ACSAC ALTO CERCAPUQUIO S. A. C.
SMALL AND MEDIUM HYDROELECTRIC POWER DEVELOPMENTS, JUNIN STATE, PERU
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Cautionary Statement
This document is for information purposes only and does not constitute an offer to sell or a solicitation to
buy securities that may be referred to herein. This document is confidential and for internal use only.
The contents are not to be reproduced or distributed to the public or the press. Securities legislation in all
provinces prohibits such distribution. The statements contained herein are based upon information believed
to be reliable but no representation regarding completeness or accuracy is made.
Some of the statements in this presentation may be forward-looking statements and as such are based on an
assumed set of economic conditions and courses of action. These include estimates of future production
levels, expectations regarding development and production costs, expected trends in prices and other
statements that describe future plans, objectives or goals.
There is a significant risk that actual results will vary, perhaps materially, from results projected depending on such
factors as changes in general economic conditions and financial markets, changes in prices for energy
technological and operational hazards in development activities, uncertainties inherent in the timing and
availability of financing, governmental and other approvals, political unrest or instability in countries where
ACSAC may be or may become active, labor relations and other risk factors.
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
The Power Policy of Peru
5/25/2010
• To promote investment in Electric power generation
• To guarantee energy supply: Energy Security
• To extend the energy coverage: Rural Electrification
• Diversify the energy supply matrix
• To promote the use of renewable energy sources.
• To contribute to a sustainable economic growth while diminishing the environmental impact.
• To encourage the efficient use of the energy .
• To promote national and regional energy integration.
ACSAC ALTO CERCAPUQUIO S. A. C.
Electric Power Market in Peru
•Peru is the strongest growth economy in Latin America, and all sectors are expanding their demand for electricity
•Installed capacity in Peru was 6,658 MW, (2006)
•48% was hydro-based, provides 68% of output (was over 85% in1990`s)
•May 2008: Renewable Energy Decree for promotion of generation of renewable energy, including hydropower up to 20 MW
•Demand growth over the past five years has been 5-10 percent, projected at 6-8% for this year
•400 MW of new generation capacity is necessary each year
•Peru has also been in the process of integrating its power grid with those of Ecuador, Chile and Bolivia (and Brazil)
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Power Market in Peru
•Almost all of the recent increase in demand is being supplied by new open cycle gas generation using natural gas from the Camisea field, (which may be smaller that predicted).
•However, Peru is becoming an LNG exporter, and is developing a petrochemical Industry
•Ministry of Energy and Mines MEM) approved the National Rural Electrification Plan (PNER) 2009 – 2018, which includes projects aimed to provide electricity to more Peruvians
•Officials are encouraging miners to consider their own including power generation assets in new mines
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Executive Summary
ALTO CERCAPUQUIO S. A. C. (ACSAC) is a registered closed corporation in Peru, with a business mandate focused initially on the development of hydroelectric projects in Junín State and later throughout Peru.
The Company shareholders comprise four Canadians:
Dennis Netherton - P. Eng. Civil Engineer
Bradley Bowman - P. Geo., Environmental Scientist
Janice Linquist - Environmental Scientist and Senior Fish Biologist
Stephen G. Mlot – P. Eng., Mining Engineer
and three Peruvian professionals:
Wilson Vargas Miranda - Mining Executive
Ms. Fanny Fuentes Carolla Marinos – Chartered Accountant
Dr. Jorge Rullier – Registered Peruvian Lawyer
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
ACSAC Project
•Located at department of Junín 200 km to the east of Lima Rio de la Virgin, Atlantic Watershed
•Accessible by train and road
•Huancayo is the nearest main city (50 km) pop. 325,000
•Watershed area of basin is 720 square kilometres
•Head gross = 900 m
•Developable head = 755m
•ACSAC -1 6.15 MW At the lower end of the watershed
•ACSAC -2 – 24 MW Development farther upstream
•ACSAC - 3, and - 4, sites have been identified
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
ACSAC ALTO CERCAPUQUIO S. A. C.
Current Status• 760 square kilometre watershed area,
•Joint water management contract with Electroperu ,with 5 controlled alpine lake reservoirs,
•The former 1.8 MW hydroelectric facility that supplied power to the former Cercapuquio Mine,
•40 ha site for power station, which deals with Community issues
•Power Purchase Agreement with Distriluz (10 year)
•Investment to date $ 1.7 Million
•Physical Assets Valued at $ 3.2 Million
•Construction Ready, to start this summer.
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
ACSAC -1:The usable components of the old hydroelectric facility include;
•40 hectares (98 acres) of property,
•a control dam,
•gated intake system,
•diversion tunnel in hard rock formation,
•3.2 kilometres of reinforced concrete power canal which includes an additional 4 tunnel sections,
•a good quality aqueduct,
•usable access roads.
•The head works, penstock, powerhouse, and transformer station no longer exist.
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Construction Costs: $ 9,429,961
Annual Costs: $ 1,398,881
Revenue from Power sales: $ 2,145,746
GHG Credits: $ 325,118
Net Annual Income: $ 1,071,983
IRR: 41.2%
NPV: $ 9,690,840
Payback 5.0 yrs
ACSAC – 1 Summary
Design Flow: 6.5 m3/sec
Gross Head: 110 m
Turbine Type: Francis
Number of Turbines: 2
Plant Capacity: 5,750 kW
Energy Delivered: 48,265 MWh
Project life: 30 yr (min)
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Construction Costs: $ 42.5 Million
Annual Costs : $ 5,300,000
Revenue from Power sales: $ 8,916,716
GHG Credits: $ 1,351,040
Annual Net Income: $ 4,967,756
IRR: 43.2%
NPV: $ 24,764,599
Payback 4.8 yrs
ACSAC – 2 Summary
Design Flow: 4.9 m3/sec
Gross Head: 640 m
Turbine Type: Pelton
Number of Turbines: 2
Plant Capacity: 24,192 kW
Energy Delivered: 198,150 MWh
Project life: 30 yr (min)
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
5/25/2010
ACSAC ALTO CERCAPUQUIO S. A. C.
Total Requirement: $ 9.5 Million
Debt on offer: $ 6.5 Million
Equity Required: $ 3.0 Million
Financing
5/25/2010
Finance ACSAC – 1 on a private basis, get into production, advance ACSAC – 2, acquire additional development sites.
Go-Public on ACSAC – 2 construction, to fund larger Capital requirements, and to grow and expand the business.
ACSAC ALTO CERCAPUQUIO S. A. C.
We may be young but we are starting to run, come along with us.
Contact :
Alto Cercapuquio S.A.C.
Stephen G. Mlot, P.Eng
416 573 0583
905 787-9086 fax
5/25/2010