ACCIONA Infrastructure's experience in Railways
1
RAILWAYS Trams Urban Rail Metro Terminal Stations Maintenance Infrastructure Conventional Railway High Speed Rail Almost 100 years of experien- ce at the construction of un- derground lines in 9 different cities around the world MLG rail tech- nology with NFU embedded plate Kowloon interchange station: Asia’s largest interchange on 2000 More than 1,200 km of railway lines More than 160 km of tunnels More than 48 km on viaducts
Transcript of ACCIONA Infrastructure's experience in Railways
![Page 1: ACCIONA Infrastructure's experience in Railways](https://reader035.fdocuments.us/reader035/viewer/2022070513/588531d31a28ab26518b50e9/html5/thumbnails/1.jpg)
RAILWAYS
TramsUrban Rail
Metro
Terminal StationsMaintenance Infrastructure
Conventional RailwayHigh Speed Rail Almost 100 years of experien-
ce at the construction of un-derground lines in 9 different cities around the world
MLG rail tech-nology with NFU embedded plate
Kowloon interchange station: Asia’s largest interchange
on 2000
More than 1,200 km of railway linesMore than 160 km of tunnels More than 48 km on viaducts