HALLMARKS

• Short-term

• Results-oriented

• Non-traditional areas

• Quantum leaps, major advances

• Inter-related projects

• Emphasis on openness

Safety

Renewal

Reliability

Capacity

Safe Highways

Better TransportDecisions

ReliableTravel Time

Great Customer Service

Rapid Renewal and Lasting Facilities

FOUR FOCUS AREAS

Integrate mobility, economic, environmental, and community needs into the planning and

design of new highway capacity

$18 million 8 Projects

SHRP 2 Capacity Research

Long-Range Corridor Environmental Design Permitting Planning Planning Review

Effects of Congestion

Pricing

Models and Assignments

Performance Measures

Habitats & Wetlands

Planning and NEPA

Economic Impact and Land Use

Effects ofTechnology

Effects of RoadManagement

FHWA

DOTsMPOs

Resource Agencies

Citizens

ElectedOfficials

Advocacy

Decision Points and Decision Makers

Highlights-Capacity

• Travel Demand Model Partnerships (C10): States/MPOs can partner with bidders

• Workshops on Key Decision Points (C01): need folks from “the trenches”

• Web-based Performance Measures (C02): project finishes in a month

• Case studies on economic impacts of highway expansion (C03): suggestions needed for cases

• Contributions of operations, technology, design (C05): need data sources on arterial flow

SHRP 2 Safety Research

Understanding Driving

Behavior$43.2 Million 11 Projects

2 Safety Research Tracks

Data Collection

2500+ Drivers

Data Collection

Vehicles at Intersections

Countermeasures

Data Analysis

Crash R

isk

Crash Risk

In-Vehicle Study

Site-Based Study

Data Analysis

TrafficRoadway Conditions

Traffic ControlsWeather

Distractions

Highlights-Safety

• Finalize sample design: driver and vehicles factors (S05)

• Selection of sites for field study (S07)– Urban, rural, suburban– Weather, topography, design factors– Other data sources– Qualified contractors

• Rodeo to test roadside/roadway data collection capabilities (S03/S04)

SHRP 2 Reliability Research

reduce congestion through incident reduction, management,

response, and mitigation

$18 million 12 projects

Reliability

Performance Measures

• Travel Time Variability

• Travel time index: Average travel time/free-flow travel time

• Planning time index: 95th percentile travel time index

• Buffer time: time added to trip to arrive within a window with acceptable probability

• Buffer index: (mean – 95 percentile)/mean

Traffic Math 10175 vs. 90 Minutes Clearance Time:

Explaining the Value of 15 Minutes Saved

• Example:– I-5 northbound, Fife vicinity

– Average 8% trucks

– Two (of four) lanes blocked

– 6:00 a.m., typical Wednesday

– $14 - $18/hour Auto Delay Cost

– $56/hour Truck Delay Cost

• Cost savings of clearing 15 minutes faster = $146,000

Source: WSDOT

Highlights — Reliability

• Project L06 (PB Consult)– Workshop on Institutional Barriers to Non-

Recurring Congestion Management Strategies

• Project L03 (Cambridge Systematics)– Potential Performance Measures and Mitigation

Strategies for Evaluation

• L01 (Midwest Research Institute)– Identification of Case Studies of Successful

Integration of N-RC Operations Business Processes

SHRP 2 Renewal Research

Get in, Get out, Stay out

$28.9 million 14 Tracks

RapidApproaches

MinimalDisruption

SuccessfulRenewal

Long-LivedFacilities

3 Strategic Objectives with 5 Integrated Research Tracks for

Successful Highway Renewal

TechnologyTechnology Project DeliveryProject Delivery

SuccessfulRenewal

Integrated approach

Enable Enable Performance-Based Performance-Based

RenewalRenewal• Rapid Approach• Minimum Disruption• Long Life

R06. High-Speed NDT

R07. Performance Specs Incentive Specs Warranties

R07. Performance Specs Incentive Specs Warranties

R09. Risk Manual for Renewal Contracts

R09. Risk Manual for Renewal Contracts

Integrated Tactic 1

R04: Innovative

Bridge Designs

R04: Innovative

Bridge Designs

R01: Locating & Characterizing Utilities

R01: Locating & Characterizing Utilities

R16: Railroad-DOTMitigation StrategiesR16: Railroad-DOT

Mitigation Strategies

R09: Risk Manual for Rapid Renewal Contracts

R09: Risk Manual for Rapid Renewal Contracts

Facilitate Project Facilitate Project Start-upStart-up

• Minimum Disruption

• Rapid Approach

R15: Integrating Utility and Transp. Agency Priorities

R15: Integrating Utility and Transp. Agency Priorities

R06: High-Speed NDTR06: High-Speed NDT

R11: Approaches atCorridor/Network Level

R11: Approaches atCorridor/Network Level

Integrated Tactic 2

R05. Modular PavementR05. Modular Pavement

R04. Innovative Bridge DesignsR04. Innovative Bridge Designs

R23. Using Existing In-place Pavement

R23. Using Existing In-place Pavement

R03. Reducing Personnel FatigueR03. Reducing

Personnel Fatigue

R10. Innovative Project Management

R10. Innovative Project Management

R02. Geotechnical Solutions

R02. Geotechnical Solutions

R06. High-Speed NDTR06. High-Speed NDT

Integrated Tactic 3

Accelerate Accelerate ConstructionConstruction

• Rapid Approach

• Minimum Disruption

R21. Composite Systems

R21. Composite Systems

R02. Geotechnical Solutions

R02. Geotechnical Solutions

R26. Preservation Approaches

R26. Preservation Approaches

R23. Using Existing In-place Pavement

R23. Using Existing In-place Pavement

R19. Durable Bridge Systems

R19. Durable Bridge Systems

R06. High-Speed NDT

R06. High-Speed NDT

Integrated Tactic 4

Reduce MaintenanceReduce MaintenanceFrequencyFrequency

• Minimum Disruption• Extends Life

R10. Innovative Project Management

R10. Innovative Project Management

R07. Performance Specs Incentive Spec

Warranties

R07. Performance Specs Incentive Spec

Warranties

R09. Risk Manual for Renewal Contracts

R09. Risk Manual for Renewal Contracts

R04. Innovative Bridge DesignsR04. Innovative Bridge Designs

Integrated Tactic 5Facilitate Facilitate

Responsive ContractingResponsive Contracting• Rapid Approach• Minimum Disruption• Long Life

R03. Reducing Personnel FatigueR03. Reducing

Personnel Fatigue

Highlights - Renewal

• Preliminary results:– Approaches for mitigating impacts of

utility relocation (R15)– Locating underground utilities (R01)– Non-destructive testing (R06)

• Refined research plans for follow on detailed development project

SHRP 2 Research Related to Design• Primarily in 2 focus areas

– Renewal– Reliability

• Deliverables– Design Guidelines– Procedures– Other tools (data gathering, etc)– Training programs– Design specifications (bridges)

Design Guidelines

Develop design guidelines for mechanical and chemical treatment of base, sub-base and subgrade layers

Identify state of reliability-related design practice. Develop guide book and dissemination plan

R02 Geotechnical Solutions for Soil Improvements, Rapid Embankment Construction and Stabilization of the Pavement Working Platform $3.0M

R23 Using Existing Pavement in Place and Achieving Long Life $1.0 M

L07 Evaluation of Costs and Effectiveness of Highway Design Features to Improve Travel Time Reliability $2.5 M

Develop design guidelines and criteria for the use of various options

State DOT help needed (R23)

1. Guideline development (4 DOTs min)

2. Workshops planned for 2009 and 2010

Design Procedures

Feasibility study of potential uses. Develop generic Modular Pavement Design Procedures

Procedures for development of composite pavement systems. Development of design manuals

R05 Modular Pavement Technology $1.0 M

R21 Composite Pavement Systems $4M

Data gathering and such

Report documenting current techniques and practices, software toolbox, R&D plan Future SHRP2 Projects

RFP advertisement July 29

R01 Encouraging Innovation in Locating and Characterizing Underground Utilities $300K ($5M)

R06-D NDT to identify Delaminations between HMA Layers

R06-A NDT to Identity Bridge Deck Deterioration

R06-E Development of Continuous Deflection Sensors

R15-B Utility Conflict Identification and Solutions

RFP advertisement July 29

RFP advertisement July 29

RFP advertisement July 29

Training Programs

R15-A Model Curricula and Certification Programs for Utility Relocation

RFP advertisement July 29

Design Specifications

New methods for accelerated bridge design and construction. AASHTO-formatted LRFD design specifications

AASHTO-formatted LRFD design specifications

R04 Innovative Bridge Designs for Rapid Renewal $2.0 M

R19-A & B Bridges for Service Life beyond 100 years

$2M + $1M

RFPs to be released on July 29

R06-A: NDT to identify concrete bridge decks deterioration

R06-B: Evaluating Applications of Field Spectroscopy Devices to Fingerprint Commonly Used Construction Materials

R06-C: Using Infrared and High Speed Ground Penetrating Radar for Uniformity measurement on New HMA Layers

R06-D: NDT to identify Delimitations between HMA Layers

R06-E: Development of Continuous Deflection Sensors

R06-F: Real-Time smoothness measurements of PCC Pavements During Constructions

R06. Plan for Developing High-Speed NDT Procedures for Design Evaluation and Construction Inspection

R15. Strategies for Integrating Utility and

Transportation Agency Priorities in Renewal Projects

RFPs to be released on July 29

R15-A: Model Curriculum and Certification Programs in Utility Relocation Engineering

R15-B: Utility Conflict Identification and Solutions

Thank you for listening!

http://www.trb.org/shrp2/