ACCELERATION PROGRAM OF POWER PLANT ...energy-indonesia.com/03dge/0130830esdm.pdfACCELERATION...
Transcript of ACCELERATION PROGRAM OF POWER PLANT ...energy-indonesia.com/03dge/0130830esdm.pdfACCELERATION...
© pr@m 2013
ACCELERATION PROGRAM OF POWER
PLANT DEVELOPMENT PHASE II (FTP II)
Directorate of Electricity Program
MINISTRY OF ENERGY AND MINERAL RESOURCES
DIRECTORATE GENERAL OF ELECTRICITY
Coffee Morning and Aid Mubarak Eid 1 Syawal 1434 H
Jakarta, August 2013
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Legal Base of Electricity Planning
Law No. 30 Year 2009 on Electricity
Government Regulation No. 14 Year 2012 on Electricity Supply Operations.
Presidential Decree No. 4 of 2010 dated January 8, 2010 Jo. Presidential
Regulation No. 48 Year 2011 dated July 27, 2011 on Assignment to PT. PLN
(Persero) for Conducting Accelerated Development of Power Plants Using
Renewable Energy, Coal and Gas, which is known as a program of 10,000 MW
Phase II program with locations throughout Indonesia .
Minister of Energy and Mineral Resources Regulation No. 21 Year 2013
concerning the second amendment of ESDM No. 01 of 2012 on List of Projects to
Accelerate Development of Power Plants Using Renewable Energy, Coal, and Gas
and Related Transmission.
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Development Direction of Power Supply (Based on Draft RUKN 2012-2031)
Power Plant
Directed at realistic growth, preferred to overcome the shortage of power
supply, support the MP3EI, increase reserves by emphasizing the utilization of
renewable energy sources and limit fuel generation development plan.
Geared to meet the electricity demand in the outer islands so that all people
have access to electricity.
Power Transmission
Open for use with the public interest with respect to the ability of the existing
transmission network capacity.
Directed to system growth, increase system reliability and reduce constraints
on the distribution system as well as the construction of new plants
Power Distribution
Open for use with the parties will utilize the distribution network by taking into
account the ability of the existing distribution network capacity.
Directed to anticipate sales growth of electric power, maintaining the level of
reliability and efficiency as well as improve the quality of care.
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
: Transmission line ( existing
: Transmission line (planning)
: Power generation
• INSTALLED CAPACITY OF POWER GENERATION : 44.661 MW
• LENGHT OF TRANSMISSION LINE: - 500 KV : 5.052 kms - 275 KV : 1.510 kms - 150 KV : 26.282 kms - 70 KV : 4.457 kms • LENGTH OF DISTRIBUTION LINE: - JTM : 294.167 kms - JTR : 396. 568 kms
SUMATERA : • Power generation : 7.420 MW (17%) • 275 kV : 1.028 kms • 150 kV : 8.597 kms • 70 kV : 332 kms • JTM : 79.472 kms • JTR : 88.024 kms
JAMALI : • Power Generation: 31.924 MW (71%) • 500 kV : 5.052 kms • 150 kV : 12.977 kms • 70 kV : 3.474 kms • JTM : 143.941 kms • JTR : 237.297 kms
Nusa Tenggara: • Power Generation : 514 MW (1%) • JTM : 8.468 kms • JTR : 8.362 kms
KALIMANTAN : • Power Generation : 1.949 MW (4%) • 150 kV : 3.028 kms • 70 kV : 528 kms • JTM: 24.384 kms • JTR: 23.382 kms
SULAWESI : • Pembangkit : 2.318 MW (5%) • 275 kV: 482 kms •150 kV : 2.988 kms • 70 kV : 528 kms • JTM: 24.925 kms • JTR : 27.284 kms
PAPUA : • Generation : 251 MW (0,6%) • JTM : 2.718 kms • JTR : 3.637 kms
MALUKU : • Power Generation : 286 MW (0,6%) • JTM : 4.813 kms • JTR : 2.718 kms
Status: Mei 2013
Infrastructur of National Power Supply
IPP 23%
PLN 73%
PPU 4%
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
2006 2007 2008 2009 2010 2011 2012 2013 2014
Electrif ication
Rasio
63.00% 64.34% 65.10% 65.79% 67.15% 72.95% 76.56% 79.30% 81.40%
Target of RPJM 67.20% 70.40% 73.60% 76.80% 80.00%
PLANREALIZATION
Category :
> 60 %
41 - 60 %
20 - 40 %
Aceh 90,96%
Sumut 86,70%
Sumbar 76,14%
Riau 85,09%
Sumsel 73,97.%
Bengkulu 79,37%
Babel 94,13%
Lampung 74,91%
Jakarta 99,99%
Banten 77,52%
Jabar 76,03%
Jateng 79,95%
Jambi 70,37%
DIY 77,26%
Jatim 74,31%
Bali 74,95%
NTB 53,63%
NTT 53,42%
Kalbar 71,46%
Kalsel 76,74%
Kaltim 73,08%
Sulut 76,22%
Sulteng 66,83%
Sulsel 76,29%
Malut 74,12%
Maluku 72,07%
Papua 34,62%
Sulbar 66,65%
Kepri 83,56%
Sultra 60,53%
Papua Barat 67,88%
Kalteng 73,32%
Gorontalo 60,99%
Electrification Rasio 2012
© pr@m 2013
300 300
2560
1350
810
2,625.5
1,981.5
0
500
1000
1500
2000
2500
3000
2009 2010 2011 2012 Jan - Juli 2013 Aug - Des 2013 2014
REALIZATION AND TARGET
COMMERCIAL OPERATION FTP I to July 2013
Realization
5.320 MW (53,6%)
Target
4.607 MW (46,4%)
Banten - Labuan#1
MW
Banten - Labuan#2
1. Jabar - Indramayu (3x330 MW)
2. Banten – Suralaya (1x625 MW)
3. Banten – Lontar #1 (315 MW)
4. Jateng - Rembang 2x315 MW
1. Banten - Lontar #2 & #3 (630 MW)
2. Jatim – Paiton (1x660 MW)
3. Sulut – Amurang (2x25 MW)
4. Sultra – Kendari #2 (10 MW)
1. Kepri – Tj. Balai Karimun (2x7 MW)
2. Lampung – Tarahan Baru (2x100 MW)
3. Jabar – Pelabuhan Ratu(3x350 MW)
4. Jatim – Tj.Awar-awar (2x350 MW)
5. NAD – Nagan Raya (2x110 MW)
6. Sumbar – Teluk Sirih (2x112 MW)
7. Babel – Bangka Baru (2x30 MW)
8. Babel – Belitung#1 (16,5 MW)
9. Sultra – Kendari #1 (10 MW)
10. Sulsel – Barru #1 (50 MW)
11. NTT – Ende (2x7 MW)
12. NTT – Kupang (2x16,5 MW)
13. Malut – Tidore (2x7 MW)
14. Papua – Jayapura (2x10 MW)
1. Jateng – Adipala (1x660 MW)
2. Sumut – Pangkalan Susu (2x220 MW)
3. Babel – Belitung#2 (16,5 MW)
4. Riau – Tenayan (2x110 MW)
5. Kalbar – Parit Baru (2x50 MW)
6. Kalbar – Bengkayang (2x27,5 MW)
7. Kaltim – Teluk Balikpapan (2x110 MW)
8. NTB – Lombok (2x25 MW)
9. NTB – Bima (2x10 MW)
10. Gorontalo – Anggrek (2x25 MW)
11. Kalteng – Pulang Pisau (2x60 MW)
12. Maluku – Ambon (2x15 MW)
1. Sulsel – Barru#2 (50 MW)
2. Kalsel - Asam-asam (2x65 MW)
3. Jatim – Pacitan (2x15 MW)
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
REVISE OF PROJECTS IN FTP II
(Minister Regulation of ESDM No.21 Year 2013)
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Behind the Change in Projects FTP 2
In support of economic growth, it would require additional generating capacity of
4,000 MW up to 5,000 MW per year.
In an effort to anticipate setbacks operating schedule several power projects.
A change in the electricity system development plan as stated in RUPTL of PT.
PLN (Persero) 2012-2021 which was approved by the Minister on 28 December
2012.
Letter of Managing Director of PT PLN (Persero) to the Director General of
electricity Number 0379/101/DIRUT/2013 dated May 7, 2013 related to changes
in the capacity and the name of the project, additional projects, and project
cancellations .
Necessary to amend the project list in the FTP 2
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
List of Projects in FTP II (Change in line with Minister Regulation of ESDM No 21 Year 2013)
DEVELOPER
TYPE OF POWER
GENERATION
NUMBER OF PROJECTS CAPACITY
(MW)
PLN
17 projects
5,749 MW (32%)
PLTP 6 340
PLTA 4 1.379
PLTU 6 3.750
PLTG 1 280
IPP
59 project
12,169 MW (68%)
PLTP 46 4.625
PLTA 6 424
PLTU 7 7.120
TOTAL 76 17.918
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Changes in Projects FTP II (1)
DEVELOPER TYPE OF
GENERATION
NUMBER
OF
PROJEC
T
CAPACITY(
MW)
PLN
17 proyek
5.749 MW (32%)
PLTP 6 340
PLTA 4 1.379
PLTU 6 3.750
PLTG 1 280
PLTGB
IPP
59 proyek
12.169 MW (68%)
PLTP 46 4.625
PLTA 6 424
PLTU 7 7.120
76 17.918
DEVELOPER TYPE OF
GENERATION
NUMBER
OF
PROJEC
TS
CAPACITY
(MW)
PLN
26 proyek
3.757 MW (37%)
PLTP 6 340
PLTA 3 1,269
PLTU 8 1,804
PLTG 1 280
PLTGB 8 64
IPP
72 proyek
6.290 MW (63%)
PLTP 45 4,585
PLTA 8 484
PLTU 19 1,221
98 10,047
Type of Power
Generation
Total Estimation
Of Capacity (MW)
Compositio
n
(%)
PLTP (geothermal) 4.925
PLTA (hydro) 1.753
Total EBT (NRE) 6.678 66%
PLTU (Steam) 3.025
PLTG (Gas) 280
PLTGB (Coal
Gassification) 64
Total NON EBT (Non
NRE) 3.369 34%
Total EBT + NON EBT 10.047
Type of Generation Total of Estimation
Of Capacity (MW)
Composition
(%)
PLTP 4.965
PLTA 1.803
Total EBT 6.768 38%
PLTU 10.870
PLTG 280
Total NON EBT 11.150 62%
Total EBT + NON EBT 17.918
(Minister Regulation of ESDM No 01 Year 2012)
(Minister Regulation of ESDM No 21 Year 2013)
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Composition of Power Generation
NRE vs Non NRE Developer
Minister Regulation of
ESDM No 01
Year 2012
Minister Regulation of
ESDM No. 21
Year 2013
PLTP 28%
PLTA 10%
PLTU 61%
PLTG 1%
NRE 38%
Non NRE 62%
PLN 32%
IPP 68%
Changes in Project FTP II (2)
PLTP 49%
PLTA 17%
PLTU 30%
PLTG 3%
PLTGB 1%
NRE 67%
Non NRE 33%
PLN 37%
IPP 63%
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Changes in Projects FTP II (3) PLN IPP
Generation Capacity (MW) Genereation Capacity (MW)
Project Expelled
1. PLTGB Sabang 2. PLTU Melak 3. PLTU Ketapang 4. PLTU Bau-bau 5. PLTGB Tanjung Batu 6. PLTGB Putussibau 7. PLTGB 8. PLTGB Selayar 9. PLTGB Larantuka 10. PLTGB Tobelo dan 11. PLTGB Tual
8 14 20 20
8 8 8 8 8 8 8
1. PLTA Rajamandala 2. PLTA Simpang Aur 3. PLTU Nias 4. PLTU Tanjung Pinang 5. PLTU Tanjung Balai Karimun 6. PLTU Bangka 7. PLTU Nunukan 8. PLTU Luwuk 9. PLTU Mamuju 10. PLTU Kendari 11. PLTU Kolaka 12. PLTU Sumbawa 13. PLTU Biak 14. PLTU Jayapura 15. PLTU Nabire 16. PLTU Merauke 17. PLTU Klalin dan 18. PLTU Andai
47 23 21 30 20 60 14 20 50 50 20 20 14 30 14 14 30 14
Total 118 Total 491
New Projects
1. PLTU Jawa 6 2. PLTA Jatigede
2000 110
1. PLTP Oka Ile Ange 2. PLTU Jawa 1 3. PLTU Jawa 3 4. PLTU Jawa 4 5. PLTU Jawa 5
10 1000 1320 2000 2000
Total 2110 Total 6330
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
SUMATERA • PLTA : 453
MW
• PLTP : 2.725
MW
• PLTU : 400
MW
TOTAL : 3.578
MW
JAWA – BALI • PLTA : 1.150 MW
• PLTP : 1.935 MW
• PLTU : 9.720 MW
TOTAL : 12.805 MW
KALIMANTAN • PLTU : 500 MW
• PLTG/MG : 280 MW
TOTAL : 780 MW
SULAWESI • PLTA : 200
MW
• PLTP : 195
MW
• PLTU : 200
MW
TOTAL : 595
MW
MALUKU • PLTP : 35 MW
TOTAL : 35 MW
NUSA TENGGARA • PLTP : 75 MW
• PLTU : 50 MW
TOTAL : 125 MW
PAPUA TOTAL : 0
MW
Map of Location of Project FTP II (Minister Regulation of ESDM No 21 Year 2013)
TOTAL :
76 Projects (17.918
MW) Outside of Jawa
29% Jawa 71%
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
PROJECT FTP II – PLN Power projects owned by PT PLN (Persero) consists of 26 (twenty six)
project (ESDM No. 01 of 2012), with the status:
4 (four) in the stage of pre-construction projects with a total capacity of
1,514 MW and plans that COD 2015 till 2017 Upper Cisokan (4x260 MW),
hydro shavings 3 (2x87 MW), New Trenches power plant (2x50 MW), and
Takalar power plant (2x100 MW).
11 (eleven) projects with a total capacity of 2,125 MW are under FS,
auction Mining Working Area (WKP), the Engineering Procurement
Construction (EPC), financing, and exploration.
8 (eight) PLTGB total project capacity of 64 MW and 3 (three) power plant
projects with a total capacity of 54 MW proposed project excluded from the
list of FTP-2 (ESDM No. 21 of 2013), for the procurement of some projects
were canceled, too small-scale projects and some projects replaced with
another project.
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
Power projects owned by Independent Power Producer (IPP) consists of 72
(seventy-two) project (ESDM No. 01 of 2012), with the status:
Projects under construction and preparation of construction with a total
capacity of 105 MW is hydropower Wampu (3x15 MW) and geothermal
Patuha unit 1 (60 MW) with COD plan 2014-2015.
Exploitation of geothermal power plant project in stages with a total
capacity of 630 MW Geothermal Power Plant which Patuha units 2 and 3
(2x60 MW) MW, geothermal Ulubelu 3.4 (2x55 MW), geothermal Lahendong
5.6 (2x20 MW), Karaha Bodas geothermal power plant unit 1 (30MW ) and
PLTP Sarulla 1 (3x110 MW) with COD plan 2015-2017
PROJECT FTP II – IPP (1)
© pr@m 2013
ESDM untuk Kesejahteraan Rakyat
FTP II – IPP (2)
Projects with a total capacity of 5,064 MW are under auction WKP
(geothermal area), publishing Mining Permit (IUP), appointment,
assignment, negotiation, closing biding, Letter of Intent (LOI), the filing of
Feasibility Assurance (JKU), Power Purchase Agreement (PPA), and
exploration, and development of specific PLTP Sarulla 2 awaiting results
of Sarulla 1.
Other projects with a total capacity of 491 MW proposed project excluded
from the list of FTP-2 (ESDM No. 21 of 2013), on the grounds, among
others, some project developers do not need JKU, too small-scale
project, the project will be built by PLN, and some projects changed with
other projects.
© pr@m 2013
LIST OF PROJECTS FTP II – PLN
(Minister Regulation of ESDM No. 21 Year 2013)
No Name of Projects Location Capcity COD
Estimation (MW)
1 PLTP Sungai Penuh (2x55 MW) Jambi 110 2016/2017
2 PLTP Hululais (2x55 MW) Bengkulu 110 2016/2017
3 PLTP Kotamobagu 1,2 (2x20 MW) Sulut
40 2019
4 PLTP Kotamobagu 3,4 (2x20 MW) 40 2020
5 PLTP Sembalun (2x10 MW) NTB 20 2018
6 PLTP Tulehu (2x10 MW) Maluku 20 2016
7 PLTA Upper Cisokan (4x260 MW) Jabar 1040 2017
8 PLTA Asahan 3 (2x87 MW) Sumut 174 2016
9 PLTA Masang 2 (55 MW total) Sumbar 55 2017
10 PLTU Indramayu (1 x1.000 MW) Jabar 1000 2020
11 PLTU Pangkalan Susu 3&4 (2x200) Sumut 400 2016
12 PLTA Jatigede Jabar 110 2016
13 PLTU Jawa 6 Jabar 2000 2020
14 PLTU Parit Baru (2x50 MW) Kalbar 100 2015
15 PLTU Takalar (2x100 MW) Sulsel 200 2015/2016
16 PLTU Lombok (2x25 MW) NTB 50 2016
17 PLTG Bangkanai (280 MW total) Kalteng 280 2014/2015/20
16
Status per 27 Juni 2013
© pr@m 2013
No Name of Projects Location Capacity COD
Estimation (MW)
1 PLTP Tangkuban Perahu 1
(2x55 MW) Jabar 110 2017
2 PLTP Kamojang 5,6
{(1x30MW)+(1x60MW)} Jabar 90 2015/2017
3 PLTP Ijen (2x55 MW) Jatim 110 2019
4 PLTP Iyang Argopuro (1x55 MW) Jatim 55 2019
5 PLTP Wilis/ Ngebel (3x55 MW) Jatim 165 2018/2019
6 PLTP Gunung Endut (1x55 MW) Banten 55 2020
7 PLTP Rawa Dano (1x 110 MW) Banten 110 2017
8 PLTP Cibuni (1x10 MW) Jabar 10 2016
9 PLTP Cisolok-Cisukarame
(1x 50 MW) Jabar 50 2017
10 PLTP Karaha Bodas
{(1x30MW)+(2x55 MW)} Jabar 140 2015/2017
11 PLTP Patuha (3x60 MW) Jabar 180 2014/2017
12 PLTP Tampomas (1x45 MW) Jabar 45 2017
13 PLTP Tangkuban Perahu 2
(2x30 MW) Jabar 60 2017
14 PLTP Wayang Windu 3,4
(2x110 MW) Jabar 220 2020/2021
LIST OF PROJECTS FTP II– IPP (1)
(Minister Reg. of ESDM No. 21 Year 2013)
Status per 27 Juni 2013
No Name of Projects Location Capacity COD
Estimation (MW)
15 PLTP Gunung Ciremai (2x 55 MW) Jabar 110 2020
16 PLTP Baturaden (2x110 MW) Jateng 220 2017/2019
17 PLTP Dieng {(1x55)+(1x60)} Jateng 115 2017
18 PLTP Guci (1x55 MW) Jateng 55 2019
19 PLTP Ungaran (1x55 MW) Jateng 55 2017
20 PLTP Seulawah Agam (1x55 MW) NAD 55 2020
21 PLTP Jaboi (2x5 MW) NAD 10 2018
22 PLTP Sarulla 1 (3x110 MW) Sumut 330 2016/2017
23 PLTP Sarulla 2 (2x55 MW) Sumut 110 2017
24 PLTP Umbul Telumoyo (1x55 MW) Jateng 55 2020
25 PLTP Simbolon Samosir (2x55 MW) Sumut 110 2020
26 PLTP Sipoholon Ria-Ria (1x55 MW) Sumut 55 2020
27 PLTP Sorik Merapi (240 MW total) Sumut 240 2016/2017
28 PLTP Muara Laboh (2x110 MW) Sumbar 220 2016
29 PLTP Bonjol (3x55 MW) Sumbar 165 2020
© pr@m 2013
LIST OF PROJECTS FTP II– IPP (2)
(Minister Reg. of ESDM No. 21 Year 2013)
(Permen ESDM Nomor 21 Tahun 2013)
Status per 27 Juni 2013
No Name of Project Location Capacity COD
Estimation (MW)
30 PLTP Lumut Balai (4x55 MW) Sumsel 220 2015/2016/
2018 (#3)
31 PLTP Rantau Dadap (2x110 MW) Sumsel 220 2017
32 PLTP Rajabasa (2x110 MW) Lampung 220 2017
33 PLTP Ulubelu 3, 4 (2x55 MW) Lampung 110 2016/2017
34 PLTP Suoh Sekincau (4x55 MW) Lampung 220 2018/2019
35 PLTP Wai Ratai (1x55 MW) Lampung 55 2020
36 PLTP Danau Ranau (2x55 MW) Lampung 110 2020
37 PLTP Lahendong 5,6 (2x20 MW) Sulut 40 2015/2016
38 PLTP Bora (1x5 MW) Sulteng 5 2020
39 PLTP Merana/Masaingi (2x10 MW) Sulteng 20 2018
40 PLTP Hu'u (2x10 MW) NTB 20 2017
41 PLTP Atadei (2x2,5 MW) NTT 5 2016
42 PLTP Sukoria (3x5 MW) NTT 15 2017/2018/
2019
43 PLTP Mataloko (1x5 MW) NTT 5 2018
44 PLTP Jailolo (2x5 MW) Malut 10 2016
No Name of Project Location Capacity COD
Estimation (MW)
45 PLTP Oka Ile Ange (10 MW) NTT 10 2020
46 PLTP Songa Wayaua (1x5 MW) Malut 5 2017
47 PLTA Peusangan 4 (1x83 MW) NAD 83 2018
48 PLTA Wampu (3x15 MW) Sumut 45 2015
49 PLTA Hasang (40 MW total) Sumut 40 2017
50 PLTA Semangka (2x28 MW) Lampung 56 2016
51 PLTA Bonto Batu (2x50 MW) Sulsel 100 2016
52 PLTA Malea (2x45 MW) Sulsel 90 2016
53 PLTU Madura (2x200 MW) Jatim 400 2016
54 PLTU Kaltim (2x100 MW) Kaltim 200 2016
55 PLTU Kalsel (2x100 MW) Kalsel 200 2017/2018
56 PLTU Jawa 1 (1x1.000 MW) Jabar 1.000 2017
57 PLTU Jawa 3 (2x660 MW) Jabar 1.320 2017
58 PLTU Jawa 4 (2x1.000 MW) Jateng 2.000 2019
58 PLTU Jawa 5 (2x1.000 MW) Jabar 2.000 2019