suite 500 2815 coliseum centre drive charlotte, north carolina 28217 t] 704.379.1919 f] 704.379.1920 www. adw architects.com Addendum #1 July 26, 2018 Re: Addendum No. 1 Pilot Mountain State Park Visitor Center 1792 Pilot Knob Park Road Pinnacle, NC 27043 ADW Job No. 16088 These clarifications constitute Addendum No. 1 and considered part of the Bid Documents. General Contractor shall see that their sub-contractors are in full receipt of the information contained herein. General Clarifications: 1.) Mailed bids will not be accepted. Bids are to be hand delivered to the Pilot Mountain State Park Visitors Center attention Matt Windsor at 1792 Pilot Knob Park Road, Pinnacle, NC 27043. 2.) The GC is to maintain the existing park entry road clean of mud, dirt & debris due to construction activities by washing or sweeping as needed or as directed by the Park Superintendent. 3.) The GC is to coordinate with the Park Superintendent any deliveries or construction activities that occur Friday before a Holiday weekend 4.) See attached pre-bid meeting attendance list for July 25 th , 2018. Project Manual: 1.) Section 00 01 01 Table of Contents. a. See attached revised Table of Contents which includes a listing of items in divisions 00, 01 & 03. 2.) Section 01 23 00 Alternates: a. Part 2-Products: Item 2.02-Alternate No. 2: Add storage room #108 to receive Epoxy Floor. 3.) Section 06 18 00 prefabricated Structural Wood: Section 1.02 part C-manufacturers: Add Timber Systems, 162 S. Saginaw Street, Lapeer, MI (810) 245-6212 Contact Kristin Riedel as an approved manufacturer. 4.) Section 07 27 26 Fluid-Applied Membrane Air Barriers: Part 2.3 A item 1: Add TK-Airmax 2104 Vapor Permeable Air Barrier and TK-Climate Tech by TK products Construction Coatings as an acceptable manufacturer and products. 5.) Section 12 21 14 Horizontal wood blinds: The following rooms are to receive horizontal wood blinds: Multi-purpose #105 (3-windows Type E)

Transcript of Addendum #1 - North Carolina Pilot Mountain New... · Addendum #1 . July 26, 2018 . Re: Addendum...

suite 500 2815 coliseum centre drive charlotte, north carolina 28217 t] 704.379.1919 f] 704.379.1920 w w w . a d w a r c h i t e c t s . c o m

Addendum #1 July 26, 2018 Re: Addendum No. 1 Pilot Mountain State Park Visitor Center 1792 Pilot Knob Park Road

Pinnacle, NC 27043 ADW Job No. 16088

These clarifications constitute Addendum No. 1 and considered part of the Bid Documents. General Contractor shall see that their sub-contractors are in full receipt of the information contained herein.

General Clarifications:

1.) Mailed bids will not be accepted. Bids are to be hand delivered to the Pilot Mountain State Park Visitors Center attention Matt Windsor at 1792 Pilot Knob Park Road, Pinnacle, NC 27043.

2.) The GC is to maintain the existing park entry road clean of mud, dirt & debris due to construction activities by washing or sweeping as needed or as directed by the Park Superintendent.

3.) The GC is to coordinate with the Park Superintendent any deliveries or construction activities that occur Friday before a Holiday weekend

4.) See attached pre-bid meeting attendance list for July 25th, 2018. Project Manual:

1.) Section 00 01 01 Table of Contents. a. See attached revised Table of Contents which includes a listing of items in divisions 00,

01 & 03.

2.) Section 01 23 00 Alternates: a. Part 2-Products: Item 2.02-Alternate No. 2: Add storage room #108 to receive Epoxy

Floor.

3.) Section 06 18 00 prefabricated Structural Wood: Section 1.02 part C-manufacturers: Add Timber Systems, 162 S. Saginaw Street, Lapeer, MI (810) 245-6212 Contact Kristin Riedel as an approved manufacturer.

4.) Section 07 27 26 Fluid-Applied Membrane Air Barriers: Part 2.3 A item 1: Add TK-Airmax 2104 Vapor Permeable Air Barrier and TK-Climate Tech by TK products Construction Coatings as an acceptable manufacturer and products.

5.) Section 12 21 14 Horizontal wood blinds: The following rooms are to receive horizontal wood

blinds: Multi-purpose #105 (3-windows Type E)

Page 2 of 2 a d w a r c h i t e c t s

Multi-purpose #106 (3-windows Type E) Open office #111 (2-windows Type D) Superintendent #112 (1-window Type D) Retail #103 (3-windows Type E)

Drawings:

1.) Cover sheet A000: a. Delete C504 from the drawing list. This sheet does not exist in the civil drawings. b. Alternates: Alternate #2-add storage room #108 to receive epoxy floor system.

2.) C100:

a. Sheet Index: Delete sheet C504 from index.

3.) C200: a. Delete reference to alternate #2 at patio area. Patio area will be in the base bid.

4.) S100:

a. See attached sheet S100 for footing revision along grid C1.

5.) S200: a. See attached sheet S200 for top of wall revisions along grid 7.

6.) S503:

a. See attached sheet S503 for revisions to detail 3/S503.

Exhibit Drawings:

1.) See attached revised sheet CW-3 of the exhibit drawings. The beam that bisects the displays has been changed to a plywood beam wrapped in veneer to match Glulam beams.

End of Addendum #1 Cc: \File

SECTION 00 01 10 – TABLE OF CONTENTS

SCO ID# 16-14418-01A 00 01 10 - 1

PILOT MOUNTAIN VISITOR CENTER Pinnacle, NC ADW Project Number: 16088.00

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS Section 00 01 01 - Project Title Page Section 00 01 10 - Table of Contents Section 00 01 11 - Professional Seals Page Section 00 01 15 - List of Drawings Section 00 11 13 - Advertisement for Bids Section 00 21 19 - Notice to Bidders Section 00 31 32 - Geotechnical Data Section 00 31 33 - Pilot Mountain Visitor Center Geotech Report Section 00 72 00 - Instruction to Bidders & General Conditions Section 00 73 00 - Supplementary General Conditions Section 00 74 00 - Guidelines for MBE Participation in State Construction Projects

DIVISION 01 - GENERAL REQUIREMENTS Section 01 10 00 - Summary of Work Section 01 22 00 - Unit Prices Section 01 23 00 - Alternates Section 01 25 00 - Substitutions-Prior to bid Section 01 25 13 - Substitutions-Post Bid Section 01 26 00 - Contract Modification Procedures Section 01 29 00 - Payment Procedures Section 01 29 13 - State and County Tax Form Section 01 33 00 - Submittal Procedures Section 01 33 00A - ADW Electronic Machine-Readable File Release Form Section 01 40 00 - Quality Requirements Section 01 42 00 - References Section 01 45 29 - Testing Laboratory Services Section 01 58 00 - Project Identification Section 01 73 29 - Cutting and Patching

DIVISION 02 - EXISTING CONDITIONS

Not Used

DIVISION 03 - CONCRETE Section 03 30 00 - Cast-in-place Concrete Section 03 45 00 - Precast Architectural Concrete

TABLE OF CONTENTS SECTION 00 01 10

SCO ID# 16-14418-01A 00 01 10 - 2

DIVISION 04 - MASONRY Section 04 20 00 - Unit Masonry Section 04 73 00 - Calcium Silicate Manufactured Stone DIVISION 05 - METALS Section 05 12 00 - Structural Steel Framing Section 05 31 00 - Steel Decking Section 05 40 00 - Cold-Formed Metal Framing

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES Section 06 17 36 - Metal-Plate-Connected Wood Trusses Section 06 18 00 - Pre-Fabricated Structural Wood Section 06 20 00 - General Carpentry Section 06 22 00 - Millwork

DIVISION 07 - THERMAL AND MOISTURE PROTECTION Section 07 19 00 - Water Repellants Section 07 21 13 - Board Insulation Section 07 21 16 - Blanket Insulation Section 07 21 60 - Continuous Insulation Walls Panels Section 07 25 00 - Weather Barrier Membrane Section 07 27 26 - Fluid-Applied Membrane Air Barriers Section 07 30 10 - Self-Adhering Roofing Underlayment – HT (@ Metal Roof Location

Only) Section 07 31 03 - Fiberglass-Reinforced Asphalt Shingles-30 year Section 07 44 00 - Concrete Faced Insulated Perimeter Wall Panels Section 07 46 46 - Mineral Fiber Cement Siding Section 07 54 19 - Polyvinyl Chloride (PVC) Roofing Section 07 61 13 - Standing Seam Metal Roofing Section 07 62 00 - Sheet Metal Flashing & Trim Section 07 71 23.13 - Manufactured Downspout Adapters Section 07 72 53 - Snow Guards (Metal Roofs) Section 07 72 53.01 - Snow Guards (Asphalt Shingle Roofs) Section 07 84 00 - Through-Penetration Firestop Systems Section 07 90 00 - Sealants

DIVISION 08 - OPENINGS Section 08 11 13 - Hollow Metal Doors and Frames Section 08 14 16 - Flush Wood Doors Section 08 31 13 - Access Doors and Frames Section 08 41 13 - Aluminum-Framed Entrances and Storefronts Section 08 44 13 - Glazed Aluminum Curtain Walls

TABLE OF CONTENTS SECTION 00 01 10

SCO ID# 16-14418-01A 00 01 10 - 3

Section 08 52 13 - Aluminum-Clad Wood Windows Section 08 71 00 - Door Hardware Section 08 71 01 - Door Hardware Schedule Section 08 81 00 - Glass Glazing Section 08 91 00 - Louvers

DIVISION 09 - FINISHES Section 09 21 16 - Gypsum Board Assemblies Section 09 30 00 - Tiling Section 09 51 00 - Acoustical Ceilings Section 09 65 19 - Resilient Floorings & Accessories Section 09 67 10 - Fluid Applied Epoxy Flooring Section 09 68 13 - Tile Carpeting Section 09 91 00 - Painting Section 09 98 60 - Sanitary Wall Finish

DIVISION 10 - SPECIALTIES Section 10 11 00 - Visual Display Surfaces Section 10 14 00 - Signage Section 10 21 13 - Toilet Compartments - Solid Plastic Section 10 28 13 - Toilet Accessories Section 10 28 14 - Baby Changing Stations Section 10 44 00 - Fire Extinguishers and Cabinets Section 10 75 00 - Flagpoles

DIVISION 11 - EQUIPMENT Not Used

DIVISION 12 - FURNISHINGS Section 12 21 13 - Horizontal Wood Blinds

DIVISION 13 - SPECIAL CONSTRUCTION

Not Used

DIVISION 14 - CONVEYING DEVICES

Not Used

DIVISION 21 - FIRE SUPPRESSION Not Used DIVISION 22 - PLUMBING

TABLE OF CONTENTS SECTION 00 01 10

SCO ID# 16-14418-01A 00 01 10 - 4

Section 22 05 00 - Plumbing General Section 22 05 03 - Plumbing Pipe, Tube & Fittings Section 22 05 23 - General-Duty Valves for Plumbing Piping Section 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment Section 22 05 53 - Identification for Plumbing Piping and Equipment Section 22 07 00 - Plumbing Insulation Section 22 11 13 - Facility Water Distribution Piping Section 22 13 13 - Facility Sanitary Sewers

DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) Section 23 05 00 - Common Work Results for HVAC Section 23 05 13 - Common Motor Requirements for HVAC Equipment Section 23 05 29 - Hangers and Supports for HVAC Piping and Equipment Section 23 05 53 - Identification for HVAC Piping and Equipment Section 23 05 93 - Testing, Adjusting and Balancing for HVAC Section 23 07 00 - HVAC Insulation Section 23 11 23 - Facility Natural-Gas Piping Section 23 23 00 - Refrigerant Piping Section 23 31 13 - Metal Ducts Section 23 33 00 - Air Duct Accessories Section 23 34 23 - HVAC Power Ventilators Section 23 37 13 - Diffusers, Registers and Grilles Section 23 37 23 - HVAC Gravity Ventilators Section 23 81 26 - Split-System Air-Conditioners

DIVISION 26 - ELECTRICAL Section 26 05 00 - Common Work Results for Electrical Section 26 05 19 - Low-Voltage Electrical Power Conductors and Cables Section 26 05 26 - Grounding and Bonding for Electrical Systems Section 26 05 29 - Hangers and Supports for Electrical Systems Section 26 05 33 - Raceway and Boxes for Electrical Systems Section 26 05 43 - Underground Ducts and Raceways for Electrical Systems Section 26 05 48 - Vibration and Seismic Controls for Electrical Systems Section 26 05 53 - Identification for Electrical Systems Section 26 09 23 - Lighting Control Devices Section 26 24 16 - Panelboards Section 26 27 26 - Wiring Devices Section 26 28 13 - Fuses Section 26 28 16 - Enclosed Switches and Circuit Breakers Section 26 41 13 - Lightning Protection for Structures Section 26 43 13 -Transient-Volt Suppression for Low-Voltage Electrical PowerCircuits Section 26 51 00 - Interior Lighting Section 26 51 19 - LED Interior Lighting

TABLE OF CONTENTS SECTION 00 01 10

SCO ID# 16-14418-01A 00 01 10 - 5

Section 26 56 00 - Exterior Lighting

DIVISION 27 - TELECOMMUNICATIONS

Not Used

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

Section 28 31 11 - Digital, Addressable Fire-Alarm System DIVISION 31 - EARTHWORK Section 31 10 00 - Site Clearing Section 31 20 00 - Earth Moving Section 31 20 20 - Erosion Control Section 31 23 19 - Dewatering Section 31 31 00 - Soil Treatment DIVISION 32 - EXTERIOR IMPROVEMENTS Section 32 12 16 - Asphalt Paving Section 32 13 13 - Concrete Paving Section 32 13 73 - Concrete Paving Joint Sealants Section 32 17 23 - Pavement Markings Section 32 92 00 - Turf and Grasses DIVISION 33 - UTILITIES Section 33 05 00 - Common Work Results for Utilities Section 33 41 00 – Storm Utility Drainage Piping Section 33 46 00 – Storm Sub Drains FORMS

- Form of Proposal - MBE Contractor List and Affidavits A thru E - Form of Bid Bond - Form of Construction Contract Checklist - Form of Construction Contract - Form of Performance Bond - Form of Payment Bond - Sheet for attaching Power of Attorney - Sheet for attaching Insurance Certificates - Form of Approval of the Attorney General and the Office of State

Budget and Management

END OF SECTION 00 01 10

CDRevisions

Notes

PIL

OT

MO

UN

TAIN

STA

TE P

AR

KP

INN

AC

LE, N

C

334.500

4.000

12.000 12.000 12.000

60.000 67.000 77.000

4.000

4.000

78.000

34.500 60.000 48.000 48.000 36.000 36.000 36.000

SECTION 3&5CENTERWALL-1

CW-3

6/20/2018 DMH6/28/2018 DMH

PLYWOOD BEAM WRAPPED IN VENEER (specified to match GLULUM BEAMS)

ARTIFACT CASES WITH ADJUSTABLE SHELVING BLACK, OR TEMPERED GLASS SHELVES•1/4" THICK TEMPERED GLASS GLAZING ON OUTSIDE OF CASE•ACCESS BY TAKING OFF TOP AND BOTTOM LAMINATED PANELS•

12.000 12.000 12.000

CW-R1 CW-R2

CW-R3CW-R4

1CW-3 1/2" = 1'

3 & 5 CENTER WALL-3

CW-P2

CW-P3 CW-P4 CW-P5 CW-P6 CW-P7 CW-P8