Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.
-
Upload
jalen-covel -
Category
Documents
-
view
215 -
download
2
Transcript of Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.
Add Doors to Open Multi-deck Cases: Provisional UES
RTF MeetingAugust 30, 2011
1
Thanks to All Participants
2
Measure Summary
• Retrofitting insulated glass doors to existing medium temperature open multi-deck cases
• Provisional savings estimates ~440-kWh/lin ft and 52-therms/lin ft
• Based on a DOE2.2r simulation
• Requesting Provisional UES Status
3
Proposed Provisional UES Values
Measure
Site Savings (kWh/ft)
Site Savings
(therms/ft)Measure
Life
Capital Cost ($/ft)
TRC B/C Ratio
Door Retrofit- No night covers in Baseline/Multiplex Compressor- Seattle, WA 457.2 57.4 12 $566 1.9
Door Retrofit- Night covers in Baseline/Multiplex Compressor- Seattle, WA 415.2 51.9 12 $566 1.8
Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Seattle, WA 477.4 57.4 12 $566 2.0
Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Seattle, WA 432.7 51.9 12 $566 1.8
Door Retrofit- No night covers in Baseline/Multiplex Compressor- Spokane, WA 419.1 51.7 12 $566 1.8
Door Retrofit- Night covers in Baseline/Multiplex Compressor- Spokane, WA 377.5 46.5 12 $566 1.6
Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Spokane, WA 436.7 51.7 12 $566 1.8
Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Spokane, WA 392.7 46.5 12 $566 1.6
Door Retrofit- No night covers in Baseline/Multiplex Compressor- Billings, MT 417.3 48.0 12 $566 1.7
Door Retrofit- Night covers in Baseline/Multiplex Compressor- Billings, MT 371.6 43.1 12 $566 1.5
Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Billings, MT 433.9 48.0 12 $566 1.8
Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Billings, MT 386.1 43.1 12 $566 1.6
Standard Protocol Checklist
5
Link: Appendix A - Guidelines Checklist Grocery Refrigeration Systems.xlsx
Modeling Methodology
6
• Modeled using DOE 2.2R• “Typical” store was built using GrocerSmart
Audit Data• Multiplex Baseline assumes Floating Head Pressure, T8
lamps, and EC motors are in place.• Stand-alone system baseline assumes T8 lamps and EC
motors.
• Infiltration, conduction, and radiation load based on manufacturer data, the ASHRAE Refrigeration Handbook, and SCE lab test reports
DOE2.2R- Modeling Constants
7
DOE2.2R- Key Variables
8
Case Refrigeration Load
9
Compressor Energy Use
10
Whole Building Energy Use
11
Calibration Plan• Collect Metered Data
– Rack: Volts, Amps, PF– Condenser: Volts, Amps, PF– HVAC Unit: 1-time Voltage reading, Amps– Hourly Natural Gas via Utility Interval Meter– Hourly Outside Air Temperature
• Minimum 3 weeks baseline • Minimum 3-weeks post
– This is a direct load measure. We expect less seasonal interaction than system measures like floating head pressure.
12
Calibration Plan• Develop regressions for daily or hourly
refrigeration use correlated to ambient temperature
• Annualize using TMY data– Pre, Post and Savings (Pre minus Post)
13
Calibration Plan
• Collect DOE2.2r inputs per data collection specifications• Use inputs to run DOE2.2r for Baseline & Post estimates
of total refrigeration energy• Compare estimates of Baseline, Post & Savings
estimates of refrigeration energy to best-practice estimates
• Modify DOE2.2r models and iterate tests until both baseline energy use, post energy use and energy savings at all sites are reasonable and there is no significant bias.
14
Issues Resolved in Subcommittee
15
RTF Proposed Motion:
“I _________ move that the RTF approve the UES for Adding Doors to Open Multi-deck Cases under provisional status and place the measure Grocery-Night Covers Under Review.
Strip Curtains
17
• 3 UES measures given provisional status on 8/3/2010
• Sunset date set as 8/3/2011
• A request was made at that time to investigate the measure impact on door open time
• First rebate issued 11/30/2010
Strip Curtains
18
• PECI has installed meters at 6 locations to collect door open times pre/post implementation
• Initial results: not statistically valid
• In the meantime: New UES guidelines
• PECI proposes: extend sunset until it undergoes RTF subcontractor review