Academia Industry Linkage in Renewable Energy

14
PAK- SAUDI ACADEMIA INDUSTRY LINKAGES RENEWABLE ENERGY & GREENFIELD FUNDS

description

Plz join Academia-Industry Linkage Forum " AILF" group at www.linkedin.com We offer you services worldwide from concept, business plan, linkages and business development from Project Planning to Management in Renewable energy, Environment & ICT. to organisations, companies and NGOs. As to develop your business plan, idea or project linkages with InfoDEV, UN, Vienna Energy Forum & World Future Energy Summit, Abu Dhabi & renowned consultants, Technology & innovation centers in EU, United States, Asia, Russia ) CAR) & Baltic States.

Transcript of Academia Industry Linkage in Renewable Energy

Page 1: Academia Industry Linkage in Renewable Energy

PAK- SAUDIACADEMIA INDUSTRY LINKAGES

RENEWABLE ENERGY & GREENFIELD FUNDS

Page 2: Academia Industry Linkage in Renewable Energy

OUR PARTNER:

Page 3: Academia Industry Linkage in Renewable Energy

Academia Industry Linkage Forum, Peshawar( RE) 2008

Page 4: Academia Industry Linkage in Renewable Energy

FEB, 2010, GUJRANWALARE. PAPER PRESENTATION US. CONSULATE GENERAL

Page 5: Academia Industry Linkage in Renewable Energy

PAK-US ACADEMIA-INDUSTRY LINKAGES INBIO AND SOLAR ENERGY PROJECTS 2010

Page 6: Academia Industry Linkage in Renewable Energy

MY PRESENTATION MODEL MODEL “ABCD” RIYADH

Academia- Industry Linkages, RE

Page 7: Academia Industry Linkage in Renewable Energy

ALIF SAUDI ARABIA 2008AT INTERCONTINENTAL

HOTEL,RIYADH

Page 8: Academia Industry Linkage in Renewable Energy
Page 9: Academia Industry Linkage in Renewable Energy
Page 10: Academia Industry Linkage in Renewable Energy

NUST- ACRE COOPERATION : BIO-DIESEL

Page 11: Academia Industry Linkage in Renewable Energy
Page 12: Academia Industry Linkage in Renewable Energy
Page 13: Academia Industry Linkage in Renewable Energy

WHY TO CHOOSE SOLAR THERMAL TECHNOLOGY ?• Pakistan is has the 6th largest solar radiation availability, 14 hours average daily with 1800~2200 KWh per square meter with an annual sunshine duration 8~8.5 hours.

• If 0.25% of Baluchistan is used for solar generation with efficiency of 20% would produce enough electricity to cover all Pakistan demand

•Solar Thermal Power system is need of time for farmers and for remote locations which can be operated with little maintenance or intervention after initial setup.

• Once the initial capital cost of building the plant has been spent, operating cost are low when compared to existing technologies.

Page 14: Academia Industry Linkage in Renewable Energy

Looking for developing a micro CSP Pilot Project at your facilities.

Parabolic Trough Parabolic Dish