Accellera Systems Initiative Overview June 2013

17
Accellera Systems Initiative Overview June 2013 Shishpal Rawat, Chairman

Transcript of Accellera Systems Initiative Overview June 2013

Accellera Systems Initiative Overview June 2013

Shishpal Rawat, Chairman

© 2013 Accellera Systems Initiative, Inc. June 2013

Accellera By The Numbers

2

9 IEEE standards created 20 Accellera standards released 25 years in existence (combined)

40 Corporate & Associate members 859 total attendees at the DVCon 2013

24,511 free IEEE EDA standards downloaded 142,849 unique visitors to www.accellera.org in 2012

Our Mission To provide design and verification standards required by systems,

semiconductor, IP and design tool companies to enhance a front-end design automation process.

To collaborate with its community of companies, individuals and organizations in delivering the standards that lower the cost to design commercial EDA, IC and embedded system solutions.

© 2013 Accellera Systems Initiative, Inc. June 2013

Broad Industry Support

Corporate Members Associate Members

3

Welcome new members Altera, Broadcom, Ericsson, Maxim, NVIDIA and Synapse!

OVL 1.0 1.8 2.1 2.3 2.4 2.5 2.6 2.7 V-AMS 2.0 2.1 2.2 2.3 2.3.1

SV 3.1 3.1a IEEE 1800 2012 PSL 1.1 IEEE 1850 UPF 1.0 IEEE 1801 2013 ITC 1.0 1.1 2.0 2.1 2.2

UCIS 1.0 VHDL 1.0 3.0 3.1 4.0 IEEE 1076 UVM 1.0 & 1.1 1.1d OCI 1.0 IEEE 1450

IP-XACT 1.5 IEEE 1685 2.0 IP Tagging 1.0

SystemRDL

MLWG

2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999

OSCI formed

Accellera OSCI Merge

Accellera formed (VI & OVI)

Merger with SPIRIT

Standards History & Progress

© 2013 Accellera Systems Initiative, Inc. June 2013

Standards History & Progress

LWG 1.0 2.0 2.1 & IEEE 1666-2005 2.2 & IEEE 1666-2011 2.3

TLM 1.0 2.0

SCV 1.0 1.0p2 2.0

SWG Draft 1 Draft 2

AMS AMS Study Group Draft 1 1.0 2.0

CCI Requirements 1.0

OSCI formed

5

2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999

Accellera OSCI Merge

Accellera formed (VI & OVI)

Merger with SPIRIT

© 2013 Accellera Systems Initiative, Inc. June 2013

News & Events

April 2013 - Multi-Language Working Group Launched - New Accellera Forums - New UVM World Community at www.accellera.org - Announced Soft IP Tagging 1.0 Standard

March 2013 - SystemC AMS 2.0

Completed

Join the Community - Register at www.accellera.org/community

© 2013 Accellera Systems Initiative, Inc. June 2013

DAC Birds of a Feather Meetings

June 4, 7:00-9:00PM Multi-Language: Room 11AB

"Creating a Standard for Interoperability of Multi-language Verification Environments and Components“

IP Protection: Room 12AB

"Exploring the IP Protection P1735 Standard"

7

© 2013 Accellera Systems Initiative, Inc. June 2013

2013 Leadership Award

Dr. Stanley Krolikoski It is with our sincere gratitude that we honor you with this award for your significant contribution to the standards community and to the EDA industry.

Recognizes active leadership and significant contribution to the vision of EDA and IP standards and governance of Accellera Systems Initiative and its precedent organizations.

8

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC Working Group Status

SystemC Working Groups

Language Synthesis AMS CCI TLM Verification

9

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC Language WG

Charter: - Responsible for the definition and development of the SystemC core language, the

foundation on which all other SystemC libraries and functionality are built.

Current status - Released version 2.3 of the reference simulator to reflect IEEE 1666-2011 - Final package reorganized to include TLM 2.0

Plans for 2013 - Discuss new concepts affecting modeling performance - Collect and resolve submitted issues as needed

10

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC Synthesis WG

Charter: To define the SystemC synthesis subset to allow synthesis of digital hardware from high-level specifications.

Current status - Release of standard targeted for Q4 2013 - www.accellera.org/apps/org/workgroup/swg

Plans for 2013 - Review and edit draft to make sure it fully covers the SystemC LRM - Decide on remaining open items - Start work on new topics for the second version of the standard

11

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC AMS WG

Charter: The SystemC AMS Working Group is responsible for the standardization of the SystemC AMS extensions, defining and developing the language, methodology and class libraries for analog, mixed-signal and RF modeling in SystemC

Current status - Released the SystemC AMS 2.0 standard in March 2013

- www.accellera.org/downloads/standards/

Plans for 2013 - Update SystemC AMS User’s Guide to explain all Dynamic TDF features,

to be released H2 2013

12

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC Control Configuration & Inspection WG

Charter: To define standards that allow tools to interact with models in order to perform activities such as configuration, debug and analysis; target topics are:

- Configuration parameters - Command and control - Registers - Save and restore

Current Status - Currently preparing a draft of the Configuration standard for public review - www.accellera.org/apps/org/workgroup/cciwg

Plans for 2013 - Gather and incorporate feedback on the Configuration draft standard then prioritize and

start working on the Control and Inspection standards

13

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC TLM WG

Charter: To define industry standard interfaces for interoperable transaction-level models supporting architectural exploration, performance analysis, building virtual platforms for software development, and functional verification.

Current status - Delivered TLM library update to conform the IEEE1666 2011 standard - Integrated TLM 2.0 library with the SystemC core language package

14

© 2013 Accellera Systems Initiative, Inc. June 2013

SystemC Verification WG

Charter: The Verification Working Group (VWG) is responsible for defining verification extensions to the SystemC language standard, and to enrich the SystemC reference implementation by offering an add-on SystemC Verification (SCV) library to ease the deployment of a verification methodology based on SystemC.

Current Status - Currently updating the OSCI SCV library - www.accellera.org/apps/org/workgroup/vwg

Plans for 2013 - To further develop and integrate verification methodologies in SystemC/TLM - Public review planned for June 2013

15

© 2013 Accellera Systems Initiative, Inc. June 2013

Advancing Standards Together

Share your experiences - Visit www.accellera.org and register to post on forums at new site

forums.accellera.org

Show your support - Record your adoption of standards

Become an Accellera member - Join working groups

16

Thank you!

17