A. CONTINUING PUBLIC PARTICIPATION OBJECTIONS B. FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C. REASONS OVERRIDE IS INAPPROPRIATE D. UNDUE PRESSURE ON THE CEC, ITS OFFICIALS & STAFF TO EXPIDITE PROCESS AND OVERRIDE CITY, CONSTITUTION, & VOTERS CAlifornians for Renewable Energy, Inc. (CARE) 821 Lakeknoll Dr. Sunnyvale, CA 94089 (408) 325-4690 By Mike Boyd – President CARE

Transcript of A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING...

Page 1: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

A. CONTINUING PUBLIC PARTICIPATION OBJECTIONS

B. FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES

C. REASONS OVERRIDE IS INAPPROPRIATED. UNDUE PRESSURE ON THE CEC, ITS OFFICIALS

& STAFF TO EXPIDITE PROCESS AND OVERRIDE CITY, CONSTITUTION, & VOTERS

CAlifornians for Renewable Energy, Inc. (CARE)

821 Lakeknoll Dr.Sunnyvale, CA 94089

(408) 325-4690By Mike Boyd – President CARE

Page 2: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

CONTINUING PUBLIC PARTICIPATION CONTINUING PUBLIC PARTICIPATION OBJECTIONSOBJECTIONS

FUTILITYFUTILITY

UNFAIR TREATMENTUNFAIR TREATMENT

NO PARTICIPATION COST PAYMENTSNO PARTICIPATION COST PAYMENTS

Page 3: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

ISO report on June 14, 2000 points to the first two producersISO report on June 14, 2000 points to the first two producersTo WITHHOLD POWER that started California’s CrisesTo WITHHOLD POWER that started California’s Crises

by scheduling the outage of 439 MW on the Hottest day of the yearby scheduling the outage of 439 MW on the Hottest day of the year

ISO report on June 14, 2000 points to the first two producersISO report on June 14, 2000 points to the first two producersTo WITHHOLD POWER that started California’s CrisesTo WITHHOLD POWER that started California’s Crises

by scheduling the outage of 439 MW on the Hottest day of the yearby scheduling the outage of 439 MW on the Hottest day of the year

CALPINECALPINEOWNEDOWNED

GENERATIONGENERATION

CALPINECALPINEOWNEDOWNED

GENERATIONGENERATION

SOUTHERNENERGYOWNED

GENERATION

Page 4: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

The producer controlled ISO board failed to declare a stage-3

Emergency which would have curtailed exports out of state

The Spot Market price rose to$1,300/MW while the Day-AheadMarket rose to the then ISO Price Cap of $750/MW

Page 5: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

In a sample news articles from the day after this man made disaster titled Breeze eases killer heat from the San Francisco Examiner on June 15, 2000, states

“The scorching heat wave that apparently killed two elderly people and caused electrical blackouts around the Bay Area seemed to be coming to an end as the ocean breeze and fog were expected to cool the region considerably Thursday.”

In the Friday, June 16, 2000 addition of the Contra Costa Times by Carolyn McMillan Cooler air could slip over hills states,

“at least 10 people died and others suffered heat strokes; PG&E shuts off power to scores in an effort to preserve the power grid

The heat wave was particularly devastating Wednesday, contributing to the deaths of at least two people in the East Bay, six in San Mateo County and two other suspected cases in Santa Clara County.

Those rotating outages marked the first time that PG&E was ordered by state regulators to yank electricity from its regular customers.”

Page 6: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

In CARE’s October 3, 2000 Complaint to the Federal Energy Regulatory Commission (FERC) CARE contends that Independent Energy Producers, and the Cal-ISO are involved together in a ISO/generator trust to drive up the price of electricity, and justify expedited power plant construction in California to further maximize generator profits.

CARE provided FERC this document of ISO/Generator Collusion as Evidence that they had the “opportunity” to exercise “market power”

Page 7: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

In response to CARE's complaint the Federal Energy Regulatory In response to CARE's complaint the Federal Energy Regulatory Commission (FERC) issued its December 15, 2000 Order calling for,Commission (FERC) issued its December 15, 2000 Order calling for,

•dissolution of the ISO board of directors,dissolution of the ISO board of directors,

•made a determination that energy pricing in California was not "just made a determination that energy pricing in California was not "just

and reasonable", andand reasonable", and

•that energy producers had opportunity to exercise "market power".that energy producers had opportunity to exercise "market power".

FERC failed however to,FERC failed however to,

•determine "just and reasonable" rates, anddetermine "just and reasonable" rates, and

•order refundsorder refunds (except for a small amount in January 2001) (except for a small amount in January 2001), and , and

•failed to carry out its fiduciary duties to investigate CARE's alleged failed to carry out its fiduciary duties to investigate CARE's alleged

anti-trust and civil rights violations.anti-trust and civil rights violations.

Page 8: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

Calpine Corp. and Southern Energy took their three plants down on June 14, 2000 for maintenance to with hold power during a period of peak demand to contrive an outage to create a shortage and test their market power.

CARE alleges the apparent exercise of market power by these generators in cooperation with the Cal-ISO was done to increase the cost of power and justify the approval of their pending new generation projects under consideration by the CEC. CALPINE acted with impunity for their actions irrespective of the loss of life and associated run-up in price of power that resulted.

TO NOW REWARD CALPINE FOR WHAT IS TANTAMOUNT TO INVOLUNTARY MANSLAUGHTER BYAPPROVING THEIR PROPOSED POWER PLANT IN SAN JOSE IS EXTORTION AT IT’S WORST. IF YOU DO THIS THE VOTERS OF THIS STATE WON'T FORGET

Page 9: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

REASONS THE OVERRIDE IS INAPPROPRIATEREASONS THE OVERRIDE IS INAPPROPRIATE

•IT ISN'T NECESSARYIT ISN'T NECESSARY

•OVERRIDE MUST BE AVOIDED AS MUCH OVERRIDE MUST BE AVOIDED AS MUCH

AS POSSIBLEAS POSSIBLE

•IT ISN'T CONSISTENT WITH FUNDAMENTAL IT ISN'T CONSISTENT WITH FUNDAMENTAL

DEMOCRATIC PRINCIPLESDEMOCRATIC PRINCIPLES

•IT'S UNCONSTITUTIONALIT'S UNCONSTITUTIONAL

•THIS IS AN EXCEPTIONAL CASETHIS IS AN EXCEPTIONAL CASE

Page 10: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

THERE IS UNDUE PRESSURE ON THE CEC, ITS OFFICIALS THERE IS UNDUE PRESSURE ON THE CEC, ITS OFFICIALS & STAFF TO EXPIDITE THE PROCESS AND OVERRIDE CITY, & STAFF TO EXPIDITE THE PROCESS AND OVERRIDE CITY, CONSTITUTION, & VOTERSCONSTITUTION, & VOTERS

THE STATE ASSEMBLY PASSING A RESOLUTION THE STATE ASSEMBLY PASSING A RESOLUTION AND EVEN THE PRESIDENT ENCOURAGING THE CEC AND EVEN THE PRESIDENT ENCOURAGING THE CEC TO OVERRIDE THE CITY OF SAN JOSE IS A TRULY TO OVERRIDE THE CITY OF SAN JOSE IS A TRULY UNPRECEDENTED INCREDIBLY IMPROPER THING TO DOUNPRECEDENTED INCREDIBLY IMPROPER THING TO DO

IF THE LEGISLATURE WANTS TO DECLARE AN EMERGENCY IF THE LEGISLATURE WANTS TO DECLARE AN EMERGENCY & SUSPEND ENVIRONMENTAL LAWS, LET IT DO SO& SUSPEND ENVIRONMENTAL LAWS, LET IT DO SO

BUT AS THE LEGISLATIVE RECORD NOW STANDS WITH BUT AS THE LEGISLATIVE RECORD NOW STANDS WITH A LIMITED MOSTLY DOCUMENTARY EXCEPTION, A LIMITED MOSTLY DOCUMENTARY EXCEPTION, APPROVAL OF POWERPLANTS MUST BE ACCOMPANIED APPROVAL OF POWERPLANTS MUST BE ACCOMPANIED BY THE SAME LEVEL OF ENVIRONMENTAL PROTECTION BY THE SAME LEVEL OF ENVIRONMENTAL PROTECTION AS FOR OTHER CEQA PROJECTS AS FOR OTHER CEQA PROJECTS

Page 11: A.CONTINUING PUBLIC PARTICIPATION OBJECTIONS B.FAILURE OF APPLICANT’S ANALYSIS TO EXAMINE EXISTING MARKETS &CALPINE’S ROLE IN THE CRISES C.REASONS OVERRIDE.

WE NEED ASSURANCES, FOR THE RECORD, WE NEED ASSURANCES, FOR THE RECORD, THAT YOU'RE NOT BEING UNDULY THAT YOU'RE NOT BEING UNDULY INFLUENCEDINFLUENCED

WE'D LIKE TO WE'D LIKE TO HEAR IT FOR THE RECORD HEAR IT FOR THE RECORD THAT NOBODY HAS BEEN TELLING THAT NOBODY HAS BEEN TELLING YOU THE PROCESS MUST BE EXPEDITED YOU THE PROCESS MUST BE EXPEDITED AT ALL COSTSAT ALL COSTS