Accelerated Hybrid Construction for Education Facilities
-
Upload
innovative-modular-solutions -
Category
Education
-
view
14 -
download
0
Transcript of Accelerated Hybrid Construction for Education Facilities
![Page 1: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/1.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Innovative Modular SolutionsAccelerated Hybrid Construction Technology for Education Facilities
2016
![Page 2: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/2.jpg)
Innovative Modular Solutions | www.innovativemodular.com
About Innovative Modular Solutions Founded in 1999o Licensed general contractor / commercial modular contractoro Prime or specialty contractor, offering design-build serviceso Temporary and permanent projects of 400 to 100,000 square feet
Team of industry veterans with diverse, complementary skillso Technical construction managemento Factory manufacturing, managemento General contracting and operations, saleso Sales and sales management
All employees are CPR and first-aid trained.
All field workers are OSHA certified (10 or 30 hour).
![Page 3: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/3.jpg)
Innovative Modular Solutions | www.innovativemodular.com
IMS Offers Accelerated Construction Technology
![Page 4: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/4.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Modular Construction Overview Modular solutions provide an alternative method of construction. Building components are manufactured in a controlled factory environment to the same
building codes as conventional construction, using the same materials. Partially finished components are transported to the project site, assembled and finished. Modular buildings can be one, two or more stories. Modular buildings can be temporary, semi-permanent or permanent. Modular construction can be easily incorporated with other types of construction to
capitalize on the advantages that each has to offer.
![Page 5: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/5.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Benefits of Modular Construction Speed: On Time, Accelerated Construction Scheduleo Concurrent site preparation and modular component fabricationo Reduced weather delayso Works well in areas where the construction season is shorto Reduced job site ‘chaos’ – limited deliveries, limited disruption
Flexibility: Project Team Defines Design and Finisho Design of building as well as makeup of design teamo Portability responds to changes in user demographicso Variety of financing options available
Cost: Controlled Budget Processo Replicable, standardized
• Few change orders • Improved quality
o Costs typically less than conventional construction
![Page 6: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/6.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Modular = Green Inherently green – contributes to sustainable building initiatives Limits site disturbance Minimizes waste onsite due to factory construction and recycling Eliminates environmental factors that affect building materials Reduces overall construction time Simplifies relocation and reuse of buildings Saves energy through o Reduced building volumeo Efficient HVAC designo High insulation levels
![Page 7: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/7.jpg)
Innovative Modular Solutions | www.innovativemodular.com
CONVENTIONAL—SITE BUILT CONSTRUCTION
PRE-ENGINEERED CONSTRUCTION
Project SiteDeliver
CutPrepare
Assemble Piece by Piece
Raw Material Inputs
Manufacturing FacilityDeliver
Cut, PrepareShip
Building Element Outputs
Project SiteDeliver
Assemble Element by Element
Relative Tim
e Scale
Longest Delivery Cycle
MODULAR CONSTRUCTION
Manufacturing FacilityDeliver
Cut, Prepare Assemble
Ship
Building Component Outputs
Project SiteDeliver, Assemble
Component by Component
Shortest Delivery Cycle
Raw Material Inputs Raw Material Inputs
Construction Process:
![Page 8: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/8.jpg)
Innovative Modular Solutions | www.innovativemodular.com
60% - 90% factory completion including MEP
![Page 9: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/9.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Conventional Building Practices employed on site
![Page 10: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/10.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Can be indistinguishable from site built structures
![Page 11: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/11.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Hybrid Construction is a Combination of Modular and Conventional, Pre-Engineered, or another Method of Construction
o Common for Large Projects
o Allows the Project to take Advantage of the Benefits of Different Methods
o High Ceiling, Long Span Spaces can be Conventional or Pre-Engineered
o Repetitive Spaces (Classrooms, Restrooms, Offices) can be Modular
o Concurrent Construction - Preplanning Allows Modular Components to be Built Off-Site While Site Preparation Activities (Grading, Foundations, Utilities, etc.) are completed on site
About Hybrid Construction
![Page 12: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/12.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Existing BuildingAddition Addition
Future Building
Modular Construction easily accommodates Phased Construction o Future Additions (Horizontal)o Future Additions (Vertical) – Add a Second Flooro Future Upgrade to Finishes
Phased Construction Offers Flexibility
![Page 13: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/13.jpg)
Innovative Modular Solutions | www.innovativemodular.com
The Project Team should review all material selections and
specifications
Selections are easily customized
Selections include most options available in conventional construction
Material Selection drives the cost of any construction project
Customers should use and specify ‘commercial grade’ materials
Material Selection
![Page 14: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/14.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Options Include: Outright Purchase
Bond Financing
Operating Lease
Finance Lease
![Page 15: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/15.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Temporary and Semi-Permanent Construction
![Page 16: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/16.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Permanent Modular Construction
![Page 17: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/17.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Custom Floorplans
![Page 18: Accelerated Hybrid Construction for Education Facilities](https://reader035.fdocuments.us/reader035/viewer/2022062903/58d0f0601a28abba558b6dfd/html5/thumbnails/18.jpg)
Innovative Modular Solutions | www.innovativemodular.com
Modular building quality and design has improved significantly Acceleratedo Concurrent construction = shorter schedule
Cost effectiveo Factory costs are controlled, will maintain value if properly designed, built, and
maintained Flexibleo Design and finish
Sustainableo Energy efficient, less disruption
Financingo Several options available
Summary