Active Parking Management – System Design Review Active Parking Management Wynn Aung Conley Brodziak Bryan Blakeslee Andrew Eggers Tyler Ludwig

Transcript of Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1...

Page 1: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Active Parking Management!

 Wynn  Aung    �  Conley  Brodziak    �  Bryan  Blakeslee    �  Andrew  Eggers    �  Tyler  Ludwig  

Page 2: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Team Members!

•  Tyler  Ludwig  –  ME,  Project  Manager  •  Conley  Brodziak  –  ME,  Asst.  Project  Manager  •  Bryan  Blakeslee  –  EE,  CE  •  Andrew  Eggers  –  CE  •  Wynn  Aung  –  EE  

Roles  &  Responsibili,es  Tyler  –  IndicaAon  Structural  Design,  CAD,  7  Segment  Housing  Conley  –  Sensor  Package,  Solar  Panel  MounAng,  Groundwork  Bryan  –  Power  System  and  User  Interfaces  Andrew  –  Microprocessor  and  7  Segment  IntegraAon  Wynn  –  IndicaAon  System  and  7  Segment  Design  

Page 3: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Major Changes Since SDR!

•  Sensor Scope!•  On-road solution options approved!•  Single station, off road solutions abandoned due to difficulty/inaccuracy!•  Tactile on-road detection chosen for robustness, proven effectiveness!

•  System Housing/Structure !•  Reuse of previous Senior Design project !

•  14 foot light pole!•  Large weatherproof housing for electronics/user interfaces!

•  Power Systems!•  Wind turbine for main power generation!•  Solar Panel for secondary backup power!•  Overall power budget increase due to generator change!

•  Additional Changes!•  7 Segment numeric display of open spaces!

•  Large display for commuters!•  Facilitated by additional power budget!

Page 4: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Indicator Design!!

•  Dimensions!•  2’x2’ Square Angled Roof!•  18” Diameter LED mount!•  22” Outer Diameter!

•  Materials!•  ABS Plastic Housing and Roof!•  Aluminum LED mounting!•  Thin plexiglass shroud!

•  Mounted to Pole with generic mount!

Page 5: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Indicator Design!!

Exploded  View  

Page 6: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Housing Design!

•  Dimensions & Materials!•  10”x18” Outer Diameter!•  6”x14” Viewing Area!•  Aluminum enclosure !•  Steel Mounting Plate!

•  Layered Design!•  Clear plexiglass shield!•  Mounting layer for 7 segment

displays!•  Circuit Layer!•  Back pole-mounting layer!

Page 7: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Housing Design!

Exploded  View  

Page 8: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Solar Panel Mount!

•  Easy Assembly!•  No angled connections!•  All single bolt connections!•  Easy pole adaptation!!

•  Parts/Materials!•  Steel Strut Channel!•  Aluminum L Brackets!•  ½” Bolts/Nuts!

Page 9: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Solar Panel Mount!

Exploded  View  

Side  View  

Isometric  View  

Page 10: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Sensor Selection Criteria!

Solution Componants  Req'd Cost Lifetime Reliability Ease  of  Install Lead  Time Compatibility Accuracy Power  Req'd?Road  Tube + -­‐ + + + + +Air  Switch + + + + + + + YesSpeed  Bump + + -­‐ + + + -­‐Stakes  for  SB + + + -­‐ + + N/ASteel  Plate + 0 0 -­‐ + -­‐ -­‐Piezo  brass -­‐ 0 + + -­‐ 0 0 NoCoax  Adaptor + + + 0 + + N/ATie  Downs + -­‐ + -­‐ + + N/A

Loop -­‐ + + -­‐ -­‐ 0 + Yes

Concrete  Filler 0 0 + -­‐ 0 + N/A

Magnetometer 0 + -­‐ 0 0 -­‐ -­‐ YesXtrinsic + + + ? + ? + YesConcrete  Filler 0 0 + -­‐ 0 + N/APVC + + + + + + N/A

Air  Sensor

Brass  

Linguini

Indu

ctive  

Loop

Magnet

Page 11: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Road Tube Benefits!

•  Proven Technology!•  Easily Replaced!•  Low Cost!•  Doesn’t Require Electricity to Road!

Page 12: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Road Tube on Speed Bump Isometric!

Stakes  

Page 13: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Road Tube on Speed Bump Top View!

City  Tube  

Speed  Bump  

Page 14: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Road Tube Layout Isometric!

Page 15: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Road Tube Layout Top View!

Page 16: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Sensor Solution Concerns!

•  Road Tube life = 8-10 months!•  Air Switch life = 5 years!•  Air Switch Location!•  Weatherproofing!•  Tube Network - crimping!•  Cyclists and Pedestrians – False trips!

Page 17: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Concrete Pad Isometric!

Page 18: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Concrete Pad Top View!

Page 19: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Electrical System Overview!

•  System requires >99% uptime!•  Solar panel and wind turbine provides power

redundancy with battery backup!•  Primary 12V power rail supplies energy for indication

systems!•  Secondary power rails provide power for microcontroller

(8V) and sensor electronics (5V)!•  Also provides physical interconnections for data

transmission between sensors and user interface!

Page 20: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Electrical Diagram!

Page 21: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Power System Diagram!

Page 22: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Wind Turbine Analysis!

Page 23: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Wind Turbine Analysis

Page 24: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

User Interface Overview!

•  Provides  mounAng  locaAon  for  screen,  keypad,  safety  cutoffs,  power  metering,  and  circuit  breakers  

•  User  interface  allows  configuraAon  of  system  parameters  and  data  retrieval  

•  Safety  cutoffs  allow  disabling  of  solar  panel  and  wind  turbine  for  maintenance  

•  Allows  monitoring  of  power  system  input  

Page 25: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

User Interface Diagram!

Page 26: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Display!

•  6.5" board!!•  6 inches (153 mm) digit!!•  Forward current : 20 mA!

•  Operating temp : -25C to 80C!

!•  COM-08530!!

Page 27: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Block Diagram of 7 Segment Display!

Page 28: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

LED Lighting!

•  Length : 1 m! Width : 9 mm!!•  LED size : 3.2 mm x 2.8

mm!!•  Forward current : 20 mA!!•  Forward voltage : 12 V!!•  Power rating : 12 mW!!•  901-SB-0625-CT & 901-

SB-0565-CT !

Page 29: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

LED Flasher Circuit!

Page 30: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Display Driver!

One Digit Shown

Shifter

Page 31: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Display Driver!

Components: Shifter

Page 32: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Display Driver!

Components: Relay

Page 33: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

7 Segment Display Driver!

Components: 7 segment LED display

Page 34: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Software Breakdown: Overview!

Page 35: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Software Breakdown: Subsystem Functionality!

Page 36: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

User Interface: Components!

Input: Numpad Output: Display & SD card

Page 37: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

User Interface: SD data example!

The time interval is configurable by the user.

Page 38: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

User Interface: Menu Options!

l  Initial welcome screen!  Comes up automatically when door is opened..!  Press '#' to continue..!

l  Then menu options are given:!  1. Help 7. Set recording interval!  2. Set lot capacity 8. Free function!  3. Set current lot usage 9. About parking monitor!  4. Close lot (RED)!  5. Mount SD card Testing will be done to refine !  6. Eject SD card this user interface.!

Page 39: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Customer Needs!

Need  # Importance Description Customer Achieved?1 3 Operation  in  inclement  weather Randy  Vercauteren ü2 9 Resistant  to  vandalism Randy  Vercauteren ü3 9 Operation  during  high  volume  traffic Randy  Vercauteren ü4 9 Doesn't  impede  current  parking Randy  Vercauteren ü5 9 Inform  commuter  of  lot  status Randy  Vercauteren ü6 1 Retrevial  of  real  time  data Randy  Vercauteren -­‐7 9 Maximum  2%  counting  error Randy  Vercauteren ü8 3 Field  programmable Randy  Vercauteren ü9 1 Aesthetically  pleasing Randy  Vercauteren ?10 3 Operates  for    at  least  one  month  on  internal  power  source Randy  Vercauteren ü11 3 Indicator  must  be  visible  above  landscape Randy  Vercauteren ü12 3 Affordable Mark  Smith -­‐13 9 Sustainable  operation Enid  Cardinal ü14 9 Conforms  to  RIT  Facilities  color  scheme Randy  Vercauteren ü

Page 40: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Specifications!

Spec.  # Customer  Need Specification  (metric) Unit  of  Measure Marginal  Value Ideal  Value Achieved?S1 3,10 Time  of  operation Hours 0900-­‐1700 24/7 üS2 7,5 Accuracy Percent 2 1 üS3 10 Minimum  battery  lifetime Months 1  month Infinite üS4 9 Aesthetically  pleasing Binary Y YS5 8 Field  programmable Binary Y Y üS6 6 Duration  of  record  storage Days 30 365 üS7 1 Operational  temperature  range °F -­‐10  to  110 -­‐20  to  140S8 1 Waterproof  unit Binary Y Y üS9 1 Operational  in  snow Feet 3 10S10 1 Withstand  continuous  wind  gusts MPH 60 100 üS11 5,11 Visible  indication  of  lot  status  in  all  directions Yards 150 150 üS12 1 Operational  in  humidity Percent 90 100S13 13 Must  sustain  itself Binary Y Y üS15 2 Cannot  be  easily  stolen Binary Y Y üS16 3 Minimum  height Feet 15 20 üS17 12 Project  within  budget Binary Y YS18 14 Color  (black) Binary Y Y ü

Page 41: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Bill of Materials!

System Item Description S/N Location Quantity Price for each Total PriceLead Time (days)

Status? notes

Concrete80lb bag of Quickrete Setting Post Concrete Mix 110180 Home Depot 11 $3.80 $41.80 0

Anchor Bolts for concrete

Hilti Kwik Bolt 3 5/8 in. x 4-3/4 in. Long Thread Expansion Anchors (2-Pack) 337938 Home Depot 2 $8.24 $16.48 0

Cable housing For middle of concrete $0.00Ground Rod 9' Ground Rod #70860 Lowes 1 12 $12.00 0

70.28Road Tube EPDM 1/4" 9/16" 100ft #CITY TUBE http://diamondtraffic.com 1 $100.00 $100.00Air Switch SPST Weatherproof #AS-4WP http://diamondtraffic.com 4 $78.50 $314.00Tape 6" Marmac Road Tape 60' #MMT6 http://diamondtraffic.com 1 $0.00Screws (sensor to speedbump) 1" s.s. screws to hold 50ct Lowes? 1 $10.00 $10.00End Plug End plug for road tube #EP-312 http://diamondtraffic.com 4 $1.00 $4.00Speed Bump 6' long Donated Donated 4 $0.00 $0.00Anchors for Speed Bump 6" spikes (talk to FMS) 16 $3.00 $48.00

Male to male barbHose connections (maybe not necessary) 4 $2.00 $8.00

PVC Elbow 90 deg sch.40 1/2in 5WNZ6 Grainger 32 $0.40 $12.80PVC Pipe 10ft 1" sch.40 23976 Lowes 1 $3.33 $3.33PVC Flange Speed bump interfaceWiring (Signal) Multiconductor signal cable Lowe's 1 $0.00Road Tube Elbows 90deg bends to avoid crimping

500.13

15A BreakerSelf-Resetting Breaker (Non-Stocked) 0813015.ZXST Mouser 1 $12.22 $12.22

Charge Controller Solar Battery Charge Regulator SS-10L-12V Amazon 1 $57.75 $57.75AirX Wind Turbine 400 W Turbine AirX 1 $0.00 $0.00 n/a obtained

Wiring (Power) 8AWG stranded power wire 112-4001B Lowe's 1 $29.59 $29.59

Andy: may be able to get from EE or CE senior design labs

ALEKO Solar Panel 60W solar panel

http://www.amazon.com/ALEKO%C2%AE-60W-60-Watt-Monocrystalline- 1 $157.00 $157.00

256.56

Pole Mounting

Power Systems

Sensor

Page 42: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Bill of Materials Cont’d!

Microcontroller Arduino ATmega2560-16AU ebayhttp://www.ebay.com/itm/New-Mega-2560-ATmega2560-16AU- 1 $21.00 $21.00 5

LCD Display 4x20 Display LCD-00256https://www.sparkfun.com/produc

ts/256 1 $18.00 $18.00

Keypad 12 button keypad COM-08653https://www.sparkfun.com/products/8653 1 $5.00 $5.00

SD card interface 5v / 3v module ebay

http://www.ebay.com/itm/SD-Card-Module-for-AVR-Arduino-PIC-ARM-breakout-board-for-MMC- 1 $5.10 $5.10

8-32 Screws $0.00 $0.008-32 Spacers 0 $0.008-32 Nuts 0 $0.00 Andy: can get from labs

49.1

NE555 Timer for LED blinking circuit595-

NE555PSRG4 www.mouser.com 1 $0.33 $0.33Red LED Strip Red LEDs 901-SB-0625-CT Mouser 3 $15.48 $46.44Green LED Strip Green LEDs 901-SB-0565-CT Mouser 3 $15.48 $46.44

Roof Panels 2'x1'x1/8" ABS Sheet

http://www.tapplastics.com/product/plastics/cut_to_size_plastic/acrylic_sheets_clear/508 4 $10.00 $10.00

Bases 2ftx2ftx1/8"ABS Sheet

http://www.tapplastics.com/product/plastics/cut_to_size_plastic/acrylic_sheets_clear/508 2 33.2 $33.20

Mount Plate 6"x18" Aluminum Sheet # 475365 Home Depot 1 8.97 $8.97

Plexiglass 6"x96-"x1/16" Custom

http://www.tapplastics.com/product/plastics/cut_to_size_plastic/acrylic_sheets_clear/508 1 20 $20.00

L Brackets 1"1.5" 4pk Lowes 4 2.27 $9.08174.46

7 Segment7-Segment Display - 6.5" (Red) COM-08530 COM-08530

https://www.sparkfun.com/products/8530 3 $14.95 $44.85

Shifter 8 bit Shifter (5v) MM74HCT164 www.mouser.com 3 $0.69 $2.07Relay 8 channel relay switch (5v) ebay

http://www.ebay.com/itm/NEW-8-Channel-5V-Relay-Module-Shield- 3 $13.00 $39.00 ordered

85.92Strut Channel 2' 3310T53 McMaster Carr 1 7.86 $7.865" Bolts 1/2 5" Bolts Lowes 4 $1.57 $6.28Nuts 1/2" Nuts 2 pk Lowes 2 $1.09 $2.18

7 Segment Electronics

Pole Mounting

User Interface

Components

Indicator

Page 43: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Bill of Materials Cont’d!

U Channel 4" Border for & Seg Housing 1630T13 McMaster Carr 1 $51.79 $51.797 Seg Mounting Plate Aluminum Sheet # 202091748 Home Depot 1 $9.88 $9.887 Seg Back Mount Steel Sheet #128280 Lowe's 1 $9.46 $9.46Threaded Rod 8-32 6' 92825A040 McMaster Carr 1 $2.45 $2.458-32 Spacers Circuit 1/2" Long LDPE .140" ID (x20) 92825A040 McMaster Carr 1 $7.00 $7.008-32 Spacers LED 1/2" Long Aluminum .166 92510A465 McMaster Carr 60 $0.27 $16.208-32 Nuts Pack of 50 91875A115 McMaster Carr 1 $9.88 $9.888-32 Lock Washers Pack of 100 92147A425 McMaster Carr 1 $3.25 $3.258-32 1" Cap Screws Pack of 50 91251A199 McMaster Carr 1 $7.51 $7.51Plexiglass Shield for 7 Seg box 987359 Home Depot 1 $12.98 $12.98Tap Screws #8 3/8 334515 Home Depot 1 $4.98 $4.988-32 Lock Washer Aluminum 95856A215 McMaster Carr 1 $3.67 $3.67L Bracket 2.5x5/8" Aluminum 1556A55 McMaster Carr 4 $1.10 $4.40

143.45

U channel10' Slotted 1 5/8 X 1 5/8 w. 9/16 holes green painted steel 3310T483 McMaster Carr 1 $33.41 $33.41

L Channel 6' 90deg 1 3/4 X 1 3/4 X 1/8thick 9017K13 McMaster Carr 1 $22.43 $22.43Clamping Bolts 5" 1/2-20 partial thread grade 8 63377? Lowe's in store 4 $2.00 $8.00Washers 9/16 min ID 1 1/4 max OD Lowe's in store 40 $0.10 $4.00Reinforcement Bars 4' Steel Bar Lowe's in store 2 $11.00 $22.00Bolt (L to U) 2.5" 1/2-20 ful thread grade 8 4 $0.30 $1.20Bolt (L to Reinforcement) 1" 3/8-16 full thread grade 8 6 $0.35 $2.10Bolt (mid reinforcement to solar panel 1" 3/8-16 full thread grade 8 2 $0.35 $0.70Nuts locking 3/8-16 hex 8 $0.15 $1.20Nuts 1/2-20 Hex 4 $0.10 $0.40

95.44

7 Segment Housing

note: I found a bunch of spacers, screws, nuts and such in the CE senior design lab that we can make use of.

Solar Panel Mount

Grand Total= $1,391.66 *Does  not  include  shipping  &  some  parts  

Page 44: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Cost Overview!

System CostFull $ 1,391.66 w.o. Seven Seg Display $ 1,162.29 w.o. Solar Panel $ 1,081.47 w.o. 7seg and solar $ 852.10

Page 45: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Risk Mitigation!Risk  Item Effect Cause Liklihood Severity Importance Action  to  Minimize  Risk Owner

1Software  Development  

TimeUnable  to  operate  

systemMSD  timeframe 3 3 9 Continue  to  develop  software. Andrew  Eggers

2 Road  Tube  Defects Does  not  accurately  count  vehicles

Wear  and  tear/manufacturer

2 2 4 Protect  tubes  from  harsh  environment.  Secure  to  pavement

Conley  Brodziak

3Lead  times  beyond  

construction  starts  dateDelayed  construction  of  

systemOut  of  stock  parts,  not  ordering  on  time

2 2 4Monitor  stock  of  potentially  needed  parts,  order  parts  with  long  lead  times  early  in  development  cycle

All

4 BudgetUnable  to  purchase  necessary  technology

MSD  Budget  limitation

1 3 3Use  low  cost  materials/technology.  Coordinate  between  team  budget  

needsTyler  Ludwig

5 Structeral  IntegrityPhysical  damage  to  system/surroundings

Construction  limitations

1 3 3Proper  structural  analysis.  Knowledge  of  FMS/PATS  construction  limitations.

Conley  Brodziak

6 WeatherproofingWater  damage  on  

internal  components.  Exterior  degredation

Operational  environment

1 2 2Maintain  watertight  seal  around  vital  

electrical  components.  Select  weather  resiliant  materials.

Tyler  Ludwig

7Insufficient  Indication  of  

Lot  StatusCommuter  confusion,  

lack  of  visibility

LED's  not  bright  enough  compared  to  

sunlight1 2 2 Public  awareness  of  new  system  and  

instructional  signage.Wynn  Aung

8Power  

Supply/Generation

Human  power  intervention  (battery  

depletion)

Both  solar  panel  and  wind  turbine  fail

1 1 1Perform  worst  case  current  draw  

analysis,  select  parts  to  exceed  worst  case

Bryan  Blakeslee

9 VandalismCosmetic  damage  to  system,  impaired  system  operation

Human  condition 1 1 1Theft  deterrent  stickers.  Keep  

housing  locked.    System  anchored  to  ground.    Solar  panels  out  of  reach

Conley  Brodziak

Page 46: Active Parking Management - EDGEedge.rit.edu/edge/P13331/public/Project_Review/DDR... · S8 1 Waterproof&unit Binary Y Y ! S9 1 Operational&in&snow Feet 3 10 S10 1 Withstand&continuous&wind&gusts

Active Parking Management – System Design Review!

Build Plan!

•  Week 11 (MSD I)!•  Final selection of all components!•  Assess lead times, begin ordering items for build in MSD II!

•  Week 1!•  Test Road Tube/ Integrate with speed bump!•  Construct Solar Panel Bracket!•  Begin programming with sensor!•  Facilities ground setup!

•  Week 2!•  Construct Indicator, Integrate LEDs!•  Construct 7 Segment Circuitry & Begin Housing!•  Construct Input Panel Machined Parts!

•  Week 3!•  Begin electronics routing to main housing!•  Test system operation (7 Segment count, Indicator status)!•  Finish main housing constructions items!

•  Weeks 4-9!•  Commence iterative testing of complete system (as completion occurs)!•  Modify Pole for outdoor installation/cosmetics!•  Take care of small details!