DEPARTMENTAL REPORT FOR THE MONTH OF AUGUST 2016 1 DEPARTMENT OF ELECTRICAL & ELECTRONICS (EX) ST. ALOYSIUS INST. OF TECHOLOGY, JABALPUR BY- Prof. PRAGTI JYOTISHI HOD, EX-Dept.

Transcript of Action planed and compeleted august 2016

Page 1: Action planed and compeleted august 2016

1

DEPARTMENTAL REPORT FOR THE MONTH OF AUGUST 2016

DEPARTMENT OF

ELECTRICAL & ELECTRONICS (EX)

ST. ALOYSIUS INST. OF TECHOLOGY, JABALPUR

BY- Prof. PRAGTI JYOTISHI HOD, EX-Dept.

Page 2: Action planed and compeleted august 2016

ADMISSION AND COUNSELINGS.NO. FACULTY NAME BE POLY

1 Ms.Pragti Jyotishi 3 0

2 Mr.Ashish Shrivas 2 5

3 Mr.Deepak S.Rathore 3 0

4 Ms.Shweta Gupta 2 1

5 Mrs.Trivelli Rao 0 0

6 Mr.K.G.Awasthi 0 2

Page 3: Action planed and compeleted august 2016

TEACHING LEARING

• Lecture Notes ( NPTEL,Writen,Softcopy)• Quiz (Each unit 20 Questions)• Assignment (After completion of each unit)• Class Test (After completion of each unit)

Page 4: Action planed and compeleted august 2016

Result Improvement Plan

Event ActivityDate

MST MST-I for EX-III, V and VII Sem

19/09/2016

to 21/09/2016

MST-II for EX-III, V and VII Sem13/10/2016

to

15/10/2016

Remedial Plan

Review of EX-VI & IV Sem result, and plan for the remedial classes be made accordingly 03/10/2016

Page 5: Action planed and compeleted august 2016

Event Activity Date

Pre-University

Test

PUT & Sessionals for EX-III, V and VII Sem

07/11/2016 to

11/11/2016

Study Materials

Giving solution for PUT papers,5 Year’s RGPV question papers ,Model question paper be solved. 15/11/16

Result Improvement Plan

Page 6: Action planed and compeleted august 2016

RESULT OF THE PREVIOUS SEMESTER RECENTLY DECLARED

EX-801 EX-802 EX-8303 EX-8401CAEMD CAPS FACTS PSE

0

10

20

30

40

50

60

70

80

90

100

Comparative Result ChartEX-VIII Sem

Perc

enta

ge

Year Appeared Student Passed StudentJun-16 6 6Jun-15 9 9Jun-14 15 15

Page 7: Action planed and compeleted august 2016

CE [EX-601] CS [EX-602] SGP [EX-603] EI [EX-604] ECM[EX-605]0

10

20

30

40

50

60

70

80

90

100

Comparative Result ChartEX-VI Sem

Perc

enta

ge

Year Appeared Students Passed Students Result in %Jun-16 7 7 100Jun-15 5 3 60Jun-14 11 7 63.63

Page 8: Action planed and compeleted august 2016

STEP PROGRAM AND SKILL DEVELOPMENT

Sr. No.

Sem Step Program Faculty Incharge

Day Lect

1 III MATLAB Tools Prof. Ashish Shrivas

Monday-Tuesday-Friday

Commencing from I st week of

sept. 2016

2V &

VII

P-SIM Prof. Shweta Gupta

Wednesday-Thursday-Saturday

4

Page 9: Action planed and compeleted august 2016

TRAINING AND PLACEMENT ACTIVITIES

• The departmental TPO(Mr. Ashish Shrivas) has made WHATSAPP groups (Batch wise) and added college TPO in that Group.

• Student data has been updated.

Page 10: Action planed and compeleted august 2016

PUBLICATIONS • News Letter in the month of August 2016

(Ms.Pragti Jyotishi) .• “Reactive Compensation in 132kv and 33kv

Grid of Narsinghpur Area” (IJCER) ISSN (e): 2250– 3005, Volume 06, Issue 06, June – 2016. Mr. J.C. Bhola/ Ms. Pragti Jyotishi

• “Analysis of Reactive Compensation at a 132/33 KV Grid Substation” (IJMRET) Volume 1, Issue 1, June 2016. Ms. Pragti Jyotishi

Page 11: Action planed and compeleted august 2016
Page 12: Action planed and compeleted august 2016
Page 13: Action planed and compeleted august 2016

REASEARCH AND DEVELOPMENT

• NIL

Page 14: Action planed and compeleted august 2016

FINAL YEAR PROJECTSSt. Aloysius Institute of Technology, Jabalpur(M.P.)

MAJOR PROJECT (VII SEM 2016)

S.NO. MAJOR PROJECT TOPIC SEM STUDENT FACULTY

1 ENERGY AUDIT SAIT COLLEGE 7

ANURAGINI TOPPO

Mr.Deepak S.Rathore & Mr.K.G.Awasthi

SWATI SONI

SEEMA EKKA

ROSHAN KIRO

2 VAN DE GRAFF GENERATOR 7

YOGESH NANWANIMr.Ashish ShrivasAKHAND TIWARI

VISHAL APAT

3

ANALSIS TO ASCERTAIN

REACTIVE SHUNT COMPENSATION AT

132/33 KV MADHOTAL SUBSTATION JABALPUR

7 GUNJAN PRAJAPATI

 

Page 15: Action planed and compeleted august 2016

INDUSTRIAL VISITS

• SEMESTERS-V & VII INDUSTRIAL VISIT • SITE- HIGH VOLTAGE LAB, EE DEPTT., JEC,

JABALPUR (MP) • DATE-02/09/2016 (FRIDAY) • TIME-10:00 AM TO 12:30 PM

Page 16: Action planed and compeleted august 2016
Page 17: Action planed and compeleted august 2016

LAB READINESS

• All labs are in working condition.• Lab manuals of all practical oriented subjects

are updated except III sem.

Page 18: Action planed and compeleted august 2016

CO-CURRICULAR AND EXTRA-CURRICULAR EVENTSDate Day Event Activity In charge

Aug-16

8/4/2016 Thursday Monthly BulletinPublication of News Letter

Ms. Pragti Jyotishi

8/5/2016 Friday   Departmental meeting HOD-EX

8/6/2016 Saturday Society Activity Registration of new members followed by planning of future activities of the Society

Staff & Students of EX-Deptt.

8/8/2016 Monday Talent Hunt Program (I SEM)

Registration of new members for extra-curricular activities Ms. Shweta Gupta

8/13/2016 Saturday Society Activity Plantation Ms. Shweta Gupta

8/15/2015 Monday Independence DayIndependence Day Celebration

Ms. Pragti Jyotishi

8/16/2016 Tuesday Fortnight attendance display Display of Subjectwise Attendance Record Ms.Pragti Jyotishi

Page 19: Action planed and compeleted august 2016

8/27/2016 Saturday Society Activity Departmental Notice Board Decoration Mrs.Trivelli Rao

8/31/2016 Wednesday Fortnight attendance display Display of Subject wise Attendance Record Ms. Pragti Jyotishi

Date Day Event Activity Incharge

Aug-16

02/09/2016 Friday Industrial Visit Visit to High Voltage lab of JECMs. Shweta Gupta/Mr.Ashish Shrivas

Page 20: Action planed and compeleted august 2016

SPORTS AND GAMES

S.NO DATE EVENT NO.OF STUDENTS PARTICIPATED

INCHARGE

1 30/8/2016 CHESS BE: 16

POLY: 6

Mr.Deepak S.Rathore

2 31/8/2016 CHESS BE: 08

Page 21: Action planed and compeleted august 2016

INSTITUTE SOCIAL RESPONSIBILITY

• Assembly Coordinator : Ms.Pragti Jyotishi• Value Education Coordinator: Ms.Pragti Jyotishi • Sports Coordinator : Mr.Deepak.S.Rathore &

Mr.Ashish Shrivas• News Letter: All Ex-Deptt. faculty involve.• I st year Coordinator: Ms.Shweta Gupta• T & P Coordinator : Mr. Ashish Shrivas• Society :Mrs.Trivelli Rao

Page 22: Action planed and compeleted august 2016

• ANTI RAGGING SQUAD & DISCIPLINE COMMITTEE:Ms.Pragti Jyotishi

• CULTURAL COMMITTEE: Ms. Shweta Gupta (Incharge)

• TECH FEST COMMITTEE:Ms. Pragti Jyotishi & Ms. Shweta Gupta

• INDEPENDENCE DAY & REPUBLIC DAY COMMITTEE: Ms. Pragati Jyotishi (Incharge)

• WOMEN DEVELOPMENT CELL:Ms. Pragti Jyotishi (Incharge) & Ms. Shweta Gupta

Page 23: Action planed and compeleted august 2016

EXPERT LECTURESr.

No.Planning

DateExpert Topic Faculty Incharge

1 09/09/2016 Dr. Ashok Tiwari(Dir.-Central

Training Institute, MPPKVVCL)

SCADA in distribution and Advanced distribution

systems

Prof.Pragti Jyotishi