AL SALAM STREET UPGRADING

COST CONTROL VIA INTELLIGENT PLANNING AND DESIGN

FOR GEOGRAPHICAL CHALLENGES

February 2010

Page 2: Abu Dhabi street tunnel_-_Jan_2010

Contract 1

Contract 5001

Contract 4

Contract 3

Page 3: Abu Dhabi street tunnel_-_Jan_2010

Introduction

Part 1

Part 2

Part 3

Louis Berger, Abu DhabiProgram Manager

Page 4: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

SUMMARY

Department of Municipal AffairsAbu Dhabi Municipality

Employer

Samsung – Saif Bin Darwish JV Contractor

Parsons International Ltd Consultant

Dhs 3,105, 000,208.10 Original Contract Value

Dhs 3,111,864,476.16 Estimated Contract Value to date

May 15, 2008 Start Date

October 31st, 2010 Completion Date

900 days Construction Period

50% % Work Performed

54.4% % Work Planned

PART 1

DESIGNPROJECT DESCRIPTION

MONTHLY EXECUTIVE REPORT – SEPTEMBER 2009

Page 5: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

PHYSICAL PROGRESS

Section 1Base Slab and Excavation

Works

PART 1

DESIGN

Page 6: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

Page 7: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

Page 8: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

Page 9: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

PROGRESS STATUSSECTION 1 TO 4

Page 10: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

PROGRESS STATUSSECTION 1

Page 11: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

PROGRESS STATUSSECTION 2

Page 12: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

PROGRESS STATUSSECTION 3

Page 13: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger Group, Abu DhabiProgram Manager

PROGRESS STATUSSECTION 4

Page 14: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

DIAPHRAGM WALLSTYPES OF DIAPHRAGM WALLS

SIMPLE DIAPHRAGM

WALLS

DIAPHRAGM WALLS WITH GROUTED

GROUND ANCHORS (WHERE ADJACENT BUILDINGS ARE FAR

AWAY)

DIAPHRAGM WALLS WITH STRUTS

(WHERE ADJACENT BUILDINGS ARE CLOSER TO THE

TUNNEL)

DIAPHRAGM WALLS WITH JET GROUTED ANCHORS (WHERE

UTILITIES ARE RUNNING PARALLEL

TO THE TUNNEL)

Page 15: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

JET GROUTINGTYPES OF JETGROUTED EXCAVATION SUPPORT

SYSTEMS

JETGROUTED DIAPHRAGM WALLS WITH JETGROUTED

ANCHORS

JETGROUTED DIAPHRAGM WALLS WITH JETGROUTED

ANCHORS + GROUTED GROUND

ANCHORS

JETGROUTED DIAPHRAGM WALLS WITH

GROUTED GROUND

ANCHORS

Page 16: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

WATER PROOFINGWATER PROOFING SYSTEM USED IN THE PROJECT

Page 17: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

UTILITY ROOMSUTILITY ROOMS ALONG THE TUNNEL

Page 18: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

RESTRICTED SITE ACCESSRESTRICTED SITE ACCESS DUE TO BUILDINGS AT

CLOSE PROXIMITY

Page 19: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

RESTRICTED SITE ACCESSRESTRICTED SITE ACCESS DUE TO BUILDINGS AT

CLOSE PROXIMITY

NO OR LIMITED ACCESS

Page 20: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

UTILITY BRIDGESUTILITY BRIDGES FOR UTILITIES CROSSING THE

TUNNEL

Page 21: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

UTILITY BRIDGESUTILITY BRIDGES FOR UTILITIES CROSSING THE

TUNNEL

UTILITY BRIDGES

Page 22: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

UTILITY BRIDGESUTILITY BRIDGES FOR UTILITIES CROSSING THE

TUNNEL

Page 23: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

COMPLEXITYCOMPLEXITY IN CONSTRUCTION – SECTION 3 & 4

TUNNEL

UTILITY CORRIDOR

EXISTING 400 KV CABLE

Page 24: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

COMPLEXITYCOMPLEXITY IN CONSTRUCTION – SECTION 2

Page 25: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

COMPLEXITYCOMPLEXITY IN CONSTRUCTION – SECTION 2

Page 26: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

Louis Berger, Abu DhabiProgram Manager

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 27: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

Louis Berger, Abu DhabiProgram Manager

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 28: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

Louis Berger, Abu DhabiProgram Manager

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 29: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

Louis Berger, Abu DhabiProgram Manager

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 30: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

Louis Berger, Abu DhabiProgram Manager

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 31: Abu Dhabi street tunnel_-_Jan_2010

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9

St. No.2

St. No.4

St. No.5 St. No.7 St. No.9 St. No.11 St. No.13

TRAFFIC MANAGEMENTCOMPLEXITY IN TRAFFIC MANAGEMENT

Louis Berger, Abu DhabiProgram Manager

LIVE TRAFFIC

TEMP. PAVEMENT WORKS

UTILITY RELOCATION WORKS

PERMANENT CONSTRUCTION

Page 32: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

CAVITY ISSUEJET GROUTED CUT OFF WALL WITH SECANT PILES

FOR RESOLVING CAVITY ISSUES

POSSIBLE CAVITY AREA

DIAPHRAGM WALL

JET GROUTED CUTTOFF WALL

SECANT PILES

Page 33: Abu Dhabi street tunnel_-_Jan_2010

Louis Berger, Abu DhabiProgram Manager

CAVITY ISSUEJET GROUTED CUT OFF WALL WITH SECANT PILES

FOR RESOLVING CAVITY ISSUES