ABSTRACT - MPWRD

22
Review of Feasibility Approved Schemes (Between Dated 05.06.2014 to 19/05/2017) DPR Status (05-06-2017) S. No. CE Office Pin-Pointed Schemes as on 05/06/2017 (Pending for Feasibility Approval) District Division Feasibility Approved between Dated 05- 06-2014 to 19-05-2017 DPR Received Upto 05/06/2017 AA Accorded Upto 05/06/2017 151 Received Double Feasibility DPR Not Received 1 CE DK Sagar 145 82 49 31 3 2 28 Chhatarpur Water Resources Division, Nowgong, Chhatarpur 7 6 1 1 Damoh Water Resources Division Damoh 17 17 15 Panna Water Resources Division Panna 1 0 1 Sagar Water Resources Division-1 Sagar 51 22 13 3 2 24 Tikamgarh Water Resources Division Tikamgarh 6 4 2 2 2 CE GB Rewa 84 56 32 28 0 4 20 Anuppur Water Resources Division Anuppur 12 7 7 5 Satna Water Resources Division Satna 2 0 2 Shahdol Water Resources Division Shahdol 20 14 14 3 3 Singarauli Water Resources Division-2 Singarauli 6 0 6 Umaria Water Resources Division Umaria 16 11 7 1 4 3 CE NT Indore 287 314 216 152 3 1 94 Agar Water Resources Division Shajapur 7 3 2 4 Alirajpur Water Resources Division Alirajpur 29 27 13 1 1 ABSTRACT

Transcript of ABSTRACT - MPWRD

MergedFileReview of Feasibility Approved Schemes (Between Dated 05.06.2014 to 19/05/2017)
DPR Status (05-06-2017) S.
Received
1 CE DK Sagar 145 82 49 31 3 2 28
Chhatarpur Water Resources Division,
Damoh Water Resources Division Damoh 17 17 15
Panna Water Resources Division Panna 1 0 1
Sagar Water Resources Division-1 Sagar 51 22 13 3 2 24
Tikamgarh Water Resources Division
6 4 2 2
2 CE GB Rewa 84 56 32 28 0 4 20
Anuppur Water Resources Division Anuppur 12 7 7 5
Satna Water Resources Division Satna 2 0 2
Shahdol Water Resources Division Shahdol 20 14 14 3 3
Singarauli Water Resources Division-2
Umaria Water Resources Division Umaria 16 11 7 1 4
3 CE NT Indore 287 314 216 152 3 1 94
Agar Water Resources Division Shajapur 7 3 2 4
Alirajpur Water Resources Division Alirajpur 29 27 13 1 1
ABSTRACT
S.
No.
Burhanpur Water Resources Division
Dewas Water Resources Division Dewas 15 13 12 2
Dhar Water Resources Division-1 Dhar 24 14 11 10
Dhar Water Resources Division Manawar 6 6 6
Indore Water Resources Division Indore 4 4 2
Jhabua Water Resources Division-1 Jhabua 42 31 19 1 10
Khandwa Water Resources Division Khandwa 8 5 1 3
Khargone Water Resources Division Khargone 10 2 2 1 7
Mandsaur Water Resources Division
Neemuch Water Resources Division Neemuch 5 4 4 1
Ratlam Water Resources Division Ratlam 34 31 21 3
Shajapur Water Resources Division Shajapur 20 14 12 6
Ujjain Water Resources Division Ujjain 16 9 5 7
4 CE WG Seoni 107 80 35 21 0 2 43
Balaghat Survey Division Balaghat 6 2 1 3
Chhindwara Water Resources Division
Jabalpur Hiran Division Jabalpur 3 1 1 1 1
Katni Water Resources Division Katni 3 0 3
Mandla Water Resources Division Mandla 9 6 5 3
Narsinghpur Water Resources Division
5 CE WRD
Betul Water Resources Division -2 Betul 63 20 5 43
Betul Water Resources Division Multai 4 4 4
6 CE WRD
4
7 CE YB Gwalior 88 43 25 15 0 1 17
Bhind Water Resources Division Bhind 12 4 3 1 7
Gwalior Water Resources Division Ambah 1 1
Morena Water Resources Division Morena 17 13 9 4
Sheopur Water Resources Division Sheopur 4 3 3 1
Shivpuri Water Resources Division Shivpuri 9 4 5
8 CECB Bhopal 310 133 96 52 8 0 29
S.
No.
Guna Water Resources Division Guna 6 3 0 2 1
Guna Water Resources Division
Raisen Water Resources Division Raisen 32 18 12 1 13
Rajgarh Water Resources Division Rajgarh 28 23 18 5
Rajgarh Water Resources Division
Sehore Water Resources Division Sehore 32 28 3 1 3
Vidisha Sanjay Sagar Project Bah River
Division Ganj Basoda Distt Vidisha
14 7 4 4 3
Grand Total 1150 775 477 308 14 10 274
DETAILS Review of Feasibility Approved Schemes (Between Dated 05.06.2014 to 19/05/2017)
(DPR Status Dated 05-06-2017) S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
Water Resources Division Bhopal
1 Mithi chapri CECB Bhopal Dam 16.06.2016 Bhopal 382 DPR Not Received
2 CECB Bhopal 07.01.2016 Bhopal 150 AA Accorded 26.03.16 200 228
Water Resources Division Sehore
CECB Bhopal Dam 24/04/2017 Sehore 510 DPR Not Received
4 Mahadeo Berda CECB Bhopal Dam 26/10/2016 Sehore 550 DPR Received
5 Amirganj Tank
CECB Bhopal Tank 23/08/2016 Sehore 450 DPR Received
6 Saupani CECB Bhopal Dam 16.06.2016 Sehore 1458 DPR Not Received
7 CECB Bhopal 30/04/2016 Sehore 175 DPR Received
8
CECB Bhopal 30/04/2016 Sehore 110 DPR Received
9
CECB Bhopal 30/04/2016 Sehore 280 DPR Not Received
10 CECB Bhopal 30/04/2016 Sehore 215 DPR Received
11 CECB Bhopal 30/04/2016 Sehore 200 DPR Received
12 CECB Bhopal 16.03.2016 Sehore 205 DPR Received
13 CECB Bhopal 16.03.2016 Sehore 215 DPR Received
14   CECB Bhopal 16.03.2016 Sehore 200 DPR Received
15 CECB Bhopal 16.03.2016 Sehore 200 DPR Received
16 CECB Bhopal 16.03.2016 Sehore 220 DPR Received
17 CECB Bhopal 16.03.2016 Sehore 190 DPR Received
18
CECB Bhopal 16.03.2016 Sehore 170 DPR Received
19 CECB Bhopal 16.03.2016 Sehore 200 DPR Received
20 CECB Bhopal 16.03.2016 Sehore 150 DPR Received
21   CECB Bhopal 16.03.2016 Sehore 185 151 Received
22 CECB Bhopal 16.03.2016 Sehore 470 DPR Received
23
CECB Bhopal 16.03.2016 Sehore 175 DPR Received
24
CECB Bhopal 16.03.2016 Sehore 175 DPR Received
25
CECB Bhopal 16.03.2016 Sehore 170 DPR Received
26
CECB Bhopal 16.03.2016 Sehore 175 DPR Received
27
CECB Bhopal 16.03.2016 Sehore 190 AA Accorded 31/12/2016 180 305.430
28 Mogra Barrage CECB Bhopal 16.03.2016 Sehore 150 DPR Received
29 CECB Bhopal 16.03.2016 Sehore 155 DPR Received
30 CECB Bhopal 16.03.2016 Sehore 195 DPR Received
31 CECB Bhopal 16.03.2016 Sehore 190 DPR Received
32 CECB Bhopal 16.03.2016 Sehore 175 DPR Received
33 Chakldi CECB Bhopal Barrage 27.08.2015 Sehore 270 AA Accorded 04.02.16 250 426.63
34 Haliyakhedi
Jamuniya
CECB Bhopal Barrage 27.08.2015 Sehore 180 AA Accorded 04.02.16 190 276.03
Water Resources Division Raisen
35 Barkhedi Jorawar CECB Bhopal Dam 21/04/2017 Raisen 415 DPR Not Received
36 Suneti CECB Bhopal Dam 21/04/2017 Raisen 1200 DPR Not Received
37 Neemkheda CECB Bhopal Dam 8/2/2017 Raisen 470 DPR Not Received
38 Tekapar Khurd CECB Bhopal Dam 17/11/2016 Raisen 790 DPR Not Received
39 Ghatkheri CECB Bhopal Dam 17/11/2016 Raisen 425 DPR Not Received
40 Chandrapura CECB Bhopal 30/04/2016 Raisen 125 DPR Received
41 Bisan Kheda CECB Bhopal 30/04/2016 Raisen 260 DPR Received
42 CECB Bhopal 30/04/2016 Raisen 125 DPR Received
43 CECB Bhopal 30/04/2016 Raisen 200 DPR Received
44 CECB Bhopal 30/04/2016 Raisen 130 DPR Not Received
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
45 CECB Bhopal 30/04/2016 Raisen 115 AA Accorded 31/12/2016 155 245.680
46 CECB Bhopal 30/04/2016 Raisen 225 DPR Not Received
47 CECB Bhopal 30/04/2016 Raisen 255 DPR Not Received
48 CECB Bhopal 30/04/2016 Raisen 250 AA Accorded 20/10/2016 555 782.24
49 CECB Bhopal 30/04/2016 Raisen 140 DPR Not Received
50 CECB Bhopal 30/04/2016 Raisen 200 DPR Received
51 CECB Bhopal 30/04/2016 Raisen 180 DPR Not Received
52 CECB Bhopal 30/04/2016 Raisen 415 DPR Not Received
53 CECB Bhopal 30/04/2016 Raisen 1340 DPR Not Received
54 CECB Bhopal 30/04/2016 Raisen 1370 DPR Not Received
55 CECB Bhopal 16.03.2016 Raisen 120 AA Accorded 22/09/2016 95 146.14
56   CECB Bhopal 16.03.2016 Raisen 120 AA Accorded 22/09/2016 90 148.01
57 CECB Bhopal 16.03.2016 Raisen 150 AA Accorded 22/09/2016 150 233.82
58   CECB Bhopal 16.03.2016 Raisen 115 AA Accorded 22/09/2016 140 222.74
59 CECB Bhopal 16.03.2016 Raisen 220 DPR Received
60 CECB Bhopal 07.01.2016 Raisen 170 AA Accorded 16/05/2016 190 312.83
61 CECB Bhopal 07.01.2016 Raisen 160 AA Accorded 30.03.16 200 323
62 CECB Bhopal 07.01.2016 Raisen 165 AA Accorded 16/05/2016 340 536.38
63 CECB Bhopal 07.01.2016 Raisen 425 AA Accorded 1/10/2016 375 1296.42
64 Chargawaon Tank CECB Bhopal Dam 27.08.2015 Raisen 191 AA Accorded 16/05/2016 190 550.35
65 Jamuniya Tekapar
66 Markneda Gulab
Tank
CECB Bhopal Dam 27.08.2015 Raisen 243 AA Accorded 16/05/2016 260 650.61
Sanjay Sagar Project Bah River Division Ganj Basoda Distt Vidisha
67 Satiyakhedi CECB Bhopal Barrage 12/1/2017 Vidisha 195 DPR Not Received
68 Sonsera Chak
69 Barkheda Hargan
CECB Bhopal 30/04/2016 Vidisha 200 DPR Received
70 Kilan Khedi Tank CECB Bhopal 30/04/2016 Vidisha 210 DPR Not Received
71 Jamuniya Kala CECB Bhopal 30/04/2016 Vidisha 640 151 Received
72 Dapkan Tank CECB Bhopal 30/04/2016 Vidisha 200 151 Received
73 CECB Bhopal 07.01.2016 Vidisha 180 AA Accorded 17/08/2016 465 798.89
74 CECB Bhopal 07.01.2016 Vidisha 460 151 Received
75 CECB Bhopal 07.01.2016 Vidisha 290 AA Accorded 22/09/2016 505 848.4
76 Bijukhedi Tank CECB Bhopal Dam 27.08.2015 Vidisha 220 DPR Not Received
77 Chitavar Tank CECB Bhopal Dam 27.08.2015 Vidisha 134 151 Received
78 Dargawan Tank CECB Bhopal Dam 27.08.2015 Vidisha 627 DPR Received
79 Semalkhedi
Teerath Tank
CECB Bhopal Dam 27.08.2015 Vidisha 1247 AA Accorded 1/10/2016 1240 4309.34
80 Saloi CECB Bhopal Barrage 27.08.2015 Vidisha 455 AA Accorded 6/1/2016 510 822.33
Chief Engineer Chambal Betwa Basin>> Water Resources Circle Guna
Water Resources Division Narsingh Garh
81 GuruPura Barrage CECB Bhopal Barrage - Rajgarh - AA Accorded 26/3/2016 350 239.03
82 AnkhKhedi CECB Bhopal Barrage 08.09.2015 Rajgarh 140 AA Accorded 2.01.16 180 215.03
83 CECB Bhopal 07.01.2016 Rajgarh 225 AA Accorded 17/08/2016 230 340.96
84 CECB Bhopal 07.01.2016 Rajgarh 100 AA Accorded 22/09/2016 75 124.04
85 Mawsa CECB Bhopal Barrage 08.09.2015 Rajgarh 110 AA Accorded 2.01.16 125 216.39
86 Semlapar CECB Bhopal Barrage 27.08.2015 Rajgarh 450 AA Accorded 17/08/2016 315 361.37
87 Ugal Nalla CECB Bhopal Barrage 08.09.2015 Rajgarh 140 AA Accorded 2.01.16 125 212.94
Water Resources Division Guna
88 Sumer CECB Bhopal Stop Dam 08.09.2015 Guna 230 DPR Received
89 Majhola CECB Bhopal Barrage 08.09.2015 Guna 210 DPR Received
90 Fatehpur Without
91 Jhamra Without
92 Jhikani Without
93 Amrohi Tank
Water Resources Division Ashok Nagar
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
94
CECB Bhopal 10.03.2016 Ashoknagar 270 AA Accorded 20/10/2016 270 269.27
95 CECB Bhopal 10.03.2016 Ashoknagar 190 DPR Received
96
CECB Bhopal 10.03.2016 Ashoknagar 275 AA Accorded 20/10/2016 200 276.83
97
CECB Bhopal 10.03.2016 Ashoknagar 270 DPR Received
98
CECB Bhopal 10.03.2016 Ashoknagar 260 AA Accorded 22/09/2016 145 251.76
99
CECB Bhopal 10.03.2016 Ashoknagar 190 AA Accorded 20/10/2016 250 418.06
100
CECB Bhopal 07.01.2016 Ashoknagar 210 DPR Not Received
101 CECB Bhopal 07.01.2016 Ashoknagar 210 DPR Not Received
102 Nahargarh Tank
Water Resources Division Rajgarh
103 Mangatpura CECB Bhopal Barrage 8/2/2017 Rajgarh 110 DPR Not Received
104 Kupa Barrage CECB Bhopal Barrage 8/2/2017 Rajgarh 170 DPR Not Received
105 Shivpura
(Without Canal)
CECB Bhopal Dam 17/11/2016 Rajgarh 160 DPR Not Received
106 Sundarpura CECB Bhopal Dam 17/11/2016 Rajgarh 160 DPR Not Received
107 CECB Bhopal 30/04/2016 Rajgarh 185 DPR Received
108 CECB Bhopal 30/04/2016 Rajgarh 290 DPR Not Received
109 CECB Bhopal 16.03.2016 Rajgarh 135 DPR Received
110 CECB Bhopal 12.01.2016 Rajgarh 155 DPR Received
111 .2 CECB Bhopal 12.01.2016 Rajgarh 70 DPR Received
112 CECB Bhopal 12.01.2016 Rajgarh 100 DPR Received
113 CECB Bhopal 12.01.2016 Rajgarh 80 AA Accorded 17/08/2016 135 397.16
114 CECB Bhopal 07.01.2016 Rajgarh 240 AA Accorded 17/08/2016 240 617.44
115 CECB Bhopal 07.01.2016 Rajgarh 470 AA Accorded 25/05/2016 470 1443.38
116 Piplya Kumar CECB Bhopal Dam 09.12.2015 Rajgarh 740 AA Accorded 25/05/2016 345 1192.47
117 Pipliya CECB Bhopal Dam 09.12.2015 Rajgarh 130 AA Accorded 16/05/2016 120 370.39
118 Amlabe CECB Bhopal Dam 30.10.2015 Rajgarh 375 AA Accorded 16/08/2016 400 1019.35
119 Arolia CECB Bhopal Barrage 30.10.2015 Rajgarh 110 AA Accorded 04.02.16 110 101.57
120 Berkhedi CECB Bhopal Dam 30.10.2015 Rajgarh 500 AA Accorded 17/08/2016 330 942.99
121 Dhablikalan CECB Bhopal Dam 30.10.2015 Rajgarh 300 AA Accorded 25/05/2016 360 1135.24
122 Ganeshpura
Bhojpura
CECB Bhopal Dam 30.10.2015 Rajgarh 300 AA Accorded 16/05/2016 330 700
123 Kherkhedi CECB Bhopal Barrage 30.10.2015 Rajgarh 170 AA Accorded 26.03.16 160 224.21
124 Kundibeh CECB Bhopal Dam 30.10.2015 Rajgarh 135 AA Accorded 26.03.16 120 356.02
125 Mandakheda CECB Bhopal Dam 30.10.2015 Rajgarh 80 AA Accorded 26.03.16 90 269.72
126 Phoota Talab CECB Bhopal Dam 30.10.2015 Rajgarh 260 AA Accorded 26.03.16 250 640.52
127 Pipalkhedi CECB Bhopal Barrage 30.10.2015 Rajgarh 135 AA Accorded 30.03.16 130 199.24
128 Salri CECB Bhopal Barrage 30.10.2015 Rajgarh 125 AA Accorded 26.03.16 170 277.32
129 Suhahedi CECB Bhopal Dam 30.10.2015 Rajgarh 320 AA Accorded 30.03.16 315 859.32
130 Uchavada
Barrage cum
CECB Bhopal Barrage 30.10.2015 Rajgarh 110 AA Accorded 30.03.16 165 225
Water Resources Division Raghogarh
131 ( )
CECB Bhopal 07.01.2016 Guna 90 AA Accorded 20/10/2016 110 329.5
132 Hatipura Without
Canal
CECB Bhopal Dam 08.09.2015 Guna 140 AA Accorded 30/3/2016 185 540.02
133 Gulwada Without
Canal
CECB Bhopal Dam 08.09.2015 Guna 200 AA Accorded 30.03.16 100 290
Chief Engineer WRD Hoshangabad>> Water Resources Circle Hoshangabad
Water Resources Division Betul-2
134 Koliya CE WRD
135 Sonari CE WRD
136 Gangai Storage CE WRD
Hoshangabad
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
Hoshangabad
138 Auruwa Nalla
139 Dondi Barrage CE WRD
Hoshangabad
140 Shital Jhiri Barrage CE WRD
Hoshangabad
141 Sehara Barrage CE WRD
Hoshangabad
142 Kotmi Barrage CE WRD
Hoshangabad
143 Tader Tank CE WRD
Hoshangabad
144 Sonarkhapa
145 Saliwadadhana
146 Rajani Tank
147 Nandra
148 Umri Pandol
149 Rambhakhedi CE WRD
150 Rakhidhana CE WRD
151 Pastalai CE WRD
152 Khambara
(Without Canal)
CE WRD
153 Junawani
(Without Canal)
CE WRD
154 Mahilawadi CE WRD
155 Kheri (Without
156 Khatedakala
(Without Canal)
CE WRD
157 Morni (Churni)
158 Labada Barrage CE WRD
Hoshangabad
159 Koylari (Canal
160 Kajali Tank CE WRD
Hoshangabad
161 Bagdara (Canal
162 Chouki Kolgaon
Tank (Canal Less)
163 Chikhakpati CE WRD
164 Bhogitera Barrage CE WRD
Hoshangabad
165 Amagohan CE WRD
166 Amdhana Tank CE WRD
Hoshangabad
167 Bakakhodari
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
Hoshangabad
169 Bhagtan Dhana
170 Kumbi Tank
171 Ambada (Without
172 Ambori (Without
173 Bijasani (Without
174 Chakora CE WRD
175 Chhindi CE WRD
176 Chichanda
(Without Canal)
CE WRD
177 Devgaon Stop
178 Golkheda CE WRD
179 Gamgaon CE WRD
180 Gamgaon Hiwra CE WRD
Hoshangabad
181 Gadharadhana CE WRD
182 Paregaon Dam
183 Parakhati Dam
184 Barangwadi Dam CE WRD
Hoshangabad
185 ( )
CE WRD
186 CE WRD
187 CE WRD
Hoshangabad
11.01.2016 Betul 320 AA Accorded 20/10/2016 240 678.25
188 CE WRD
Hoshangabad
11.01.2016 Betul 200 AA Accorded 17/08/2016 240 809.98
189 CE WRD
Hoshangabad
190 CE WRD
Hoshangabad
11.01.2016 Betul 1240 AA Accorded 24-03-2017 1070 3743.720
191 CE WRD
192 CE WRD
Hoshangabad
193 CE WRD
Hoshangabad
194 CE WRD
Hoshangabad
195 CE WRD
Hoshangabad
07.01.2016 Betul 745 AA Accorded 16/08/2016 690 2264.02
196 CE WRD
Hoshangabad
197 CE WRD
Hoshangabad
07.01.2016 Betul 310 AA Accorded 22/09/2016 285 933.49
198 CE WRD
Hoshangabad
11.01.2016 Betul 450 AA Accorded 17/08/2016 450 812.15
Water Resources Division Multai
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
Hoshangabad
07.01.2016 Betul 640 AA Accorded 1/10/2016 600 2084.36
200 CE WRD
Hoshangabad
07.01.2016 Betul 320 AA Accorded 1/10/2016 310 1060.79
Chief Engineer Narmada Tapti Basin Indore >> Water Resources Circle Khargone
Water Resources Division Khargone
201 Dasalgaon Tank CE NT Indore Dam 18/04/2017 Khargone 605 DPR Not Received
202 Damkheda CE NT Indore Dam 23/11/2016 Khargone 1535 DPR Not Received
203 Tirathpani Tank
CE NT Indore Dam 23/11/2016 Khargone 1010 DPR Not Received
204 Roshia Tank CE NT Indore Dam 28/10/2016 Khargone 1115 AA Accorded 24-03-2017 955 3318.300
205 Sai Kheda Barrage CE NT Indore Barrage 1/10/2016 Khargone 105 DPR Not Received
206 Dasanga Barrage CE NT Indore Barrage 1/10/2016 Khargone 175 DPR Not Received
207 Satsol Tank CE NT Indore Tank 23/08/2016 Khargone 1220 DPR Not Received
208 ( )
CE NT Indore 16.03.2016 Khargone 1425 AA Accorded 12/4/2016 1425 1597.49
209 Kevti CE NT Indore Dam 19.08.2015 Khargone 1450 151 Received
210 Bhamori Tank CE NT Indore Dam 3/5/2017 Khargone 820 DPR Not Received
Water Resources DivisionBadwani
211 Salun (Without
CE NT Indore Dam 8/2/2017 Badwani 115 DPR Not Received
212 Mozali CE NT Indore Barrage 24/01/2017 Badwani 240 DPR Not Received
213 Bhudi CE NT Indore Barrage 24/01/2017 Badwani 225 DPR Not Received
214 Takli Moripura
CE NT Indore Barrage 22/12/2016 Badwani 440 DPR Not Received
215 Julwaniya Barrage CE NT Indore Barrage 22/12/2016 Badwani 350 DPR Not Received
216 Gularpani CE NT Indore Dam 17/11/2016 Badwani 260 DPR Not Received
217 Rajpura CE NT Indore Dam 17/11/2016 Badwani 125 DPR Not Received
218 Kalamba CE NT Indore Dam 17/11/2016 Badwani 415 DPR Not Received
219 Ekalbara CE NT Indore Barrage 17/11/2016 Badwani 225 DPR Not Received
220 Rojnimal CE NT Indore Dam 17/11/2016 Badwani 150 DPR Not Received
221 Jamanjhira CE NT Indore Barrage 17/11/2016 Badwani 300 DPR Not Received
222 Dugani CE NT Indore Dam 17/11/2016 Badwani 1250 DPR Not Received
223 Sonkhedi CE NT Indore Dam 17/11/2016 Badwani 580 DPR Not Received
224 Dongrgaon 2 CE NT Indore Dam 16.06.2016 Badwani 297 DPR Not Received
225 Kajalmata CE NT Indore Dam 16.06.2016 Badwani 1098 DPR Not Received
226 Sakad CE NT Indore Dam 3/5/2016 Badwani 100 AA Accorded 31/12/2016 105 274.670
227 Kunjari CE NT Indore Dam 3/5/2016 Badwani 75 DPR Received
228 CE NT Indore 16.03.2016 Badwani 240 AA Accorded 17/08/2016 240 419.54
229 CE NT Indore 16.03.2016 Badwani 230 AA Accorded 17/08/2016 260 453.77
230   CE NT Indore 16.03.2016 Badwani 235 AA Accorded 17/08/2016 235 410.69
231 Ghegaon Barrage CE NT Indore 16.03.2016 Badwani 230 AA Accorded 22/09/2016 230 389.98
232 CE NT Indore 16.03.2016 Badwani 250 AA Accorded 22/09/2016 250 434.3
233 CE NT Indore 16.03.2016 Badwani 215 AA Accorded 22/09/2016 225 389.62
234 CE NT Indore 16.03.2016 Badwani 240 AA Accorded 22/09/2016 240 402.51
235 CE NT Indore 16.03.2016 Badwani 240 AA Accorded 17/08/2016 240 419.27
236 (
CE NT Indore 16.03.2016 Badwani 200 AA Accorded 16/05/2016 290 425.3
237 -2
()
CE NT Indore 16.03.2016 Badwani 1400 AA Accorded 12/4/2016 510 1106.74
238 CE NT Indore 11.01.2016 Badwani 200 AA Accorded 16/05/2016 200 339.27
239 CE NT Indore 11.01.2016 Badwani 200 DPR Not Received
240 CE NT Indore 11.01.2016 Badwani 300 AA Accorded 16/05/2016 315 542.91
241 CE NT Indore 07.01.2016 Badwani 400 AA Accorded 16/05/2016 280 437.31
242 CE NT Indore 07.01.2016 Badwani 400 AA Accorded 16/05/2016 290 491.99
243 Susari River CE NT Indore Dam 19.08.2015 Badwani 1194 AA Accorded 16/08/2016 1325 3128.8
244 Berdha CE NT Indore Dam 19.08.2015 Badwani 1402 AA Accorded 23.02.16 1390 4845.87
245 Lingwa CE NT Indore Barrage 19.08.2015 Badwani 270 AA Accorded 09.09.15 270 325.23
246 Than CE NT Indore Barrage 19.08.2015 Badwani 270 AA Accorded 09.09.15 270 331.28
247 Naktinari CE NT Indore Barrage 19.08.2015 Badwani 260 AA Accorded 09.09.15 260 391.28
248 Pisnawal CE NT Indore Barrage 19.08.2015 Badwani 300 AA Accorded 09.09.15 300 406.99
249 Goi CE NT Indore Barrage 19.08.2015 Badwani 250 AA Accorded 09.09.15 250 372.30
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
250 Thingali CE NT Indore Barrage 19.08.2015 Badwani 260 AA Accorded 22.09.15 260 381.41
Water Resources Division Khandwa
251 Kalda Nalla Tank CE NT Indore Dam 1/10/2016 Khandwa 700 DPR Received
252 Baldi Barrage CE NT Indore Barrage 1/10/2016 Khandwa 250 DPR Received
253 Dharampuri CE NT Indore Barrage 1/10/2016 Khandwa 380 DPR Received
254 Bham Barrage CE NT Indore Barrage 1/10/2016 Khandwa 480 DPR Not Received
255 Aabna Stop Dam CE NT Indore Barrage 1/10/2016 Khandwa 450 DPR Received
256 Sukta Barrage CE NT Indore Barrage 1/10/2016 Khandwa 600 DPR Not Received
257 CE NT Indore 07.01.2016 Khandwa 700 AA Accorded 12.04.16 670 2334.93
258 Diwaal Tank CE NT Indore Dam 3/5/2017 Khandwa 320 DPR Not Received
Water Resources Division Burhanpur
259 Dewal Barrage CE NT Indore Barrage 28/11/2016 Burhanpur 325 DPR Not Received
260 Dewal Barrage CE NT Indore Barrage 28/11/2016 Burhanpur 755 DPR Not Received
261 Bhagat Baba
Storage Tank No-
1 (Without Canal)
CE NT Indore Dam 28/11/2016 Burhanpur 290 DPR Not Received
262 Bhagat Baba
Storage Tank No-2
CE NT Indore Dam 28/11/2016 Burhanpur 180 DPR Not Received
263 Kardali Tank CE NT Indore Dam 28/11/2016 Burhanpur 190 DPR Not Received
264 Borban CE NT Indore Dam 28/11/2016 Burhanpur 335 DPR Not Received
265 Satoda Storage
CE NT Indore Dam 28/11/2016 Burhanpur 550 DPR Not Received
266 Kanapur Barrage
CE NT Indore Barrage 28/11/2016 Burhanpur 470 DPR Not Received
267 Kanapur Barrage
CE NT Indore Barrage 28/11/2016 Burhanpur 235 DPR Not Received
268 Rihata Nimgaon
Causeway
28/11/2016 Burhanpur 450 DPR Not Received
269 Dhamani Barrage CE NT Indore Barrage 28/11/2016 Burhanpur 300 DPR Not Received
270 Khokri Barrage CE NT Indore Barrage 28/11/2016 Burhanpur 410 DPR Not Received
271 Khokri Barrage CE NT Indore Barrage 28/11/2016 Burhanpur 390 DPR Not Received
272 Bodarli CE NT Indore Barrage 28/10/2016 Burhanpur 300 DPR Not Received
273 Amba Dam CE NT Indore Dam 23/08/2016 Burhanpur 400 DPR Not Received
274 Andharwadi
Navtha Barrage
Cum Causeway
Causeway
275 Khokari Barrage
Causeway
23/08/2016 Burhanpur 250 DPR Received
276 Pangari Barrage CE NT Indore Barrage 23/08/2016 Burhanpur 220 DPR Received
277 Ratagarh Tank
(without canal)
CE NT Indore Tank 23/08/2016 Burhanpur 290 AA Accorded 6/3/2017 285 451.620
278 Tandi Tank
(without canal)
CE NT Indore Tank 23/08/2016 Burhanpur 115 AA Accorded 31/12/2016 205 335.500
279 Malvir Barrage CE NT Indore Barrage 23/08/2016 Burhanpur 325 DPR Received
280 Raisena Barrage CE NT Indore Barrage 23/08/2016 Burhanpur 230 DPR Received
281 Borgaon Barrage
Causeway
23/08/2016 Burhanpur 500 DPR Received
282 CE NT Indore 07.01.2016 Burhanpur 300 Double Feasibility
283 Daiyat CE NT Indore Barrage 19.08.2015 Burhanpur 850 AA Accorded 21.08.15 850 1516.84
284 Dasghat CE NT Indore Barrage 19.08.2015 Burhanpur 900 AA Accorded 21.08.15 900 1497.42
285 Jasondi CE NT Indore Barrage 19.08.2015 Burhanpur 300 AA Accorded 09.09.15 300 489.31
286 Phonarkhurd CE NT Indore Barrage 19.08.2015 Burhanpur 440 AA Accorded 31.08.15 440 514.10
287 Kalu Shah CE NT Indore Barrage 19.08.2015 Burhanpur 236 AA Accorded 09.09.15 231 384.26
288 Kodari CE NT Indore Barrage 19.08.2015 Burhanpur 170 AA Accorded 09.09.15 170 275.55
289 Tarapati CE NT Indore Barrage 19.08.2015 Burhanpur 235 AA Accorded 09.09.15 235 381.47
290 Shekpura Tank CE NT Indore Dam 3/5/2017 Burhanpur 1800 DPR Not Received
chief Engineer Narmada Tapti Basin Indore >> Water Resources Circle, Ujjain
Water Resources Division Ujjain
291 Lal Talab CE NT Indore Dam 28/03/2017 Ujjain 130 DPR Not Received
292 Bheal Kheda CE NT Indore Dam 18/10/2016 Ujjain 1400 DPR Not Received
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
CE NT Indore Dam 18/10/2016 Ujjain 150 DPR Not Received
294 Godramata CE NT Indore Barrage 18/10/2016 Ujjain 290 DPR Not Received
295 Chandvasla Tank CE NT Indore Dam 5/10/2016 Ujjain 2460 DPR Not Received
296 Dhaniya Khedi
Barrage
CE NT Indore 30/04/2016 Ujjain 90 AA Accorded 22/09/2016 80 222.21
297   CE NT Indore 17.03.2016 Ujjain 130 AA Accorded 17/08/2016 110 326.3
298
CE NT Indore 11.01.2016 Ujjain 5500 DPR Not Received
299 CE NT Indore 11.01.2016 Ujjain 350 DPR Received
300 CE NT Indore 07.01.2016 Ujjain 140 DPR Received
301 CE NT Indore 07.01.2016 Ujjain 125 AA Accorded 31/12/2016 150 162.13
302 Bachakhedi Tank CE NT Indore Dam 16.11.2015 Ujjain 125 DPR Received
303 Bhagwatpur Tank CE NT Indore Dam 28.08.2015 Ujjain 200 AA Accorded 6/1/2016 150 233.76
304 Indokh CE NT Indore Barrage 28.08.2015 Ujjain 383 DPR Not Received
305 Harwakhedi CE NT Indore Weir 28.08.2015 Ujjain 3000 DPR Received
306 Chichodia CE NT Indore Barrage 19.08.2015 Ujjain 490 AA Accorded 31.08.15 490 618.53
Water Resources Division Ratlam
307 Gujar Bardiya CE NT Indore Dam 18/04/2017 Ratlam 155 DPR Not Received
308 Bajranj Garh CE NT Indore Barrage 18/10/2016 Ratlam 575 DPR Received
309 Gadawadiya CE NT Indore Dam 18/10/2016 Ratlam 150 DPR Received
310 Mandliya CE NT Indore Tank 18/10/2016 Ratlam 750 DPR Received
311 Khedi CE NT Indore Barrage 18/10/2016 Ratlam 710 DPR Received
312 Puniyakhedi CE NT Indore Tank 18/10/2016 Ratlam 1080 DPR Not Received
313 Alampura CE NT Indore Barrage 18/10/2016 Ratlam 115 DPR Received
314 Mandwi CE NT Indore Dam 18/10/2016 Ratlam 145 AA Accorded 6/3/2017 145 494.050
315 Gothra CE NT Indore Barrage 18/10/2016 Ratlam 500 DPR Received
316 Kuajhagar CE NT Indore Dam 18/10/2016 Ratlam 270 DPR Received
317 Umran CE NT Indore Tank 18/10/2016 Ratlam 260 DPR Received
318 Makodiya Rundi CE NT Indore 30/04/2016 Ratlam 140 AA Accorded 22/09/2016 130 452.26
319 Garhi Katara Kala
Tank
CE NT Indore 30/04/2016 Ratlam 100 AA Accorded 22/09/2016 100 277.4
320 Amba Pada Tank CE NT Indore 30/04/2016 Ratlam 145 AA Accorded 22/09/2016 130 452.67
321 Bhutpada Tank CE NT Indore 30/04/2016 Ratlam 95 AA Accorded 22/09/2016 92 265.34
322 Amarpura Kala CE NT Indore 30/04/2016 Ratlam 200 AA Accorded 6/3/2017 160 463.330
323 Sansar Tank CE NT Indore 30/04/2016 Ratlam 180 AA Accorded 22/09/2016 200 690.91
324 Banikhedi Barrage CE NT Indore 30/04/2016 Ratlam 500 AA Accorded 17/08/2016 500 865.83
325 Bardiya Rathore
Barrage
CE NT Indore 30/04/2016 Ratlam 115 AA Accorded 31/12/2016 155 269.020
326 Narayani Barrage CE NT Indore 30/04/2016 Ratlam 110 DPR Received
327 Dhaturiya Barrage CE NT Indore 30/04/2016 Ratlam 125 DPR Received
328 Thikariya Barrage CE NT Indore 30/04/2016 Ratlam 270 AA Accorded 17/08/2016 170 290.63
329 ( )
CE NT Indore 16.03.2016 Ratlam 1700 AA Accorded 22/2/2017 6963.000
330 CE NT Indore 16.03.2016 Ratlam 860 AA Accorded 12/4/2016 870 1499.1
331 Hasanpaliya CE NT Indore 02.03.2016 Ratlam 90 AA Accorded 30.03.16 130 224.95
332 Patakhedi
Barrage
CE NT Indore 02.03.2016 Ratlam 90 AA Accorded 30.03.16 155 267.77
333 Dodiyana No-1
Barrage
CE NT Indore 02.03.2016 Ratlam 100 AA Accorded 30.03.16 210 381.30
334 CE NT Indore 07.01.2016 Ratlam 120 AA Accorded 26.03.16 125 359.93
335 CE NT Indore 07.01.2016 Ratlam 260 AA Accorded 17/08/2016 195 339.85
336 CE NT Indore 07.01.2016 Ratlam 230 DPR Not Received
337 Kundal CE NT Indore Barrage 19.08.2015 Ratlam 218 AA Accorded 09.09.15 245 417.90
338 Kesariya Kund
(with out canal)
CE NT Indore Dam 19.08.2015 Ratlam 200 AA Accorded 31.08.15 200 582.30
339 Bhatwariya CE NT Indore Barrage 19.08.2015 Ratlam 640 AA Accorded 03.10.15 640 1027.40
340 Borkhedi CE NT Indore Barrage 19.08.2015 Ratlam 720 AA Accorded 03.10.15 720 1019.04
Water Resources Division Neemuch
341 Banda irrigation CE NT Indore Dam 16.06.2016 Neemuch 1388 DPR Not Received
342 CE NT Indore 16.03.2016 Neemuch 110 AA Accorded 16/05/2016 110 180.74
343 CE NT Indore 16.03.2016 Neemuch 110 AA Accorded 16/05/2016 110 112.46
344 CE NT Indore 16.03.2016 Neemuch 116 AA Accorded 16/05/2016 115 184.63
345 CE NT Indore 11.01.2016 Neemuch 515 AA Accorded 16/08/2016 1850 4775.46
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
CE NT Indore Dam 28/10/2016 Mandsaur 280 DPR Not Received
347 Ishakpura 
(without canal)
348 Lunaheda
 (without canal)
CE NT Indore Barrage 29/09/2016 Mandsaur 70 DPR Not Received
349 Semli Kankar
CE NT Indore Dam 29/09/2016 Mandsaur 215 DPR Not Received
350 Semli (without
CE NT Indore Weir 29/09/2016 Mandsaur 310 DPR Not Received
351 Banjari (without
CE NT Indore Dam 29/09/2016 Mandsaur 245 DPR Not Received
352 Jhangriya Dam
353 Kotada Mata
354 Bhatuni Dam
355 Pratap Pura Dam
CE NT Indore Dam 23/08/2016 Mandsaur 310 DPR Received
356 Changali Weir CE NT Indore Weir 23/08/2016 Mandsaur 300 DPR Not Received
357 Sedra Karnali
CE NT Indore Dam 23/08/2016 Mandsaur 400 DPR Not Received
358 CE NT Indore 30/04/2016 Mandsaur 34650 AA Accorded 17/08/2016 340 516.8
359 CE NT Indore 30/04/2016 Mandsaur 310 AA Accorded 17/08/2016 310 464.65
360
CE NT Indore 07.01.2016 Mandsaur 200 AA Accorded 30.03.16 105 156.56
361 CE NT Indore 07.01.2016 Mandsaur 340 AA Accorded 26.03.16 260 444.83
362 CE NT Indore 07.01.2016 Mandsaur 330 AA Accorded 26.03.16 275 426.00
363
CE NT Indore 07.01.2016 Mandsaur 260 AA Accorded 26.03.16 205 341.04
364 Nandawata Tank CE NT Indore Dam 28.08.2015 Mandsaur 276 AA Accorded 26.03.16 260 656.28
365 Armaliya Solid CE NT Indore Weir 28.08.2015 Mandsaur 1000 AA Accorded 04.02.16 1101 991.00
366 Wakli Tank CE NT Indore Dam 28.08.2015 Mandsaur 434 AA Accorded 04.02.16 435 1279.17
367 Sonagara CE NT Indore Weir 19.08.2015 Mandsaur 660 AA Accorded 31.08.15 658 411.30
chief Engineer Narmada Tapti Basin Indore >> Water Resources Circle, Dhar
Water Resources Division-1, Jhabua
CE NT Indore Dam 26/10/2016 Jhabua 230 DPR Not Received
369 Rundipada CE NT Indore Barrage 26/10/2016 Jhabua 350 DPR Not Received
370 Nauganwa Kaliya CE NT Indore Barrage 26/10/2016 Jhabua 220 151 Received
371 Bherupada
(Without Canal)
CE NT Indore Dam 26/10/2016 Jhabua 450 DPR Not Received
372 Palasdor Barrage CE NT Indore Barrage 26/10/2016 Jhabua 180 DPR Received
373 Salarpada CE NT Indore Barrage 26/10/2016 Jhabua 360 DPR Not Received
374 Dhamanda CE NT Indore Dam 26/10/2016 Jhabua 400 DPR Not Received
375 Behadawi
(Without Canal)
CE NT Indore Dam 26/10/2016 Jhabua 100 DPR Not Received
376 Khardu CE NT Indore Barrage 26/10/2016 Jhabua 365 DPR Received
377 Hidi Badi CE NT Indore Barrage 26/10/2016 Jhabua 325 DPR Received
378 Amalwani CE NT Indore Barrage 26/10/2016 Jhabua 335 DPR Received
379 Mandli Badi CE NT Indore Barrage 18/10/2016 Jhabua 230 DPR Received
380 Bhagor CE NT Indore Barrage 18/10/2016 Jhabua 260 DPR Received
381 Barkheda/ CE NT Indore Barrage 18/10/2016 Jhabua 285 DPR Received
382 Balwasa CE NT Indore Barrage 18/10/2016 Jhabua 500 DPR Received
383 Jhayada CE NT Indore Barrage 18/10/2016 Jhabua 525 DPR Not Received
384 Matasula CE NT Indore Barrage 18/10/2016 Jhabua 395 DPR Received
385 Badi Sangat Tank CE NT Indore 30/04/2016 Jhabua 100 AA Accorded 17/08/2016 100 198.06
386 Nahar Puriya Tank CE NT Indore 30/04/2016 Jhabua 80 DPR Received
387 Kudi Kho Tank CE NT Indore 30/04/2016 Jhabua 80 DPR Received
388 Bakhatpura Tank CE NT Indore 30/04/2016 Jhabua 140 DPR Received
389 CE NT Indore 11.01.2016 Jhabua 150 AA Accorded 30.03.16 100 206.70
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
390 CE NT Indore 07.01.2016 Jhabua 210 DPR Not Received
391 Bherupada CE NT Indore Dam 28.08.2015 Jhabua 451 AA Accorded 22.09.15 600 826.15
392 Kadiwala naka CE NT Indore Dam 28.08.2015 Jhabua 232 DPR Not Received
393 Ratanpada CE NT Indore Dam 28.08.2015 Jhabua 600 AA Accorded 22.09.15 495 743.54
394 Talawada CE NT Indore Barrage 28.08.2015 Jhabua 600, 13
MCM
DPR Not Received
395 Devigarh CE NT Indore Barrage 19.08.2015 Jhabua 280 AA Accorded 09.09.15 280 398.81
396 Jhaparda CE NT Indore Barrage 19.08.2015 Jhabua 135 AA Accorded 09.09.15 135 226.11
397 Valdimaal CE NT Indore Barrage 19.08.2015 Jhabua 220 AA Accorded 22.09.15 240 353.43
398 Demara (Patel
Faliya)
CE NT Indore Barrage 19.08.2015 Jhabua 225 AA Accorded 09.09.15 225 372.10
399 kikalberi CE NT Indore Barrage 19.08.2015 Jhabua 300 AA Accorded 22.09.15 325 551.95
400 Ambapada (with
out canal)
CE NT Indore Dam 19.08.2015 Jhabua 618 AA Accorded 21.08.15 830 1870.18
401 Dhamanda CE NT Indore Dam 19.08.2015 Jhabua 214 AA Accorded 31.08.15 214 328.86
402 Guvali CE NT Indore Barrage 19.08.2015 Jhabua 750 AA Accorded 03.10.15 750 1088.28
403 Rampura CE NT Indore Barrage 19.08.2015 Jhabua 975 AA Accorded 21.08.15 975 1522.97
404 Rangpura CE NT Indore Barrage 19.08.2015 Jhabua 720 AA Accorded 03.10.15 720 1063.36
405 Bhamarda CE NT Indore Barrage 19.08.2015 Jhabua 440 AA Accorded 31.08.15 440 582.69
406 Kallipura CE NT Indore Barrage 19.08.2015 Jhabua 490 AA Accorded 31.08.15 490 682.76
407 Narwaliya CE NT Indore Barrage 19.08.2015 Jhabua 575 AA Accorded 31.08.15 575 833.60
408 Rundipada CE NT Indore Barrage 19.08.2015 Jhabua 250 AA Accorded 22.09.15 350 514.63
409 Salarpada CE NT Indore Barrage 19.08.2015 Jhabua 410 AA Accorded 31.08.15 425 612.46
Water Resources Division, Manawar
410 CE NT Indore 17.03.2016 Dhar 220 AA Accorded 17/08/2016 220 602.42
411 Dharamrai Tank CE NT Indore Dam 28.08.2015 Dhar 325 AA Accorded 01.12.15 300 869.29
412 Kapsi Barrage CE NT Indore Barrage 28.08.2015 Dhar 280 AA Accorded 04.02.16 300 506.29
413 Kherli Tank CE NT Indore Dam 28.08.2015 Dhar 150 AA Accorded 01.12.15 150 323.77
414 CE NT Indore 11.01.2016 Dhar 205 AA Accorded 30.03.16 205 602.55
415 Kundia Nala CE NT Indore 30/04/2016 Dhar 175 AA Accorded 22/09/2016 225 672.06
Water Resources Division-1,Dhar
416 Bichhiya Tank
CE NT Indore Dam 28/03/2017 Dhar 194 DPR Not Received
417 Chandan Khedi CE NT Indore Barrage 18/10/2016 Dhar 170 DPR Received
418 Magarda CE NT Indore Barrage 18/10/2016 Dhar 300 DPR Not Received
419 Kapsi Nag Baba CE NT Indore Barrage 18/10/2016 Dhar 300 DPR Not Received
420 Songaon CE NT Indore Barrage 18/10/2016 Dhar 300 DPR Not Received
421 Kundiya Nala No1 CE NT Indore Dam 18/10/2016 Dhar 345 DPR Not Received
422 Bandi Tank
CE NT Indore Dam 18/10/2016 Dhar 170 DPR Received
423 Gungi Devi Dam CE NT Indore Dam 23/08/2016 Dhar 1270 DPR Not Received
424 Kundiya Nalla
425 Barkeshwar
CE NT Indore Dam 16.06.2016 Dhar 875 DPR Not Received
426 Bhawar chhewra
CE NT Indore Dam 16.06.2016 Dhar 324 DPR Not Received
427 Pasawada Barrage CE NT Indore 30/04/2016 Dhar 180 AA Accorded 17/08/2016 240 401.85
428 Chhayan Barrage CE NT Indore 30/04/2016 Dhar 300 DPR Not Received
429 Kelpada Barrage CE NT Indore 30/04/2016 Dhar 340 AA Accorded 17/08/2016 180 307.04
430 CE NT Indore 12.01.2016 Dhar 110 AA Accorded 26.03.16 115 304.79
431 CE NT Indore 11.01.2016 Dhar 1000 AA Accorded 16/08/2016 900 2937.54
432 CE NT Indore 07.01.2016 Dhar 300 AA Accorded 26.03.16 245 418.62
433 CE NT Indore 07.01.2016 Dhar 300 AA Accorded 26.03.16 215 366.25
434 CE NT Indore 07.01.2016 Dhar 430 AA Accorded 12.04.16 425 1242.64
435 Chunar CE NT Indore Dam 19.08.2015 Dhar 1620 AA Accorded 21.08.15 1620 2582.92
436 Dumala CE NT Indore Dam 19.08.2015 Dhar 650 AA Accorded 03.10.15 600 1432.20
437 Idriya CE NT Indore Dam 19.08.2015 Dhar 300 AA Accorded 31.08.15 300 660.93
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
Canal)
CE NT Indore Dam 19.08.2015 Dhar 225 AA Accorded 31.08.15 225 359.60
439 Ambedi CE NT Indore Dam  05.06.2014 Dhar 200 DPR Not Received
Water Resources Division, Alirajpur
440 Bilasa Barrage CE NT Indore Barrage 20/10/2016 Alirajpur 150 DPR Received
441 Handi Barrage CE NT Indore Barrage 20/10/2016 Alirajpur 150 DPR Received
442 Kaliawao Barrage CE NT Indore Barrage 20/10/2016 Alirajpur 120 DPR Received
443 Dhonga Tank CE NT Indore Dam 20/10/2016 Alirajpur 235 DPR Not Received
444 Mod Nadi CE NT Indore Barrage 1/10/2016 Alirajpur 235 DPR Received
445 Borjhad CE NT Indore Barrage 1/10/2016 Alirajpur 200 DPR Received
446 Khutaja CE NT Indore Barrage 1/10/2016 Alirajpur 210 DPR Received
447 Kuluwat CE NT Indore Barrage 1/10/2016 Alirajpur 225 DPR Received
448 Borjha No. 2 CE NT Indore Barrage 1/10/2016 Alirajpur 205 DPR Received
449 Hirapur CE NT Indore Barrage 1/10/2016 Alirajpur 200 DPR Received
450 Orsang CE NT Indore Barrage 1/10/2016 Alirajpur 220 DPR Received
451 Ankhar CE NT Indore Barrage 1/10/2016 Alirajpur 250 DPR Received
452 Kadwal CE NT Indore Barrage 1/10/2016 Alirajpur 220 DPR Received
453 Hathani CE NT Indore Barrage 1/10/2016 Alirajpur 690 DPR Received
454  Sejgaon CE NT Indore Barrage 1/10/2016 Alirajpur 200 DPR Received
455 Ambi Nalla CE NT Indore Dam 08.09.2015 Alirajpur 150 AA Accorded 22.09.15 225 253.54
456 Baradala CE NT Indore Barrage 08.09.2015 Alirajpur 180 151 Received
457 Kosduna CE NT Indore Barrage 08.09.2015 Alirajpur 170 AA Accorded 22.09.15 200 314.08
458 Heran CE NT Indore Barrage 28.08.2015 Alirajpur 385 AA Accorded 09.09.15 385 573.60
459 Jharkali Tank CE NT Indore Dam 28.08.2015 Alirajpur 220 AA Accorded 22.09.15 200 671.50
460 Mayawat CE NT Indore Barrage 28.08.2015 Alirajpur 210 AA Accorded 22.09.15 270 360.03
461 Chandpur CE NT Indore Barrage 19.08.2015 Alirajpur 131 AA Accorded 22.09.15 170 214.86
462 Somniyawat CE NT Indore Barrage 19.08.2015 Alirajpur 178 AA Accorded 22.09.15 180 271.50
463 Delwani CE NT Indore Barrage 19.08.2015 Alirajpur 540 AA Accorded 09.09.15 540 882.97
464 Baladmun no.2 CE NT Indore Barrage 19.08.2015 Alirajpur 350 AA Accorded 09.09.15 350 568.85
465 Temachi CE NT Indore Barrage 19.08.2015 Alirajpur 280 AA Accorded 22.09.15 280 435.14
466 Bhoradiya CE NT Indore Barrage 19.08.2015 Alirajpur 120 AA Accorded 22.09.15 130 196.16
467 badaguda CE NT Indore Barrage 19.08.2015 Alirajpur 120 AA Accorded 22.09.15 120 196.19
468 Chamarbegda CE NT Indore Barrage 19.08.2015 Alirajpur 245 AA Accorded 09.09.15 245 425.42
chief Engineer Narmada Tapti Basin Indore >> Water Resources Circle, Indore
Water Resources Division, Shajapur
469 Pipliyajaphar CE NT Indore Weir 17/11/2016 Agar 195 DPR Not Received
470 Pipliyachacha CE NT Indore Weir 17/11/2016 Shajapur 250 DPR Not Received
471 Jaihedaghat CE NT Indore Weir 17/11/2016 Shajapur 185 DPR Not Received
472 Lodhakhedi CE NT Indore Weir 17/11/2016 Shajapur 226 DPR Not Received
473 Bajjaheda CE NT Indore Weir 17/11/2016 Shajapur 180 DPR Not Received
474 Tungani CE NT Indore Weir 18/10/2016 Shajapur 290 DPR Not Received
475 CE NT Indore 30/04/2016 Agar 650 DPR Not Received
476 CE NT Indore 30/04/2016 Shajapur 700 AA Accorded 17/08/2016 500 830.02
477 CE NT Indore 30/04/2016 Agar 600 DPR Not Received
478 CE NT Indore 30/04/2016 Shajapur 370 AA Accorded 22/09/2016 480 807.33
479 CE NT Indore 30/04/2016 Agar 600 DPR Not Received
480 CE NT Indore 30/04/2016 Shajapur 400 AA Accorded 17/08/2016 660 987.16
481 CE NT Indore 30/04/2016 Shajapur 925 DPR Received
482 CE NT Indore 30/04/2016 Shajapur 270 DPR Received
483 CE NT Indore 11.01.2016 Agar 200 AA Accorded 9/9/2015 300 437.45
484 CE NT Indore 07.01.2016 Shajapur 200 DPR Not Received
485 CE NT Indore 07.01.2016 Shajapur 210 AA Accorded 20/10/2016 280 490.2
486 CE NT Indore 07.01.2016 Shajapur 300 AA Accorded 22/09/2016 345 598.23
487 CE NT Indore 07.01.2016 Shajapur 215 AA Accorded 17/08/2016 390 647.58
488 CE NT Indore 07.01.2016 Shajapur 205 AA Accorded 22/09/2016 140 236.83
489   CE NT Indore 07.01.2016 Shajapur 250 AA Accorded 16/08/2016 680 1052.17
490 CE NT Indore 07.01.2016 Shajapur 250 AA Accorded 17/08/2016 760 755.79
491 Sripatpura CE NT Indore Weir 19.08.2015 Agar 300 AA Accorded 09.09.15 300 249.71
492 Bhandedi CE NT Indore Weir 19.08.2015 Shajapur 350 AA Accorded 31.08.15 350 398.85
493 DhoDhar CE NT Indore Weir 19.08.2015 Shajapur 340 AA Accorded 31.08.15 340 439.95
494 Karadlya Tingajpur CE NT Indore Weir 19.08.2015 Shajapur 300 AA Accorded 09.09.15 300 437.45
495 CE NT Indore 30/04/2016 Agar 600 DPR Received
Water Resources Division,Dewas
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
496 CE NT Indore 11.01.2016 Dewas 530 DPR Not Received
497 CE NT Indore 07.01.2016 Dewas 210 DPR Not Received
498   CE NT Indore 07.01.2016 Dewas 210 AA Accorded 17/08/2016 215 343.89
499 CE NT Indore 07.01.2016 Dewas 215 AA Accorded 17/08/2016 200 324.9
500 CE NT Indore 07.01.2016 Dewas 215 AA Accorded 30.03.16 180 288.50
501
CE NT Indore 07.01.2016 Dewas 220 AA Accorded 17/08/2016 220 351.34
502 CE NT Indore 07.01.2016 Dewas 220 DPR Received
503 CE NT Indore 07.01.2016 Dewas 210 AA Accorded 30.03.16 125 200.70
504 CE NT Indore 07.01.2016 Dewas 240 AA Accorded 17/08/2016 245 334
505 CE NT Indore 07.01.2016 Dewas 210 AA Accorded 17/08/2016 200 265.34
506 CE NT Indore 07.01.2016 Dewas 210 AA Accorded 17/08/2016 220 365.4
507 CE NT Indore 07.01.2016 Dewas 210 AA Accorded 17/08/2016 195 305.23
508 Eklayra CE NT Indore Barrage 01.12.2015 Dewas 227 AA Accorded 30.03.16 405 678.07
509 Chandkhedi CE NT Indore Barrage 19.08.2015 Dewas 72 AA Accorded 22.09.15 160 173.06
510 Mau CE NT Indore Barrage 19.08.2015 Dewas 150 AA Accorded 09.09.15 150 160.26
Water Resources Division,Indore
511 Gokuliya Kund
CE NT Indore Dam 21/12/2016 Indore 105 DPR Received
512 CE NT Indore 30/04/2016 Indore 380 DPR Received
513 Lotiya nalla CE NT Indore Dam 28.08.2015 Indore 150 AA Accorded 22.09.15 125 294.64
514 Madlawada Stop
Dam Cum Bridge
CE NT Indore Stop Dam 19.08.2015 Indore 425 AA Accorded 09.09.15 475 815.24
chief Engineer Ganga Basin Rewa >> Water Resources Circle, Shadol
Water Resources Division-2 Shahdol
515  Balound CE GB Rewa Dam 1/10/2016 Shahdol 495 Double Feasibility
516 Barbaspur Tank CE GB Rewa Dam 1/10/2016 Shahdol 320 DPR Not Received
517 Dhonga Tank CE GB Rewa Dam 1/10/2016 Shahdol 225 DPR Not Received
518 Halfal nalla CE GB Rewa Dam 1/10/2016 Shahdol 860 DPR Not Received
519 Baloundi CE GB Rewa Dam 16.06.2016 Shahdol 497 Double Feasibility
520 CE GB Rewa 16.03.2016 Shahdol 250 AA Accorded 27.01.17 470 1632.23
521 CE GB Rewa 07.01.2016 Shahdol 495 Double Feasibility
522 CE GB Rewa 07.01.2016 Shahdol 1070 AA Accorded 1/10/2016 655 2262.45
523 Bichhi Nalla Tank CE GB Rewa Dam 02.01.2016 Shahdol 1060 AA Accorded 25/05/2016 760 2356.95
524 Markhi Devi CE GB Rewa Dam 02.01.2016 Shahdol 2000 AA Accorded 1/10/2016 1000 3493.88
525 Shahi CE GB Rewa Dam 12.10.2015 Shahdol 450 AA Accorded 25.01.16 450 1572.36
526 Amahohatola CE GB Rewa Dam 12.10.2015 Shahdol 151 AA Accorded 2.01.16 178 528.15
527 Odari Diversion CE GB Rewa Weir 12.10.2015 Shahdol 950 AA Accorded 25/05/2016 950 2828.34
528 Samdhin Nala CE GB Rewa Dam 19.08.2015 Shahdol 1530 AA Accorded 25.01.16 825 2877.09
529 Gandhiya CE GB Rewa Dam 19.08.2015 Shahdol 460 AA Accorded 13.10.15 466 1549.66
530 Dudhariya Nala CE GB Rewa Dam 19.08.2015 Shahdol 340 AA Accorded 25.01.16 350 1210.87
531 Diyapipar CE GB Rewa Dam 19.08.2015 Shahdol 356 AA Accorded 25.01.16 350 1208.15
532 Baloundi CE GB Rewa Dam 19.08.2015 Shahdol 495 AA Accorded 25.01.16 335 1140.65
533 Rimar CE GB Rewa Dam 19.08.2015 Shahdol 350 AA Accorded 25.01.16 355 1007.25
534 Tetka CE GB Rewa Dam 19.08.2015 Shahdol 500 AA Accorded 13.10.15 421 1195.69
Water Resources Division Anuppur
535 Sitamadi Tank CE GB Rewa Dam 12/1/2017 Anuppur 9900 DPR Not Received
536 Doomer Tola Tank CE GB Rewa Dam 12/1/2017 Anuppur 425 DPR Not Received
537 Cholna storage CE GB Rewa Weir 12/1/2017 Anuppur 1400 DPR Not Received
538 Dhanpuri Tank CE GB Rewa Tank 9/1/2017 Anuppur 435 DPR Not Received
539 Badi Tummi
Storage Tank
CE GB Rewa Dam 02.01.2016 Anuppur 50 AA Accorded 16/05/2016 75 197.42
540 Pipariya Tank CE GB Rewa Dam 02.01.2016 Anuppur 800 AA Accorded 16/08/2016 840 2624.65
541 Samrar CE GB Rewa Dam 19.08.2015 Anuppur 525 AA Accorded 23.02.16 530 1590.30
542 Jhilmil CE GB Rewa Dam 19.08.2015 Anuppur 1015 AA Accorded 23.02.16 900 1960.40
543 Gohrari Diversion CE GB Rewa Diversion 19.08.2015 Anuppur 600 AA Accorded 23.02.16 600 1390.37
544 Bakan Diversion CE GB Rewa Diversion 19.08.2015 Anuppur 1188 AA Accorded 23.02.16 700 2423.90
545 Narmada CE GB Rewa Diversion 19.08.2015 Anuppur 1500 DPR Not Received
546 Singhpur CE GB Rewa Diversion 19.08.2015 Anuppur 500 AA Accorded 23.02.16 650 2222.09
Water Resources Division Umaria
CE GB Rewa Weir 28/11/2016 Umaria 1950 DPR Not Received
548 Changera tank CE GB Rewa Dam 16.06.2016 Umaria 423 DPR Received
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
549 Halfal nala tank CE GB Rewa Dam 16.06.2016 Umaria 450 DPR Not Received
550 Khoh tank CE GB Rewa Dam 16.06.2016 Umaria 351 DPR Received
551 CE GB Rewa 30/04/2016 Umaria 360 DPR Not Received
552 CE GB Rewa 30/04/2016 Umaria 431 DPR Received
553 CE GB Rewa 30/04/2016 Umaria 560 AA Accorded 27.01.17 625 2164.89
554 CE GB Rewa 16.03.2016 Umaria 85 DPR Received
555 CE GB Rewa 16.03.2016 Umaria 180 AA Accorded 17/08/2016 165 550.97
556 CE GB Rewa 16.03.2016 Umaria 110 AA Accorded 22/09/2016 105 348.85
557 CE GB Rewa 07.01.2016 Umaria 340 DPR Not Received
558 Construction of
for Umrar Tank
CE GB Rewa Weir 30.12.2015 Umaria 1000 AA Accorded 5/12/2016 715 627.9
559 Choote tummi CE GB Rewa Dam 19.11.2015 Umaria 75 AA Accorded 6/1/2016 74 255.93
560 Bhanpura CE GB Rewa Dam 23.10.2015 Umaria 280 AA Accorded 25.01.16 330 1134.31
561 Magar CE GB Rewa Dam 23.10.2015 Umaria 800 AA Accorded 12/4/2016 990 3440.74
562 CE GB Rewa 07.01.2016 Umaria 100 Double feasibility
chief Engineer Ganga Basin Rewa >> Mahan Project Gulab Sagar, Sidhi
Water Resources Division-2 Singarauli
Pipe
Irrigation
System
12/1/2017 Singarauli - DPR Not Received
564 Chhulahiya Tank CE GB Rewa Dam 17/11/2016 Singarauli 295 DPR Not Received
565 Rihand CE GB Rewa LIS 17/11/2016 Singarauli 1900 DPR Not Received
566 Kandas CE GB Rewa Barrage 17/11/2016 Singarauli 315 DPR Not Received
567 Garai Gaon Weir CE GB Rewa Weir 17/11/2016 Singarauli 240 DPR Not Received
568 Dhonga Tank CE GB Rewa Dam 17/11/2016 Singarauli 240 DPR Not Received
chief Engineer Ganga Basin Rewa >> Bansagar Canal Circle Rewa
Water Resources Division Satna
569 Jhagraha Tank CE GB Rewa Dam 16.06.2016 Satna 268 DPR Not Received
570 Pathar kachar CE GB Rewa Dam 16.06.2016 Satna 976 DPR Not Received
chief Engineer Dhasan Ken Basin Sagar >>Water Resources Circle, Sagar
Water Resources Division-1, Sagar
571 Notha Tank CE DK Sagar Dam 28/03/2017 Sagar 590 DPR Not Received
572 Barodiya
Chandrapura tank
CE DK Sagar Dam 28/03/2017 Sagar 140 DPR Not Received
573 Pathariya Vyas CE DK Sagar Dam 28/03/2017 Sagar 180 DPR Not Received
574 Tinsua Tank CE DK Sagar Dam 8/2/2017 Sagar 195 DPR Not Received
575 Bersala Feeder
CE DK Sagar Dam 8/2/2017 Sagar 890 DPR Not Received
576 Aamghat Scheme CE DK Sagar Dam 08.02.17 Sagar 200 DPR Not Received
577 Dalpatpur Tank
CE DK Sagar Dam 08.02.17 Sagar 400 DPR Not Received
578 Samnapur Nittri CE DK Sagar Dam 08.02.17 Sagar 705 DPR Not Received
579 Padariya Kalan CE DK Sagar Dam 08.02.17 Sagar 390 DPR Not Received
580 Luhagarh Weir CE DK Sagar Weir 08.02.17 Sagar 300 DPR Not Received
581 Bhainsa Nalla CE DK Sagar Weir 08.02.17 Sagar 350 DPR Not Received
582 Purena Tank CE DK Sagar Dam 08.02.17 Sagar 295 DPR Not Received
583 Semmra CE DK Sagar Dam 08.02.17 Sagar 190 DPR Not Received
584 Budakheda Tank CE DK Sagar Dam 08.02.17 Sagar 200 DPR Not Received
585 Pipariya Jasraj CE DK Sagar Dam 08.02.17 Sagar 500 DPR Not Received
586 Kishangarh CE DK Sagar Dam 08.02.17 Sagar 590 DPR Not Received
587 Kalipathar Tank CE DK Sagar Dam 21/12/2016 Sagar 445 DPR Not Received
588 Bakhra Goghri CE DK Sagar Dam 21/12/2016 Sagar 430 DPR Not Received
589 churari Tank
590 Khatora (Without
CE DK Sagar Dam 18/10/2016 Sagar 230 DPR Not Received
591 Lachhasir
(Without Canal)
CE DK Sagar Dam 18/10/2016 Sagar 405 DPR Received
592 Banjaria CE DK Sagar Weir 18/10/2016 Sagar 115 DPR Received
593 Churari Tank
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
595 Sagauni Tank
CE DK Sagar Tank 23/08/2016 Sagar 990 DPR Not Received
596 Jamdarra Tank CE DK Sagar Dam 16.06.2016 Sagar 652 DPR Received
597 Kirkaota CE DK Sagar Dam 16.06.2016 Sagar 335 151 Received
598 Muderi Tank CE DK Sagar Dam 16.06.2016 Sagar 332 151 Received
599 Barodiya Nonagir
CE DK Sagar 30/04/2016 Sagar 220 DPR Received
600 CE DK Sagar 11.01.2016 Sagar 6000 DPR Not Received
601 CE DK Sagar 11.01.2016 Sagar 600 DPR Not Received
602 CE DK Sagar 11.01.2016 Sagar 1525 DPR Received
603 CE DK Sagar 11.01.2016 Sagar 300 AA Accorded 31/12/2016 210 611.720
604 CE DK Sagar 07.01.2016 Sagar 1950 DPR Received
605 CE DK Sagar 07.01.2016 Sagar 200 AA Accorded 31/12/2016 170 507.080
606 CE DK Sagar 07.01.2016 Sagar 110 AA Accorded 31/12/2016 140 409.970
607 Baroda Tank CE DK Sagar Dam 10.09.2015 Sagar 525 DPR Received
608 Bhagwantpura CE DK Sagar Dam 10.09.2015 Sagar 1100 AA Accorded 1/10/2016 920 3186.35
609 Chaakmuhari Dam CE DK Sagar Dam 10.09.2015 Sagar 290 AA Accorded 30/3/2016 270 938.14
610 Chargauwa Weir CE DK Sagar Dam 10.09.2015 Sagar 350 AA Accorded 30.03.16 310 540.76
611 Extension of Babir
matiya canal
CE DK Sagar Weir 10.09.2015 Sagar 310 AA Accorded 20/10/2016 310 182.34
612 Hinghlaj mata CE DK Sagar Dam 10.09.2015 Sagar 350 AA Accorded 06.01.16 300 478.09
613 Jamunia Gound CE DK Sagar Weir 10.09.2015 Sagar 680 AA Accorded 16/08/2016 715 2201.33
614 Khatola Tank CE DK Sagar Dam 10.09.2015 Sagar 1990 AA Accorded 24-03-2017 1415 4911.100
615 Madni Tank CE DK Sagar Dam 10.09.2015 Sagar 425 AA Accorded 1/10/2016 370 1175.84
616 Mansurwari
L.B.C. Extension
CE DK Sagar Dam 10.09.2015 Sagar 1000 AA Accorded 1/10/2016 1000 1063.89
617 Maswasi Baheria
CE DK Sagar Dam 10.09.2015 Sagar 750 151 Received
618 Niwarikalan Tank CE DK Sagar Dam 10.09.2015 Sagar 1000 AA Accorded 27.01.17 950 3119.75
619 Udetpara Tank CE DK Sagar Dam 10.09.2015 Sagar 460 DPR Received
620 Pathar (Without
CE DK Sagar Dam 6/5/2017 Sagar 364 DPR Not Received
621 Noniya Tank
CE DK Sagar Dam 6/5/2017 Sagar 140 DPR Not Received
Water Resources Division Damoh
622 Semra Tank CE DK Sagar Dam 28/03/2017 Damoh 125 AA Accorded 26/3/2016 160 521.79
623 Bhuri Tank CE DK Sagar Dam 16.06.2016 Damoh 270 DPR Received
624 CE DK Sagar 30/04/2016 Damoh 1062 DPR Received
625 CE DK Sagar 30/04/2016 Damoh 400 AA Accorded 20/10/2016 300 447.15
626 Ankhkheda Weir CE DK Sagar Weir 10.09.2015 Damoh 350 AA Accorded 04.02.16 290 464.84
627 Ballarpur  Weir CE DK Sagar Weir 10.09.2015 Damoh 800 AA Accorded 04.02.16 815 926.12
628 Bichhiya Weir CE DK Sagar Weir 10.09.2015 Damoh 950 AA Accorded 23.02.16 950 1107.49
629 Bijawar Weir CE DK Sagar Weir 10.09.2015 Damoh 550 AA Accorded 04.02.16 550 676.08
630 Chakeri ghat Weir
Causeway
631 Donda Stop Dam CE DK Sagar Weir Cum
Causeway
632 Ghatoiya Ghat
Causeway
633 Itwakotra Weir
Causeway
634 Jhamra Stop Dam CE DK Sagar Weir Cum
Causeway
635 Khiriya Stop Dam CE DK Sagar Weir Cum
Causeway
636 Sagoni Kala Weir
Causeway
10.09.2015 Damoh 1000 AA Accorded 04.02.16 600 917.79
637 Salaiya Tank CE DK Sagar Tank 10.09.2015 Damoh 125 AA Accorded 26.03.16 150 500.60
638 Semra Tank CE DK Sagar Tank 10.09.2015 Damoh 125 AA Accorded 26.03.16 160 521.79
chief Engineer Dhasan Ken Basin Sagar >>Water Resources Circle, Chhatarpur
Water Resources Division Tikamgarh
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
CE DK Sagar Dam 16.06.2016 Tikamgarh 360 DPR Not Received
640 CE DK Sagar 17.03.2016 Tikamgarh 1980 DPR Not Received
641 Satdhara Tank CE DK Sagar Dam 02.01.2016 Tikamgarh 730 AA Accorded 24-03-2017 570 1973.89
642 Hari Nagar Tank  CE DK Sagar Dam 02.01.2016 Tikamgarh 200 DPR Received
643 Dhonda Ghat CE DK Sagar Weir 02.01.2016 Tikamgarh 350 DPR Received
644 Ghuraya Ghat CE DK Sagar Weir 02.01.2016 Tikamgarh 350 AA Accorded 17/08/2016 280 404.65
Water Resources Division Nogong
645 Garhi Semra CE DK Sagar Dam 24/10/2016 Chhatarpur 150 DPR Received
646 CE DK Sagar 30/04/2016 Chhatarpur 415 DPR Received
647 CE DK Sagar 11.01.2016 Chhatarpur 180 DPR Received
648   CE DK Sagar 11.01.2016 Chhatarpur 170 DPR Received
649 CE DK Sagar 11.01.2016 Chhatarpur 450 DPR Received
650 CE DK Sagar 07.01.2016 Chhatarpur 430 AA Accorded 16/05/2016 360 453.1
651 Bagora Feeder CE DK Sagar Weir  05.06.2014 Chhatarpur 30 DPR Not Received
Water Resources Division Panna
CE DK Sagar Dam 3/5/2017 Panna 175 DPR Not Received
chief Engineer Yamuna Basin >>Water Resources Circle, Gwalior
Water Resources Division Shivpuri
CE YB Gwalior Dam 14/12/2016 Shivpuri 9950 DPR Not Received
654 Baniyani Stopdam CE YB Gwalior Stopdam 14/12/2016 Shivpuri 180 DPR Received
655 Khadoey CE YB Gwalior Stopdam 14/12/2016 Shivpuri 180 DPR Received
656 Taktaki Minor CE YB Gwalior Dam 16.06.2016 Shivpuri 2048 DPR Not Received
657 Mukajhir Tank CE YB Gwalior 30/04/2016 Shivpuri 1000 DPR Not Received
658 CE YB Gwalior 17.03.2016 Shivpuri 400 DPR Not Received
659   () CE YB Gwalior 17.03.2016 Shivpuri 500 DPR Not Received
660 CE YB Gwalior 16.03.2016 Shivpuri 350 DPR Received
661 CE YB Gwalior 16.03.2016 Shivpuri 380 DPR Received
662 Stopdam No-3 on
chief Engineer Yamuna Basin >>Lower Chambal Circle, Morena
Water Resources Division Bhind
CE YB Gwalior Barrage 18/04/2017 Bhind 350 DPR Not Received
664 Gudawali
Stopdam (Beseli
CE YB Gwalior Barrage 18/04/2017 Bhind 325 DPR Not Received
665 Bharaso Stopdam
CE YB Gwalior Barrage 18/04/2017 Bhind 335 DPR Not Received
666 Patlokhari CE YB Gwalior Barrage 18/04/2017 Bhind 300 DPR Not Received
667 Kachogara Weir CE YB Gwalior Weir 22/12/2016 Bhind 480 Double feasibility
668 Shukla Pura CE YB Gwalior Weir 22/12/2016 Bhind 360 DPR Not Received
669 Rani Virgawan
CE YB Gwalior Weir 22/12/2016 Bhind 720 DPR Not Received
670 Maghan Stopdam CE YB Gwalior Barrage 21/12/2016 Bhind 190 DPR Received
671 CE YB Gwalior 16.03.2016 Bhind 350 DPR Not Received
672 CE YB Gwalior 16.03.2016 Bhind 480 AA Accorded 17/08/2016 350 595.97
673 Modana Stop
dam Come
Causeway at
CE YB Gwalior Barrage 18.09.2015 Bhind 750 AA Accorded 4.02.16 460 776.30
674 Para Stop dam
at Kunwari River
CE YB Gwalior Barrage 18.09.2015 Bhind 450 AA Accorded 4.02.16 340 573.81
Water Resources Division Morena
675 Pahari Stopdam CE YB Gwalior Weir 17/11/2016 Morena 300 DPR Received
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
CE YB Gwalior Weir 17/11/2016 Morena 405 DPR Received
677 Garhikheda CE YB Gwalior Barrage 17/11/2016 Morena 400 DPR Not Received
678 Sikahra CE YB Gwalior Dam 17/11/2016 Morena 440 DPR Received
679 Chinnoni Karera CE YB Gwalior Barrage 18/10/2016 Morena 300 DPR Received
680 Garhi Keda CE YB Gwalior Barrage 18/10/2016 Morena 325 DPR Not Received
681 Sangoli CE YB Gwalior Barrage 18/10/2016 Morena 490 DPR Not Received
682 Mohari CE YB Gwalior Barrage 18/10/2016 Morena 420 DPR Not Received
683 Khitora Stop Dam CE YB Gwalior 17.03.2016 Morena 370 AA Accorded 22/09/2016 450 676.72
684 Parichha Stop CE YB Gwalior 16.03.2016 Morena 360 AA Accorded 22/09/2016 415 702.16
685 Naka Solid Weir CE YB Gwalior 16.03.2016 Morena 500 AA Accorded 22/09/2016 470 778.24
686 Kheriya KLalan
Stop Dam
CE YB Gwalior 16.03.2016 Morena 625 AA Accorded 22/09/2016 335 558.26
687 Bhidosa
Causeway Come
Stop dam at
CE YB Gwalior Barrage 18.09.2015 Morena 306 AA Accorded 4.02.16 380 588.21
688 Construction of
Ahroli Stop dam
at Kunwari River
CE YB Gwalior Barrage 18.09.2015 Morena 550 AA Accorded 4.02.16 460 637.27
689 Construction of
Galetha Stop dam
at Kunwari River
CE YB Gwalior Barrage 18.09.2015 Morena 700 AA Accorded 4.02.16 550 854.59
690 Construction of
Lalor Stop dam
at Kunwari River
CE YB Gwalior Barrage 18.09.2015 Morena 700 AA Accorded 4.02.16 370 558.20
691 Construction of
Sihoniya Stop
dam Come
Causeway at
CE YB Gwalior Barrage 18.09.2015 Morena 265 AA Accorded 4.02.16 350 509.25
Water Resources Division Sheopur
692 Tehla Stop Dam CE YB Gwalior Weir 2/2/2017 Sheopur 375 DPR Not Received
693 Jat Khedi CE YB Gwalior 07.01.2016 Sheopur 260 AA Accorded 16/05/2016 235 329.68
694 CE YB Gwalior 07.01.2016 Sheopur 400 AA Accorded 16/05/2016 370 488.91
695 CE YB Gwalior 07.01.2016 Sheopur 280 AA Accorded 16/05/2016 300 413.58
chief EngineerWain Ganga Basin >>Water Resources Circle, Seoni
Water Resources Division -1 Seoni
696 Bandra tank CE WG Seoni Dam 16.06.2016 Seoni 635 DPR Not Received
697 Darbai tank CE WG Seoni Dam 16.06.2016 Seoni 252 DPR Received
698 Extension of
CE WG Seoni Dam 16.06.2016 Seoni 1062 DPR Not Received
699 Thanwar Jhori CE WG Seoni 30/04/2016 Seoni 480 DPR Not Received
700 Erma Tank CE WG Seoni 30/04/2016 Seoni 155 DPR Received
701 Sarora Tank CE WG Seoni 30/04/2016 Seoni 280 DPR Received
702 CE WG Seoni 11.01.2016 Seoni 4000 DPR Not Received
703 CE WG Seoni 07.01.2016 Seoni 390 AA Accorded 1/10/2016 365 1034.59
704 CE WG Seoni 07.01.2016 Seoni 320 DPR Received
705
CE WG Seoni 07.01.2016 Seoni 230 DPR Received
706 Dhupghat Madhi
CE WG Seoni Dam 16.11.2015 Seoni 250 DPR Received
707 Patan Kanera CE WG Seoni Dam 16.11.2015 Seoni 330 DPR Received
708 Agarya CE WG Seoni Dam  05.06.2014 Seoni 450 DPR Not Received
709 Amantcla CE WG Seoni Dam  05.06.2014 Seoni 1240 DPR Not Received
710 Bhattekhari Stop
Dam Cum Rapta
CE WG Seoni
Water Resources Division, Jabalpur
711 Dhawai Tank CE WG Seoni Dam 18/04/2017 Jabalpur 140 DPR Not Received
712 Dargarh Tank CE WG Seoni Dam 16.12.2015 Jabalpur 1960 Double Feasibility
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
AA in Lakh
713 Dargarh Tank CE WG Seoni Dam 23.09.2015 Jabalpur 1960 AA Accorded 12/4/2016 1950 6594.89
714 Nayatola CE WG Seoni Dam 16.06.2016 Katni 158 DPR Not Received
715 Sagoni (Without
CE WG Seoni Weir 8/2/2017 Narsinghpur 150 DPR Not Received
718 Kacharkona Weir CE WG Seoni Weir 19/05/2017 Narsinghpur 145 DPR Not Received
Water Resources Division, Dindori
CE WG Seoni Weir 8/2/2017 Dindori 150 DPR Received
720 Rawan Kund CE WG Seoni Dam 18/10/2016 Dindori 480 DPR Not Received
721 Barbaspur Tank CE WG Seoni Dam 18/10/2016 Dindori 665 DPR Not Received
722 Bijaura CE WG Seoni Dam 16.12.2015 Dindori 580 DPR Received
723 Chhindgaon CE WG Seoni Dam 16.12.2015 Dindori 350 DPR Received
Water Resources Division, Mandla
724 Thanwar RBC CE WG Seoni Dam 18/10/2016 Mandla 1350 DPR Not Received
725 CE WG Seoni 11.01.2016 Mandla 370 AA Accorded 16/08/2016 500 1601.62
726 CE WG Seoni 11.01.2016 Mandla 280 AA Accorded 16/08/2016 390 1264.04
727 CE WG Seoni 11.01.2016 Mandla 880 AA Accorded 1/10/2016 630 2042.87
728 CE WG Seoni 07.01.2016 Mandla 1200 DPR Not Received
729 CE WG Seoni 07.01.2016 Mandla 1060 DPR Not Received
730 CE WG Seoni 07.01.2016 Mandla 190 DPR Received
731 CE WG Seoni 07.01.2016 Mandla 170 AA Accorded 17/08/2016 250
732 Gour Tank CE WG Seoni Dam 23.09.2015 Mandla 1068 AA Accorded 25/05/2016 1105 3435.77
chief EngineerWain Ganga Basin >>Water Resources Circle, Balaghat
Water Resources Survey Division, Balaghat
733 Pola Tank CE WG Seoni Dam 28/03/2017 Balaghat 1170 DPR Not Received
734 Manpur Tank CE WG Seoni Dam 28/03/2017 Balaghat 900 Double Feasibility
735 Rani Talab CE WG Seoni Dam 28/03/2017 Balaghat 200 DPR Not Received
736 Madari Dabra CE WG Seoni Dam 28/03/2017 Balaghat 235 DPR Not Received
737 CE WG Seoni 11.01.2016 Balaghat 900 DPR Received
738 CE WG Seoni 07.01.2016 Balaghat 1250 DPR Received
chief EngineerWain Ganga Basin >>Water Resources Circle, Chhindwara
Water Resources Division, Chhindwara
739 Rohna Khurd CE WG Seoni Dam 16/12/2016 Chhindwara 125 DPR Not Received
740 Devranidai CE WG Seoni Barrage 18/10/2016 Chhindwara 110 DPR Not Received
741 Baranga Khurd CE WG Seoni Dam 18/10/2016 Chhindwara 800 DPR Not Received
742 Gadarwara Tank CE WG Seoni Dam 18/10/2016 Chhindwara 145 DPR Not Received
743 Sanwalkheda
CE WG Seoni Barrage 18/10/2016 Chhindwara 150 DPR Not Received
744 Jhirna Stopdam CE WG Seoni Barrage 18/10/2016 Chhindwara 160 DPR Not Received
745 Markadhana
CE WG Seoni Barrage 18/10/2016 Chhindwara 200 DPR Not Received
746 Ghogharidhana CE WG Seoni Dam 18/10/2016 Chhindwara 350 DPR Not Received
747 Heerawadi Tank CE WG Seoni Dam 18/10/2016 Chhindwara 145 DPR Not Received
748 Saikheda Tank
CE WG Seoni Dam 18/10/2016 Chhindwara 140 DPR Not Received
749 Rangari Tank CE WG Seoni Dam 18/10/2016 Chhindwara 235 DPR Not Received
750 Pither Storage
CE WG Seoni Dam 18/10/2016 Chhindwara 125 DPR Not Received
751 Dolnalla Tank CE WG Seoni Dam 18/10/2016 Chhindwara 190 DPR Not Received
752 Bichua Kalan
CE WG Seoni Dam 18/10/2016 Chhindwara 200 DPR Not Received
753 Langha Storage
CE WG Seoni Dam 18/10/2016 Chhindwara 160 DPR Not Received
754 Jakhawadi
Storage Tank
CE WG Seoni Dam 29/09/2016 Chhindwara 120 DPR Not Received
755 Bhivkund Tank
CE WG Seoni Tank 23/08/2016 Chhindwara 345 DPR Not Received
S. No. Name of Scheme CE Project Type Date of
Feasibility
Proposed
(Hac)
CE WG Seoni Dam 16.06.2016 Chhindwara 1206 DPR Received
757 CE WG Seoni 16.03.2016 Chhindwara 100 AA Accorded 17/08/2016 85 289.97
758 CE WG Seoni 11.01.2016 Chhindwara 1300 DPR Not Received
759
CE WG Seoni 07.01.2016 Chhindwara 120 AA Accorded 16/05/2016 150 251.41
760 ( )
CE WG Seoni 07.01.2016 Chhindwara 200 DPR Not Received
761 CE WG Seoni 07.01.2016 Chhindwara 170 AA Accorded 16/05/2016 175 293.71
762 CE WG Seoni 07.01.2016 Chhindwara 150 AA Accorded 16/05/2016 200 334.46
763 CE WG Seoni 07.01.2016 Chhindwara 110 AA Accorded 16/05/2016 130 221.91
764 CE WG Seoni 07.01.2016 Chhindwara 235 AA Accorded 17/08/2016 235 795.51
765 Balkachar Tank CE WG Seoni Dam 16.12.2015 Chhindwara 340 DPR Not Received
766 Panchdhar Deori
Stop Dam
CE WG Seoni Barrage 16.12.2015 Chhindwara 310 AA Accorded 16/05/2016 235 390.55
767 Singorikhurd
Manawadi Stop
CE WG Seoni Barrage 16.12.2015 Chhindwara 325 AA Accorded 16/05/2016 230 382.05
768 Bandhani CE WG Seoni Dam 16.12.2015 Chhindwara 324 AA Accorded 1/10/2016 345 1141.51
769 Kekra CE WG Seoni Dam 16.12.2015 Chhindwara 406 AA Accorded 1/10/2016 355 1239.78
770 Khapekalan CE WG Seoni Dam 16.12.2015 Chhindwara 785 AA Accorded 1/10/2016 760 2643.25
771 Seltiya CE WG Seoni Dam 16.12.2015 Chhindwara 778 AA Accorded 1/10/2016 530 1742.78
772 Sendurjana CE WG Seoni Dam 16.12.2015 Chhindwara 288 AA Accorded 17/08/2016 290 862.2
773 Kona Pindrai
(Stop Dam) on
CE WG Seoni Barrage 30.11.2015 Chhindwara 145 AA Accorded 30.03.16 167 263.73