Accepted - gov.uk · 26/02/2016 TB Atkins Main Line C222-ATK-CV-DPP-020-000013-FPD AS SHOWN A1...

1
107 - S2 Hill F a r m Cu l v e r t 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 170.0 180.0 190.0 70.0 80.0 90.0 100.0 110.0 120.0 130.0 140.0 150.0 160.0 170.0 180.0 190.0 108-L1 Edgcote Viaduct 102-L1 Greatworth Green Tunnel North Embankment 108-L3 Edgcote South Embankment 107-L2 Edgcote 106-L1 Lower Thorpe North Cutting South Cutting 105-L3 Lower Thorpe 104-L1 Thorpe Mandeville Cutting Embankment Mandeville 104-L2 Thorpe Viaduct 105-L1 Lower Thorpe North Embankment 105-L4 Lower Thorpe Chainage 102 + 400 102 + 500 102 + 600 102 + 700 102 + 800 102 + 900 103 + 000 103 + 100 103 + 200 103 + 300 103 + 400 103 + 500 103 + 600 103 + 700 103 + 800 103 + 900 104 + 000 104 + 100 104 + 200 104 + 300 104 + 400 104 + 500 104 + 600 104 + 700 104 + 800 104 + 900 105 + 000 105 + 100 105 + 200 105 + 300 105 + 400 105 + 500 105 + 600 105 + 700 105 + 800 105 + 900 106 + 000 106 + 100 106 + 200 106 + 300 106 + 400 106 + 500 106 + 600 106 + 700 106 + 800 106 + 900 107 + 000 107 + 100 107 + 200 107 + 300 107 + 400 107 + 500 107 + 600 107 + 700 107 + 800 107 + 900 108 + 000 108 + 100 108 + 200 108 + 300 108 + 400 108 + 500 108 + 600 108 + 700 108 + 800 Horizontal Alignment L=5242.2 L = 375 . 1 L=990.3 R=8256.0 L = 375 . 1 L=2735.6 L = 300 . 0 L=208.5 R=-10000.0 L=75.0 L=1488.2 R=-8250.0 Vertical Alignment R=56000.0 L=224.0 G = - 0 . 900 % L = 3193 . 3 R=-56000.0 L=224.0 G = - 0 . 500 % L = 748 . 0 R=-40000.0 L=400.0 Existing Level 171 . 3 168 . 5 168 . 7 169 . 6 168 . 8 168 . 5 167 . 7 170 . 4 174 . 3 176 . 0 175 . 9 174 . 7 171 . 1 168 . 0 167 . 7 164 . 3 159 . 8 158 . 0 162 . 6 160 . 7 154 . 6 142 . 2 136 . 4 136 . 4 134 . 1 133 . 5 132 . 1 133 . 8 140 . 1 139 . 4 133 . 3 130 . 0 134 . 4 141 . 0 149 . 6 159 . 1 153 . 4 147 . 9 138 . 6 129 . 8 126 . 7 125 . 2 124 . 0 121 . 5 120 . 1 119 . 2 119 . 8 119 . 4 120 . 1 125 . 1 122 . 4 118 . 5 116 . 0 114 . 2 114 . 2 109 . 3 109 . 5 109 . 1 108 . 9 109 . 3 112 . 7 Proposed Level 159 . 1 158 . 6 158 . 1 157 . 6 157 . 1 156 . 6 156 . 1 155 . 6 155 . 1 154 . 6 154 . 1 153 . 6 153 . 1 152 . 6 152 . 1 151 . 4 150 . 5 149 . 6 148 . 7 147 . 8 146 . 9 146 . 0 145 . 1 144 . 2 143 . 3 142 . 4 141 . 5 140 . 6 139 . 7 138 . 8 137 . 9 137 . 0 136 . 1 135 . 2 134 . 3 133 . 4 132 . 5 131 . 6 130 . 7 129 . 8 128 . 9 128 . 0 127 . 1 126 . 2 125 . 3 124 . 4 123 . 5 122 . 6 121 . 7 121 . 0 120 . 5 120 . 0 119 . 5 119 . 0 118 . 5 118 . 0 117 . 5 117 . 0 116 . 5 116 . 4 116 . 5 116 . 8 + 3 . 8 + 8 . 7 + 7 . 8 + 9 . 2 + 8 . 9 + 9 . 4 + 6 . 8 + 4 . 6 + 7 . 0 + 1 . 7 + 2 . 2 + 2 . 8 + 3 . 1 + 4 . 7 + 5 . 2 + 5 . 2 + 3 . 7 + 3 . 2 + 1 . 6 + 1 . 5 + 3 . 5 + 4 . 8 + 4 . 3 + 8 . 7 + 8 . 0 + 7 . 9 + 7 . 6 + 7 . 1 + 3 . 8 Cut and Fill - 12 . 2 - 9 . 9 - 10 . 6 - 12 . 0 - 11 . 7 - 11 . 9 - 11 . 6 - 14 . 8 - 19 . 2 - 21 . 4 - 21 . 8 - 21 . 1 - 18 . 0 - 15 . 4 - 15 . 6 - 12 . 9 - 9 . 3 - 8 . 4 - 13 . 9 - 12 . 9 - 7 . 7 - 0 . 4 - 0 . 6 - 5 . 8 - 15 . 3 - 25 . 7 - 20 . 9 - 16 . 3 - 7 . 9 - 4 . 1 - 1 . 9 360km/h 400km/h 107-L1 Culworth Cutting 106-L2 Culworth Embankment South Embankment 105-L2 Lower Thorpe 105 - S1 Ri v e r Ch e r we ll Cu l v e r t 105 - S3 L o we r T ho r p e Cu l v e r t Route Element ID Design Speed Chainage 102 + 400 102 + 500 102 + 600 102 + 700 102 + 800 102 + 900 103 + 000 103 + 100 103 + 200 103 + 300 103 + 400 103 + 500 103 + 600 103 + 700 103 + 800 103 + 900 104 + 000 104 + 100 104 + 200 104 + 300 104 + 400 104 + 500 104 + 600 104 + 700 104 + 800 104 + 900 105 + 000 105 + 100 105 + 200 105 + 300 105 + 400 105 + 500 105 + 600 105 + 700 105 + 800 105 + 900 106 + 000 106 + 100 106 + 200 106 + 300 106 + 400 106 + 500 106 + 600 106 + 700 106 + 800 106 + 900 107 + 000 107 + 100 107 + 200 107 + 300 107 + 400 107 + 500 107 + 600 107 + 700 107 + 800 107 + 900 108 + 000 108 + 100 108 + 200 108 + 300 108 + 400 108 + 500 108 + 600 108 + 700 108 + 800 Horizontal Alignment L=5242.2 L = 375 . 1 L=990.3 R=8256.0 L = 375 . 1 L=2735.6 L = 300 . 0 L=208.5 R=-10000.0 L=75.0 L=1488.2 R=-8250.0 Vertical Alignment R=40000.0 L=280.0 G = - 0 . 500 % L = 1360 . 4 R=56000.0 L=224.0 G = - 0 . 900 % L = 3193 . 3 R=-56000.0 L=224.0 G = - 0 . 500 % L = 748 . 0 R=-40000.0 L=400.0 Existing Level 170 . 4 171 . 6 172 . 0 171 . 3 168 . 5 168 . 7 169 . 6 168 . 8 168 . 5 167 . 7 170 . 4 174 . 3 176 . 0 175 . 9 174 . 7 171 . 1 168 . 0 167 . 7 164 . 3 159 . 8 158 . 0 162 . 6 160 . 7 154 . 6 142 . 2 136 . 4 136 . 4 134 . 1 133 . 5 132 . 1 133 . 8 140 . 1 139 . 4 133 . 3 130 . 0 134 . 4 141 . 0 149 . 6 159 . 1 153 . 4 147 . 9 138 . 6 129 . 8 126 . 7 125 . 2 124 . 0 121 . 5 120 . 1 119 . 2 119 . 8 119 . 4 120 . 1 125 . 1 122 . 4 118 . 5 116 . 0 114 . 2 114 . 2 109 . 3 109 . 5 109 . 1 108 . 9 109 . 3 112 . 7 Proposed Level 159 . 7 159 . 8 159 . 6 159 . 1 158 . 6 158 . 1 157 . 6 157 . 1 156 . 6 156 . 1 155 . 6 155 . 1 154 . 6 154 . 1 153 . 6 153 . 1 152 . 6 152 . 1 151 . 4 150 . 5 149 . 6 148 . 7 147 . 8 146 . 9 146 . 0 145 . 1 144 . 2 143 . 3 142 . 4 141 . 5 140 . 6 139 . 7 138 . 8 137 . 9 137 . 0 136 . 1 135 . 2 134 . 3 133 . 4 132 . 5 131 . 6 130 . 7 129 . 8 128 . 9 128 . 0 127 . 1 126 . 2 125 . 3 124 . 4 123 . 5 122 . 6 121 . 7 121 . 0 120 . 5 120 . 0 119 . 5 119 . 0 118 . 5 118 . 0 117 . 5 117 . 0 116 . 5 116 . 4 116 . 5 116 . 8 + 3 . 8 + 8 . 7 + 7 . 8 + 9 . 2 + 8 . 9 + 9 . 4 + 6 . 8 + 4 . 6 + 7 . 0 + 1 . 7 + 2 . 2 + 2 . 8 + 3 . 1 + 4 . 7 + 5 . 2 + 5 . 2 + 3 . 7 + 3 . 2 + 1 . 6 + 1 . 5 + 3 . 5 + 4 . 8 + 4 . 3 + 8 . 7 + 8 . 0 + 7 . 9 + 7 . 6 + 7 . 1 + 3 . 8 Cut and Fill - 10 . 7 - 11 . 8 - 12 . 4 - 12 . 2 - 9 . 9 - 10 . 6 - 12 . 0 - 11 . 7 - 11 . 9 - 11 . 6 - 14 . 8 - 19 . 2 - 21 . 4 - 21 . 8 - 21 . 1 - 18 . 0 - 15 . 4 - 15 . 6 - 12 . 9 - 9 . 3 - 8 . 4 - 13 . 9 - 12 . 9 - 7 . 7 - 0 . 4 - 0 . 6 - 5 . 8 - 15 . 3 - 25 . 7 - 20 . 9 - 16 . 3 - 7 . 9 - 4 . 1 - 1 . 9 Design Speed 360km/h 400km/h Acce ss Re i n s t a t e m e n t 102 - S3 Gr ea t wo r t h Pa r k Re i n s t a t e m e n t 102 - S5 B4525 W e l s h Ro a d Re i n s t a t e m e n t 103 - S3 Su l g r a v e Ro a d ( T ho r p e M a nd e v ill e ) Ov e r b r i dg e 104 - S2 Ba nbu r y Ro a d 105 - S2 Cu l wo r t h Gr ound s Cu l v e r t Acc o mm od a ti on Ov e r b r i dg e 106 - S1 Cu l wo r t h Gr ound s Acc o mm od a ti on Ov e r b r i dg e 107 - S1 Br i d l e wa y AG10 106 - S2 Br i d l e wa y AG9 Ov e r b r i dg e 106 - S3 Da n e s M oo r AT S 11 0 . 0 m 110 . 0 m 1 2 0 . 0 m 120 . 0 m 130 . 0 m 1 4 0 . 0 m 1 4 0 . 0 m 1 4 0 . 0 m 160 . 0 m 1 60 . 0 m 17 0 . 0 m 17 0 . 0 m 102 + 00 0 103 + 000 104 + 000 105 + 000 106 + 000 107 + 000 108 + 000 1 0 9 + 0 0 0 W W W W W W W W W W W W W W W W W W 0 500 200 100 1000 @ 1:10000 METRES 0 100 50 20 10 @ 1:1000 METRES Scale H 1:10000 V 1:1000 Profile Scale 1:10000 Plan THORPE MANDEVILLE LOWER THORPE EDGCOTE HS2 Alignment Overbridge Bridleway AG9 26/02/2016 TB Civil Atkins Main Line C222-ATK-CV-DPP-020-000013-FPD A1 AS SHOWN Country South Country South Design F o r Con t i nu a t i on Re f e r T o Sh ee t 31 F o r Con ti nu a ti on Re f e r T o Sh ee t 33 Chainage 102+400 to 108+800 Sheet 32 HMG 25/02/16 FINAL PRELIMINARY DESIGN P01 P01 For Acceptance AAR RP 26/02/16 AAR 26/02/16 RP Fit for Acceptance Drawn Checked Approved Drawing No. Date Scale Size Rev. Drawn Rev Description Project/Contract Discipline/Function Zone Creator/Originator Legends/Notes: Drawing Title Design Stage HS2 App Con App Checked Scale with caution as distortion can occur. may be used for legal or other official purposes. Only an official copy of a title plan or register obtained from the Land Registry sold or published without the formal permission of Land Registry. This material was last updated on 2015 and may not be copied, distributed, Registry under delegated authority from the Controller of HMSO. ' Crown Copyright material is reproduced with the permission of Land Ordnance Survey Licence number 100049190 ' Crown Copyright and database right 2015. All rights reserved. or if it is issued in part or issued incompletely in any way. the reproduction of this document after alteration, amendment or abbreviation HS2 accepts no responsibility for any circumstances which arise from London, E14 5AB One Canada Square, Registered office: Registration No. 06791686 Registered in England Tunnel portal Ditches - new Tunnels external extent Woodland habitat creation Wetland habitat creation Grassland habitat creation Ecological mitigation pond HS2 Access road Watercourse diversion Electricity substation Balancing pond Noise fence barrier Replacement floodplain storage Land drainage area (scrub / woodland) Landscape mitigation planting Main utility works County boundary Borough / District boundary Community forum boundary Rail alignment Rail alignment formation Landscape earthworks Engineering earthworks 10 + 000 Stopped-up PRoW Hedgerow habitat creation Grassed areas Sustainable placement Public realm (PRoW) Existing public right of way PRoW New, diverted or realigned (e.g. 10+000) Chainage Existing watercourse or portal building Depot, station, headhouse development use Returned to suitable Reinstatement Sulgrave Road Green Tunnel Greatworth Edgcote Viaduct Viaduct Lower Thorpe (Thorpe Mandeville) Overbridge Banbury Road Retaining Wall Retaining Wall Overbridge Accommodation Culworth Grounds Reinstatement B4525 Welsh Road Overbridge Accommodation Bridleway AG10 Station Auto-transformer Danes Moor Realignment River Cherwell Code 1 - Accepted

Transcript of Accepted - gov.uk · 26/02/2016 TB Atkins Main Line C222-ATK-CV-DPP-020-000013-FPD AS SHOWN A1...

Page 1: Accepted - gov.uk · 26/02/2016 TB Atkins Main Line C222-ATK-CV-DPP-020-000013-FPD AS SHOWN A1 Country South Country South Design sold or published without the formal permission of

107-S

2 Hill Farm C

ulvert

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0

180.0

190.0

70.0

80.0

90.0

100.0

110.0

120.0

130.0

140.0

150.0

160.0

170.0

180.0

190.0

108-L1 Edgcote Viaduct 102-L1 Greatworth Green Tunnel

North Embankment

108-L3 Edgcote

South Embankment

107-L2 Edgcote106-L1 Lower Thorpe North Cutting

South Cutting

105-L3 Lower Thorpe

104-L1 Thorpe Mandeville Cutting

Embankment

Mandeville

104-L2 Thorpe

Viaduct

105-L1 Lower Thorpe

North Embankment

105-L4 Lower Thorpe

Chainage

102+400

102+500

102+600

102+700

102+800

102+900

103+000

103+100

103+200

103+300

103+400

103+500

103+600

103+700

103+800

103+900

104+000

104+100

104+200

104+300

104+400

104+500

104+600

104+700

104+800

104+900

105+000

105+100

105+200

105+300

105+400

105+500

105+600

105+700

105+800

105+900

106+000

106+100

106+200

106+300

106+400

106+500

106+600

106+700

106+800

106+900

107+000

107+100

107+200

107+300

107+400

107+500

107+600

107+700

107+800

107+900

108+000

108+100

108+200

108+300

108+400

108+500

108+600

108+700

108+800

Horizontal Alignment L=5242.2

L=375.1L=990.3

R=8256.0L=375.1L=2735.6

L=300.0

L=208.5

R=-10000.0L=75.0

L=1488.2

R=-8250.0

Vertical Alignment R=56000.0

L=224.0

G=-0.900%

L=3193.3

R=-56000.0

L=224.0

G=-0.500%

L=748.0

R=-40000.0

L=400.0

Existing Level 171.3

168.5

168.7

169.6

168.8

168.5

167.7

170.4

174.3

176.0

175.9

174.7

171.1

168.0

167.7

164.3

159.8

158.0

162.6

160.7

154.6

142.2

136.4

136.4

134.1

133.5

132.1

133.8

140.1

139.4

133.3

130.0

134.4

141.0

149.6

159.1

153.4

147.9

138.6

129.8

126.7

125.2

124.0

121.5

120.1

119.2

119.8

119.4

120.1

125.1

122.4

118.5

116.0

114.2

114.2

109.3

109.5

109.1

108.9

109.3

112.7

Proposed Level 159.1

158.6

158.1

157.6

157.1

156.6

156.1

155.6

155.1

154.6

154.1

153.6

153.1

152.6

152.1

151.4

150.5

149.6

148.7

147.8

146.9

146.0

145.1

144.2

143.3

142.4

141.5

140.6

139.7

138.8

137.9

137.0

136.1

135.2

134.3

133.4

132.5

131.6

130.7

129.8

128.9

128.0

127.1

126.2

125.3

124.4

123.5

122.6

121.7

121.0

120.5

120.0

119.5

119.0

118.5

118.0

117.5

117.0

116.5

116.4

116.5

116.8

+3.8

+8.7

+7.8

+9.2

+8.9

+9.4

+6.8

+4.6

+7.0

+1.7

+2.2

+2.8

+3.1

+4.7

+5.2

+5.2

+3.7

+3.2

+1.6

+1.5

+3.5

+4.8

+4.3

+8.7

+8.0

+7.9

+7.6

+7.1

+3.8

Cut and Fill -12.2

-9.9

-10.6

-12.0

-11.7

-11.9

-11.6

-14.8

-19.2

-21.4

-21.8

-21.1

-18.0

-15.4

-15.6

-12.9

-9.3

-8.4

-13.9

-12.9

-7.7

-0.4

-0.6

-5.8

-15.3

-25.7

-20.9

-16.3

-7.9

-4.1

-1.9

360km/h400km/h

107-L1 Culworth Cutting

106-L2 Culworth Embankment

South Embankment

105-L2 Lower Thorpe

105-S

1 River

Cherw

ell C

ulvert

105-S

3 L

ower

Thorp

e C

ulvert

Route Element ID

Design Speed

Chainage

102+400

102+500

102+600

102+700

102+800

102+900

103+000

103+100

103+200

103+300

103+400

103+500

103+600

103+700

103+800

103+900

104+000

104+100

104+200

104+300

104+400

104+500

104+600

104+700

104+800

104+900

105+000

105+100

105+200

105+300

105+400

105+500

105+600

105+700

105+800

105+900

106+000

106+100

106+200

106+300

106+400

106+500

106+600

106+700

106+800

106+900

107+000

107+100

107+200

107+300

107+400

107+500

107+600

107+700

107+800

107+900

108+000

108+100

108+200

108+300

108+400

108+500

108+600

108+700

108+800

Horizontal Alignment L=5242.2

L=375.1L=990.3

R=8256.0L=375.1L=2735.6

L=300.0

L=208.5

R=-10000.0L=75.0

L=1488.2

R=-8250.0

Vertical Alignment R=40000.0

L=280.0

G=-0.500%L=1360.4

R=56000.0

L=224.0

G=-0.900%

L=3193.3

R=-56000.0

L=224.0

G=-0.500%

L=748.0

R=-40000.0

L=400.0

Existing Level 170.4

171.6

172.0

171.3

168.5

168.7

169.6

168.8

168.5

167.7

170.4

174.3

176.0

175.9

174.7

171.1

168.0

167.7

164.3

159.8

158.0

162.6

160.7

154.6

142.2

136.4

136.4

134.1

133.5

132.1

133.8

140.1

139.4

133.3

130.0

134.4

141.0

149.6

159.1

153.4

147.9

138.6

129.8

126.7

125.2

124.0

121.5

120.1

119.2

119.8

119.4

120.1

125.1

122.4

118.5

116.0

114.2

114.2

109.3

109.5

109.1

108.9

109.3

112.7

Proposed Level 159.7

159.8

159.6

159.1

158.6

158.1

157.6

157.1

156.6

156.1

155.6

155.1

154.6

154.1

153.6

153.1

152.6

152.1

151.4

150.5

149.6

148.7

147.8

146.9

146.0

145.1

144.2

143.3

142.4

141.5

140.6

139.7

138.8

137.9

137.0

136.1

135.2

134.3

133.4

132.5

131.6

130.7

129.8

128.9

128.0

127.1

126.2

125.3

124.4

123.5

122.6

121.7

121.0

120.5

120.0

119.5

119.0

118.5

118.0

117.5

117.0

116.5

116.4

116.5

116.8

+3.8

+8.7

+7.8

+9.2

+8.9

+9.4

+6.8

+4.6

+7.0

+1.7

+2.2

+2.8

+3.1

+4.7

+5.2

+5.2

+3.7

+3.2

+1.6

+1.5

+3.5

+4.8

+4.3

+8.7

+8.0

+7.9

+7.6

+7.1

+3.8

Cut and Fill -10.7

-11.8

-12.4

-12.2

-9.9

-10.6

-12.0

-11.7

-11.9

-11.6

-14.8

-19.2

-21.4

-21.8

-21.1

-18.0

-15.4

-15.6

-12.9

-9.3

-8.4

-13.9

-12.9

-7.7

-0.4

-0.6

-5.8

-15.3

-25.7

-20.9

-16.3

-7.9

-4.1

-1.9

Design Speed 360km/h400km/h

Access R

einstate

ment

102-S

3 Gre

atw

orth P

ark

Reinstate

ment

102-S

5 B

4525 W

els

h R

oad

Reinstate

ment

103-S

3 S

ulgra

ve R

oad

(T

horp

e M

andeville)

O

verbridge

104-S

2 B

anbury R

oad

105-S

2 C

ulw

orth Gro

unds C

ulvert

Acco

mm

odation O

verbridge

106-S

1 C

ulw

orth Gro

unds

Acco

mm

odation O

verbridge

107-S

1 Bridle

way A

G10

106-S

2 Bridle

way A

G9 O

verbridge

106-S

3 D

anes M

oor

ATS

110.0m

110.0m

120.0

m

120.0m

130.0m

140.0

m

140.0

m

140.0m

160.0

m 160.0

m

170.0m

170.0m

102+000

103+000

104+000

105+000

106+000

107+000

108+000

109+000

W

W

WW

W

W

W

W

WW

W

W

W

W

W

W

W

W

W

0 500200100 1000

@ 1:10000METRES

0 100502010

@ 1:1000METRES

Scale H 1:10000 V 1:1000

Profile

Scale 1:10000

Plan

THORPE MANDEVILLE

LOWER THORPE

EDGCOTE

HS2 Alignment

Overbridge

Bridleway AG9

26/02/2016

TB

Civil

Atkins

Main Line

C222-ATK-CV-DPP-020-000013-FPD

A1AS SHOWN

Country South Country South Design

For

Continuation R

efer

To S

heet 31

For

Continuation R

efer

To S

heet 33

Chainage 102+400 to 108+800

Sheet 32

HMG

25/02/16

FINAL PRELIMINARY DESIGN

P01

P01

For Acceptance

AARRP

26/02/16

AAR

26/02/16

RP

Fit for Acceptance

Drawn Checked Approved

Drawing No.

Date Scale Size

Rev.

DrawnRev Description

Project/Contract

Discipline/Function

Zone

Creator/Originator

Legends/Notes:

Drawing Title

Design Stage

HS2 AppCon AppChecked

Scale with caution as distortion can occur.

may be used for legal or other official purposes.

Only an official copy of a title plan or register obtained from the Land Registry

sold or published without the formal permission of Land Registry.

This material was last updated on 2015 and may not be copied, distributed,

Registry under delegated authority from the Controller of HMSO.

' Crown Copyright material is reproduced with the permission of Land

Ordnance Survey Licence number 100049190

' Crown Copyright and database right 2015. All rights reserved.

or if it is issued in part or issued incompletely in any way.

the reproduction of this document after alteration, amendment or abbreviation

HS2 accepts no responsibility for any circumstances which arise from

London, E14 5AB

One Canada Square,

Registered office:

Registration No. 06791686

Registered in England

Tunnel portalDitches - new

Tunnels external extentWoodland habitat creation

Wetland habitat creation

Grassland habitat creation

Ecological mitigation pond

HS2 Access road

Watercourse diversion

Electricity substation

Balancing pond

Noise fence barrier

Replacement floodplain storage

Land drainage area (scrub / woodland)

Landscape mitigation planting Main utility works

County boundary

Borough / District boundary

Community forum boundary

Rail alignment

Rail alignment formation

Landscape earthworks

Engineering earthworks

10+000

Stopped-up PRoW

Hedgerow habitat creation

Grassed areas

Sustainable placement

Public realm

(PRoW)

Existing public right of way

PRoW

New, diverted or realigned (e.g. 10+000)

Chainage

Existing watercourseor portal building

Depot, station, headhouse

development use

Returned to suitable

Reinstatement

Sulgrave Road

Green Tunnel

Greatworth

Edgcote Viaduct

Viaduct

Lower Thorpe

(Thorpe Mandeville)

Overbridge

Banbury Road

Retaining Wall Retaining Wall

Overbridge

Accommodation

Culworth Grounds

Reinstatement

B4525 Welsh Road

Overbridge

Accommodation

Bridleway AG10

Station

Auto-transformer

Danes Moor

Realignment

River Cherwell

Code 1

- Acc

epted