15
EMERGENCY SITUATION IN TEDAŞ Ezgi ÇARŞIBAŞI 1

Transcript of Aci̇ldurumezgi̇2014 (6) (1).pptx yeni̇i̇

EMERGENCY SITUATION

IN TEDAŞ

Ezgi ÇARŞIBAŞI

1

EMERGENCY SİTUATİON

2

Working place issues cause to

serious injures, death and these

issues damage to our company

GOALS

Life is about to save, prevent injuries and protect properties and environment.

3

EMERGENCY SİTUATİON 1. Fıre

2. Earthquake

3. Flood

4. Snowfall

5. Food poisoning

6. Storm

7. Landslide

8. Accident

4

TYPES OF CRİSİS Accidental

Enviromental

Techonogical

5

CRİSİS ANALYSİS

Urgent situation risk analysis rapport in thefacility and building surrounded by regionpossible risks basically based fire, earthquakeexplosion dangerous chemicals, biologicalevents water, air climate and soil dirtinessaddition to this war events has to be consideredin that crisis management in final project

6

7

FIRE

Struggling against fire depending on how big

business facility the order in work used

substances and appearance of it and how many

workers there are in business facility is there

enough fire extinguisher and detectors addition

to this alarm systems will be put in business

facility in this final project

8

2.Adım

3.Adım4.Adım

1.Adım

Developing plannig

Planning

Risk analysis

Practice

FOURTH STEPS

9

ORGANİZATİON CHARTS

10

.ACİL DURUM ANA KOORDİNATÖRÜ– GENEL MÜDÜR

YANGIN AMİRİ

YANGINAMİR YRD.

1 VARDİYAYANGIN

EKİPLERİ

YANGIN AMİR YRD.

2 VARDİYA YANGINEKİPLERİ

YANGIN AMİR YRD.

3 VARDİYAYANGINEKİPLERİ

ARAMAKURTARMA EKİPLERİ

KORUMA VE GÜVENLİKEKİPLERİ

ULAŞTIRMAEKİBİ

ANA KOOR.YRD.

HASAR TESP.EKİBİ

TASFİYEEKİBİ

BAKIM ONA.EKİBİ

İLK YARDIMEKİBİ

İLK YARDIMEKİPLERİ

ACİL DURUM KONTROL MERKEZİAcil Durum Ana KoordinatörüAcil Dur. Ana Koor. Yrd.-Üretim Yöneticisi -Kalite Güv. İK Yön. -İş Güvenliği Uzmanı -Personel Şefi -Gelmişse: İşyeri Hekimi

İtfaiye Yetkilisi

Polis etkilisi

11

EquipmentsFIRE EXTENCİON( 3 PEOPLE)

SECURİTY (3 PEOPLE)

FİRST-AİD (2 PEOPE)

PRESERVATİON(2 PEOPLE)

numbers of workers maybe will be increase

according to risk and threat

12

13

POİNTS

Rectangle and square

14

POİNTS SHEETS

15