ACCELERATED DECK REPLACEMENT FOR THE MACDONALD BRIDGE
Dusan Radojevic, Ph.D., P.Eng., P.E.
WSDOT ABC WorkshopTumwater, WA2015 April 01
![Page 2: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/2.jpg)
2
Project Location
HALIFAX, NS
![Page 3: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/3.jpg)
3
Bridge Location
![Page 4: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/4.jpg)
4
Bridge Location
Macdonald Bridge
MacKay Bridge
DARTMOUTH
HALIFAX
![Page 5: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/5.jpg)
5
›Designed by P. L. Pratley›Built by Dominion Bridge Company Ltd. in 1955.›Suspension bridge: Main span 1,446 ft., L=2,498 ft.›Operated by Halifax Harbour Bridges
Original Bridge
![Page 6: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/6.jpg)
6
Roadway Deck
›Deck OK for strength but high maintenance.›Suspended structure replacement - Entirely new suspended structure including hangers in 2016.
![Page 7: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/7.jpg)
7
Scope
›Replace suspended bridge superstructure including hangers
›Strengthen towers and bents if necessary›Traffic to be kept running›Superstructure replacement allowed only during closures – night / weekend closures
›Full segment replacement
16-33 ft. (10m) DECK SEGMENTS
22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS
![Page 8: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/8.jpg)
8
Typical Deck Cross Sections
EXISTING
NEW
![Page 9: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/9.jpg)
9
Fabrication
![Page 10: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/10.jpg)
10
Fabrication
![Page 11: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/11.jpg)
11
Fabrication
![Page 12: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/12.jpg)
12
Fabrication
![Page 13: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/13.jpg)
13
New Deck Segment
Photo from Lion's Gate Bridge Deck Replacement
![Page 14: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/14.jpg)
14
Existing Elements
›Cables inspected in 2010›Main cables in good shape, with sufficient capacity
›Tower and bents – very good
![Page 15: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/15.jpg)
15
How?
Direction of Deck Replacement
›Traffic to be kept running›10 ½ hour full closures at night›Approximately 7 full weekend closures›Single-lane closures at off-peak times
16-33 ft. (10m) DECK SEGMENTS
22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS
![Page 16: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/16.jpg)
16
Typical segment replacement
1
2
![Page 17: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/17.jpg)
17
Typical segment replacement
4
3
![Page 18: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/18.jpg)
18
Typical segment replacementPhoto from Lion's Gate Bridge Deck Replacement
![Page 19: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/19.jpg)
19
Typical segment replacement
![Page 20: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/20.jpg)
20
Typical segment replacement
![Page 21: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/21.jpg)
21
Typical Erection Gantry
![Page 22: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/22.jpg)
22
Typical Erection Gantry
![Page 23: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/23.jpg)
23
Segment replacement in Halifax side span
›16 deck segments to be in Halifax side span›Over DND property
16-33 ft. (10m) DECK SEGMENTS
22-66 ft. (20m) DECK SEGMENTS 8-66 ft. (20m) DECK SEGMENTS
![Page 24: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/24.jpg)
24
Turntable Erection Gantry
![Page 25: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/25.jpg)
25
Halifax Side Span Segment Replacement
![Page 26: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/26.jpg)
26
Halifax Side Span Segment Replacement
![Page 27: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/27.jpg)
27
Increased Shipping Clearance
42434445464748495051525354555657
100 200 300 400 500 600 700 800 900 1000
Elevation [m]
Chainage [m]
Existing Road Profile Final Road Profile Existing Clearance Final Clearance
DMT DCBHMTHCB
NAVIGATIONCHANNEL
›Bridge deck jacked up following deck replacement›Raising of deck 10 ft. at midspan; 1 ft. at towers› Increase in shipping clearance 7 ft.
![Page 28: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/28.jpg)
28
Erection Analysis›Complex analysis; 700+ steps analyzed; iterative
![Page 29: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/29.jpg)
29
Wind Engineering›Halifax – hurricane zone›High wind speeds –> significant wind loads
![Page 30: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/30.jpg)
30
Wind Engineering – Aeroelastic Models
![Page 31: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/31.jpg)
31
Wind Engineering – Aeroelastic Models
![Page 32: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/32.jpg)
32
Main Cable Dehumidification
![Page 33: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/33.jpg)
33
Main Cable Dehumidification
INJECTION COLLAR
DH PLANTCABLE WRAPPING
![Page 34: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/34.jpg)
34
When?
›RFP – December 2013›Proposals received (ABC, FI, AV JV) - April 2014›LNP, American Bridge Canada – June 2014 ›Contract award – October 2014›Erection start – expected August 2015›Substantial completion – Sept/Oct 2016
![Page 35: ACCELERATED DECK REPLACEMENT FOR THE MACDONALD … · 2016-02-26 · Direction of Deck Replacement ›Traffic to be kept running ›10 ½ hour full closures at night ›Approximately](https://reader033.fdocuments.us/reader033/viewer/2022043005/5f8bb1d98ccfbd62405ddefc/html5/thumbnails/35.jpg)
New Bridge
35
Existing Bridge
Questions ?