    ACCEPTBLE RISKA New Look at HazardAssessments

    Presented by:Holly Elke, CRSP, CSP, CHRP, CMQ/OE

    Senior QHSE AdvisorSH&E System Solutions

  • 8/9/2019 acceptable risk.pdf

    2/40

  • 8/9/2019 acceptable risk.pdf

    3/40

    THE HAZARD BASED

    APPROACH

    Control and mitigate sourcesof harm or loss (hazards)

    that may be encountered bypersonnel.

  • 8/9/2019 acceptable risk.pdf

    4/40

    THE HAZARD BASEDAPPROACH

    HAZARD SOURCES

    P eople

    E quipment

    M aterial

    E nvironment

    CHANGE

  • 8/9/2019 acceptable risk.pdf

    5/40

    HAZARD BASEDREGULATIONS

    ALBERTA: OHS CODE PART 2 Hazard Assessment, Elimination

    and Control.

    BRITISH COLUMBIA: WCA DIVISION 3 General Duties OfEmployers & PART 3 OHS Regs OHS Program Contents

  • 8/9/2019 acceptable risk.pdf

    6/40

  • 8/9/2019 acceptable risk.pdf

    7/40

  • 8/9/2019 acceptable risk.pdf

    8/40

    TERMINOLOGY

    RISKEffect of uncertainty on objectives

    Effects positive or negative deviations fromwhat is expected.

    Uncertainty Lack of information,understanding or knowledge of an event, itsconsequence, or likelihood.

    Objectives - financial, production, operational,HSE goals that are strategic, corporate,project, product or process driven.

    ISO Guide 73/ ANSI Z690

  • 8/9/2019 acceptable risk.pdf

    9/40

    TERMINOLOGY

    RISK

    Combination of the likelihood of an

    occurrence of a hazardous event orexposure(s) and the severity of injuryor ill health that can be caused by the

    event or exposure(s).

    OHSAS 18001

  • 8/9/2019 acceptable risk.pdf

    10/40

  • 8/9/2019 acceptable risk.pdf

    11/40

    RISK BASED REGULATIONS

    9(3) If a hazard cannot beeliminated or controlled undersubsection (2), the employer mustuse administrative controls thatcontrol the hazard to a level as

    low as reasonably achievable.

    ALBERTA OHS CODE PART 2 HazardAssessment, Elimination and Control

  • 8/9/2019 acceptable risk.pdf

    12/40

    RISK BASED REGULATIONS

    "as low as reasonably achievable"or "ALARA" means, in reference

    to a substance, that measuresmust be taken to keep a worker'sexposure to a level as low as isreasonably achievable;

    BC OHS Regs: Part 5 Chemical Agents andBiological Agents

  • 8/9/2019 acceptable risk.pdf

    13/40

    THE ALARP TRIANGLE

  • 8/9/2019 acceptable risk.pdf

    14/40

    RISK BASED REGULATIONS

    SASKATCHEWAN: OHSRegulations Part III GeneralDuties (S. 22 OHS Program).

    MANITOBA: WSH Regs MSIs,Working Alone, Violence.

    OSHA (US): 1910.119 - Process

    Safety Management Standard.

    OSHA: I2P2 (Injury & IllnessPrevention Program) proposed.

  • 8/9/2019 acceptable risk.pdf

    15/40

    RISK BASED STANDARDS

    OHSAS 18001: 2007

    CSA Z1000- 06 (CANADA)

    CSA Z1002-

    12 HazardIdentification, Elimination & RiskAssessment/Control (New)

    ISO 31000:2009 RiskManagement Principles andGuidelines.

  • 8/9/2019 acceptable risk.pdf

    16/40

    WHY USE A RISK-BASEDAPPROACH ?

    Standardizes risk managementgoals and methods to be used =increase in process efficiency.

    Consistent framework that can beused by all business units andwork groups = increase in process& employee effectiveness.

    Due Diligence (defensible).

  • 8/9/2019 acceptable risk.pdf

    17/40

    WHAT APPROACH DOES YOUR

    COMPANY USE?

  • 8/9/2019 acceptable risk.pdf

    18/40

    RISK MANAGEMENT PROCESS

    COMPANY MANDATE AND MANAGEMENT COMMITTMENT

    CREATE THE

    FRAMEWORK FORMANAGING RISK:

    GOALS, PRINCIPLES,PROCESS

    IMPLEMENT THEFRAMEWORK:OBJECTIVES,RESOURCES,

    COMMUNICATION,TRAINING

    MONITOR & REVIEWTHE FRAMEWORK:

    KPIs, AUDITS,NONCONFORMANCE

    MANAGEMENTREVIEW

    IMPROVE THE

    FRAMEWORK:CONTINUOUS

    IMPROVEMENTINITIATIVES

    PLAN

    DO

    CHECK

    ACT

  • 8/9/2019 acceptable risk.pdf

    19/40

    RISK MANAGEMENT PROCESS

    Communicate/Consult StakeholdersEstablish Risk Management Goals

    Internal and External factors

    Consider company resources &capability

    Define Risk Criteria to be used

    Frequency, likelihood, consequencesto be measured

    ALARA or ALARP

  • 8/9/2019 acceptable risk.pdf

    20/40

    RISK MANAGEMENT PROCESS

    Establish Risk Assessment Methods

    Risk Identification

    Risk Analysis Risk Evaluation (Prioritization)

    Determine Risk Treatment Options

    Avoidance, Elimination, Substitution

    Engineering, Administrative, PPE

  • 8/9/2019 acceptable risk.pdf

    21/40

    RISK MANAGEMENT PROCESS

    Monitor and Review

    Changes

    New and emerging risks

    Improvement opportunities

    Efficiency & Effectiveness of RiskTreatment Options

  • 8/9/2019 acceptable risk.pdf

    22/40

    RISK ANALYSIS: LIKELIHOOD

    Frequency of Exposure Probability Loss = Likelihood

    FREQUENCY OF EXPOSURE:

    4 - Frequent (5+ per week/job)

    3-

    Occasional ( 1+ per week/ 3+ per job )2 - Rare ( 1+ per moth/ 2+ per job)

    1 - Very Rare (1+ per year/job)

    PROBABILITY OF LOSS:

    4 - Expected/Likely (Happens often; > 1 per year)3 - Probable/ Occasional (1 occurrence in 3 years)

    2 - Possible/Rare ( 1 occurrence in 5 years)

    1 - Remote/Very Rare (Once in the life of the facility or

    company)

  • 8/9/2019 acceptable risk.pdf

    23/40

    RISK ANALYSIS: LIKELIHOOD

    PROBABILITY OF LOSS

    FREQUENCY 1 2 3 4

    1 1 2 3 4

    2 2 4 4 8

    3 3 6 9 12

    4 4 8 12 16

  • 8/9/2019 acceptable risk.pdf

    24/40

    RISK ANALYSIS: SEVERITY

    SEVERITY

    CATEGORYHEALTH SAFETY

    ENVIRONMENTAL

    IMPACT

    FINANCIAL

    LOSSPUBLIC IMPACT

    6One or more

    fatalities

    Catastrophic mutual

    aid required

    Major environmental

    impact to neighbouring

    receptors (public streams,

    vegetation, air, ground

    water)

    Extensive damage

    & extended

    downtime

    (Corporate)

    Serious impact -

    large community

    5

    Serious injury -

    permanent

    disability, life-

    threatening

    occupational

    illnesses

    Significant Event-

    fulldisaster

    response

    Off-site release or

    repeated non-compliance

    issues with potential for

    significant adverse impact

    Major downtime(Division / Area)

    Serious impact-

    small community

    4

    Serious injury -

    disabling

    occupational

    illnesses

    Serious threat -

    emergency response

    (external agencies

    involved)

    Contained within the

    facility - large impact or

    repeat non-compliance

    issues

    Minor damage or

    downtime

    (Department)

    Minor

    families affected

    3

    Temporary

    disability - minor

    injuries, acute

    health effects

    Important occurrence -

    potential emergency

    response

    Contained within facility -

    minimal impact &

    regulatory reporting

    required

    Minor damage or

    downtime

    (Individual

    processes)

    Minor limited no.

    of individuals

    affected

    2 First Aid or lessNoticeable occurrence -

    reportable

    Contained within facility

    with no adverse impact -

    below reportable levels

    Minor damage &

    no downtimeMinimal to none

  • 8/9/2019 acceptable risk.pdf

    25/40

    RISK ANALYSIS

    Severity Likelihood = Risk Level or Priority Number

    SEVERITY

    4 4 8 12 16 24 32 36 48 64

    3 3 6 9 12 18 24 27 36 48

    2 2 4 6 8 12 16 18 24 32

    1 1 2 3 4 6 8 9 12 16

    1 2 3 4 6 8 9 12 16

    LIKELIHOOD (Fr x Pb)

  • 8/9/2019 acceptable risk.pdf

    26/40

    RISK EVALUATION

    RISK LEVEL PRIORITIZATION

    1-9 = Minimal Risk Acceptable

    12-16 = Marginal Risk Acceptable with controls

    18-27 = Serious Risk Further controls suggested

    32-64 = Critical Risk Further controls required

  • 8/9/2019 acceptable risk.pdf

    27/40

    RISK TREATMENT OPTIONS

    Avoidance choose to not performthe task or work activity.

    Elimination Remove the hazard(i.e. design valve handles to beaccessible at floor level)

    Substitution Use a less harmfulsubstance (solvent replacement for

    Toluene/Xylene/Varsol).

    Share the Risk hire competentpersonnel to perform the task

  • 8/9/2019 acceptable risk.pdf

    28/40

    RISK TREATMENT OPTIONS

    Engineered Guards, Ventilation,Interlocking isolation systems(pipelines), Ergonomic equipment

    Administrative Safe WorkProcedures, Practices, Rules,Training, Job rotation/schedule.

    Share the Risk hire competentpersonnel to perform the task

    PPE

  • 8/9/2019 acceptable risk.pdf

    29/40

    RISK METHOD SELECTION

    CAN/CSA 31000Risk Assessment Techniques

    (Based upon IEC/ISO 31010:2009)

    HAZOP, What if, FMEA/FMECA, FTA,HACCP, Root cause analysis, etc.

    PHA, Consequence/ Probability matrix

    & Human Reliability Assessmentprovide the foundation for our hybridTHA/JSA methods.

  • 8/9/2019 acceptable risk.pdf

    30/40

    APPLICATION OF RISKMANAGEMENT PRINCIPLES:

    DEMONSTRATION USING A TASKHAZARD ASSESSMENT METHOD

  • 8/9/2019 acceptable risk.pdf

    31/40

  • 8/9/2019 acceptable risk.pdf

    32/40

  • 8/9/2019 acceptable risk.pdf

    33/40

  • 8/9/2019 acceptable risk.pdf

    34/40

  • 8/9/2019 acceptable risk.pdf

    35/40

  • 8/9/2019 acceptable risk.pdf

    36/40

  • 8/9/2019 acceptable risk.pdf

    37/40

  • 8/9/2019 acceptable risk.pdf

    38/40

    Types of WorkList all types of work done at

    the work site.

    Work Related ActivitiesList all work related activities

    for each type of work.

    HazardsList the hazards for each work

    related activity. List both

    health and safety hazards.

    Risk (14) Rank (Priority)

    ControlsList the proposed

    control(s) for each

    hazard.

    Completion

    DateList the date

    the controls

    will be in

    place.

    Cons

    euences

    Fre

    quency

    Pro

    babilit

    Total

    Sample Hazard Assessment Form

    http://humanservices.alberta.ca/working-in-alberta/268.html

  • 8/9/2019 acceptable risk.pdf

    39/40

    QUESTIONS ?

  • 8/9/2019 acceptable risk.pdf

    40/40

    CONTACT INFORMATION