ACCOMPLISHMENT REPORTNovember 23, 2010 to November 30, 2010
NAME: Labung, Martin Joseph T.
COMPANY NAME: Cybermetrics Corporation
Date Accomplishment
November 23, 2010 Orientation of the company. The do’sand don’ts while inside the office. Job Description was introduced. Read theBasic Training in Software training.
November 24, 2010 Continuation of reading about Basic Training in Software training testing.Introduced the validation guide of Facili-works, while reading the validation,A hand on in the system was made.
November 25, 2010 Exploring the whole system while continuing reading the instruction the validation guide.
November 30, 2010Smoke testing was given. But I did the Personal and Global Setting of the system.
Noted by:
Arvin Twaño Rosanna EsquivelQA Supervisor In-charge in the Internship Program
![Page 2: Accomplishment Template](https://reader035.fdocuments.us/reader035/viewer/2022080209/551fe0fa497959d4398b57c8/html5/thumbnails/2.jpg)
ANGELES UNIVERSITY FOUNDATIONAngeles CityCollege of Computer Studies
AY 2009-2010
ACCOMPLISHMENT REPORTDecember 01, 2010 to December 30, 2010
NAME: Labung, Martin Joseph T.
COMPANY NAME: Cybermetrics Corporation
Date Accomplishment
December 01, 2010 Continuation of finding issues of the Personal and Global Setting and to the smoke testing, after that, continuation of the smoke testing.
December 02, 2010Absent
December 06, 2010 No Electricity (No OJT)
December 07, 2010 Continuation of Smoke testing.
December 08, 2010 Continuation of the smoke testing. After that the new release build 014 checklistwas being evaluated also.After the checklistI did the test planning.
December 09, 2010 Continuation of the test planning, edit the procedure text.
December 13, 2010 Rechecking of the Procedure text then smoke testing on the build 014
![Page 3: Accomplishment Template](https://reader035.fdocuments.us/reader035/viewer/2022080209/551fe0fa497959d4398b57c8/html5/thumbnails/3.jpg)
ANGELES UNIVERSITY FOUNDATIONAngeles CityCollege of Computer Studies
AY 2009-2010
Date Accomplishment
December 14, 2010 Continuation of the smoke testing. After checking of some issues on the build 013
December 15, 2010 Smoke testing on build 014, after that we verify the issues by using different user and
OS, checking issues on report module on build 014 and the advanced filter.
December 16, 2010 Rechecking of procedure text for some concatenated words, extra periods and wrong spelling.etc.
December 20, 2010 Install the 8.6 build 014 and did the checklist.
December 21, 2010 Continuation of build 014using different Installing option and OS. Checking of CalProbuild 002.
December 22, 2010 Checking of CalPro build 002 verified if the fixed issues doesn’t have any problem withdifferent user.
December 23, 2010 Checking of CalPro build 002 then checking of the installer in windows 2008, 64 and 32 bit.
December 28, 2010 Rechecking of the issues fixed in build 015, didthe checklist for build 015.
![Page 4: Accomplishment Template](https://reader035.fdocuments.us/reader035/viewer/2022080209/551fe0fa497959d4398b57c8/html5/thumbnails/4.jpg)
ANGELES UNIVERSITY FOUNDATIONAngeles CityCollege of Computer Studies
AY 2009-2010
Date Accomplishment
December 29, 2010 Absent
December 30, 2010 Did the smoke testing for build 015.
Noted by:
Arvin Twaño Rosanna EsquivelQA Supervisor In-charge in the Internship Program