Acqua Private Residences Construction Update October 2013
2
Interior works at Niagara progress, structural works for towers 2 to 4 continue
Aluminum and glass door installation at Acqua’s first tower, the Niagara, continue this month simultaneous with exterior and interior painting works and the placement of drywall and balcony railings. Construction is also on-going for the Niagara’s structural crown at the roofdeck of the building. Meanwhile, Sutherland progresses to 26th floor level formworks and rebar installation, while mechanical, electrical and plumbing works are on-going on the lower floors. Following pile capping activities for Acqua’s third tower, Dettifoss, column bar and shearwall starter bar installation are underway. Livingstone has reached the third level formworks for its basement parking level. Acqua Private Residences is developed by Century Limitless Corporation under Century Properties Group Inc. It is located in Mandaluyong City and is a 10-minute drive from Makati, accessible via the Makati-Mandaluyong bridge and the new Estrella-Pantaleon Bridge.
3 The Niagara (left) continues painting works and drywall, balcony railings and windows installation.
Sutherland (right) reached 26th level structural works this month.
Acqua Private Residences The Niagara & Sutherland Towers Photos as of October 2013
4 Works for the structural frame of the Niagara’s crown are on-going.
Acqua Private Residences The Niagara Tower Photos as of October 2013
5 Installation of balcony railings and windows have begun at the Niagara.
Acqua Private Residences The Niagara Tower Photos as of October 2013
6 The northwest elevation of the Sutherland tower
Acqua Private Residences Sutherland Tower Photos as of October 2013
7 Column bar and shearwall installation progress at the Dettifoss site
Acqua Private Residences Dettifoss Tower Photos as of October 2013
8 Structural works for the Livingstone’s parking levels are underway.
Acqua Private Residences Livingstone Tower Photos as of October 2013