M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

PARTA

CURRENTSTATUSOFWORK

NoofBuildings StatusStatusoftheEnvironmentalManagement

Facilities

5Buildings

Workinprogress 207 m3/daycapacityofSTPisproposed.

03no.ofsoakpits&Septictanksprovided.

PART A- CURRENT STATUS OF WORK

Page 4: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

:PARTB:

2. PointwisecompliancestatustovariousstipulationslaiddownbytheMinistryinitsclearanceletterSEAC‐2014/CR‐305/TC‐3areasfollows:

Sr.No Condition StatusGeneralConditionsforPre‐constructionphase:

(i)This environmental clearance is issuedsubject torestrictingtotalbuiltupareato26,482.72sq.masapprovedbyLocalAuthority.

Yes,Noted.

(ii) This environmental clearance is issuedsubject toutilizationofexcesstreatedwater.

Noted.

(iii)PP ensures that the treated water shall not bedischargedintoriver/nala/waterbody.

Noted.

(iv)

This environmental clearance is issuedsubject toland use verification. Local authority/planningauthorityshouldensurethiswithrespecttoRules,Regulations, Notifications, GovernmentResolutions, Circulars, etc. issued if any.Judgments/orders issued by Hon’ble High court,Hon’ble NGT, Hon’ble supreme Court regardingDCR provisions, environmental issues applicableby concern should be verified. PP should submitexactlythesameplansappraisedbyconcernSEACand SEIAA. If any discrepancy found in the planssubmitted or details provided in the above Paramay be reported to environmental department.Thisenvironmentalclearanceissuedwithrespecttotheenvironmentalconsiderationanditdoesnotmean that State Level Impact AssessmentAuthority (SEIAA) approved the proposed landuse.

Environmental Clearance Obtainedvide letter No. SEAC‐III‐2014/CR‐305/TC.3 dated 05th November,2015.PleasereferEnclosureII

(v)E‐waste shall be disposed through Authorizedvendor as per E‐waste (Management andHandling)Rules,2011.

Residential project, it is notgenerate E waste in constructionphase

(vi)

Occupation certificate shall be issued to theprojectonlyafterensuringavailabilityofdrinkingwater and connectivity of the sewer line to theprojectsite.

Noted.

(vii)

This environmental clearance is issuedsubject toobtaining NOC from Forestry & Wildlife angleincluding clearance from the standing committeeoftheNationalBoardforWildlifeasifapplicable& this environmental clearance does notnecessarily implies that Forestry & Wild lifeclearance granted to the project as perwhichwillbeconsideredseparatelyonmerit.

There are no eco‐sensitive zoneswithinthe10kmsoftheproject.

PART B- POINT WISE REPLY

Page 5: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Status

(viii)PPhastoabidetheconditionstipulatedbySEAC&SEIAA.

Noted.

(ix)

Theheight,Constructionbuiltupareaofproposedconstruction shall be in accordance with theexistingFSI/FARnormsoftheurbanlocalbody&it should ensure the same along with surveynumber before approving layout plan & beforeaccording commencement certificate to proposedwork.Planapprovingauthorityshouldalsoensurethezoningpermissibilityfortheproposedprojectaspertheapproveddevelopmentplanofthearea.

Height,builtupareaofconstructionis accordancewith the existing FSI/FARnorms.Heightofthebuilding‐61mtr.Commencement certificate isattachedinpreviousreport.

(x)

“Consent for establishment” shall be obtainedfromMaharashtra Pollution Control Board underairWaterActandacopyshallbesubmittedtotheenvironment department before start theconstructionworkatthesite.

Consent to Establish No. Format1.0/BO/ROHQ/PN‐21733‐14/CE/CC‐7400. Please referEnclosureno.III.

(xi)

All required sanitary and hygienic measuresshould be in place before starting constructionactivities and to be maintained throughout theconstructionphase.

9nos.oftoiletsareprovidedatsiteforworkers.

Provision made for drinkingwater & domestic water atprojectsite.

Solid waste is being disposeddaily to municipal collectionsystem.

First aid room is provided atsite and medical check‐up ofconstruction workers done onperiodically.

Proper housekeeping and sitesanitationisprovided.

GeneralconditionsforConstructionPhase‐

(i)

Provision shall be made for the housing ofconstruction labour within the site with allnecessary infrastructure and facilities such as fuelfor cooking, mobile toilets, mobile STP, safedrinkingwater,medical health care, crèche& FirstAidRoometc.

Hutments(50nos.)areprovidedforallworkers.

Hutments are isolated fromconstruction activity for safetypurpose.

All other facilities like drinkingwater, kerosene, first aid room,toilets & etc. are provided onsiteduringconstructionphase.

(ii)

Adequate drinking water and sanitary facilitiesshouldbeprovidedforconstructionworkersatthesite. Provision should be made for mobile toilets.The safe disposal of wastewater and solid wastesgeneratedduringtheconstructionphaseshouldbeensured.

Yes, Regular supply of Drinkingwater ismadeavailable at siteandtoilets are provided at site forworkers.Solid waste generated is collectedseparately for dry & wet waste&handedovertoauthorizedvendor.

(iii)The solid waste generated to should be properlycollected and segregated. Dry/inert solid wasteshould be disposed off to the approved sites for

Solid waste generated is collectedseparately for dry & wet waste &disposedproperly.

Page 6: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Statuslandfillingafterrecoveringrecyclablematerial.

(iv)

Disposalofmuckduringconstructionphaseshouldnot create any adverse effect on neighboringcommunitiesandbedisposedtakingthenecessaryprecautionsforgeneralsafetyandhealthaspectsofpeople,onlyinapprovedsiteswiththeapprovalofcompetentauthority.

All the waste generated from thesite preparation and excavation isusedwithinthesite.

(v)Arrangement shall bemade that waste water andstormwaterdonotgetmixed.

We will be provide separate pipelines & drains for strom water &wastewater.

(vi)All the topsoil excavated during constructionactivitiesshouldbestoredforuseinhorticulture/landscapedevelopmentwithintheprojectsite.

All the topsoil excavated materialis used for land leveling. Top Soilwas used for landscaping & storestheprojectpremisesarea.

(vii)

Additional soil for leveling of the proposed siteshall be generated within the sites (to the extentpossible) so that natural drainage system of theareaisprotectedandimproved.

Excess excavated material andconstruction waste is used forleveling.

(viii)

Green Belt Development shall be carried outconsidering CPCB guidelines including selection ofplant species and in consultation with the localDFO/AgricultureDept.

Green Belt Development shall bedeveloped by considering CPCBguidelinesin2682m2Area.Treesplanted:460Nos.

(ix)

Soil and ground water sample will be tested toascertain that there is no threat to ground waterqualitybyleachingofheavymetalsandothertoxiccontaminants.

Soilanalysisreportenclosed.There is no use of ground waterenvisaged in the project area.Therefore this condition is notapplicabletotheproject.PleaserefertheAnnexureno.I.

(x)

Construction spoils, including bituminousmaterialandotherhazardousmaterialmustnotbeallowedtocontaminatewatercoursesandthedumpsitesforsuchmaterialmustbesecuredso that theyshouldnotleachintothegroundwater.

We are not using any bituminousmaterial/ hazardous material ofanytypeatthesite.

(xi)

Any hazardous waste generated duringconstruction phase should be disposed off as perapplicable rules and norms with necessaryapprovals of the Maharashtra Pollution ControlBoard.

No any hazardous waste wasgenerated during constructionphase.

(xii)

The diesel generator sets to be used duringconstruction phase should be low sulphur dieseltype and should conform to Environment(Protection) Rules prescribed for air and noiseemissionstandards.

DG set arewith acoustic canopy&confirming the rules made underthe Environment (Protection) Act1986.

(xiii)The diesel required for operatingDG sets shall bestored in underground tanks and if required,clearancefromconcernauthorityshallbetaken.

DGsetsareusedonlyduringpowerfailure & diesel is stored withnecessaryprecautions.

(xiv) Vehicleshiredforbringingconstructionmaterialto Vehicles arebeingoperatedduring

Page 7: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Statusthe sites should be in good condition and shouldhavepollutioncheckcertificateandshouldconformtoapplicableairandnoiseemissionstandardsandshouldbeoperatedonlyduringnon‐peakhours.

non‐peak hours. Standard ofconstruction vehicles are checkedregularly including PUC certificate.As per the monitoring data noiselevels and air quality found to bewithinprescribedstandards.

(xv)

Ambientnoiselevelsshouldconformtoresidentialstandards both during day and night. Incrementalpollutionloadsontheambientairandnoisequalityshould be closely monitored during constructionphase. Adequate measures should be made toreduce ambient air and noise level duringconstruction phase, so as to conform to thestipulatedstandardsbyCPCB/MPCB.

Alladequatemeasuresaremadetoreduceambientair&noiselevels.

Ambient air and noise Monitoringreport enclosed. Please referAnnexureI.

(xvi)

Fly ash shouldbeused asbuildingmaterial in theconstruction as per the provision of Fly AshNotificationofSeptember1999andamendedason27th August, 2003.( The above condition isapplicableonlyiftheprojectsitelocatedwithinthe100kmofThermalPowerStation).

Weareusedflyashinconstructionwork.

(xvii)Ready mixed concrete must be used in buildingconstruction.

We are using ready mix concreteforconstruction.

(xviii)

The approval of competent authority shall beobtained for structural safety of the building anypossible earthquake, adequacy of firefightingequipment etc. as per National Building Codeincludingmeasuresfromlighting.

No‐objection certificate fromDirector of Maharashtra FireServices is attached in previousreport.

(xix)Strom water control and its re‐use as per CGWBandBSIStandardsforvariousapplications.

Collection of rain water fromterraces in rain water harvestingtanksand thewaterwillbe reusedinoperationphase.

(xx)Water demand during construction should bereducebyuseofpre‐mixedconcrete,curingagentsandotherbestpracticesreferred.

Weareusingpremixedconcretetoreducewaterdemand.

(xxi)

The ground water level and its quality should bemonitored regularly in consultation with GroundwaterAuthority.

There is no use of ground waterenvisaged in the project area.Therefore this condition is notapplicabletotheproject.

(xxii)

The installation of the Sewage Treatment Plant(STP)shouldbecertifiedbyanindependentexpertandareport inthisregardshouldbesubmittedtotheMinistrybeforetheprojectiscommissionedforoperation. Discharged of this unused treatedaffluent, if any should be discharged in the sewerline.Treatedeffluent emanating fromSTPshallberecycled/refusedtothemaximumextentpossible.Treatment of 100% gray water by decentralized

STP of capacity 207 cum/day isproposed.

Page 8: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Statustreatment should be done. Necessary measuresshouldbemadetomitigatetheodorproblemfromSTP.

(xxiii)

Permissiontodrawgroundwater&constructionofbasement if any shall be obtained from thecompetent authority prior to construction /operationoftheproject.

There is no use of ground waterenvisagedintheprojectarea.

(xxiv)Separationofgrayandblackwatershouldbedonebytheuseofdualplumbinglineforseparationofgrayandblackwater.

Dual plumbing system will beprovided

(xxv)Fixtures for showers, toilet flushing and drinkingshouldbe of low floweitherbyuse of aeratorsorpressurereducingdevicesorsensorbasedcontrol.

Low flow fixtures will be used forshowers, toilet flushing anddrinking.

(xxvi)

Useofglassmaybereducedupto40%toreducedelectricity consumption and load on airconditioning. If necessary, use high quality doubleglasswithspecialreflectivecoatinginwindows.

Residential building, use of glasswillbelessthan40%.

(xxvii)

Roof shouldmeet prescriptive requirement as perEnergy Conservation Building Code by usingappropriate thermal insulation material to fulfillrequirement.

We will be provided appropriatethermalinsulation.

(xxviii)

Energy conservation measures like installation ofCFLs /TFLS for the lighting areas outside thebuilding should be integral part of project designand should be in place before projectcommissioning. Use CFLs and TFLs should beproperly collected and disposed off/ sent forrecyclingasper theprevailingguidelines/ rulesofregulatory authority to avoid mercurycontamination.Useofsolarpanelsmaybedonetotheextentpossiblelikeinstallingsolarstreetlights,common solar water heaters system. Projectproponentsshouldinstall,aftercheckingfeasibility,solarplushybridnonconventionalenergysourcesassourcesofenergy.

Energyconservationmeasures:1. Use of CFL lamps in all

public/commonareas.2. Energyefficientlightingfixtures

provisiontoallbuildings.

(xxix)

Diesel power generating sets proposed as sourcesof back up power for elevators and common areaillumination during operation phase should be ofenclosedtypeandconformtorulesmadeundertheEnvironment (Protection)Act, 1986.Theheight ofstack of DG sets should be equal to the heightneeded for the combined capacity of all proposedDGsets.Uselowsulphurdiesels.ThelocationoftheDG setsmay be decidedwith in consultationwithMaharashtraPollutionControlBoard.

DG set arewith acoustic canopy &confirming the rules made underthe Environment (Protection) Act1986.One DG Set of capacity 45 KVAprovided.

Page 9: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Status

(xxx)

Noise should be controlled to ensure that it doesnot exceed the prescribed standards. Duringnighttime the noise levels measured at theboundaryof thebuilding shall be restricted to thepermissible level to comply with the prevalentregulation.

Allprecautionsfornoiseabatementare taken during the constructionactivities.

Monitoring report is enclosed.Please,referAnnexureNo.I

(xxxi)

Traffic congestion near the entry and exit pointsfromtheroadsadjoining theproposedprojectsitemust be avoided. Parking should be fullyinternalizedandnopublicspaceshouldbeutilized.

There is already internal parkingso, that there is no use of publicspace.Proposed parking area (sq.m)‐11369.37For 4 wheeler‐250 nos and 2wheeler‐772nos.

(xxxii)

OpaquewallshouldmeetprescriptiverequirementasperEnergyConservationBuildingCode,whichisproposed to be mandatory for all air‐conditionedspaces while it is aspirational for non‐air –conditioned spaces by use of appropriate thermalinsulationmaterialtofulfillrequirement.

Noted.

(xxxiii)The building should have adequate distancebetween them toallowmovementof freshairandpassageofnaturallight,airandventilation.

Allbuildingsareconnected.

(xxxiv)

Regular supervision of the above and othermeasures for monitoring should be in place allthrough the construction phase, so as to avoiddisturbancetothesurrounding.

Regular supervision of the aboveandothermeasures formonitoringis being supervised by ProjectEngineerandqualifiedsupervisors.

(xxxv)

Under the provision of Environment (Protection)Act,1986,legalactionshallbeinitiatedagainsttheprojectproponentifitwasfoundthatconstructionof the project has been started without obtainingenvironmentclearance.

Environmental Clearance Obtainedvide letter No. SEAC‐III‐2014/CR‐305/TC.3 dated 05th November,2015.PleasereferEnclosureII

(xxxvi)Six monthly monitoring reports should besubmittedtotheRegionalofficeMoEF,BhopalwithcopytothisdepartmentandMPCB.

Sixmonthlymonitoringreportsaresubmitted Regional office MoEF,Nagpur&MPCB,Mumbai.

GeneralconditionsforPost‐construction/operationphase‐

(i)

ProjectproponentshallensurecompletionofSTP,MSW disposal facility, green belt development,prior to occupation of the buildings. No physicaloccupation or allotment will be given unless allabove said environmental infrastructure isinstalled and made functional including waterrequirement in Para.2 Prior certification fromappropriateauthorityshallbeobtained.

STPof207m3willbeinstallingforthetreatmentofsewage.

Solid waste handover toauthorizedvendor.

(ii)

Wet garbage should be treated by organic wasteconvertor and treatedwaste (manure) should beutilized in the existing premises for gardening.Andnowet garbagewill be disposedoutside the

Wet garbage collected properly &disposedproperly.

Page 10: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Statuspremises.Localauthorityshouldensurethis.

(iii)Local body should ensure that no occupationcertification is issued prior to operation of STP/MSWsiteetc.withduepermissionofMPCB.

Noted&willbeobeyed.

(iv)Acomplete setofalldocumentssubmitted to thedepartment should be forwarded to the Localauthority&MPCB.

We are submitting six monthlyreports regularly along withnecessarydocuments.

(v)In the case of any change(s) in the scope of theproject, the project would require a freshappraisalbythisDepartment.

Noanychangesinproject.

(vi)A separate environment management cell withqualified staff shall be set up for implementationofthestipulatedenvironmentalsafeguards

EnvironmentalManagement Cell isbeing supervised by ProjectEngineerandqualifiedsupervisors.

(vii)

Separate funds shall be allocated forimplementation of environmental protectionmeasures/EMP along with item‐wise breaks‐up.Thesecostshallbeincludedaspartoftheprojectcost. The funds earmarked for the environmentprotection measures shall not be diverted forotherpurposesandyear‐wiseexpenditureshouldreportedtotheMPCB&thisdepartment.

We are submitting herewith fundsallocated for EnvironmentalManagementPlan(EMP).DuringConstructionphase:CapitalCost:1.08lacs/annumDuringoperationalPhase:Total set up Cost: 178.48lacs/annum.O&Mcoat:27.02lacs/annum

(viii)

Theprojectmanagementshalladvertiseatleastintwo local newspapers widely circulated in theregionaroundtheproject,oneofwhichshallbeintheMarathilanguageofthelocalconcernedwithinseven days of issue of this letter, informing thatthe project has been accorded environmentalclearance and copies of clearance letter areavailable with theMaharashtra Pollution ControlBoard and may also be seen at Website athttp://ec.maharashtra.gov.in.

Already advertisement had beenpublished in local Marathinewspaper‘Punyanagari&Englishnewspaper ‘Buisness Standard’ on04th June, 2016. Documentattachedinpreviousreport.

(ix)

Project management should submit half yearlycompliance reports in respect of the stipulatedpriorenvironmentclearancetermsandconditionsin hard & soft copies to the MPCB & thisdepartment, on 1st June & 1st December of eachcalendaryear.

We are submitting six monthlyreports regularly along withnecessarydocuments.

(x)

A copy of the clearance letter shall be sent byproponent to the concerned MunicipalCorporationandthelocalNGO,ifany,fromwhomsuggestions/representations,ifany,werereceivedwhile processing the proposal. The clearanceletter shall also be put on the website of thecompanybytheproponent.

Local NGO letter is submitted inpreviousreport.

Page 11: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Status

(xi)

The proponent shall upload the status ofcompliance of the stipulated EC conditions,including results of monitored data on theirwebsiteandshallupdatethesameperiodically.ItshallsimultaneouslybesenttotheRegionalOfficeofMoEF, the respective ZonalOfficeofCPCBandthe SPCB. The criteria pollutant levels namely;SPM, RSPM, SO2, NOx (ambient levels as well asstack emissions) or critical sectoral parameters,indicated for the project shall be monitored anddisplayed at a convenient location near themaingateofthecompanyinthepublicdomain.

Yes,notedandobeyed.

(xii)

The project proponent shall also submit sixmonthlyreportsonthestatusofcomplianceofthestipulated EC conditions including results ofmonitoreddata(bothinhardcopiesaswellasbye‐mail) to the respectiveRegionalofficeofMoEF,therespectiveZonalOfficeofCPCBandtheSPCB.

We are submitting 6 monthlyreports regularly along withnecessarydocuments.

(xiii)

The environmental statement for each financialyearending31stMarchinForm‐Vasismandatedto be submitted by the project proponent to theconcerned State Pollution Control Board asprescribed under the Environment (Protection)Rules, 1986, as amended subsequently, shall alsobeputon thewebsiteof thecompanyalongwiththestatusofcomplianceofECconditionsandshallalso be sent to the respective Regional Offices ofMoEFbye‐mail.

Noted&agreed.

(4)

The environmental clearance is being issuedwithoutprejudicetotheactioninitiatedunderEPActoranycourtcasepending in thecourtof lawand it does notmean that project proponent hasnot violated any environmental laws in the pastand whatever decision under EP Act or of theHon’ble court will be binding on the projectproponent. Hence this clearance does not giveimmunity to the project proponent in the casefiled against him. If any or action initiated underEPact.

Noted.

(5)

In case of submission of false document and noncompliance of stipulated conditions,Authority/Environment Department will revokeor suspend the Environmental clearance withoutany intimation and initiate appropriate legalactionunderEnvironmentalprotectionAct,1986.

Noted.

(6)TheEnvironmentdepartmentreservestherighttoadd any stringent condition or to revoke the

Noted.

Page 12: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstruction “Acropolis”atSus,Tal.Mulshi,Pune.

Sr.No Condition Statusclearance if condition stipulated is notimplementedtothesatisfactionofthedepartmentorforthatmatter,forotheradministrationreason.

(7)Validity of environmental clearanance: Theenvironmental Clearance accorded shall be validforaperiodof5years.

Noted.

(8)

In case any deviation or alteration in the projectproposed from those submitted to thisdepartment for clearance, fresh reference shouldbemadetothedepartmenttoassesstheadequacyof the condition(s) imposed and to incorporateadditional environmental protection measuresrequired,ifany.

Agreedtocomplywith

(9)

The above stipulation would be enforced amongothersunderthewater(preventionandcontrolofpollution)act1974,theair(preventionandcontrolof pollution) Act,1981,the environment(protection) Act,1986 and rules their under,hazardous waste(Management and Handling)Rules,1989andit’samendment,thepublicliabilityinsuranceact,1991andit’samendments.

Agreedtocomplywith

(10) Any appeal against this environment Clearanceshall lie with the National Green Tribunal, VanVigyan Bhavan, Sec‐5, R. K. Puram, New Delhi‐110022,ifpreferred,within30daysasprescribedunder Section 16 of the National Green TribunalAct,2010.

Noted&agreed.

Page 13: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstructions. “Acropolis”,atSus,Tal.Mulshi,Pune.

MonitoringtheImplementationofEnvironmentalSafeguardsMinistryofEnvironment,ForestandClimateChange

WesternRegion,RegionalOffice,Nagpur.

DATASHEET

Date‐:30.12.20171. Projecttype:River‐valley/Mining/Industry/

Thermal/Nuclear/Other(specify) : ProposedResidentialProject

2. Nameoftheproject : “Acropolis”3. Clearanceletter(s)/OMNo.andDate : ClearanceLetterNo.SEAC‐III‐2014/CR‐

305/TC‐3,Dated05thNovember,20154. Location :

a. District(S) : Puneb. State(s) : Maharashtra

c. Latitude/Longitude :18033’.24.43”N730’45'51.13”E

5. Addressforcorrespondence

a.

AddressofConcernedProjectChiefEngineer(withpincode&Telephone/telex/faxnumbers

:

Er.ChanderashekarTendulkarRes‐A/504,SunOrbit,Off‐SinhgadRd,Anandnagar(W),Pune‐41MoBNo:‐9552523429

b.AddressofProject:Engineer/Manager(withpincode/Faxnumbers) :

Er.GirishGohilFlatNo‐104,HariPriyaApt,Datta‐DigambarcolonyWarje,Pune‐52Mobno:‐8087428429.

6. Salientfeatures a.

oftheproject :

Itisresidentialproject.Thedesignofthisprojectandutilitiesisthoroughlyplannedwiththeobjectivesofprovidingfacilitiestothepeopleandkeepingthemindonsustainabledevelopment.

b.

oftheenvironmentalmanagementplans :

SewageTreatmentPlants(STP):STP of 207 m3 will be installing for thetreatmentofsewage. SolidWastemanagementSystem:Biodegradable waste is treated withorganic waste convertor (OWC) andNon‐biodegradablewasteishandovertoSWACH.

7. Breakupoftheprojectarea :a. submergenceareaforest&

non‐forest: Non‐forest

b. Others : TotalplotArea:26,354.00m2

NetplotArea:24,973.72m2

DATA SHEET

Page 14: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstructions. “Acropolis”,atSus,Tal.Mulshi,Pune.

ProposedBuilt‐upAreaFSI: 31,404 m2

ProposedBuilt‐upAreaNonFSI:29,392.79m2

Total:60,797.51m2 8. Breakup of the project affected Population with

enumeration of Those losing houses / dwellingunits Only agricultural land only, both Dwellingunits & agricultural Land &landlesslabourers/artisan

: NotApplicable.

a. SC,ST/Adivasis : NotApplicable b.

Others(Please indicate whether these Figures arebased on any scientific And systematicsurvey carried out Or only provisionalfigures,itaSurveyiscarriedoutgivedetailsAndyearsofsurvey)

: NotApplicable

9. Financialdetails :a. Projectcostasoriginallyplannedandsubsequentrevisedestimatesandtheyearofprice

reference:1. EstimatedCostoftheProject : 121.00 CroresOnlyb. Allocationmadeforenviron‐mental

managementplanswithitemwiseandyearwiseBreak‐up.

:Allocation made for environ‐mentalmanagementplans:

DuringConstructionphase:CapitalCost:1.08lacs/annum

DuringoperationalPhase:TotalsetupCost:178.48lacs/annum.O&Mcoat:27.02lacs/annum

c. Benefitcostratio/InternalrateofReturnandtheyearofassessment :

d.Whether(c)includestheCostofenvironmentalmanagementasshownintheabove.

:

e. Actualexpenditureincurredontheprojectsofar : ‐‐‐‐

f.Actualexpenditureincurredontheenvironmentalmanagementplanssofar

‐‐‐‐

10. Forestlandrequirement : NotApplicable a.

Thestatusofapprovalfordiversionofforestlandfornon‐forestryuse : NotApplicable

b. Thestatusofclearingfelling : NotApplicablec. Thestatusofcompensatoryafforestation,it

any: NotApplicable

d. Commentsontheviability&sustainabilityofcompensatory afforestation program in thelightofactualfieldexperiencesofar

: NotApplicable

Page 15: ACK. COPY-KFC DEC

M/s.KalyaneefortuneConstructions. “Acropolis”,atSus,Tal.Mulshi,Pune.

11.ThestatusofclearfellinginNon‐forestareas(suchas submergence area of reservoir, approachroads),itanywithquantitativeinformation :

NotApplicable

12. Statusofconstruction:

5Buildings‐workinprogress.

a.Dateofcommencement(Actualand/orplanned) : 12/12/2015

b. Dateofcompletion(Actualand/orplanned)

: November2020

13. ReasonsforthedelayiftheProjectisyettostart : Notapplicable

14 Datesofsitevisits :

a.ThedatesonwhichtheprojectwasmonitoredbytheRegionalOfficeonpreviousOccasions,ifany

: Notyetvisited

b. Dateofsitevisitforthismonitoringreport : Notyetvisited

15.

DetailsofcorrespondencewithProjectauthoritiesforobtainingActionplans/informationonStatusofcompliancetosafeguardsOtherthantheroutinelettersforLogisticsupportforsitevisits)

: NotApplicable

(ThefirstmonitoringreportmaycontainthedetailsofalltheLettersissuedsofar,buttheLaterreportsmaycoveronlytheLettersissuedsubsequently.)

:

Page 16: ACK. COPY-KFC DEC

ENCLOSURE NO.II- EC COPY

Page 17: ACK. COPY-KFC DEC
Page 18: ACK. COPY-KFC DEC
Page 19: ACK. COPY-KFC DEC
Page 20: ACK. COPY-KFC DEC
Page 21: ACK. COPY-KFC DEC
Page 22: ACK. COPY-KFC DEC
Page 23: ACK. COPY-KFC DEC
Page 24: ACK. COPY-KFC DEC
Page 25: ACK. COPY-KFC DEC
Page 26: ACK. COPY-KFC DEC
Page 27: ACK. COPY-KFC DEC
Page 28: ACK. COPY-KFC DEC
Page 29: ACK. COPY-KFC DEC
Page 30: ACK. COPY-KFC DEC

MAHARASHTRA POLLUTION CONTROL BOARD

Phone : - 24010437/24020781/24014701

Fax :-24044532/24023516

Email :- [email protected]

Visit At:- http://mpcb.gov.in

Kalpataru Point, 3rd & 4th floor, Sion-

Matunga Scheme Road No. 8, Opp.

Cine Planet Cinema, Near Sion Circle,

Sion (E), Mumbai - 400 022

Datet>S/08/2014

Infrastructure/Orange/L.S. I

Consent order No: Format 1.0/BO/ROHQ/PN-21733-14/CE/CC-

To,

M/s. Kalyanee Fortune Constructions, "Acropolis",

Sr.No. 41/l,41/2/l,&41/2/14,

Village:- Sus, Taluka Mulshi, Dist. Pune.

Sub : Consent to Establish in Orange category for Building / construction project.

Ref : Minutes of Consent Committee meeting held on 30/07/2014

Your application: - CE1405000756, Date: 16/05/22014

For: Consent to Establish for Construction of Residential project.

Under Section 25 of the Water (Prevention & Control of Pollution) Act, 1974 & under Section 21 of theAir (Prevention & Control of Pollution) Act, 1981 and Municipal Solid Waste (Management &Handling) Rule 2000 and E-Waste (Management & Handling Rule 2011 is considered and the consent ishereby granted subject to the following terms and conditions and as detailed in the schedule I, II, III &IV annexed to this order:

1. The consent to Establish is granted for a period upto:- Commissioning of the unit or five years,whichever is earlier.

2. The Proposed Capital investment of the Project is Rs 121.78 Crs. (As per CA certificate).

3. The Consent to Establish is valid for development of new Residential project by M/s. Kalyanee

Fortune Constructions, named as "Acropolis" at Sr.No. 41/l,41/2/l,&41/2/14, Village:- Sus,

Taluka Mulshi, Dist. Pune on total plot area of 26,300.0 Sq. mtrs and total construction built up

area of 57,644.08 Sq. mtrs. As per construction commencement certificate issued by local body.

4. Conditions under Water (P&CP), 1974 Act for discharge of effluent:

Sr.no.1.2.

Description

Trade effluentDomestic effluent

Permitted quantityof dischargeNil187.0CMD

Standards tobe achievedNAAs perSchedule -I

Disposal

NA60% shall be reused & recycled andremaining shall be discharged inmunicipal sewer.

5. Conditions under Air (P&CP) Act, 1981 for air emissions:

Sr. No.1 .1 .

Description of stack / sourceDG sets (320 x4 K.VA )DO sets (380.0 KVA )

Number of Stack41

Standards to be achievedAs per Schedule -11As per Schedule -I I

M/s. Ka/vanee Fortune Constructions, "Acropolis",SRO Pune I/I/O/L/03662000 Page 1 of 6

ENCLOSURE NO.III- CTE COPY

Page 31: ACK. COPY-KFC DEC

6. Conditions under Municipal Solid Waste (Management and Handling) Rule,2000

Sr. No.

1.2.

~>j.

Type Of Waste

Biodegradable WasteNon Biodegradable WasteSTP Sludge

Quantity

485.0208.028.0

UOM

Kg/DayKg/DayKg/D

Treatment

oweSegregation—

Disposal

Used as manureBy saleUsed as manure

7. This Board reserves the right to review, amend, suspend, revoke etc. this consent and the sameshall be binding on the industry.

8. This consent should not be construed as exemption from obtaining necessary NOC/permissionfrom any other Government agencies.

9. The applicant shall submit an affidavit within 15 days in the prescribed format towards not taking

further effective steps prior to obtaining the Environment Clearance.

10. The applicant shall not take any effective step prior to Environment Clearance. As per Para 2 of

EIA notification dated-14/09/2006, the effective steps include starting of any construction work or

preparation of land by the project management. However as clarified by the MoEF vide office

memorandum no. J-1103/41/2006-IA.II(I); Dated-19/8/2010,fencing of the site to protect it from

getting encroached & construction of temporary shed(s) for the guard(s) & acquisition of land shall

not be treated as an effective steps.

11. PP shall submit an affidavit in Board's prescribed format within 15 days regarding the

compliance of conditions of Environment Clearance and Consent to Establish conditions.

For and on behalf of theMaharashtra Pollution Control Board

(Rajeev KuMembe

Received Consent fee of-Sr. Amount(Rs.) DD. No.No.: - .:v:: ; • • . / • ; • • • • : . • ' : . ; • • •1 243665.0 050811 29/04/2014

"Drawn On

Axis Bank

Copy to:1. Regional Officer, MPCB, Pune. And Sub-Regional Officer, Pune -II, they are directed to ensure the

compliance of the consent conditions.2. Chief Accounts Officer, MPCB, Mumbai.3. CC/CAC desk- for record & website updation purposes.

M/s. Kalyanee Fortune Constructions. "Acropolis",SRO Pune l'l'O'L'03662000 Page 2 of 6

Page 32: ACK. COPY-KFC DEC

Schedule-lTerms & conditions for compliance of Water Pollution Control:

1)

3)

4)

A] As per your consent application, you have proposed to provide the sewage treatmentsystem with the design capacity of 200.0 CMD

B| The Applicant shall operate the sewage treatment system to treat the sewage so as to achievethe following standards/ prescribed under EP Act, 1986 and Rules made there under from timeto time, whichever is stringent.

12->j4

PHSuspended SolidsBOD 3 Days 27 degree CDetergent

Not to exceedNot to exceedNot to exceedNot to exceed

6.5 to 9.0100mg/l.100mg/l.01 mg/1.

C| The treated domestic effluent shall be 60% recycled and reused for flushing, fire fightingand cooling of Air conditioners etc. The remaining shall be discharged into Municipal sewer/utilized on land for gardening after conforming to above standards. The firm shall affix theseparate meter for ensurance of 60% recycling of treated sewage and keep the records of thesame. In no case effluent shall find its way to any water body directly /indirectly at any time.

The Board reserves its rights to review plans, specifications or other data relating to plant setup forthe treatment of water, works for the purification thereof & the system for the disposal of sewage ortrade effluent or in connection with the grant of any consent conditions. The Applicant shall obtainprior consent of the Board to take steps to establish the unit or establish any treatment and disposalsystem or an extension or addition thereto.

The firm shall ensure replacement of pollution control system or its parts after expiry of itsexpected life as defined by manufacturer so as to ensure the compliance of standards and safety ofthe operation thereof.

In case, the water consumption of the project is not covered under the water consumption of localbody, in that situation, the project proponent shall submit the CESS Returns in the prescribedformat given under the provision of Water (Prevention & Control of Pollution) Cess Act, 1977and Rules made thereunder for various category of water consumption.

In case the water consumption is duly assessed under the quantity of water consumption oflocal body, the project proponent shall submit certificate to that effect from the concern localbody with the request not to assess CESS on their water consumption, being already assessedon the water consumption of local body.

Sr. no.

1.

Purpose for water consumed

Domestic purpose

Water consumption quantity(CMD)216.0

M/s. Kalyanee Fortune Constructions, "Acropo/is",SRO Pune I/I/O/L/03662000 f\ 3 of 6

Page 33: ACK. COPY-KFC DEC

Schedule-ll

Terms & conditions for compliance of Air & Noise Pollution Control:

1. As per your application, you have proposed to erect following stack (s) and to observe thefollowing fuel pattern-

Sr. No. Stack Attached To

DGsets (340 x4 + 380 KVA ) 5.5 Diesel 273.0 Lit/Hr* D.G. Set shall be operate only in case of power failure.

2. The applicant shall operate and maintain above mentioned air pollution control system, so as toachieve the level of pollutants to the following standards:

Participate matter Not to exceed | 150.00 mg/Nnr'.

3. The Applicant shall obtain necessary prior permission for providing additional controlequipment with necessary specifications and operation thereof or alteration orreplacement/alteration well before its life come to an end or erection of new pollution controlequipment.

4. The Board reserves its rights to vary all or any of the condition in the consent, if due to anytechnological improvement or otherwise such variation (including the change of any controlequipment, other in whole or in part is necessary)

5. Conditions during construction phase:-

During construction phase, applicant shall provide temporary sewage disposal and MSWfacility for staff and worker quarters.

During construction phase, the ambient air and noise quality should be closely monitoredto achieve Ambient Air Quality Standards and Noise by the project proponent throughMoEF approved laboratory.

Noise generating activity shall be carried out during day time only.

M/s. Ka/yanee Fortune Constructions, "Acropolis",SRO Pune l/I/O/L/03662000 Page 4 of 6

Page 34: ACK. COPY-KFC DEC

Schedule-IIJDetails of Bank Guarantees

Sr.No.

1

Consent(Cto

E/O/R)

Establish

Amt of BGImposed

Rs. 5.0 lakh

SubmissionPeriod

15 days atRegionalOffice Pune.

Purpose of BG

Rs. 5.0 lakh for ensuring thecompliance of consentconditions.

CompliancePeriod

UptoCommissioning olthe unit

ValidityDate

Fiveyears

M/s. Kalyanee Fortune Constructions, "Acropolis",SRO Pune I/l/O/L/03662000

Page 35: ACK. COPY-KFC DEC

Schedule-IVGeneral Conditions:The following general conditions shall apply as per the type of the industry.

1) The applicant shall provide facility for collection of samples of sewage effluents, air emissions andhazardous waste to the Board staff at the terminal or designated points and shall pay to the Board for theservices rendered in this behalf.

2) The firm shall strictly comply with the Water (P&CP) Act, 1974, Air (P&CP) Act,1981 and environmentalprotection Act 1986 and Municipal Solid Waste (Management & Handling) Rule 2000 and E-Waste(Management & Handling Rule 2011.

3) Drainage system shall be provided for collection of sewage effluents. Terminal manholes shall be providedat the end of the collection system with arrangement for measuring the flow. No sewage shall be admittedin the pipes/sewers downstream of the terminal manholes. No sewage shall find its way other than indesigned and provided collection system.

4) Vehicles hired for bringing construction material to the site should be in good condition and shouldconform to applicable air and noise emission standards and should be operated only during non-peakhours.

5) Conditions for D.G. Seta) Noise from the D.G. Set should be controlled by providing an acoustic enclosure or by treating the

room acoustically.b) Industry should provide acoustic enclosure for control of noise. The acoustic enclosure/ acoustic

treatment of the room should be designed for minimum 25 dB (A) insertion loss or for meeting theambient noise standards, whichever is on higher side. A suitable exhaust muffler with insertion lossof 25 dB (A) shall also be provided. The measurement of insertion loss will be done at differentpoints at 0.5 meters from acoustic enclosure/room and then average.

c) The industry shall take adequate measures for control of noise levels from its own sourceswithin the premises in respect of noise to less than 55 dB(A) during day time and 45 dB(A) duringthe night time. Day time is reckoned between 6 a.m. to 10 p.m and night time is reckoned between 10 p.m to 6 a.m.

d) Industry should make efforts to bring down noise level due to DG set, outside industrial premises,within ambient noise requirements by proper sitting and control measures.

e) Installation of DG Set must be strictly in compliance with recommendations of DG Set manufacturer.f) A proper routine and preventive maintenance procedure for DG set should be set and followed in

consultation with the DG manufacturer which would help to prevent noise levels of DG set fromdeteriorating with use.

g) D.G. Set shall be operated only in case of power failure.h) The applicant should not cause any nuisance in the surrounding area due to operation of D.G. Set.i) The applicant shall comply with the notification of MoEF dated 17.05.2002 regarding noise limit for

generator sets run with diesel.6) Solid Waste - The applicant shall provide onsite municipal solid waste processing system & shall comply

with Municipal Solid Waste (Management & Handling) Rule 2000 & E-Waste (M & H) Rule 2011.7) Affidavit undertaking in respect of no change in the status of consent conditions and compliance of the

consent conditions the draft can be downloaded from the official web site of the MPCB.8) The industry shall submit official e-mail address and any change will be duly informed to the MPCB.9) The treated sewage shall be disinfected using suitable disinfection method.10) The firm shall submit to this office, the 30th day of September every year, the environment statement

report for the financial year ending 31st march in the prescribed Form-V as per the provision of rule 14 ofthe Environmental (Protection) Second Amended rule 1992.

11) The applicant shall obtain Consent to Operate from Maharashtra Pollution Control Board beforecommissioning of the project.

M/s. Kalyanee Fortune Constructions, "Acropolis",SRO Pune I/I/O/L/03662QQfl

Page 36: ACK. COPY-KFC DEC

POLLUTIONMONITORINGREPORT

FOR

M/s.KALYANEEFORTUNECONSTRUCTIONS

FORYOURSITE

“ACROPOLIS”Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

SURVEYCARRIEDON:

APRIL22,2017

PREPAREDBY:

M/s.ULTRA‐TECHAIR&WATERPOLLUTIONCONSULTANTS

OFFICENO.201,202,203,204,SAUDAMINICOMMERCIALCOMPLEX,BUILDINGC3,2NDFLOOR,RIGHTBHUSARICOLONY,PAUDROAD,KOTHRUD,

PUNE‐411038Tel.No.25286109,25286106FaxNo.5380148

E‐mail:[email protected]

Visit@:www.ultratech.in

ANNEXURE NO.1- ENVIRONMENTAL MONITORING REPORT

Page 37: ACK. COPY-KFC DEC

POLLUTIONMONITORINGREPORT

SURVEYCARRIEDONAPRIL22,2017

CONTENT

Sr.No.

Particulars

PageNo.

1.

AMBIENTAIRQUALITYMONITORINGREPORT

1‐3

2

NOISELEVELMONITORINGREPORT 4

3

DRINKINGWATERANALYSISREPORT

5

4

SOILSAMPLEANALYSISREPORT 6

Page 38: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS

“ACROPOLIS”Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

AMBIENTAIRQUALITYMONITORINGREPORT

RefNo:UT/P/ELS/R/113A1/2017Date:29.04.2017LabCode:UT/L/A/111A1SR.NO. DETAILS LOCATIONNO.1 UNITS

1 DateofSampling 22.04.2017 ‐‐

2 LocationoftheSampling NearMarketingOffice

‐‐

3AmbientAirTemp.‐ ‐ (Max.)‐(Min.)

35.620.8

0c0c

4RelativeHumidity‐ ‐ (Max.)‐(Min.)

55.027.0

5 POLLUTANTS

a) ParticulateMatter(PM10) 66.3 µg/m3

b) ParticulateMatter(PM2.5) 23.1 µg/m3

c) SulphurDi‐Oxide(SO2) 13.5 µg/m3

d) OxidesOfNitrogen(NOX) 22.4 µg/m3NATIONALAMBIENTAIRQUALITYSTANDARDS,SCHEDULE‐VIIRule‐3(3B)

TheGazetteofIndiawithEffectfromMonday,November16,2009/KARTIKA25,1931

Sr.No.

PollutantsTime

WeightedAverage

NationalAmbientAirQualityStandardsIndustrial,Residential,RuralandOtherArea

EcologicalSensitivearea(NotifiedbyCentralGovernment)

1. SO2 24hours 80 802. NOx 24hours 80 803. PM10 24hours 100 1004. PM2.5 24hours 60 60

‐ENDOFREPORT‐

FORULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY

Page 39: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS“ACROPOLIS”

Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

AMBIENTAIRQUALITYMONITORINGREPORT

RefNo:UT/P/ELS/R/113A2/2017Date:29.04.2017LabCode:UT/L/A/111A2SR.NO. DETAILS LOCATIONNO.2 UNITS

1 DateofSampling 22.04.2017 ‐‐

2 LocationoftheSampling NearSalesOffice ‐‐

3AmbientAirTemp.‐ ‐ (Max.)‐(Min.)

35.620.8

0c0c

4RelativeHumidity‐ ‐ (Max.)‐(Min.)

55.027.0

5 POLLUTANTS

a) ParticulateMatter(PM10) 62.1 µg/m3

b) ParticulateMatter(PM2.5) 22.3 g/m3

c) SulphurDi‐Oxide(SO2) 11.9 µg/m3

d) OxidesOfNitrogen(NOX) 22.5 µg/m3

NATIONALAMBIENTAIRQUALITYSTANDARDS,SCHEDULE‐VIIRule‐3(3B)TheGazetteofIndiawithEffectfromMonday,November16,2009/KARTIKA25,1931

Sr.No.

PollutantsTime

WeightedAverage

NationalAmbientAirQualityStandardsIndustrial,Residential,RuralandOtherArea

EcologicalSensitivearea(NotifiedbyCentralGovernment)

1. SO2 24hours 80 802. NOx 24hours 80 803. PM10 24hours 100 1004. PM2.5 24hours 60 60

‐ENDOFREPORT‐

FORULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY

Page 40: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS“ACROPOLIS”

Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

AMBIENTAIRQUALITYMONITORINGREPORT

RefNo:UT/P/ELS/R/113A3/2017Date:29.04.2017

LabCode:UT/L/A/111A3

SR.NO. DETAILS LOCATIONNO.‐03 UNITS

1 DateofSampling 22.04.2017 ‐‐

2 LocationoftheSampling NearLabourCamp ‐‐

3AmbientAirTemp.‐‐ (Max.)‐(Min.)

35.620.8 C

4 RelativeHumidity‐ ‐(Max)‐(Min.)

55.027.0

5 POLLUTANTS

a) ParticulateMatter(PM10) 62.5 g/m3

b) ParticulateMatter(PM2.5) 25.1 g/m3

c) SulphurDi‐Oxide(SO2) 12.3 g/m3

d) OxidesOfNitrogen(NOX) 22.4 g/m3

NATIONALAMBIENTAIRQUALITYSTANDARDS,SCHEDULE‐VIIRule‐3(3B)

TheGazetteofIndiawithEffectfromMonday,November16,2009/KARTIKA25,1931

Sr.No.

PollutantsTime

WeightedAverage

NationalAmbientAirQualityStandardsIndustrial,Residential,RuralandOtherArea

EcologicalSensitivearea(NotifiedbyCentralGovernment)

1. SO2 24hours 80 802. NOx 24hours 80 803. PM10 24hours 100 1004. PM2.5 24hours 60 60

‐ENDOFREPORT‐

FORULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY

Page 41: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS“ACROPOLIS”

Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

AMBIENTNOISELEVELMONITORINGREPORT

DateofSurvey:‐22.04.2017

AMBIENTNOISELEVELSTANDARDS

‐ENDOFREPORT‐

FORULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY

RefNo:UT/P/ELS/R/113A4/2017Date:29.04.2017

SR.NO. LOCATION

NOISELEVELINdB(A)Leq

(DayTime) (NightTime)1. NearMarketingoffice 53.9 43.6

2. Nr.SalesOffice 51.5 41.4

3. NearLabourCamp 54.2 43.8

4. NearAbuilding 51.0 41.5

5. NearBbuilding 52.3 40.8

CategoryOfArea

LimitsindB(A)Leq

DayTime(6am–10pm)

NightTime(10pm–6am)

IndustrialArea 75 70CommercialArea 65 55ResidentialArea 55 45SilenceZone 50 40

Page 42: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS“ACROPOLIS”

Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

DRINKINGWATERANALYSISREPORT

RefNo:UT/P/ELS/R/113A5/2017Date:29.04.2017 LabCode:UT/L/W/92A1NatureofSample DrinkingWaterDateofSampling 22.04.2017DateofReceipt 23.04.2017DateofAnalysis 23.04.2017 To29.04.2017

PARAMETERSCONCENTRATION

STANDARD(IS:10500‐2012) UNIT

PHYSICALPARAMETERS:‐Turbidity <1 1.0 NTUColour <5 5.0 HazenOdour Agreeable Agreeable ‐‐‐Taste Agreeable Agreeable ‐‐‐CHEMICALPARAMETERS:‐pH 7.37 6.5– 8.5 ‐‐‐TotalDissolvedSolids 78 500 mg/lChlorides 17 250 mg/lSulphate 08 200 mg/lTotalHardness 32 200 mg/lCa‐Hardness 18.4 75 mg/lMg‐Hardness 07.2 30 mg/lResidualChlorine BDL 0.2 mg/lPhenoliccompounds BDL 0.001 mg/lAlkalinity 38 200 mg/lBACTERIOLOGICALPARAMETERS:TotalColiform Absent 0org/100ml Org/100mlE.coli Absent Absent ‐‐BDL:‐BelowDetectableLimit

‐ENDOFREPORT‐

FORULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY

Page 43: ACK. COPY-KFC DEC

M/s.KALYANEEFORTUNECONSTRUCTIONS“ACROPOLIS”

Sr.No.41/1,41/2/1,41/2/14atSus,Tal‐Mulshi,Pune.

SOILANALYSISREPORT

RefNo:UT/P/ELS/R/113A6/2017Date:29.04.2017

NatureofSample SoilSample

Labcode UT/L/S/34A1

DateofSampling 22.04.2017

DateofReceipt 23.04.2017

DateofAnalysis 23.04.2017 To29.04.2017 PARAMETERS CONCENTRATION

ProjectSite UNITpH 7.62 ‐‐Colour Brownish ‐‐Conductivity 0.268 mS/cmMoistureContent 3.1 %OrganicMatter 1.1 %TotalOrganicCarbon 0.5 %CalciumasCa 72 mg/kgMagnesiumasMg 21 mg/kgSodiumasNa 216 mg/kgAvailableNitrogenasN 324 mg/kgAvailablePhosphorousasP2O5 42 mg/kgAvailablePotassiumasK2O 124 mg/kgCadmiumasCd ≤0.5 mg/kgChromiumasCr 62 mg/kgCopperasCu 221 mg/kgLeadasPb ≤10 mg/kgManganeseasMn 354 mg/kgZincasZn 106 mg/kgIronasFe 6857 mg/kg

‐ENDOFREPORT‐ For,ULTRATECH

KISHORSAWANTAUTHORIZEDSIGNATORY