to remain
109A Sound Room CPT-1 RB-1 PT-8109B Storage VCT-1 RB-1 PT-8110 Open Library (E) to remain / CPT-2 (E) to remain PT-1 PT-2 / PT-3 / PT-4 /
PT-5 / PT-15(E) to remain See finish plan for accent carpet tiles in Children's Area. Patch &
repair existing flooring materials as needed.111 Conference (E) to remain (E) to remain PT-1 (E) to remain112 Study (E) to remain (E) to remain PT-1 PT-14 (E) to remain113 Study (E) to remain (E) to remain PT-1 PT-14 (E) to remain114 Office (E) to remain (E) to remain PT-1 PT-14 (E) to remain115 Office (E) to remain (E) to remain PT-1 PT-14 (E) to remain116 Staff (E) to remain (E) to remain PT-1 PT-14 (E) to remain Patch & repair existing flooring materials as needed.117 Break CPT-1 / VCT-2 / (E)
to remainRB-1 PT-1 PT-14 (E) to remain
118 Staff RR CT-1 CTB-1 CT-2 / PT-10 PT-11119 Corridor (E) to remain (E) to remain PT-1 (E) to remain120 Elev N/A N/A N/A N/A121 Stair 2 - RB-1 PT-1 PT-11122 Stair 1 - RB-1 PT-1 PT-11
0' 4' 8' 16'
N
1/8" = 1'-0"2 FINISH PLAN
Finish Legend
Mark Description Manufacturer Series Model Pattern Color Size Comments
(E) CT Existing Tile - - - - - -ACT-1 24 x 48 Acoustic Ceiling Tile Armstrong Ultima #1913 - White 24" x 48"CPT-1 Carpet Interface Urban Retreat - UR102 102994 Granite /
102992 Charcoal20" x 20" Provide a mix of the two tile colors. Coordinate final
amounts of each with Owner. To match (E) layout.CPT-2 Carpet Interface Cubic Colours - - 7258 Carnival 20" x 20" Accent in Children's. Provide quantitity (1) full box.
Coordinate installation locations with Owner.CPT-3 Carpet Interface Step Repeat - SR799 104936 Iron 20" x 20" Heavy-duty tufted carpetingCT-1 Ceramic Tile - Floor Daltile Veranda - - P506 Leather 13" x 20"CT-2 Ceramic Tile - Wall Daltile Matte Group 1 - - 0799 Pearl White 3" x 6"CTB-1 Ceramic Tile Base Daltile Veranda - - P506 Leather 6" x 13"FRP-1 Fiber Reinforced Plastic - - - - White -PL-1 Plastic Laminate Nevamar - - - WZ6004T Modern
Edge-
PT-1 Paint - Neutral Sherwin Williams - - - 258-C1 Spare White -PT-2 Paint - Children's Accent Sherwin Williams - - - 116-C4 Invigorate -PT-3 Paint - Children's Sherwin Williams - - - 148-C4 Melange
Green-
PT-4 Paint - Teen Sherwin Williams - - - 164-C5 Aquarium -PT-5 Paint - Doors Sherwin Williams - - - 283-C4 Pussywillow -PT-6 Paint Sherwin Williams - - - - - Not UsedPT-7 Paint - Portal & Book Drop Sherwin Williams - - - 106-C6 Show
Stopper-
PT-8 Paint - Idea Lab Sherwin Williams - - - 8.0: 258-C1 SpareWhite8.1: 150-C6Grasshopper, 8.2:131-C5 LemonTwist
- See Plan
PT-9 Paint - Community Learning Plaza Sherwin Williams - - - 185-C3 NotableHue
-
PT-10 Paint - Restrooms Sherwin Williams - - - 283-C2 ColonnadeGray
-
PT-11 Paint - Gyp Ceilings, Typ. Sherwin Williams - - - Match existing color -PT-12 Paint Sherwin Williams - - - - Not UsedPT-13 Paint Sherwin Williams - - - - Not UsedPT-14 Paint - Offices, Staff & Study Sherwin Williams - - - 187-C4 Dusty
HeatherPT-15 Paint - Door Frames, typ. Sherwin Williams - - - 236-C5 Cityscape -RB-1 Rubber Base Johnsonite - - - 20 Charcoal WG 4" highSSF-1 Solid Surface Countertop Chroma Quartz - - - BQ2088P Cotton
White Polish1 1/4" Thick Countertop 1 1/4" thick, Backsplash and apron 3/4"
thickTP-1 Powder Coated Toilet Partition Bradley Sentinel - Series
400- - 8517 Toffee - Overhead braced
VCT-1 Vinyl Tile Flooring Armstrong Standard ExcelonImperial Texture
- - 51861 Soft WarmGray
12" x 12"
VCT-2 Vinyl Tile Flooring Armstrong Standard ExcelonImperial Texture
51807 Shadow Blue 12" x 12"
WD-1 Wood Trim Maple - - - Paintgrade 1" x req'd See details for req'd sizes
Refer to finish plan for location of accent walls and accent flooring.
FINISH PLAN GENERAL NOTES:
1. Remove and replace all existing rubber base with RB-1.2. Paint walls, headers, and GWB soffits PT-1 unless otherwise noted.3. Provide floor transition strips along the full perimeter at all jointsbetween different floor materials.4. Remove (E) carpet tiles prior to commencement of work, and storefor reuse. Re-install tile at all flooring locations U.O.N. Supplement withnew tiles to match existing, as needed.5. Paint exposed columns PT-1 unless otherwise noted.6. Wayfinding signage and graphics by Library vendor. GC tocoordinate as required.
FURNITURE SHELVING NOTES:
1. GC to coordinate reuse of shelving from other facilities ((by Owner)to result in layout shown on plans.2. GC to coordinate with Owner for number and type of shelves pershelving unit.3. GC to install new end panels (provided as part of separate furniturecontract).4. New shelving shown for information only. To be provided andinstalled as part of separate contract.5. Excess shelving will be removed from site by Owner.
1
1 Addendum 3 1/24/2017
1
1
1
1
1
1
1
11
1
1
1
1
REF.
10
ED
9
8
Remove range & base cabinet
Remove (E) doors & drawersand prepare for new
Demolish (E) fixtures, finishes,accessories, casework andtoilet partitions in entire room
Remove (E) refrigerator & prepare for newRemove (E) garbage disposal & prepare for new
Remove (E) microwave & prepare for new 1
1
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1/8" = 1'-0"
ADD3-A01
2017 HADLEY BRANCH LIBRARYRENOVATION
PROJECT NO.35040
AD-100 DEMO PLAN
ISSUED:01/24/17ADDENDUM 3
1/8" = 1'-0"1 DEMO PLAN
1 Addendum 3 1/24/2017
FED
7
6
5
4
8
A-600
A-600
7
A-600
6 A-5001 A-600
4A-700
9
116
Elev120
Align
D6M a
1D6M a
1
2' -
2"
28' - 2 5/8"5' - 0 1/2"
10' - 3"
D6M a
1
A3M
A3M
109
Provide metal gate with the following req's: Top rail to be at 48" AFF;Vertical members spaced so as not to allow passage of4" dia. sphere;Gate width and bottom rail to be designed so that nospace between adjacent sides and floor will allowpassage of a 4" dia. sphere;provide gate latch on stair side of gate.
Emergencysign, seeschedule
Max. occupancysign, see schedule
3' -
0"
1
Face of (E) column
ADD3-A03
7
9
1
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1/8" = 1'-0"2017 HADLEY BRANCH LIBRARYRENOVATION
A-100 FLOOR PLANSADD3-A02
PROJECT NO.35040
ISSUED:01/24/17ADDENDUM 3
1/8" = 1'-0"1 MAIN LEVEL FLOOR PLAN
1 Addendum 3 1/24/2017
Level 1100' - 0"
D
New SSF-1countertop on(E) base cabs
New 24" dishwasher WhirlpoolWEDF320PADB; GC to fieldverify existing opening prior toorder
New WhirlpoolWMH32519FB; GCto field verify existingopening prior to order
(E) lockers toremain
Note: PL-1 doors anddrawers on (E) cabinets.
RB-1
1
1
Level 1100' - 0"
8
New SSF-1countertop on (E)base cabs
Note: PL-1 doors anddrawers on (E) cabinets.
New PL-1 cabinetdrawers
New WhirlpoolrefrigeratorWRT134TFDB; GCto field verify existingopening prior to order
1
New garbage disposalInSinkErator modelEvolution Select Plus.75 HP; connect to(E) power
1
Level 1100' - 0"
F
New self-checkwith cabinet below,O.F.O.I
Note: Printers and computers for 3M selfcheck to bestored in casework. Provide 3 Mockett air ventgrommet caps on side of each cabinet for venting.
7' -
2"
5
A-700
PT-5
PT-5
RB-1
N.I.C.
2' -
6"
15
A-600
Sim
SSF-11
4' -
0"
Aluminum gate. Auto-closing.Secure side posts to walls. Signageto note "Employee Access Only"
1
Level 1100' - 0"
FE8
A-600
Bookdrop
4" 1' - 4" 4"
3' -
10"WD-1 trim
Existing New
16
A-600
SimPT-5
PT-5
PL-1
± 2' - 5 1/2"2' - 0"
PT-12
PT-5
RB-1
PT-12
SSF-1
1
PT-7
1
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1/4" = 1'-0"2017 HADLEY BRANCH LIBRARYRENOVATION
A-600 DETAILS, INTERIORELEVATIONS & CASEWORK DETAILS ADD3-A03
PROJECT NO.35040
ISSUED:01/24/17ADDENDUM 3
1/4" = 1'-0"2 BREAK ROOM SOUTH WALL 1/4" = 1'-0"3 BREAK ROOM WEST WALL
1/4" = 1'-0"4 SELF-CHECK STATION 1/4" = 1'-0"7 INTERIOR BOOK DROP
1 Addendum 3 1/24/2017
Level 1100' - 0"
3' -
10"
4"
2" overhangWD-1 trim; PT-7
WD-1; PT-7
FRP
WD-1 jambbeyond; PT-7
Metal stud wall
Wood blocking
4"4"
Base asscheduled
45.0°
1
1
1
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1 1/2" = 1'-0"
ADD3-A04
2017 HADLEY BRANCH LIBRARYRENOVATION
PROJECT NO.35040
A-600 DETAILS, INTERIORELEVATIONS & CASEWORK DETAILS
ISSUED:01/24/17ADDENDUM 3
1 1/2" = 1'-0"8 INTERIOR BOOK DROP - ADD - SKA 004
1 Addendum 3 1/24/2017
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE:2017 HADLEY BRANCH LIBRARYRENOVATION
A-700 DOOR & WINDOW FRAMETYPES, SCHEDULES & DETAILS ADD3-A05
PROJECT NO.35040
ISSUED:01/24/17ADDENDUM 3
Door Schedule General Notes1. Wood doors to match (E) species, typ.2. Paint wood doors PT-5.3. Paint all (E) main level wood doors &HM doors PT-54. Paint all frames, for wood & HM doors,PT-15
1
DOOR SCHEDULE
NO. TYPE PAIRDOOR FRAME
HDWR COMMENTSWIDTH HEIGHT THICKNESS MATERIAL FINISH GLAZING TYPE MATERIAL FINISH
004 A - 3' - 0" 7' - 0" 1 3/4" HM - - F1 HM - 03005 EX - 3' - 0" 6' - 8" 1 3/4" - - - - - - - Existing006 EX - 3' - 0" 6' - 8" 1 3/4" - - - - - - - Existing007 A - 3' - 0" 7' - 0" 1 3/4" SCWD - - F1 HM - 06008 A - 3' - 0" 7' - 0" 1 3/4" SCWD - - F1 HM - 06009 A - 3' - 0" 7' - 0" 1 3/4" SCWD - - F1 HM - 06010 A Y 6' - 0" 6' - 8" 1 3/4" SCWD - - F1 HM - 07011 A - 3' - 0" 7' - 0" 1 3/4" SCWD - - F1 HM - 06100 EX Y 6' - 0" 6' - 8" 1 3/4" - - - - - - - Existing100A EX - 3' - 4" 6' - 8" 1 3/4" - - - - - - - Existing101 EX Y 6' - 0" 6' - 8" 1 3/4" - - - - - - - Existing102 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing103 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing104 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing105 EX - 2' - 6" 6' - 8" 1 3/4" - PT - - - PT - Existing106 EX Y 6' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing106A A - 3' - 0" 7' - 0" 1 3/4" SCWD PT - F1 HM PT 08106B EX - 19' - 0" 10' - 0" - - - - - - - (E) Folding accordion partition to remain107 EX Y 5' - 6" 6' - 8" 1 3/4" - PT - - - PT - Existing108 EX - 2' - 6" 6' - 8" 1 3/4" - PT - - - PT - Existing109 B Y 6' - 0" 7' - 0" 1 3/4" ALUM Clear
AnnodizedG1T - ALUM Clear
Annodized04 180 deg. hinges
109A D - 3' - 0" 7' - 0" 1 3/4" SCWD PT G1T F1 HM PT 01 Insulated door109B A - 3' - 0" 7' - 0" 1 3/4" SCWD PT - F1 HM PT 05110 EX - 3' - 0" 6' - 8" 1 3/4" - PT
PT- - - PT - Existing
111 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT 12 Existing door and frame, new hardware112 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT 12 Existing door and frame, new hardware113 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT 12 Existing door and frame, new hardware114 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT 13 Existing door and frame, new hardware115 EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing116 D - 3' - 0" 7' - 0" 1 3/4" SCWD PT G2T F1 HM PT 03 Coord. card reader lock with Library security contractor.117A D - 3' - 0" 7' - 0" 1 3/4" SCWD PT G2T F1 HM PT 08117B EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT 03 Existing door and frame, new hardware117C EX - 3' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing117D EX Y 5' - 0" 6' - 8" 1 3/4" - PT - - - PT - Existing118 EX - 2' - 8" 6' - 8" 1 3/4" - PT - - - PT - Existing119A A - 3' - 0" 6' - 8" 1 3/4" SCWD PT - F1 HM PT 10 Alarmed Panic Hardware119B EX - 3' - 8" 6' - 8" 1 3/4" - PT - - - PT - Existing121 B - 3' - 0" 7' - 0" 1 3/4" SCWD PT G2T F2 HM PT 09
1
1
1 Addendum 3 1/24/2017
1
1
1
1
1
1
1
1
1
1
1
Level 1100' - 0"
3
A-700
4
A-700
6
A-700
5
A-700
11
A-700
7
A-7007' -
2"
4' - 5"4' - 4"4' - 4"6' - 2"4' - 4"4' - 5"
Line of 80° rotation
2' -
8"4'
- 6"
28' - 0"
G1T G1T G1TG1T G1T
G1T G1T
Re: Structural for wall framing andattachment to existing structure.
1
303.607.0040Denver, Colorado 802052100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1/4" = 1'-0"2017 HADLEY BRANCH LIBRARYRENOVATION
A-700 DOOR & WINDOW FRAMETYPES, SCHEDULES & DETAILS ADD3-A06
PROJECT NO.35040
ISSUED:01/24/17ADDENDUM 3
1/4" = 1'-0"9 IdeaLAB North Storefront
1 Addendum 3 1/24/2017
DC
7
6
5
-
---
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
EX CMU BEARING WALLTO BE REMOVE
EX CMU BEARING WALLTO REMAIN
PIT WALL10"
HSS5X5X1/2
2
S-005
TYP
1
S-005
TYP
EX CMU BEARING WALLTO REMAIN
1
303.607.0040
Denver, Colorado 80205
2100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 1/4" = 1'-0"
ADD3-S01
2017 HADLEY BRANCH LIBRARYRENOVATION
PROJECT NO.165014
BASEMENT FOUNDATION PLAN
ISSUED:01/24/17
1/4" = 1'-0"1
BASEMENT FOUNDATION PLAN - ADD3
1 Addendum 3 January 24, 2017
(EXCERPT FROM DETAIL 1, SHEET S-004)
D7
6
5
6
S-008
-
---
HSS8X4X3/8
HS
S8X
4X
3/8
HS
S8X
4X
3/8
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HS
S5X
5X
1/2
HSS8X4X3/8
2
S-008
TYP
3
S-008
SIM
HSS5X5X1/2
HSS5X5X1/2
HS
S8X
4X
3/8
HS
S8X
4X
3/8
/7 S-008
HSS8X4X3/8
NOTCH EX CMU WALL FOR BEAM BEARING-GROUT FULL CELLS BELOW AND EACH SIDE OF BEAM (3 CELLS MIN)& INSTALL IMBED BASE PLATE WITH (2) 5/8"DIA x 6" HAS EMBED-WELD BEAM TO BASE PLATE WITH 3" FLARE BEVEL WELD (EA SIDE)-GROUT POCKET FLUSH WITH CMU FACE
3
S-008
SIM
1
303.607.0040
Denver, Colorado 80205
2100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 3/8" = 1'-0"
ADD3-S02
2017 HADLEY BRANCH LIBRARYRENOVATION
PROJECT NO.165014
MAIN LEVEL FRAMING CALLOUT
ISSUED:01/24/17
1 Addendum 3 January 24, 2017
3/8" = 1'-0"2
MAIN LEVEL FRAMING CALLOUT - ADD3
(EXCERPT FROM DETAIL 2, SHEET S-006)
STEEL ELEVATOR FRAMINGWITHIN SHAFT WALLRE: PLAN
1/4 1-3
1/4 1-3ANGLE TO HSS
T.O. DECK
RE: PLAN
EX CONC DECKRE: PLAN
L6x4x¼" LLV CONT ANGLEOR STEEL BENT PLATEPROVIDE 1/4" STIFFENER PL@ 2' OC MAX
1/4" STIFFENER PL@ 2' OC MAX
BEARING3" MIN
INTERIORELEVATOR SHAFT
B.O. DECK
T.O. BM
1
1/4
BM TO COL~TYP
303.607.0040
Denver, Colorado 80205
2100 Downing Street
303.607.0041 fax
Drawing Number
Delta Description Date Issued
SCALE: 3/4" = 1'-0"
ADD3-S03
2017 HADLEY BRANCH LIBRARYRENOVATION
PROJECT NO.165014
BEAM CONNECTIONS
ISSUED:01/24/17
1 Addendum 3 January 24, 2017
3/4" = 1'-0"2
CONCRETE FLOOR EDGE SUPPORT -ADD3
(EXCERPT FROM DETAIL 2, SHEET S-008)