Achieving this ambitious timber frame structure provided...

2
Achieving this ambitious timber frame structure provided 135 flats There are three buildings on this site at Bengal Mill, Manchester: North Block, which is eight storeys high. This is a concrete structure up to the fourth floor, with four levels of prefabricated timber structure above. Central Block, which is ten storeys high. This is a concrete structure. South Block, which is six storeys high. This is a concrete structure up to the first floor, with five levels of prefabricated timber structure above. Bengal Mill Client: ETF Northern Project cost: £15 million Architect: MBLA RISE Structural Engineers Ltd VAT no. 170 4576 09 t: 0117 317 9801 e: [email protected] Courtyard House, 26A Oakfield Road, Clifton, Bristol BS8 2AT

Transcript of Achieving this ambitious timber frame structure provided...

Page 1: Achieving this ambitious timber frame structure provided ...risestructures.com/wp-content/uploads/2016/07/RISE-BengalMill.pdf · Achieving this ambitious timber frame structure provided

Achieving this ambitious timber frame structure provided 135 flats

There are three buildings on this site at Bengal Mill, Manchester:

• North Block, which is eight storeys high. This is a concrete structure up to the fourthfloor,withfourlevelsofprefabricatedtimberstructureabove.

• Central Block, which is ten storeys high. This is a concrete structure.

• South Block, which is six storeys high. This is a concrete structure up to the firstfloor,withfivelevelsofprefabricatedtimberstructureabove.

Bengal Mill

Client: ETF Northern Project cost:£15million Architect: MBLA

RISE Structural Engineers Ltd VAT no. 170 4576 09

t: 0117 317 9801 e: [email protected]

CourtyardHouse,26AOakfieldRoad, Clifton,BristolBS82AT

Page 2: Achieving this ambitious timber frame structure provided ...risestructures.com/wp-content/uploads/2016/07/RISE-BengalMill.pdf · Achieving this ambitious timber frame structure provided

RISEdesignedthetimbersuperstructuresixandsevenstoreyshighusingtimberstuds89mmdeepand47mmwide.Singledatthetopfloor,doubledandtripledatthelowerfloor(wherethewallsaremostloaded)fixedtogetherwithscrewsandtheGang-Nailplatesystemforracking.Thisprovidedstabilityagainstwindloadforthebuildinginsteadoftraditionalplysheathing.Particularcarewastakentoensurethatadequatesupportstothecurvedfacadewereprovided,thatmovementjointsweresufficient,thatfireresistancewasachievedandthatdisproportionatecollapseregulationswerefollowed.

Usingatimberprefabricatedsystemmeantthatthewholeprojectwasbuiltin8monthstimeprovidingatotalof135flats.Notveryfarfromthesite,RISEalsoworkedonRoyalMills.Theprojectwasarefurbishmentofanexistingfactorywithanaddedstoreyalsoinprefabricatedtimber.

Bengal Mill

RISE Structural Engineers Ltd VAT no. 170 4576 09

Making head and tail of timber frame

t: 0117 317 9801 e: [email protected]

CourtyardHouse,26AOakfieldRoad, Clifton,BristolBS82AT

Real life tetris