    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 2 of 23

    REVISION CONTROL SHEET

    Rev

    NoDate

    Rev.

    Shts.Details of Revision

     A 19/09/2013 All Issued for Review (IFR)

    B 24/12/2013  As

    markedIssued for Approval (IFA)

    0 28/01/2014  As

    markedIssued for Design (IFD)

    1 27/03/2014  As

    marked

    Re-Issued for Design (IFD)

    2 31/07/2014 As

    markedIssued for Purchase (IFP)

    3 20/10/2014  As

    markedRe-Issued for Purchase (IFP)

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    3/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 3 of 23

    CONTENTS

    1. INTRODUCTION ........................................................................................................................ 4

    2. PURPOSE .................................................................................................................................. 5

    3. DEFINITIONS & ABBREVIATIONS .............................................................................................. 5

    4. REFERENCE DOCUMENTS......................................................................................................... 8

    4.1 INTERNATIONAL CODES AND STANDARDS ................................................................. 8

    4.2 ADMA STANDARDS / SPECIFICATIONS ...................................................................... 10

    4.3 PROJECT DOCUMENTS .............................................................................................. 12

    5. ORDER OF PRECEDENCE ......................................................................................................... 12

    6. COVERAGE .............................................................................................................................. 12

    7. EXCLUSIONS ........................................................................................................................... 13

    8. REFERENCES ........................................................................................................................... 13

    8.1 GENERAL ................................................................................................................................ 13

    8.2 EQUIVALENT STANDARDS ...................................................................................................... 13

    8.3 EQUIVALENT MATERIALS ....................................................................................................... 13

    9. USE OF LANGUAGE ................................................................................................................. 14

    10. UNITS ...................................................................................................................................... 14

    11. QUALITY ASSURANCE ............................................................................................................. 14

    12. DESIGN ................................................................................................................................... 15

    13. MATERIALS ............................................................................................................................. 16

    14. MANUFACTURING .................................................................................................................. 1815. INSPECTION AND TESTING ..................................................................................................... 19

    16. IDENTIFICATION AND MARKING ............................................................................................ 21

    17. PACKING, HANDLING AND SHIPPING .................................................................................... 22

    18. DOCUMENTATION ................................................................................................................. 22

    19. APPENDIX 1: TECHNICAL EXCEPTION/DEVIATION FORM ..................................................... 23

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    4/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 4 of 23

    1. INTRODUCTION

     ADMA-OPCO is developing several new fields in its offshore concession areas i.e.

    Umm Lulu (UL), Satah Al Razboot (SARB) and NASR. The new program objectiveis aligned and integrated with ADMA-OPCO’s mid-term total sustainable productiontarget of 1 MMSTBOPD.

    Umm Lulu field is located approximately 40 km North West of Abu Dhabi city in Arabian Gulf. Umm Lulu (UL) field is part ADMA-OPCO concession areas, for which ADMA-OPCO has studied a number of options for “Full Field Development (FFD)”.The development option being pursued is a new standalone Super Complex inUmm Lulu field (ULSC). Production will be from four reservoirs namely Thamama II,Thamama IIIA/C, Thamama IVA and Thamama IVB/C.

    Umm Lulu Full Field Development (ULFFD) Project is developed in two phases:

    Phase –I : Early Production System (EPS) with Minimal Facilities in UmmLulu Field and processing of Umm Lulu well fluids through 12”

    trunk line to Umm Al Dalk (UAD) and Zakum Central complex to

    Zirku Island.

    Phase –II : Full Field Development (FFD) producing to Zirku Island.

    The ULFFD Project Phase II is further divided into two EPC packages.

    Package-1 includes six new Wellhead Towers, all risers, infield pipelines, 20” MainOil Line, Riser Platform Jacket, Brownfield Tie-ins and Modification to EPSWellhead Tower Platforms WHT-4 & WHT-6.

    Package-2 includes Umm Lulu Super Complex (ULSC) and infield subsea and“composite power and fiber optic” cables.

     ADMA-OPCO awarded Package-2 to NPCC-TECHNIP Consortium and Scope ofwork, in brief, is as indicated below:

    ♦  Umm Lulu Super Complex (ULSC) comprising of :

    ♦  Riser Topsides Platform (ULRP Topsides)

    ♦  Gas Treatment Platform (ULGTP)

    ♦  Separation Platform (ULSP)

    ♦  Utilities Platform (ULUTP)♦   Accommodation Platform (ULAP)

    ♦  Flare Platforms (ULFL 1 and 2)

    ♦  Water Disposal Platform (ULWDP)

    ♦  Bridges and intermediate support structures

    ♦  Offshore installation, hook up, mechanical completion, base line surveying,preservation, pre-commissioning and commissioning of all facilities associatedwith the Super Complex (ULSC) as noted above.

    ♦  Ten (10) Infield composite power and fiber optic cables between WHT’s #1

    through to #8 and the ULSC facility.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    5/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 5 of 23

    ♦  Offshore final commissioning and ready for Start-Up with hydrocarbonintroduction to all facilities on ULSC from the Wellhead Towers (WHT #1through to #8).

    ♦  De-commissioning and mothballing of the 12” trunk line from WHT #4 to Umm Al Dalkh (UAD) from EPS Phase I.

    2. PURPOSE

    The purpose of this document is to define the minimum basic requirements for

    procurement of seamless and welded carbon steel, stainless steel and Corrosion

    Resistant Alloy pipes to be considered as bulk item or part of equipment package

    items for Umm Lulu Full Field Development Project (ULFFDP). 

    Should there be any exceptions to the specification, VENDOR’s quotation shall includenot only all the exception but also written confirmation for the compliance of purchaseorder specification clause by clause in accordance with Appendix-1.

    For any conflict between the requirements of Purchase Order Specification and

    Standard Code, the vendor shall inform the purchaser of all conflicts for clarification

    and approval. In case where the exceptions are not described in writing maker’s

    quotations is considered to be in total compliance with specification.

    3. DEFINITIONS & ABBREVIATIONS

    COMPANY : Abu Dhabi Marine Operating Company (ADMA-OPCO)

    CONTRACTOR /CONSORTIUM

    : Means the firm or joint venture appointed by COMPANY forproviding WORK/SERVICES to the COMPANY pursuant tothis AGREEMENT.

    (NATIONAL PETROLEUM CONSTRUCTION COMPANY(NPCC) & TECHNIP FRANCE, ABU DHABI (TECHNIP))

    NTC : NPCC-TECHNIP CONSORTIUM

     AGREEMENT /CONTRACT

    : Means the SIGNATURE AGREEMENT executed by thePARTIES (COMPANY and CONTRACTOR), the Articles of AGREEMENT, ANNEX(ES), APPENDIX(ICES),

    EXHIBIT(S) and ATTACHMENT(S).(CONTRACT No. 164034)

    PROJECT : EPC WORK FOR UMM LULU PHASE II FULL FIELDDEVELOPMENT PROJECT PACKAGE 2 – UMM LULUSUPER COMPLEX AND SUBSEA COMPOSITE POWERCABLES.

    PMC : Project Management Consultant

    VENDOR : Means any and all persons, firms, partnerships, companies,bodies, entities or a combination thereof including sub-vendors and suppliers, who are providing GOODS &

    SERVICES.SUBCONTRACTOR : Means any and all persons, firms, partnerships, companies

    or a combination thereof to whom any part of the Work has

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    6/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 6 of 23

    been subcontracted by CONTRACTOR.

    Quality Assurance : All those planned and systematic actions (QA) necessary to

    ensure quality i.e. to provide adequate confidence that aproduct or service will be fit for its intended purpose.

    Quality Manual : A Document setting out the general quality policies,procedures and practices of an organization.

    Quality Plan : A document prepared by the Contractor/Vendor setting outthe specific quality practices, resources and activitiesrelevant to a particular project.

    Quality ManagementSystem

    : The structure organization, responsibilities, activities,resources and events that together provide organizedprocedures and methods of implementation to ensure the

    capability of the organization to meet quality requirements.Supplier : The person or company including sub-suppliers who is

    providing equipment, materials, and services to performduties specified by ADMA-OPCO or EPC Contractor.

    ULAP : Umm Lulu Accommodation Platform

    ULFFDP : Umm Lulu Full Field Development Project

    ULFL : Umm Lulu Flare Tower

    ULGTP : Umm Lulu Gas Treatment Platform

    ULRP : Umm Lulu Riser Platform

    ULSC : Umm Lulu Super Complex

    ULSP : Umm Lulu Separation Platform

    ULUTP : Umm Lulu Utilities Platform

    ULWDP : Umm Lulu Water Disposal Platform

    IDC : Issued for Internal Discipline check

    IFA : Issued for Approval

    IFI : Issued for Information

    IFR : Issued for Review/Comments

    IFC : Issued for Construction 

    IFD : Issued for Design 

    IFP : Issued for Purchase

     AFD : Approved for Design

     AFC : Approved for Construction

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    7/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 7 of 23

     AFP : Approved for Purchase

    T/L : Team Leader

    IVB : Independent Verification Body

    TPA : Third Party Agency 

    HSEIA : Health, Safety and Environment Impact Assessment

    MWS : Marine Warranty Surveyor

    BP : British Petroleum

    QA : Quality Assurance

    QAS : Quality Assurance System

    QC : Quality Control

    QMS : Quality Management Systems

    SI : Systeme International d’Unites

     ASME : American Society for Mechanical Engineers

     ASTM : American Society for Testing and Material

    CE : Carbon Equivalent

    CP : Code of Practice

    H2S : Hydrogen Sulphide

    HIC : Hydrogen Induced Cracking

    ID : Inside Diameter

    ISO : International Organization for Standardization

    MSS : Manufacturer Standardization Society

    NACE : National Association of Corrosion Engineers

    NDT : Non Destructive Test

    OD : Outside Diameter

    PMI : Positive Material Identification

    SP : Specification

    BE : Bevel End

    CA : Corrosion Allowance

    CS : Carbon Steel

    DPI : Dye Penetration Inspection

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    8/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 8 of 23

    EFW : Electric Fusion Welding

    ITP : Inspection and Test Plan

    HSCS : High Strength Carbon Steel

    LTCS : Low Temperature Carbon Steel

    MPI : Magnetic Particle Inspection

    NB : Nominal Bore (of pipe size)

    NPS : Nominal Pipe Size

    NPTF : National Pipe Thread Female

    PE : Plain End

    PWHT : Post Weld Heat Treatment

    RT : Radiographic Test

    SAW : Submerged Arc Welding

    SMLS : Seamless

    PSL : Product Specification Level

    SS : Stainless Steel

    UT : Ultrasonic Test

    EEMUA : The Engineering Equipment and Materials Users Association

    4. REFERENCE DOCUMENTS

    The latest versions and amendments of all applicable UAE Legislation andEnvironmental Regulations, applicable International Laws and Regulations, ADNOCGuidelines / Codes of Practice, Project Specifications, COMPANY Specifications,Regulations, best practices and Standards, BP Standards, Guidance and Practice

    Documents and all relevant Codes and Standards on the EFFECTIVE DATE ofContract, shall be used by CONTRACTOR. The EFFECTIVE DATE of Contract is11th July 2013.

    4.1 INTERNATIONAL CODES AND STANDARDS

     ASME PUBLICATIONS 

    B16.25  : Buttwelding Ends

    B 1.20.1 : Pipe Threads, General Purpose (Inch)

    B31.3 : Process Piping

    B36.10M : Welded and Seamless Wrought Steel Pipe

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    9/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 9 of 23

    B36.19M : Stainless Steel Pipe

    Section V : Non Destructive Examination

    Section IX : Welding and Brazing Qualifications

     ASTM PUBLICATIONS 

     A 106/A 106M : Standard Specification for Seamless Carbon Steel Pipe forHigh-Temperature Service

     A 672/A 672M : Standard Specification for Electric-Fusion-Welded SteelPipe for High-Pressure Service at Moderate Temperatures

     A 333/A 333M : Standard Specification for Seamless and Welded SteelPipe for Low-Temperature Service

     A 671/A 671M : Standard Specification for Electric-Fusion-Welded SteelPipe for Atmospheric and Lower Temperatures

     A 312/A 312M : Standard Specification for Seamless, Welded, and HeavilyCold Worked Austenitic Stainless Steel Pipes

     A 358/A 358M : Standard Specification for Electric-Fusion-Welded Austenitic Chromium-Nickel Stainless Steel Pipe for High-Temperature Service and General Applications

    B 444 : Standard Specification for Nickel-Chromium-Molybdenum-

    Columbium Alloys (UNS N06625 and UNS N06852) andNickel-Chromium- Molybdenum-Silicon Alloy (UNSN06219) Pipe and Tube

    B 705 : Standard Specification for Nickel-Alloy (UNS N06625,N06219 and N08825) Welded Pipe

    B 829 : Standard Specification for General Requirements for Nickeland Nickel Alloys Seamless Pipe and Tube

    B 861 : Standard Specification for Titanium and Titanium AlloySeamless Pipe

     A370 : Standard Test Methods and Definitions for Mechanical

    Testing of Steel Products

     A530 : Standard Specification for General Requirements forSpecialized Carbon and Alloy Steel Pipe

     A 153 : Standard Specification for Zinc Coating (Hot-Dip) on Ironand Steel Hardware

     A 262 : Standard Practices for Detecting Susceptibility toIntergranular Attack in Austenitic Stainless Steels.

    G 28 : Standard Practices for Detecting Susceptibility toIntergranular Attack in Wrought, Nickel-Rich, Chromium-Bearing Alloys.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    10/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 10 of 23

     API PUBLICATIONS 

    SPEC 5L : Specification for Line Pipe

    SPEC 6A : Petroleum and Natural Gas Industries – Drilling andProduction Equipment – Wellhead and Christmas TreeEquipment

    Briti sh Standards Institution (BSI) 

    BS EN 10204 : Metallic Products – Types of Inspection Documents

    NACE PUBLICATIONS 

    MR0175/ISO 15156 : Petroleum and Natural Gas Industries – Materials for use inH2S Containing Environments in Oil and Gas Production

    Part 1 : General principles for selection of cracking-resistant materials

    Part 2 : Cracking-resistant carbon and low-alloy steels, andthe use of cast irons

    Part 3 : Cracking-resistant CRAs (corrosion-resistantalloys) and other alloys

    TM0177 : Laboratory Testing of Metals for Resistance to SulfideStress Cracking and Stress Corrosion Cracking in H2SEnvironments

    TM0284 : Evaluation of Pipeline and Pressure Vessel Steels forResistance to Hydrogen-Induced Cracking

    International Organization for Standardization (ISO) 

    ISO 9001 : Quality Management Systems – Requirements

    ISO 10474 : Steel and steel products - Inspection documents

    EEMUA PUBLICATIONS

    EEMUA 144 : 90/10 Copper Nickel Alloy Piping for Offshore Applications- Specification: Tubes Seamless and Welded

    4.2 ADMA STANDARDS / SPECIFICATIONS

    SL-001 : Status List for ADMA-OPCO Standard EngineeringDocuments

    SP-1000 : Materials for Sour Service

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    11/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 11 of 23

    SP-1002 : Preservation of New Materials & Equipment

    SP-1009 : Specification for Requirements for Projects Contractor

    Quality System

    SP-1035 : Preheat and Post Weld Heat Treatment of FerrousMaterials

    SP-1021 : Water Quality for Hydrostatic Test

    STD-00, Part 1 : Measurement Units

    STD-102 : Corrosion Inhibition of Hydrostatic Test Water and StoredWater

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    12/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 12 of 23

    4.3 PROJECT DOCUMENTS

    Description ADMA Document No.CONTRACTOR Document

    No.

    Specification for Material forSour Service 

     AD197-473-G-02352  9451Y-000-JSD-2400-003  

    Specification for Seamless Pipe  AD162-562-G-SPC-06401

    Specification for Color Codingfor Piping Material Identification 

     AD197-473-G-02995  9451Y-000-JSS-1300-027  

    Welding Specification  AD197-473-G-00502 9451Y-000-PP-622

    Positive Material IdentificationSpecification

     AD197-473-G-00503 9451Y-000-PP-623

    Packing, Marking & Shipping

    Instructions

     AD197-473-G-00198 9451Y-000-PP-604

    Specification- PipeClassification - Addendum toSP-1131.

     AD197-473-G-02655 9451Y-000-JSD-1300-004

    Inspection and Test Plan forCS & LTCS Seamless pipes

     AD197-473-G-00557 9451Y-000-ITP-1320-001

    Inspection and Test Plan for CS& LTCS Welded pipes

     AD197-473-G-00558 9451Y-000-ITP-1320-002

    Inspection and Test Plan forCu-Ni Pipes, Fittings and

    Flanged

     AD197-473-G-00560 9451Y-000-ITP-1320-006

    Inspection and Test Plan forSS, DSS & Inconel Pipes   AD197-473-G-00561 9451Y-000-ITP-1320-007

    Equipment and Bulk CriticalityLevel Calculation Sheet

     AD197-473-G-00119 9451Y-000-PP-118

    Specification for SAW Pipe  AD162-562-G-SPC-06400 

    -

    5. ORDER OF PRECEDENCE

    Where equal but conflicting requirements are identified between regulations, codesand standards, the order of precedence shall be:

    1. UAE Statutory Legislation and Regulation inclusive of ADNOC Standards andCodes of Practice.

    2. Project Specifications.

    3. COMPANY Engineering Specifications, Standards and Procedures.

    4. BP Standards, guidance and practice documents.

    5. International Codes and Standards.

    6. COVERAGE

    This specification completes the description given in the requisitions issued by

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    13/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 13 of 23

    Purchaser and stipulates the particular requirements for the fabrication, inspection and

    shipment of pipes made of carbon steel, low temperature carbon steel, high strength

    carbon steel (API 5L X60 PSL2), 316/316L stainless steel, Super Austenitic Stainless

    Steel (6Mo), Alloy 625(UNS N06625), Titanium and Copper Alloys (UNS 7060X).

    The scope of supply shall include the following:

    •  Pipe

    •  Inspection and testing

    •  Packaging and marking for transport

    •  Documentation, drawings and certifications

    7. EXCLUSIONS This Specification excludes:

    a. Non-metallic pipe (GRE, PVC, etc.)

    b. Instrumentation tubingc. Line Pipes under DNV-OS-F101 design Code

    8. REFERENCES

    8.1 General The latest edition (at the time of the contract award) of the reference documentation aslisted in Clause-4 shall be read as an integral part of this Specification.The latest edition/revision of COMPANY Standard Engineering Documents asindicated in Status List SL-001 shall be utilized.

    8.2 Equivalent StandardsStandard Documents equivalent to those referred to herein shall not be substitutedwithout written approval from COMPANY. Approval of equivalent Standard Documentswill not, in any way, release/relieve responsibility from the Vendor to meet the bestpractices and/or requirements of the reference documents referred to herein, in theevent of conflict.

    Where differences and/or conflicting issues occur between the referenced documentsthemselves or the requirements of this document, the requirements of this documentshall overrule unless otherwise advised by COMPANY.

    The Vendor shall equip himself with copies of all the referenced Standard EngineeringDocuments referred in Clause-4

     

    of this Specification and shall make them readilyavailable to all CONTRACTOR / COMPANY, or nominated representative, personnelinvolved in the work.

    8.3 Equivalent Materials

    The materials offered by the VENDOR shall be equivalent to or better than those

    specified by the Purchaser. All materials shall be new and free of defects.Where the

    VENDOR offers an alternative; Vendor shall meet the requirements as follows

    a. Any substitution of materials shall requires the prior approval of COMPANYb. In general, carbon steel pipes for which grade B is specified shall in no case be

    replaced by grade A pipes. Substitution with ERW, where SAW is specified, isprohibited.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    14/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 14 of 23

    c. Seamless pipe can be substituted for SAW pipe without prior COMPANYapproval- However SAW pipe shall not be substituted for seamless withoutprior COMPANY approval.

    d. The carbon steel pipes API 5L Gr. B could be replaced with ASTM A106 Gr. Band vice versa. This substitution is acceptable without prior approval by theCOMPANY.

    9. USE OF LANGUAGE 

    Throughout this document, the words ‘will’, ‘may / can’, ‘should’ and ‘shall / must’,when used in the context of actions by COMPANY or others, have specific meaningsas follows:

    a. ‘Will’ is used normally in connection with an action by COMPANY and / ornominated representative, rather than by a Contractor or Vendor.

    b. ‘May / Can’ is used where alternatives / action are equally acceptable.

    c. ‘Should’ is used where provision is preferred.

    d. ‘Shall / Must’ is used where a provision is mandatory / vital.

    10. UNITS 

    Units shall be in accordance with ADMA-OPCO STD-00, Part-1.

    11. QUALITY ASSURANCE

    11.1 Quality Assurance System

    11.1.1  All activities and services associated with the scope of this Specification shall beperformed by Contractors/Vendors approved by COMPANY.

    11.1.2 The Contractor/Vendor shall operate Quality Management Systems (QMS)within his organizations, which ensure that the requirements of this Specificationare fully achieved.

    11.1.3 The Contractor/Vendor’s quality management system shall be based onCOMPANY Specification SP-1009 or the latest issue of ISO 9001 Series andaccredited by an international certifying agency.

    The Contractor’s quality manual shall provide details for the preparation of aquality plan, which shall include provisions for the QA/QC of services activities.

    Where an approved Contractor/Vendor revises their Quality ManagementSystem that affect the COMPANY approved Quality / Inspection and Test Plan,then the revised Quality Plan / Inspection and Test Plan shall be submitted inwriting for COMPANY approval before initiating any service activities.

    11.1.4 The effectiveness of the Contractor’s quality management system may besubject to monitoring by COMPANY or its representative and may be auditedfollowing an agreed period of notice.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    15/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 15 of 23

    11.1.5 The Contractor/Vendor shall make regular QA audits on all their SubContractors/Suppliers. Details of these audits shall be made available toCOMPANY when requested.

    11.1.6 The Contractor/Vendor shall maintain sufficient Inspection and Quality Assurance staff, independent of the service provider management, to ensurethat the QMS is correctly implemented and that all related documentation isavailable.

    11.1.7 Using Sub-Contractors is not allowed for services/functions carried out by aContractor without COMPANY approval.

    11.2 Quality Plan

    11.2.1 Contracted activities shall be performed in accordance with an approved QualityPlan (QP).

    11.2.2 The level of detail required in the Quality Plan shall be commensurate with thescope of services provided.

    11.2.3 The quality of works is an essential factor in carrying out all services & activitiescovered by this Document.

    11.2.4 During services/activities, quality assurance/quality control issues are theresponsibility of the Vendor, and shall be approved and certified byContractor/TPA.

    11.2.5 Conflicts between Vendor & TPA shall be reported in writing toCONTRACTOR/COMPANY for resolution.

    11.3 Inspection and Certif ication Requirements

    Inspection and certification requirements for material shall be certified to BS EN10204.

    12. DESIGN

    12.1 Technical Requirements

    12.1.1 Unless additional heat treatment is specified because of fluid characteristics,Post Weld Heat Treatment is required for all welds on carbon steel and lowtemperature carbon steel welded piping where the wall thickness is greater than

    20mm. This requirement is in addition to requirement mentioned in purchasedescription and respective material standards.

    12.1.2 Unless otherwise specified all pipes shall be furnished with bevelled ends, inaccordance with ASME B16.25.

    12.1.3 Materials shall be supplied in accordance with the purchase description.Substitutions shall not be made unless written authorization is obtained fromCOMPANY. Such authorization however, shall in no way diminish theSUPPLIER's obligation to meet the requirements of the latest issues of thestandards and specifications referred to in this Specification.

    12.1.4 The dimensions for steel pipe shall be in accordance with ASME B36.10M, ASME B36.19M, or API 5L as applicable.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    16/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 16 of 23

    •  Pipes for which schedules 10, 40, 80 etc. are specified must be inaccordance with standards API 5L or ASME B36.10M.

    •  Pipes for which schedules 10S, 40S, 80S etc. are specified must be inaccordance with standard ASME B36.19M.

    12.1.5 The lengths of pipe shall be as follows:

    a. Carbon steel pipe NPS 2 and larger shall be supplied in double randomlength as defined in the applicable standard.

    b. Carbon steel pipe NPS 1 1/2 and smaller shall be supplied in single randomlengths, as defined in applicable standard.

    c. If standard does not define length, reference shall be ASTM A106 / A106M.

    The permissible quantity variation for the straight pipes shall be –0% to +1%

    random length over the total length to fulfil the requisitioned quantity.

    12.1.6 90-10/Cu-Ni pipes must be in accordance with standard EMMUA 144.

    12.1.7 Pressure rating shall be 20 bar for all 90/10-Cu/Ni 7060X seamless and weldedpipe.

    13. MATERIALS

    13.1  All Carbon steel, including normalized steels (excluding screwed galvanized),used for the fabrication of pipes shall have a maximum carbon content of 0.23%by ladle analysis.

    13.2 The maximum carbon equivalent (CE) by check analysis for CS Pipes shall be0.42%.

    Where .

    1556

    Cu NiV  MoCr  MnC CE 

      ++

    ++++=

     

    13.3 Low Temperature Carbon Steel and High strength Carbon steel materials shall beimpact tested as specified below. Method of testing to be in accordance with ASTM A370.

    a) ASTM A671 Gr.CC60 shall be impact tested at -46 deg C (-50 deg F) as perSupplementary requirement S2 and Energy impact values in Joules to be meet

     ASTM standard.

    b) High strength Carbon steel materials API5L Gr. X60 shall be impact testedat –46 deg C (-50 deg F) as per API 5L

    13.4  All pipes to API 5L shall confirm to PSL 2. PSL 1 pipes are not acceptable.

    13.5  Austenitic stainless steel pipes shall be in the solution annealing heat treatment inaccordance with corresponding ASTM standards.

    13.6  All pipes shall comply with the requirements of this specification and the

    requirements of the applicable standards such as ASTM, API 5L or other similarstandards specified in piping material specification and requisitions.

    13.7 Inconel 625 pipes shall be annealed.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    17/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 17 of 23

    13.8  All SAW & EFW pipes shall be 100% radiographed.

    13.9 The “NACE” designated carbon steel, High Strength Carbon Steel, Low

    Temperature Carbon Steel, Stainless Steel 316/316L, Super Austenitic StainlessSteel (6Mo) and solid Alloy 625 (UNS N06625) shall be in accordance with therequirement of NACE MR 0175 / ISO 15156 and Project Specification for Materialfor Sour Service (Doc. No. AD197-473-G-02352).

    For all “NACE” CS, LTCS & HSCS shall have the following:-

    a) Sulphur Content shall be 0.003% max and 0.01% max, for welded andseamless products respectively.

    b) Nickel content shall be less than 1% for welded and seamless products.

    c) For all pipes, hardness testing shall be conducted for 100% of heat (i.e.per heat per grade) and maximum hardness shall be 22 HRC for weldedand seamless products.

    d) Sour service corrosion (HIC) test shall be conducted for welded (SAW)pipes as per NACE TM 0284 using solution A low pH to NACE TM0177and Appendix –D of SP-1000.The acceptance criteria shall be as perProject Specification for Material for Sour Service (Doc. No. AD197-473-G-02352).

    For all “NACE” stainless steel shall have the following:-

    a) For all pipes, hardness testing shall be conducted for 100% of heat (i.e.per heat per grade) and maximum hardness shall be 22 HRC.

    b) PREN shall be as per NACE MR0175/ ISO 15156.

    For all “NACE” Alloy 625(UNS N06625) shall have the following:-

    a) For all pipes, hardness testing shall be conducted for 100% of heat (i.e.per heat per grade) and maximum hardness shall be 40 HRC.

    13.10 Pipe grades of material shall be as specified in purchase description.

    13.11  All 300 series stainless steel pipe shall be supplied as dual grade (i.e. 316/316LSS) and shall be marked accordingly. The material strength shall be as per316SS and the chemical composition shall be as per 316L, therefore bothstrength and chemical composition shall be satisfied.

    13.12 Requirements for weld overlay for cladded pipes shall be as per Project WeldingSpecification (Doc. No. AD197-473-G-00502).

    13.13 For stainless steel pipe manufacturer to specify is pipe supplied in hot or coldfinished condition at tender evaluation stage.

    Details of the final finished pipe shall be submitted at the tender evaluation stage.

    13.14  Alloy 625(UNS N06625) welded pipes shall be welded with filler metal and shallbe tested with 100% RT. In addition to 100% radiography shall be Eddy currenttested.

    13.15 For Alloy 625(UNS N06625) the steel melt shall be refined by AOD, VOD orequivalent process.

    13.16 Titanium Seamless pipes to ASTM B861 Gr. 2 UNS R50400 shall be annealed.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    18/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 18 of 23

    13.17 Copper Alloy (UNS 7060X) seamless and welded Pipes shall be annealed.

    13.18 Plate material used for ASTM A672 Gr. C70 Cl.22 pipe shall be supplied in

    normalized condition.13.19 For the items that are required to be heat treated during fabrication phase (items

    that are having weld edge thickness higher than 20mm), where the base materialminimum specified yield strength of material is higher than 42 KSI or for the itemsin Quench and Temper condition, the base material supplier shall supply theitems with test certificates in both as supplied condition and with simulated heattreated condition (soak at 635 Deg C+ or -10 Deg, for 1 hour per inch of weldedge thickness, minimum 1 hour) and the material properties shall comply withthe respective ASTM.

    13.20 For SS316/316L stainless steel welded pipes weld metal deposits and heataffected zone (HAZ) shall be impact test qualified at -106 Deg. C in accordance

    with Para 323.3 of ASME B 31.3 and for Super Austenitic Stainless Steel (6Mo)welded pipes weld metal deposits and heat affected zone (HAZ) shall be impacttest qualified at -122 Deg. C in accordance with Para 323.3 of ASME B 31.3.

    13.21 For Alloy 625 Welded Pipes, if the filler metal composition is outside the range ofbase metal composition, then test in accordance with ASME B31.3, Table 323.2.2is required.

    13.22 High strength carbon steel Pipe API 5L Gr.X60 shall meet the followingMechanical properties:

    Yield Strength (0.2% offset) - Min 60.2 KSI

    Tensile Strength - Min 75.4 KSI

    Elongation in 2 Inch - Min 20%

    13.23 Requirements for Pipeline Seamless & SAW Pipes shall be as per ProjectSpecification for Seamless Pipe (Doc. No. AD162-562-G-SPC-06401) & SAWPipe (Doc. No. AD162-562-G-SPC-06400) respectively

    14. MANUFACTURING

    14.1 Seamless pipes shall be made in a single section (i.e. no girth seams); the lengthof the section shall lie within the limits stipulated in dimensions.

    14.2 Unless and otherwise noted in the purchase description Carbon steel pipes up toand including NPS 16 shall be seamless. Stainless steel and copper nickel pipesup to and including NPS 12 shall be seamless. For Nickel alloy pipes up to andincluding NPS 8 shall be seamless.

    Pipes in larger sizes may be produced by rolling and longitudinal welding. Thewelded pipes shall be supplied in a single seam only. All welds shall be subjectedto 100% RT.

    14.3  All welded carbon steel pipes shall be double submerged arc welded (i.e.longitudinally welded from both sides). Electric Resistance Welded (ERW) pipeare not acceptable (the SAW process shall be used exclusively). The welds shall

    be made using an approved process. Weld seams of all welded pipe shall besubjected to full length (100%) radiographic inspection, in accordance with the

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    19/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 19 of 23

    requirements of the API 5L by the X-Ray method on radiographic films(Fluoroscopic inspection is not acceptable).

    14.4 For API 5L X60 PSL 2 Fine grain treatment shall be carried out at steel making.Heat treatment shall be normalized or quenched and tempered.

    14.5 The Carbon Steel used for the fabrication of seamless pipe and pipes welded bySubmerged arc Welding Process (SAW) shall be produced in an electric furnaceor by the basic oxygen converter, fully killed with fine grain practice. All CS pipesshall be silicon killed.

    14.6 Circular weld jointers to attain the minimum allowable length are not permitted.

    14.7 Weld repair of parent pipe material is NOT permitted.

    14.8 Flame cut weld bevel ends are not permitted. Any bevelling of the ends of thepipes shall be performed by mechanical means or other methods like plasma,laser, water jet or any other shall be selected by vendor as per his standardpractice.The process used shall assure the production of clean square, burr-freebevel cuts.

    14.9 Pipes shall be supplied in accordance with the wall thickness or schedule asstated in material requisition. Wall thickness thinner than specified tolerance shallbe approved by COMPANY for use.

    14.10 For SS/Nickel alloy pipes manufactured by EFW method, the WPS shall besubmitted for COMPANY Integrity Assurance Authority approval.

    15. INSPECTION AND TESTING

    15.1 Unless additional inspection is specified in the material requisition, inspection andtesting shall be as a minimum, in accordance with applicable standards andcodes, Inspection & Test Plan and as per Project Specification for Equipment &Bulk Criticality Level Calculation Sheet ( AD197-473-G-00119).

    15.2  All pipes shall be tested in accordance with their applicable ASTM, ASME, BS orother referenced code or standards and, where required for NACE service, inaccordance with NACE MR0175 / ISO 15156 and AD197-473-G-02352Specification for Material for Sour Service.

    15.3 Where impact testing is specified in the enquiry and purchase requisition

    document, or by the applicable ASTM Standards, it shall be Charpy V-notchtested in accordance with ASTM A370.

    15.4 The test fluid used for hydrostatic testing shall be in accordance COMPANY STD102. The chloride content of the test fluid for stainless and CRA pipe only shallnot exceed 15 ppm.

    15.5  All pipes shall be hydrostatically tested as per relevant international standard.

    15.6 Following testing, all components are to be thoroughly dried prior to preparationfor packing and shipping.

    15.7 Unless otherwise specified, non-destructive testing shall be as per ASME B31.3

    and relevant ASTM specifications.

    15.8 Welded pipes shall be tested 100% radiography (Joint Quality Factor = 1.0) asper ASME B31.3.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    20/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 20 of 23

    15.9 In addition to normal inspection, documentation and inspection details shall beprovided to prove the identities of all materials of construction and to establishthat the correct heat treatment has been applied so that the finished product

    complies fully with this specification. The inspection and test records of prototypesshall be available for the Purchaser’s review.

    15.10 The requirement for test and / or material certificates and the level of qualitysurveillance required shall be as specified on the Inspection and Test Plan, whichis a part of the Enquiry or Purchase Requisition Package.

    15.11 The VENDOR shall submit certificates of conformity with the ASTM or APIstandards specified in the requisitions for pipes made of carbon steel, alloy steel,Stainless Steel, Super Austenitic Stainless Steel, Alloy 625 (UNS N06625),Titanium and Copper alloys.

    15.12 The VENDOR shall submit material certificates in accordance with BS EN 10204

    3.1 shall contain, as a minimum, the following information:

     All chemical elements for which a specification limit is set shall be reported.The carbon equivalent (CE) shall be calculated as per clause 14.2 of thisSpecification and included in the certification.

    Mechanical properties, with results of the following mechanical tests wherea specification limit is set:

    a. Tensile tests (both ultimate and yield)

    b. Elongation Test

    c. Bend Test

    d. Impact Test

    e. Hardness Tests

    Heat treatment temperature, soaking time and cooling medium shall bestated in the certificate. The component shall be marked to ensure fulltraceability to melt and heat lot treatment.

    a.  A statement of the heat treatment applied. Where heat treatmentinvokes supplementary NDE or mechanical tests, these aremandatory and shall be included in certification.

    Non-destructive test results (MPI / DPI and UT)

    Hydrostatic and/or pneumatic test results

    HIC Test Results (for welded pipes in NACE service).

    15.13 For welded pipes, the specimens for impact testing shall be taken from threeplaces: heat affected zone, weld metal and parent metal.

    15.14 For items intended for NACE service, the manufacturer shall provide a statementof compliance with NACE MR0175 / ISO15156 and AD197-473-G-02352Specification for Material for Sour Service in addition to the other materialcertificates required.

    15.15 Certificates shall be referenced to the following:

    a. Mill and/or manufacturer’s name and location

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    21/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 21 of 23

    b. The Purchase Requisition and Purchase Requisition Item tagnumbers

    c. Heat numberd. Description of the pipes covered by the certificate, including the

    nominal pipe size, schedule / thickness, etc.

    e. Material type, specification and grade (e.g. carbon steel ASTM A106Gr. B).

    15.16 Positive Material Identification (PMI) test for Alloy material such as Stainless,Super Austenitic Stainless Steel (6Mo), Alloy 625 (UNS N06625), Titanium andCu-Ni shall be carried out in accordance with AD197-473-G-00503 (PositiveMaterial Identification Specification).

    15.17 For Test sampling: Samples for production testing shall realistically reflect theproperties in the actual component.

    15.18 For stainless steel material Inter-granular corrosion test in accordance with ASTM A262 Practice E shall be carried out.

    15.19 For CRA material Inter-granular corrosion test in accordance with ASTM G28 shall be carried out. Corrosion rate shall not exceed 0.9 mm per year.

    16. IDENTIFICATION AND MARKING

    Identification and marking of seamless and welded carbon steel, stainless steeland CRA pipes shall be in accordance with the requirements of the applicablegoverning code & COMPANY Standards.

    1. All components shall be clearly colour coded as per Project Specification for ColorCoding for Piping Material Identification (AD197-473-G-02995) and marking shallbe done as required by MSS SP 25, the following information shall be marked bycold stamping on each pipe.

    - The specification and grade of material

    - The heat or melt number / heat treatment condition ( if applicable )

    - The batch number

    - Commodity code and Ident code

    - Size and Thickness

    - Purchase Requisition Number

    However Pipes less than 3mm thick shall not be marked by stamping but byetching.

    2. Components conforming to an ASTM or ASME specifications shall be identified inaccordance with that specification.

    3. Improper identification is justification for rejection of a component.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    22/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    Page 22 of 23

    17. PACKING, HANDLING AND SHIPPING

    Vendor shall be responsible for preparation for shipment including packing,

    protection, preservation, labelling and marking of all items in accordance with SP-1002 (Specification for preservation of new materials and equipment) andSpecification for Packing, Marking & Shipping instructions (AD197-473-G-00198).

    Plain or bevel ends shall be closed with a metal or a plastic cover to protect themachined ends, to prevent ingress of foreign materials.

    Vendor shall provide the details of preparations and packing methods employed inhis bid along with the shipping documents.

    18. DOCUMENTATION

    18.1 Documentation and Manuals Certi fication RequirementsSUPPLIER shall submit documentation in accordance with the requirements ofmaterial requisition and “Instructions to vendors” concerning Documents / Drawings /Technical Data/ Spare parts/ Final manuals/ Procedures etc. After order placement, SUPPLIER shall submit for approval, all listed drawings /documents, strictly in accordance with the agreed schedule and program.

     All Certification shall be written in English as a minimum.

    18.2 Final Dossier & Certi fication Requi rements

    Final dossiers shall be submitted per instructions to Vendor for the Preparation of

    Vendor Data Books.Final dossier shall contain documents including design documents, manufacturingdata record book and instruction for installation. The manufacturing data recordsbook shall contain all documentation referenced in Inspection and Test plan, all testcertificates and records and code stamp certification documents. The test reportsshall be traceable to each component through the legible paint stenciled, heatnumbers or equivalent. All documents shall be identified with COMPANY’Spurchase order numbers and item code numbers and shall be signed by themanufacturer’s authorized signature.

  • 8/16/2019 AD197-473-G-02671-R3 SS pipe

    23/23

     

    SPECIFICATION - SEAMLESS AND WELDED CARBON , STAINLESS

    STEEL & CRA PIPE

    ADMA-OPCO Document No. : AD197-473-G-02671 Rev.

    Contractor Document No. : 9451Y-000-JSS-1300-014 3

    19. APPENDIX 1: TECHNICAL EXCEPTION/DEVIATION FORM

    TECHNICAL EXCEPTION / DEVIATION

    FORM(For Umm Lulu Full Field Development

    Project- Package 2) 

    Page : of

    Project No.:

    POS No.:

    No.

    BUYER’SDOCUMENT

    CLAUSE/TITLE

    BUYER’S SPEC.REQUIREMENT

    EXCEPTION /DEVIATION

    PROPOSED BYVENDOR

    CLARIFICATION /REASON

    FOR EXCEPTION /DEVIATION