Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

18
Add Doors to Open Multi- deck Cases: Provisional UES RTF Meeting August 30, 2011 1

Transcript of Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Page 1: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Add Doors to Open Multi-deck Cases: Provisional UES

RTF MeetingAugust 30, 2011

1

Page 2: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Thanks to All Participants

2

Page 3: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Measure Summary

• Retrofitting insulated glass doors to existing medium temperature open multi-deck cases

• Provisional savings estimates ~440-kWh/lin ft and 52-therms/lin ft

• Based on a DOE2.2r simulation

• Requesting Provisional UES Status

3

Page 4: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Proposed Provisional UES Values

Measure

Site Savings (kWh/ft)

Site Savings

(therms/ft)Measure

Life

Capital Cost ($/ft)

TRC B/C Ratio

Door Retrofit- No night covers in Baseline/Multiplex Compressor- Seattle, WA 457.2 57.4 12 $566 1.9

Door Retrofit- Night covers in Baseline/Multiplex Compressor- Seattle, WA 415.2 51.9 12 $566 1.8

Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Seattle, WA 477.4 57.4 12 $566 2.0

Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Seattle, WA 432.7 51.9 12 $566 1.8

Door Retrofit- No night covers in Baseline/Multiplex Compressor- Spokane, WA 419.1 51.7 12 $566 1.8

Door Retrofit- Night covers in Baseline/Multiplex Compressor- Spokane, WA 377.5 46.5 12 $566 1.6

Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Spokane, WA 436.7 51.7 12 $566 1.8

Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Spokane, WA 392.7 46.5 12 $566 1.6

Door Retrofit- No night covers in Baseline/Multiplex Compressor- Billings, MT 417.3 48.0 12 $566 1.7

Door Retrofit- Night covers in Baseline/Multiplex Compressor- Billings, MT 371.6 43.1 12 $566 1.5

Door Retrofit- No night covers in Baseline/Stand-alone Compressor- Billings, MT 433.9 48.0 12 $566 1.8

Door Retrofit- Night covers in Baseline/Stand-alone Compressor- Billings, MT 386.1 43.1 12 $566 1.6

Page 5: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Standard Protocol Checklist

5

Link: Appendix A - Guidelines Checklist Grocery Refrigeration Systems.xlsx

Page 6: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Modeling Methodology

6

• Modeled using DOE 2.2R• “Typical” store was built using GrocerSmart

Audit Data• Multiplex Baseline assumes Floating Head Pressure, T8

lamps, and EC motors are in place.• Stand-alone system baseline assumes T8 lamps and EC

motors.

• Infiltration, conduction, and radiation load based on manufacturer data, the ASHRAE Refrigeration Handbook, and SCE lab test reports

Page 7: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

DOE2.2R- Modeling Constants

7

Page 8: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

DOE2.2R- Key Variables

8

Page 9: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Case Refrigeration Load

9

Page 10: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Compressor Energy Use

10

Page 11: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Whole Building Energy Use

11

Page 12: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Calibration Plan• Collect Metered Data

– Rack: Volts, Amps, PF– Condenser: Volts, Amps, PF– HVAC Unit: 1-time Voltage reading, Amps– Hourly Natural Gas via Utility Interval Meter– Hourly Outside Air Temperature

• Minimum 3 weeks baseline • Minimum 3-weeks post

– This is a direct load measure. We expect less seasonal interaction than system measures like floating head pressure.

12

Page 13: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Calibration Plan• Develop regressions for daily or hourly

refrigeration use correlated to ambient temperature

• Annualize using TMY data– Pre, Post and Savings (Pre minus Post)

13

Page 14: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Calibration Plan

• Collect DOE2.2r inputs per data collection specifications• Use inputs to run DOE2.2r for Baseline & Post estimates

of total refrigeration energy• Compare estimates of Baseline, Post & Savings

estimates of refrigeration energy to best-practice estimates

• Modify DOE2.2r models and iterate tests until both baseline energy use, post energy use and energy savings at all sites are reasonable and there is no significant bias.

14

Page 15: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Issues Resolved in Subcommittee

15

Page 16: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

RTF Proposed Motion:

“I _________ move that the RTF approve the UES for Adding Doors to Open Multi-deck Cases under provisional status and place the measure Grocery-Night Covers Under Review.

Page 17: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Strip Curtains

17

• 3 UES measures given provisional status on 8/3/2010

• Sunset date set as 8/3/2011

• A request was made at that time to investigate the measure impact on door open time

• First rebate issued 11/30/2010

Page 18: Add Doors to Open Multi-deck Cases: Provisional UES RTF Meeting August 30, 2011 1.

Strip Curtains

18

• PECI has installed meters at 6 locations to collect door open times pre/post implementation

• Initial results: not statistically valid

• In the meantime: New UES guidelines

• PECI proposes: extend sunset until it undergoes RTF subcontractor review