GEA Heat Exchangers
Direct Air Cooled Condensing vs. Indirect Air Cooled Condensing Comparison Studies
ACC User Group Presentation
![Page 2: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/2.jpg)
GEA Heat Exchangers
Topics of Discussion
Heller Process Diagram
Major Components of Heller Cooling Systems Case Studies
![Page 3: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/3.jpg)
GEA Heat Exchangers
Flow Diagram
3
![Page 4: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/4.jpg)
GEA Heat Exchangers
Topics of Discussion
Heller Process Diagram
Major Components of Heller Cooling Systems Case Studies
![Page 5: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/5.jpg)
GEA Heat Exchangers
Direct Contact “DC” Jet Condenser
5
![Page 6: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/6.jpg)
GEA Heat Exchangers 6
Forgó Heat Exchanger
![Page 7: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/7.jpg)
GEA Heat Exchangers
Heat Exchanger Assembly & Erection
7
![Page 8: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/8.jpg)
GEA Heat Exchangers
Air Cooled Heat Exchanger: Natural Draft
8
• The NDCT can be built either with a conventional reinforced concrete shell or with a steel structure covered by corrugated aluminum clad.
![Page 9: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/9.jpg)
GEA Heat Exchangers
Air Cooled Heat Exchanger: Mechanical Draft
9
![Page 10: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/10.jpg)
GEA Heat Exchangers
Topics of Discussion
Heller Process Diagram
Major Components of Heller Cooling Systems Case Studies
![Page 11: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/11.jpg)
GEA Heat Exchangers
Illustrative Case Study 1
1. Aux Power Benefit (NDT) 2. Cold Condensing
![Page 12: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/12.jpg)
GEA Heat Exchangers 12 Copyright by GEA EGI
HELLER SYSTEM DIRECT ACC
OCCUPIED AREA
5030 m2 9130 m2
Comparison of Cooling Systems: Case I
![Page 13: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/13.jpg)
GEA Heat Exchangers 13 Copyright by GEA EGI
Comparison of Cooling Systems: Case I
![Page 14: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/14.jpg)
GEA Heat Exchangers 14 Copyright by GEA EGI
Main technical and budgetary price data HELLER SYSTEM DIRECT ACC
Auxiliary power consumption 1900 kWe 3610 kWe*
Minimum backpressure <0.035 bar(a) >0.065 bar(a)
Area occupied by limit noise 60% 100% (BASE)
Material & Equipment Price 0.98 0.88
I&C and electrical items related to the cooling system 0.04 0.12
Cooling system related material & equipment prices together **
1.02 1.00
Comparison of Cooling Systems: Case I
* Does not include aux power requirement for condensate extraction pumps ** Does not include cost impact due to civil works
![Page 15: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/15.jpg)
GEA Heat Exchangers
Illustrative Case Study 2
1. Aux Power Benefit (NDT) 2. Efficient Use of Limited Wet Evaporative Cooling
![Page 16: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/16.jpg)
GEA Heat Exchangers
SSC & ACC are condensing steam in parallel
PAC SYSTEM®
Cooling tower
ACC
Steam turbine
steam
![Page 17: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/17.jpg)
GEA Heat Exchangers
Dry/Wet Separate Circuit For Combination System
17
Dry ACHE Tower (Mechanical Draft or Natural Draft)
Hybrid Condenser
Wet Cooling Tower
![Page 18: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/18.jpg)
GEA Heat Exchangers
Cold Condensing Capability
18
0
50
100
150
200
250
300
350
-20 -15 -10 -5 0 5 10 15 20 25 30 35 40
Turb
ine
back
-pre
ssur
e, m
bara
Ambient Dry Bulb Temperature, °C
COLD END HEAT DISSIPATION CAPABILITY AT FULL TURBINE LOAD(considering varying heat input into the steam-cycle)
All dry Heller SystemHeller System with SprayingHeller System with 2 wet cellsACCWET Cooling Tower
![Page 19: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/19.jpg)
GEA Heat Exchangers 19 Copyright by GEA EGI
Main technical and budgetary price data HELLER SYSTEM DIRECT ACC
Auxiliary power consumption 4864 kWe 8064 kWe*
Area occupied by limit noise 60% 100% (BASE)
Material & Equipment Price 0.99 0.91
I&C and electrical items related to the cooling system 0.03 0.09
Cooling system related material & equipment prices together **
1.01 1.00
Comparison of Cooling Systems: 2 x 7FA Blocks (Combination Wet/Dry System)
* Does not include aux power requirement for condensate extraction pumps ** Does not include cost impact due to turbine hall height, and auxiliary equipment for fast start
![Page 20: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/20.jpg)
GEA Heat Exchangers
Illustrative Case Study 3
1. Footprint / Layout Flexibility (MDT) 2. Rapid Response
![Page 21: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/21.jpg)
GEA Heat Exchangers 21
Rapid Response CCPP Case Study: Heller Option
Copyright by GEA
CPC 23.6 MBTU/hr/ºF
Auxiliary power consumption 3660 kWe
Occupied area by tower 36,950 sq-ft
![Page 22: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/22.jpg)
GEA Heat Exchangers 22
Rapid Response CCPP Case Study: ACC Option
Copyright by GEA
CPC 23.6 MBTU/hr/ºF
Auxiliary power consumption 2910 kWe
Occupied area by tower 43850 sq-ft
![Page 23: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/23.jpg)
GEA Heat Exchangers 23 Copyright by GEA
Rapid Response Plant Case Study: Layout
![Page 24: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/24.jpg)
GEA Heat Exchangers 24
Rapid Response Study: Comparison Cooling System Options
Copyright by GEA
Main technical and budgetary price data HELLER SYSTEM DIRECT ACC
Auxiliary power consumption 3660 kWe 2910 kWe
Minimum backpressure <0.035 bar(a) >0.06 bar(a)
Material & Equipment Price 1 0.97 1.00
1. Does not include: (i) electrical and civil works, and mechanical erection (ACC > Heller), (ii) O&M impact (Heller < ACC)
![Page 25: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/25.jpg)
GEA Heat Exchangers 25
Rapid Response Study: Comparison Cooling System Options
Copyright by GEA
Three Rapid Response Power Plants have been permitted with Heller despite 0.75MW aux power penalty. Why? Unless extreme/expensive measures are taken, an ACC would
delay a warm/hot start by 8 minutes To “overcome” an 8 minute delay, a rapid response CCPP would
need to run 26 hours. “Super Peak Periods” average 50 minutes in duration
![Page 26: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/26.jpg)
GEA Heat Exchangers
When Indirect Dry Cooling (Heller) Should Be Considered vs. an ACC
26
• Large Power Plants where reduction in Parasitic Load / Aux Power Consumption is desired/evaluated
• Life Cycle Evaluation (vs. Installed Costs) is taken into consideration—including efficiency benefits, maintenance costs and increased availability
• Need for Site Arrangement flexibility
• Revenues generated during winter operation are significant
• Power Plant is designed around a Fast-Start concept
• Regions that are vulnerable to wind gusts
• Installation where labor is very expensive or unskilled
• Re-Powering/Retrofits requiring conversions of Wet-Cooled Systems to Dry-Cooled Systems
![Page 27: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/27.jpg)
GEA Heat Exchangers
GEA Cooling System Evaluations/Studies
27
![Page 28: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/28.jpg)
![Page 29: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/29.jpg)
GEA Heat Exchangers
Appendices, Enclosures, Attachments, etc
29
![Page 30: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/30.jpg)
GEA Heat Exchangers
Cold Condensing Capability
30
0
50
100
150
200
250
300
350
-20 -15 -10 -5 0 5 10 15 20 25 30 35 40
Turb
ine
back
-pre
ssur
e, m
bara
Ambient Dry Bulb Temperature, °C
COLD END HEAT DISSIPATION CAPABILITY AT FULL TURBINE LOAD(considering varying heat input into the steam-cycle)
All dry Heller SystemHeller System with SprayingHeller System with 2 wet cellsACCWET Cooling Tower
![Page 31: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/31.jpg)
GEA Heat Exchangers
Noise Generation Study
31
Impact of cooling systems on noise emmission Sound pressure levels around the 800 MWe CCPP equipped with functionally
equivalent dry cooling systems: natural draft HELLER System and mechanical draft direct ACC :
Direct ACC HELLER System
90 ha occupied by noise > 45 dB(A) 54 ha occupied by noise > 45 dB(A)
![Page 32: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/32.jpg)
GEA Heat Exchangers
Intergen (Developer) and Bechtel (EPC) 2400 (3×800) MW Gebze & Adapazari CCPP: Largest CCPP with Dry Cooling
32
Heller Indirect Dry Cooling References
![Page 33: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/33.jpg)
GEA Heat Exchangers
800 MWe Modugno CCPP, Italy (EPC: Alstom, owner: Energia SpA) Heller System with DC Jet condenser
No bypass stack for gas turbines, cooling system supports plant reliability
Select References, Mechanical Draft Heller Systems
24 main cooler cells with single fan 2 auxiliary cooler cells with four fans each
This document is proprietary to GEA EGI Contracting/Engineering Co. Ltd. All rights reserved.
![Page 34: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/34.jpg)
GEA Heat Exchangers 34
Natural Draft Tower Design Flexibility
![Page 35: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/35.jpg)
GEA Heat Exchangers
Wet-to-Dry Conversions
35
Pre-Conversion Wet Cooling Tower with Surface Condenser
![Page 36: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/36.jpg)
GEA Heat Exchangers
Wet-to-Dry Conversions
36
Post-Conversion Dry System utilizing existing Surface Condenser and supplement spraying
![Page 37: ACC User Group Presentationacc-usersgroup.org/wp-content/uploads/2013/10/17-Zekovich.ACCUG_… · ACC User Group Presentation . ... 300 350-20 -15 -10 -5 0 5 10 15 20 25 30 35 40](https://reader034.fdocuments.us/reader034/viewer/2022051600/5a9e562a7f8b9a75458db594/html5/thumbnails/37.jpg)
GEA Heat Exchangers
Wet-to-Dry Conversions
37