Absorber R&D and Instrumentation

27
Absorber R&D and Instrumentation MICE Meeting at FNAL, Jun 8-11, 2006 Shigeru Ishimoto KEK and MICE Japan “Sakuraso” Japanese Primula and Green H ouse

description

Absorber R&D and Instrumentation. Shigeru Ishimoto KEK and MICE Japan. MICE Meeting at FNAL, Jun 8-11, 2006. “Sakuraso” Japanese Primula and Green House. MICE Absorber (present version). Room Temp. Magnet Bore. L-He/N2 OUT. Thermometers CX-1050-SD. L-H2 OUT. L-H2 Level Sensor - PowerPoint PPT Presentation

Transcript of Absorber R&D and Instrumentation

Page 1: Absorber R&D and  Instrumentation

Absorber R&D and Instrumentation

MICE Meeting at FNAL, Jun 8-11, 2006

Shigeru Ishimoto KEK

and MICE Japan

“Sakuraso” Japanese Primula and Green House

Page 2: Absorber R&D and  Instrumentation

L-H2 Level Sensor CX-1050-SD

MICE Absorber (present version)

2-HeatersHTR-25-100

L-H2 IN

L-H2 OUT

Room Temp. Magnet Bore L-He/N2 OUT

L-He/N2 IN

ThermometersCX-1050-SD

(20 L)

Page 3: Absorber R&D and  Instrumentation

Absorber Test Cryostat & Test Absorber

Page 4: Absorber R&D and  Instrumentation

Condenser & Level Sensor

1.27 L

4-KF16

KF16

18

, t1.

0、

L=

108

.5

KF16-LONG

BRAZING

1.27 L

4-KF16

KF16

18

, t1.

0、

L=

108

.5

KF16-LONG

KF40L=100KF40

KF40 L=100 Pipe

For Test (0.2 L)

192

48 pin feedthrough on KF40

Page 5: Absorber R&D and  Instrumentation

L-H2/LHe Level sensor in absorber

CX-1050-SD

DC ~mA

V4

V3

DC Current for L-H2/LHe should be optimized (KEK R&D).

LHeLH2

Page 6: Absorber R&D and  Instrumentation

LH2/He Level Sensor

KF40 + 48 pin feedthrough

KF40 L=100

Extension Tube

CX-1050-SDX5

(serial)

CX-1050-SDX1 calibrated

(4 wires)

2 cm

2 cm

2 cm

2 cm

Page 7: Absorber R&D and  Instrumentation

LH2 Condenser

LH2 IN/OUT

Heat Links

Cryocooler & Condenser

Condenser Heater

HTR-25-100 (100W)

LH2/He Level Sensor

In Extension

KF40 + 48 pin feedthrough

1st stage

2nd stage

Page 8: Absorber R&D and  Instrumentation

Absorber Test Cryostat

MLI H2 TANK 2m3 (1.0-1.3 bar) ~1 L

Page 9: Absorber R&D and  Instrumentation

LakeShore 218S

Keithley 2700 DMM

Cernox x8

MKS 0-2000 Torr

Level #1-5

VAC. Gauge . . .

MONITOR (LabView)

Shoji Suzuki

LakeShore 218 Keithley 2700 DMM

Absorber DAQ System

Page 10: Absorber R&D and  Instrumentation

0.368 l/h (3.23 W)

(MICE; 57 hr for 20 l)

0.20 l/h (1.77 W)

Cryocooler OFF

Cryostat Test Results

4 hrs; 300K 20 K

Empty

Page 11: Absorber R&D and  Instrumentation

Level Sensor Test Results

X100

X100

Page 12: Absorber R&D and  Instrumentation

L-H2 Level Sensor Test

~ 3 mW each

~ 0.75 mW

~ 0.2 mW

Good linearity in L-H2

It will be tested in gas phase

Thermometer 0.01mA

Page 13: Absorber R&D and  Instrumentation

Changed or new parts• Transition Joint Mini flange with In-seal• G-10 support of absorber & pipes• 30 pin feedthrough at LH2 Inlet pipe• L-He IN & OUT; straight pipes• Assemble & welding method of pipes

Revision of Absorber Parts

Effect of cryocooler selection

Smaller packing size

Easy setup

Wiring path near absorber

Remove risk of transition joint

Accuracy of pipe assemble

Motivation

1 more joint between cryocooler and absorber without transition joint

Page 14: Absorber R&D and  Instrumentation

G-10 SupportAbsorber & Pipes

Mini In-Flange

30 PinFeedthrough

Tee

L-H2 IN

G-H2 OUT

He/N2 OUT

He/N2 IN

Page 15: Absorber R&D and  Instrumentation

A-A’(22.5 deg.)G-H2 OUT

L-H2 IN

He/N2 OUT

He/N2 IN

Straight Pipes

Tee

30 PinFeedthrough

Page 16: Absorber R&D and  Instrumentation

No-Transition

cut after welding

Mini In-Flange

G-10 SupportAbsorber & Pipes

Heater

L-H2 IN

Page 17: Absorber R&D and  Instrumentation

LH2

IN/OUT

He

IN/OUT

Mini In-Flange; SS/Al joints

InIn

SS

AL

Mini Rotational Flange

If it needs rotation

Page 18: Absorber R&D and  Instrumentation

G-10 x8

t=1, W=25, L=90 mm

Total ~ 0.2 W

SS, t=1Screws on

AFC Magnet

76.5

34

SS 15.7

AL 14.8

34

G-10 Support

From Absorber

Page 19: Absorber R&D and  Instrumentation

30 Pin Feedthrough

In

Page 20: Absorber R&D and  Instrumentation

Wiring of thermometers, level

sensor & heaters

4 wires measurement for thermometers and heaters

LakeShare x2 218S Max. 16 Cernox

6 for absorber (2 on top ) 5

8 wires for level sensors

Total 32 wires inside absorber 28

2 for windows

2 for LH2 pipes

2 for C-He pipes

3 for Cryocooler 2

1 for magnet bore

3 heaters

Total 52 wires in vacuum

30 PinFeedthrough

48 PinFeedthroughat Vacuum

Page 21: Absorber R&D and  Instrumentation

PC / WS

MICE absorber monitor/control (plan)

IEEE-488

Keithley/ADCAC Bridge 370S DCPS

READ OUTS

16 CX-1050SD’s

DMR 1-6

3-HTR5-CX-1050

P&VAC&LEVEL Sensors

Abs. HTR-UP

CRYOCOOL HTR

Programmable Controller or LOGIC

DIO

ALRAM, VALVES, CRYOCOOLER-OFF, HEATER-OFF…

DCPS DCPS

Abs. HTR-DWN

LAN

Abs. LEVELCX-1050

cc1mA

DIRECT CONTROL

CRYOSTAT

Inside Abs.

Contacts

2CH

Page 22: Absorber R&D and  Instrumentation

(EXCEL FILE)

http://ishimotopc2.kek.jp/MICE-Instruments.xls

Page 23: Absorber R&D and  Instrumentation

Thermometers in absorber

AC Bridge 370S

CX-1050-SD 3716; 16ch Scanner

Page 24: Absorber R&D and  Instrumentation

LakeShore Cartridge Heater

Page 25: Absorber R&D and  Instrumentation

Detail heater assemble for MICE absorber

STOPPER

HTR-25-100¼” Hole

Page 26: Absorber R&D and  Instrumentation

Digital meter relay for MICE Absorber/Cryocooler

DMR; DIGITAL METER RELAY (Digital comparator) Watanabe (Japan) for example

INPUTWSM-452HR-R3NNNX-22VD ; DC 0-199.99 mVWSM-452HR-R3NNNX-32VD ; DC 0-1.9999 VWSM-452HR-R3NNNX-42VD ; DC 0-19.999 VWSM-452HR-R3NNNX-52VD ; DC 0-199.99 V

OUTPUT( 4.5 digit set)HI-relay (NC, HO)LO-relay (NC, NO)

Scaling; A-B (V) C-D (Unit)

DC24V

Page 27: Absorber R&D and  Instrumentation

(1) Absorber R&D at KEK

- Level sensor test is going

- Absorber L-H2 cooling will start soon

(2) Revision of Absorber Parts

- New parts - - - Mini In-Flanges, G-10, feedthrough, tee …

- Pipe assemble, installation tools

(3) Absorber Instrumentation Detail

  - Selection of Cernox read out, with or without heater control

  - Needs monitor/control program

Summary