Abravanel Hall Lobby Renovation Project Addendum...

6
90 SOUTH 400 WEST, STE 110, SALT LAKE CITY, UT 84101 | +1 801 532 2393 | www.hksinc.com Abravanel Hall Lobby Renovation Project Addendum #2 Project: Salt Lake County Center for the Arts Utah Symphony | Utah Opera Abravanel Hall Lobby Renovation HKS Project No. 17350.008 Date: 02 June 2017 To: Salt Lake County Center for the Arts From: HKS Architects, Inc 90 South 400 West, Suite 110 Salt Lake City, Utah 84101 (801) 532-2393 The Pricing Documents shall be amended and/or revised by Addendum hereinafter specified and all Work affected by this Addendum shall be included. Except as may otherwise be described, labor and materials for the Work hereinafter shall conform to all requirements of the original Contract Documents. Answers to Bidder’s Questions Received 5/24/17: 1. There is a note in the cabinet specification saying that the cabinetry wood needs to be fire-rated. Please verify that this is desired, as it is more expensive. Response: The fire-retardant millwork wood is only required for the wall panels, not the cabinets. 2. Per our conversation on-site, please clarify that the Freezer, Refrigerator, Coffee Makers, TVs, Etc. are to be provided by the county and installed by the contractor. Response: Items furnished by the County & Installed by the Contractor: 1. Refrigerator 2. Freezer 3. Coffee Maker 4. Furniture 5. See sheet TA-103 for Owner Furnished Contractor Installed (OFCI) AV items

Transcript of Abravanel Hall Lobby Renovation Project Addendum...

Page 1: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

90 SOUTH 400 WEST, STE 110, SALT LAKE CITY, UT 84101 | +1 801 532 2393 | www.hksinc.com

Abravanel Hall Lobby Renovation Project Addendum #2 Project: Salt Lake County Center for the Arts Utah Symphony | Utah Opera Abravanel Hall Lobby Renovation HKS Project No. 17350.008 Date: 02 June 2017 To: Salt Lake County Center for the Arts From: HKS Architects, Inc 90 South 400 West, Suite 110 Salt Lake City, Utah 84101 (801) 532-2393 The Pricing Documents shall be amended and/or revised by Addendum hereinafter specified and all Work affected by this Addendum shall be included. Except as may otherwise be described, labor and materials for the Work hereinafter shall conform to all requirements of the original Contract Documents. Answers to Bidder’s Questions Received 5/24/17:

1. There is a note in the cabinet specification saying that the cabinetry wood needs to be fire-rated. Please verify that this is desired, as it is more expensive.

Response: The fire-retardant millwork wood is only required for the wall panels, not the cabinets.

2. Per our conversation on-site, please clarify that the Freezer, Refrigerator, Coffee Makers, TVs, Etc. are to be provided by the county and installed by the contractor.

Response: Items furnished by the County & Installed by the Contractor:

1. Refrigerator 2. Freezer 3. Coffee Maker 4. Furniture 5. See sheet TA-103 for Owner Furnished Contractor Installed (OFCI) AV

items

Page 2: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

3. As we looked at the MDF room, it became apparent that the "roof system" designed will not fit/work with the existing piping/conduit/wiring/etc. in the way. Please clarify how this is to be accomplished. Response: The drip pan/ roofing panel will need to be fitted underneath existing wiring, conduit, sprinkler piping, etc. as much as possible. The panel can be cut to divert water toward the mechanical room floor where obstructed. The design intent is for as much of the area above the room along the south MDF wall receives protection from pipe condensation above. See attached sheet A2.00.

4. Per our site conversation, please clarify what items will need to be salvaged to the owner, and where the owner will retrieve the items (on-site or elsewhere). Response: The large coat check and concessions booths, merchandise cabinets, and other millwork cabinets shall be demolished and removed by contractor. See attached revised sheet AD2.01.

Architectural Revisions:

Sheet A2.00 – Added temporary screened fencing to North Plaza area. Sheet AD2.01 – Revised demolition notes at ground floor lobby. Sheet A3.51 – The location of the speakers at the concrete columns clarified. End of Addendum #2

Page 3: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

DRAWING ABBREVIATIONS PROJECT SUMMARY

LEGEND

A

AB ANCHOR BOLTAD AREA DRAINAC AIR CONDITIONINGACT ACOUSTICAL CEILING TILEADD ADDENDUMADD'L ADDITIONALADJ ADJACENTAFF ABOVE FINISHED FLOORAGGR AGGREGATEAL ALUM ALUMINUMALT ALTERNATEANOD ANODIZEDAPPROX APPROXIMATEARCH ARCHITECTURAL

B

B.M. BENCH MARKBD BOARDBETW BETWEENBF BACKFACEBG BUMPER GUARDBL BED LOCATORBL BUILDING LINEBLDG BUILDINGBLKG BLOCKINGBM BEAMBOT BOTTOMBR BUMPER RAILBRG BEARINGBSMT BASEMENTBU ROD BACK-UP RODBUR BUILT-UP ROOFBW BEARING WALL

C

C COMPACT PARKING SPACECDR CARD READERCEM CEMENTCER CERAMICCG CORNER GUARDCIP CAST IN PLACECJ CONTROL JOINTCJ CONSTRUCTION JOINTCL CENTER LINECLG CEILINGCLR CLEARCMU CONCRETE MASONRY UNITCOL COLUMNCOMM COMMUNICATIONSCONC CONCRETECONN CONNECTIONCONST CONSTRUCTIONCONT CONTINUOUSCOORD COORDINATECPE CHLORINATED POLYETHYLENECOOR CORRIDORCR COLD ROLLEDCR CRASH RAILCSK COUNTERSUNKCT CERAMIC TILECTD CENTEREDCTR CENTERCW CURTAIN WALL

D

D DEPTHDBA DEFORMED BAR ANCHORDET DETAILDF DRINKING FOUNTAINDIA DIAMETERDIAPH DIAPHRAGMDIM DIMENSIONDJ DEFLECTION JOINTDL DEAD LOADDN DOWNDRG DRAWINGDS DOWN SPOUTDWGS DRAWINGSDWLS DOWELS

E

EA EACHEF EACH FACEEIFS EXTERIOR INSULATION AND

FINISH SYSTEMEJ EXPANSION JOINTEL ELEVATIONELEC ELECTRICELEV ELEVATOREOS EDGE OF SLABEQ EQUALEQUIP EQUIPMENTESC ESCALATOREW EACH WAYEWC ELECTRIC WATER COOLEREXIST EXISTINGEXP BLT EXPANSION BOLTEXT EXTERIOR

F

FD FLOOR DRAINFDN FOUNDATIONFE FIRE EXTINGUISHERFEC FIRE EXTINGUISHER CABINETFF FINISH FLOORFHC FIRE HOSE CABINETFIB FIBERGLASSFIN FINISHFLR FLOORFS FAR SIDEFT FOOTFTG FOOTINGFV FIELD VERIFYFVC FIRE VALVE CABINET

G

GA GAUGEGALV GALVANIZEDGB GRADE BEAMGEN GENERALGFRC GLASS-FIBER REINFORCED

CONCRETEGI GALVANIZED IRONGL GLASSGM GLAZED MASONRY UNITGND GROUNDGR GRADEGRG GLASS-REINFORCED GYPSUMGYP BD GYPSUM BOARD

H

HB HOSE BIBHDW HARDWAREHDWD HARDWOODHK HOOKHM HOLLOW METALHOR HORIZONTALHP HIGH POINTHR HOURHS HEADED STUDHSKP HOUSEKEEPINGHT HEIGHTHW HAND WASHHW HEAD OF WALL

I

IBC INTERNATIONAL BUILDINGCODE

ID INSIDE DIAMETERINSUL INSULATIONINT INTERIOR

J

K

K KIPS (1000 LB)KO KNOCK-OUTKP KICKPLATEKPD KEYPADKSF KIPS PER SQUARE FOOT

L

L ANGLELAV LAVATORYLG LONGLKB LOCKABLELL LIVE LOADLLH LONG LEG HORIZONTALLLV LONG LEG VERTICALLOC LOCATIONLP LOW POINTLT LIGHTLWC LIGHTWEIGHT CONCRETE

M

MAS MASONRYMAT'L MATERIALMAX MAXIMUMMECH MECHANICALMEMB MEMBRANEMEP MECHANICAL, ELECTRICAL

AND PLUMBINGMFG MANUFACTURERMGO MEDICAL GAS OUTLETMIN MINIMUMMISC MISCELLANEOUSMO MASONRY OPENINGMOB MEDICAL OFFICE BUILDINGMOD BIT MODIFIED BITUMENMOD MODIFIEDMSL MEAN SEA LEVELMTL METAL

N

NA NOT AVAILABLENIC NOT IN CONTRACTNOA NOTICE OF ACCEPTANCEBY FLORIDA GOVERNING

AUTHORITYNOM NOMINALNS NEAR SIDENTS NOT TO SCALENWC NORMAL WEIGHTCONCRETE

O

OA OVER ALLOC ON CENTEROD OUTSIDE DIAMETEROD OVERFLOW DRAINOFCI OWNER FURNISHED,

CONTRACTOR INSTALLEDOFOI OWNER FURNISHED, OWNER

INSTALLEDOH OPPOSITE HANDOPNG OPENINGOPP OPPOSITEOSF OUTSIDE FACE

P

P LAM PLASTIC LAMINATEPC PRECAST CONCRETEPCF POUNDS PER CUBIC FOOTPCP PORTLAND CEMENT

PLASTERPENT PENTHOUSEPL PROPERTY LINEPL PLATEPLUMB PLUMBINGPLYWD PLYWOODPP PUSH PLATEPOL POLISHEDPORT CEM PORTLAND CEMENTPR PAIRPREFAB PREFABRICATEDPSF POUNDS PER SQUAREFOOTPSI POUNDS PER SQUARE INCHPT POINTPT PNEUMATIC TUBEPTD PAINTED

R

R RISERRAD RADIUSRAF RUBBERIZED ASPHALT

FLASHINGRAM RUBBERIZED ASPHALT

MEMBRANERAU RUBBERIZED ASPHALT

UNDERLAYMENTRCP REFLECTED CEILING PLANRD ROOF DRAINREBAR REINFORCING BARRECP RECEPTACLEREF REFER OR REFERENCEREINF REINFORCINGRELOC RELOCATE/RELOCATEDREQ'D REQUIREDRFVC RECESSED FIRE VALVE

CABINETRM ROOMRO ROUGH OPENING

SAB SOUND ATTENUATION BLANKET

SBC STANDARD BUILDING CODESCHED SCHEDULESDL SUPERIMPOSED DEADLOADSECT SECTIONS/H SINGLE HUNGSHWR SHOWERSIM SIMILARSO STRUCTURAL OPENINGSOG SLAB ON GRADESP STAND PIPESPA SPACE, SPACINGSPEC SPECIFICATIONSQ SQUARESS STAINLESS STEELSSF SOLID SURFACESTA STATIONSTC SOUND TRANSMISSION

CLASSSTD STANDARDSTIFF STIFFENERSTIR STIRRUPSTL STEELSTRUC STRUCTURALSYM SYMMETRICALSYS SYSTEM

S

T

T TREADT&B TOP AND BOTTOMTC TOP OF CURBTEL TELEPHONETEMP TEMPERATURETHK THICKTLT TOILETTO TOP OFTOB TOP OF BEAMTOC TOP OF CONCRETETOF TOP OF FOOTINGTOP TOP OF PARAPETTOS TOP OF SLABTOSTL TOP OF STEELTRSH CH TRASH CHUTETW TOP OF WALLTYP TYPICAL

U

U/C UNDER COUNTERU/G UNDERGROUNDUNO UNLESS NOTED OTHERWISE

VAR VARIESVCT VINYL COMPOSITION TILEVERT VERTICALVEST VESTIBULEVWC VINYL WALL COVERING

V

W/ WITHW/C WHEEL CHAIRW/O WITHOUTW WIDTHWP WATERPROOF(ING)WD WOODWF WIDE FLANGEWL WIND LOADWP WORK POINTWPO WORK POINT - POINT OF

ORIGINWP1 WORK POINT - NUMBEREDWWF WELDED WIRE FABRIC

W

CONCRETE/ PRECASTCONCRETE

SOIL

SAND, EIFS FINISH COAT,OR CEMENT PLASTER

BRICK

CMU

STONE

FIBERGLASS SEMI RIGIDINSULATION

FIBERGLASS BATTINSULATION

MINERAL WOOL SEMI RIGIDINSULATION

EXPANDED POLYSTYRENERIGID INSULATION

EXTRUDED POLYSTYRENERIGID INSULATION

POLYISOCYANURATE RIGIDINSULATION

GYPSUM BOARD

EXTERIOR GYPSUMSHEATHING

EXTERIOR CEMENTBOARD

COATED GLASS MATWATER RESISTANTGYP BD

PLYWOOD

COVER BOARD

MATERIALS

ROOM NAME

XXXXX

X

X

1

A0.XX

X

A3

A3

ROOM NAME/NUMBER

EXISTING COLUMNCENTERLINE

COLUMN CENTERLINE

ACCESSORY

DEMOLITION NUMBEREDNOTES

BUILDING WALLSECTION

ELEVATION

SECTION DETAIL

PLAN, BLOW-UP DETAIL

INTERIOR ELEVATIONINDICATOR

DIRECTION INDICATOR

PARTITION TYPE WITH NOSOUND ATTENUATION

PARTITION TYPE WITHSOUND ATTENUATION

CMU WALL

NEW WALL

EXISTING WALL

DEMO WALL

1 HOUR FIRE WALL

2 HOUR FIRE WALL

3 HOUR FIRE WALL

4 HOUR FIRE WALL

NON-RATED SMOKE WALL

1 HOUR SMOKE WALL

2 HOUR SMOKE WALL

1 HOUR SHAFT WALL

2 HOUR SHAFT WALL

DRAWING SYMBOLS

BUILDING EXPANSIONJOINT

MEDICAL EQUIPMENT

CORNER GUARDS

CRASH RAIL

BUMPER RAIL

HAND RAIL

BED LOCATOR

WALL PROTECTION

IV TRACK

CUBICLE CURTAIN TRACK

EDGE OF SLAB

FACE OF BUILDING

PROJECT INFORMATION

PROJECT NAME: ABRAVANEL HALL LOBBY RENOVATION

ADDRESS: 123 WEST, SOUTH TEMPLE, SALT LAKE CITY, UT 84101

PROPOSED USE: LOBBY PATRON SERVICES COUNTER

OWNER-CONTACT: RYAN HENRIE - SALT LAKE COUNTY - [email protected]

PHONE: 385-468-0339

APPLICABLE CODES

- BUILDING CODE: 2015 IBC (INCLUDING APPENDIX J)

- MECHANICAL: 2015 IMC

- PLUMBING: 2015 IPC

- ELECTRICAL: 2014 NEC

- FIRE CODE: 2015 IFC

- STATE/CITY AMENDMENTS: HOUSE BILL 316

- LIFE SAFETY CODE: 2019 NFPA

- ACCESSIBILITY CODE: 2009 ICC ANSI 117.1/ 2010 ADAAG

- ENERGY CODE: 2015 IECC

- SIGN CODE: X

- FIRE CODE: X

- ANSI: X

- FM INSURED: NO

01

001

+9'-0" CEILING HEIGHT

CR - 3

BG

HR

AAA3

AAA3

A0.XX01

A0.XX01

A0.XX

BL

DUMMY SECTIONDETAILA0.XX

NUMBERING SYSTEM:

A2.10/01

DISCIPLINE:C - CIVILL - LANDSCAPEA - ARCHITECTUREM - MECHANICALE - ELECTRICALP - PLUMBINGS - STRUCTURALK - FOOD SERVICE

SERIES NUMBER

SHEET NUMBER WITHIN SERIES

NUMBER OF PLAN, DETAIL, ETC.ON SHEET

INDEX OF DRAWINGS

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE

:

ISSUE

© 2017 HKS ARCHITECTS, INC.

TE

MP

LAT

E V

ER

SIO

N:

KEY PLAN

HORTON LEES BROGDEN LIGHTING DESIGN

SAN FRANCISCO, CA 94107

LIGHTING CONSULTANT

300 BRANNAN STREET, SUITE 212

AB

RA

VA

NE

L H

AL

L

LO

BB

Y R

EN

OV

AT

ION

COLVIN ENGINEERING ASSOCIATES

SALT LAKE CITY, UTAH 84103

ELECTRICAL ENGINEER

244 WEST 300 NORTH, SUITE 200

VAN BOERUM & FRANK ASSOCIATES

SALT LAKE CITY, UTAH 84111

MECHANICAL ENGINEER

330 SOUTH 300 EAST

HKS ARCHITECTS, INC.

SALT LAKE CITY, UTAH 84101

ARCHITECT

90 SOUTH 400 WEST, SUITE 110

12

3 W

SO

UT

H T

EM

PL

E

SA

LT

LA

KE

CIT

Y, U

TA

H 8

410

1

UTAH SYMPHONY | UTAH OPERA

SALT LAKE CITY, UTAH 84101

OWNER

123 W SOUTH TEMPLE

CONSTRUCTION CONTROL CORPORATION

SALT LAKE CITY, UT 84101

OWNER'S CONSULTANT

307 WEST 200 SOUTH, SUITE 4006

SALT LAKE COUNTY CENTER FOR THE ARTS

SALT LAKE CITY, UTAH 84190-3000

OWNER

2001 SOUTH STATE STREET, N4300

REVISION

04/24/2017

6/2/

2017

10:

53:1

7 A

M

A0.01

INDEX AND

PROJECT

INFORMATION

04/24/17

17350.008

PERMIT SET

2.6.

4.20

1306

21

INDEX OF DRAWINGS

SHEET

NUMBER SHEET NAME 04/2

4/2

017 P

ER

MIT

SE

T

05/1

6/2

017 -

AD

DE

ND

UM

01

06/0

2/2

017 -

AD

DE

ND

UM

02

ARCHITECTURALA0.00 COVER SHEET █ █A0.01 INDEX AND PROJECT INFORMATION █ █ █A2.00 OVERALL FLOOR PLANS & ENLARGED MDF █ █ █AD2.01 LEVEL 01 DEMOLITION FLOOR PLAN & RCP █ █ █A2.01 LEVEL 01 ENLARGED FLOOR PLAN & RCP █ █A3.50 CABINET AND FINISH INFORMATION █ █A3.51 INTERIOR ELEVATIONS █ █ █A3.55 MILLWORK DETAILS █ █A3.56 MILLWORK DETAILS █ █

PLUMBINGP0.01 LEGEND AND GENERAL NOTES █P1.01 PLUMBING FLOOR PLANS █ █

ELECTRICALE201 SYMBOLS, ABBREVIATIONS AND SHEET INDEX █ █ED201 DEMOLITION LEVEL LOBBY/TICKETS POWER PLAN █ █EP200 LEVEL BASEMENT POWER PLAN █ █EP201 LEVEL LOBBY/TICKETS POWER PLAN █ █EP202 GROUND LEVEL POWER PLAN █

LIGHTINGLTG-01 LEVEL 01 (LOBBY) ENLARGED LIGHTING PLAN & ELEVATIONS █

AVTA101 AUDIO/ VIDEO █TA102 CONTROL █TA103 EQUIPMENT LIST █TA104 ELEVATIONS █

NO. DESCRIPTION DATE

1 ADDENDUM 01 05/16/20172 ADDENDUM 02 06/02/2017

1 2

Page 4: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

UP

UP

J

H

G

F

D

C

B

A

22212019181716151413121110986 24237

E

19.1 20.8 23.2col

c.8

e.2

f.8

h.2

D.6

EXISTING RETURN AIR

CHASE/ TUNNEL

EXISTING

MECH

TUNNELS

EXISTING

MECH

BASEMENT

EXISTING

UNEXCAVATED &

COMPACTED FILL

EXISTING

MECH

BASEMENT

EXTENT OF

DEMOLITION WORK

VIF5' - 0"

1

EXISTING

MDF CLOSET

/A2.00 01

OVERALL PLAN LEGEND

= LIMITS OF DEMOLITION AND NEW WORK

= EXISTING BUILDING OUTSIDE SCOPE OF PROJECT

J

H

G

F

D

C

B

A

22212019181716151413121110986 24237

E

19.1 20.8 23.2

AA

col

c.8

e.2

f.8

h.2

D.6

/A2.01 01

NEW PATRON

SERVICES

COUNTER

EXISTING

CONCERT

HALL

EXISTING

MAIN

LOBBY

EXISTING

BUSINESS

AREAS

EXISTING

TICKET

LOBBY

1 EXISTING

CONTROL ROOM

SHAFT

6'-0" HIGH TEMPORARYFENCE W/ PRIVACYSCREENING

6'-0" HIGH TEMPORARY FENCEW/ PRIVACY SCREENING MESH-COORDINATE WITH OWNER

EXISTLANDSCAPED

AREA

EXISTLANDSCAPED

AREA

EXISTLANDSCAPED

AREA

EXISTLANDSCAPED

AREA

EXISTLANDSCAPED

AREA

EXISTLANDSCAPED

AREA

2

FLOOR PLAN & RCP GENERAL NOTES

1. REFER TO SHEET A3.50 FOR FINISH INFORMATION AND SCHEDULES.2. REFER TO SHEET A3.50 SERIES FOR ARCHITECTURAL CABINET DETAILS,

LEGEND, ELEVATIONS, AND INFORMATION.3. (3) PORTABLE REFRIGERATED MILLWORK UNITS PART OF BASE BID.4. REMAINING (3) PORTABLE REFRIGERATED MILLWORK UNITS PART OF BID

ALTERNATE #1.5. FURNITURE SHOWN DASHED ARE OWNER FURNISHED/ CONTRACTOR

INSTALLED (OFCI).6. EQUIPMENT SHOWN BLUE DASHED ARE OWNER FURNISHED/ CONTRACTOR

INSTALLED (OFCI).7. REFER TO THE LIGHTING PLAN, SCHEDULE, AND FIXTURES AS SPECIFIED FOR

LIGHTING INFORMATION. REFER TO ELECTRICAL PLANS FOR POWER, CIRCUITAND PANEL INFORMATION.

8. NEW LIGHTS SHALL BE DIMMABLE- REFER TO LIGHTING PLANS ANDSPECS

9. SURFACE MOUNTED ELECTRICAL RACEWAYS SHALL BE PAINTED TO MATCHADJACENT WALL OR CEILING FINISH- REFER TO ELECTRICAL

DEMOLITION PLAN GENERAL NOTES

1. REFER TO SPECIFICATION SECTION 02 4119 - SELECTIVE DEMOLITION FORSPECIFIC PROJECT REQUIREMENTS.

2. REFER TO DEMOLITION SYMBOL LEGEND ON DRAWINGS.3. CONTRACTOR TO COORDINATE DEMOLITION WORK SEQUENCE.

REFERENCE PHASING DRAWINGS WHERE APPLICABLE.4. DEMOLITION DRAWINGS REPRESENT EXISTING CONDITIONS BASED ON

LIMITED EXISTING DRAWINGS AND SITE OBSERVATIONS. CONTRACTORSHALL FIELD VERIFY ALL EXISTING BUILDING AND SITE CONDITIONS.

5. DEMOLITIONS DRAWINGS GENERALLY INDICATE EXISTING SCOPE OF WORKTO BE DEMOLISHED AND ARE NOT INTENDED TO LIMIT OR FULLY DEFINETHE SCOPE OF WORK TO BE REMOVED IN ORDER TO ACCOMPLISH SCOPEOF NEW CONSTRUCTION. WHERE THESE CONDITIONS OCCUR OUTSIDE OFTHE DEMOLITION LIMITS, AREAS SHALL BE RETURNED TO THEIR ORIGINALCONDITION AS PART OF THE NEW CONSTRUCTION SCOPE OF WORK.

6. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY CONFLICTS BETWEENEXISTING CONSTRUCTION AND CONSTRUCTION DOCUMENTS.

7. REFERENCE STRUCTURAL, CIVIL, AND MEP DRAWINGS FOR OTHERDISCIPLINE DEMOLITION SCOPE OF WORK.

8. WHERE EXISTING WALL MOUNTED DEVICES, FIXTURES OR OTHER WALLMOUNTED ITEMS ARE SCHEDULED TO BE SALVAGED, REFERENCECONSTRUCTION DRAWINGS FOR NEW LOCATIONS OR COORDINATE WITHOWNER FOR STORAGE LOCATION.

9. PARTITIONS SCHEDULED TO BE REMOVED; DEMOLITION SHOULD INCLUDEMISCELLANEOUS BRACING, TRACK, ETC. TO BOTTOM OF STRUCTURE.

10. CONTRACTOR SHALL MAINTAIN ALL REQUIRED EXITS UNOBSTRUCTED,ILLUMINATED AND PROTECTED FROM CONSTRUCTION ACTIVITIES.

11. CONTRACTOR TO CLEAN AREAS ADJACENT TO DEMOLITION AREA OF DUST,DIRT AND DEBRIS CAUSED BY DEMOLITIONS OPERATIONS.

12. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOWDEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. TRANSPORTDEMOLISHED MATERIALS AND LEGALLY DISPOSE OF THEM.

DEMOLITION PLAN LEGEND

ITEMS SHOWN DASHED ARE TO BE REMOVED.

ITEMS SHOWN SCREENED ARE TO REMAIN.

ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.

DEMOLITION KEYNOTEXX

DEMOLITION NUMBERED NOTES

REMOVE EXISTING CARPET, PREP CONCRETE FLOOR SLAB TO RECEIVENEW FLOOR FINISH- REFER TO FINISH SCEDULE

PATCH/ REPAIR EXISTING GYP BD WALL & CEILING WHERE WATERDAMAGED- PAINT TO MATCH EXISTING

EXISTING MDF GYP BD WALL & CEILING FINISHES TO REMAIN

EXISTING MDF CLOSET DOOR & DOOR HARDWARE TO REMAIN

REMOVE EXISTING BOOKCASE & RETURN TO OWNER

EXISTING PAINTED GYP BD CEILING & LIGHT FIXTURE TO REMAIN

REMOVE EXISTING TELECOM RACK PER ELECTRICAL DEMO PLANS

1

2

3

4

5

6

7

C

1817 col

EXIST MECHEQUIP RM

0001

EXIST ELEV 0100

EXIST ELEVEQUIP RM

0002

EXIST MDF0003

EXIST MECHMECH TUNNEL

007

EXISTINGUNEXCAVATED &COMPACTED FILL

EXIST CONC COLUMN

SC

01

EX

IST

CO

NC

NEW TELECOMRACK & SWITCHESPER ELEC

EXIST CONC STAIRS

1

4

352

NEW CONDENSER UNITON HOUSEKEEPINGPAD PER MECH

7

EXIST MECHEQUIP RM

0001

EXIST MDF0003

EXIST ELEV 0100

6

2

AFF8' - 0"

OPEN TOSTRUCTURE

ABOVE

NEW SHEET METAL PANEL/ DRIPPAN ABOVE ROOM (SHOWNDASHED) FOR PREVENTION OFFUTURE WATER DAMAGE FROMPIPING ABOVE; SLOPE 1/4" PERFOOT TOWARD WEST WALL

03

A2.00

C

1/4" PER FOOTSLOPE

EXIST MDF0003

NEW SHEET METAL PANEL/ PAN; FIT UNDERNEATHEXISTING PIPING, CONDUIT, WIRING, ETC. ANDAROUND ANY OBSTRUCTIONS AS NEEDED TODIVERT WATER FROM ABOVE AND SLOPETOWARD MECH ROOM FLOOR

6

3

EXIST MECHEQUIP RM

0001

2X WOOD NAILERSAT 24" OC

DRIP EDGE

TURN UP SIDES ON DRIP PAN, EACH SIDE2

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PL

OT

DA

TE

:

ISSUE

© 2017 HKS ARCHITECTS, INC.

TE

MP

LA

TE

VE

RS

ION

:

KEY PLAN

HORTON LEES BROGDEN LIGHTING DESIGN

SAN FRANCISCO, CA 94107

LIGHTING CONSULTANT

300 BRANNAN STREET, SUITE 212

AB

RA

VA

NE

L H

AL

L

LO

BB

Y R

EN

OV

AT

ION

COLVIN ENGINEERING ASSOCIATES

SALT LAKE CITY, UTAH 84103

ELECTRICAL ENGINEER

244 WEST 300 NORTH, SUITE 200

VAN BOERUM & FRANK ASSOCIATES

SALT LAKE CITY, UTAH 84111

MECHANICAL ENGINEER

330 SOUTH 300 EAST

HKS ARCHITECTS, INC.

SALT LAKE CITY, UTAH 84101

ARCHITECT

90 SOUTH 400 WEST, SUITE 110

12

3 W

SO

UT

H T

EM

PL

E

SA

LT

LA

KE

CIT

Y, U

TA

H 8

410

1

UTAH SYMPHONY | UTAH OPERA

SALT LAKE CITY, UTAH 84101

OWNER

123 W SOUTH TEMPLE

CONSTRUCTION CONTROL CORPORATION

SALT LAKE CITY, UT 84101

OWNER'S CONSULTANT

307 WEST 200 SOUTH, SUITE 4006

SALT LAKE COUNTY CENTER FOR THE ARTS

SALT LAKE CITY, UTAH 84190-3000

OWNER

2001 SOUTH STATE STREET, N4300

REVISION

04/24/2017

6/2

/201

7 1

1:1

7:1

4 A

M

A2.00

OVERALL FLOOR

PLANS &

ENLARGED MDF

04/24/17

17350.008

PERMIT SET

2.6

.4.2

013

062

1

1/16" = 1'-0"07 LEVEL 00 (MECH. BASEMENT) - OVERALL FLOOR PLAN

N

N

1/16" = 1'-0"08 LEVEL 01 (LOBBY) - OVERALL FLOOR PLAN

NO. DESCRIPTION DATE

1 ADDENDUM 01 05/16/2017

2 ADDENDUM 02 06/02/2017

N

N 1/4" = 1'-0"01 LEVEL 00 (MECH. BASEMENT) - ENLARGED MDF

1/4" = 1'-0"02 LEVEL 00 (MECH. BASEMENT) - ENLARGED MDF RCP

1

1

1

1

1/2" = 1'-0"03 MDF CLOSET SECTION1

1

Page 5: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

JHGFDC

21

20

19

18

17

E

19.1

20.8

C.3 C.4

col

c.8 e.2 f.8 h.2D.6

EXIST MAINLOBBY1000

EXISTCORRIDOR

1012

EXISTWORKROOM

0104

EXIST OFFICE0105

EXIST ELEV 01

DN

EXISTPATRON

SERVICES1005

EXIST OFFICE0106

EXISTTICKETING

LOBBY0101

EXISTTICKETING

LOBBY0101

5

1 2 13

3

6 64

4

4

86

EXISTTILE

EXISTCARPET

EXISTTILE

EXISTCARPET

49

10

11 12

1413

15 15 15

16

17

24

17

17

18

18

18

18

22 22

7

17

13

EX

IST

TILE

EX

IST

CA

RP

ET

5

7

LINE OF TIER1 ABOVE

23

7

19

EXISTCORRIDOR

1012

EXIST ELEV 01

EXISTINGMAIN LOBBY

1000

EXISTOFFICE

0106

EXISTWORKROOM

0104

EXISTINGTICKETING

LOBBY0101

EXISTOFFICE

0105

16

30

30

32

31 31

3011 2

32

22 22

33333334 EXIST PATRONSERVICES

1005

30

30

32

30

31

DEMOLITION PLAN LEGEND

ITEMS SHOWN DASHED ARE TO BE REMOVED.

ITEMS SHOWN SCREENED ARE TO REMAIN.

ITEMS SHOWN SOLID ARE NEW CONSTRUCTION.

DEMOLITION KEYNOTEXX

DEMOLITION PLAN GENERAL NOTES

1. REFER TO SPECIFICATION SECTION 02 4119 - SELECTIVE DEMOLITION FORSPECIFIC PROJECT REQUIREMENTS.

2. REFER TO DEMOLITION SYMBOL LEGEND ON DRAWINGS.3. CONTRACTOR TO COORDINATE DEMOLITION WORK SEQUENCE.

REFERENCE PHASING DRAWINGS WHERE APPLICABLE.4. DEMOLITION DRAWINGS REPRESENT EXISTING CONDITIONS BASED ON

LIMITED EXISTING DRAWINGS AND SITE OBSERVATIONS. CONTRACTORSHALL FIELD VERIFY ALL EXISTING BUILDING AND SITE CONDITIONS.

5. DEMOLITIONS DRAWINGS GENERALLY INDICATE EXISTING SCOPE OF WORKTO BE DEMOLISHED AND ARE NOT INTENDED TO LIMIT OR FULLY DEFINETHE SCOPE OF WORK TO BE REMOVED IN ORDER TO ACCOMPLISH SCOPEOF NEW CONSTRUCTION. WHERE THESE CONDITIONS OCCUR OUTSIDE OFTHE DEMOLITION LIMITS, AREAS SHALL BE RETURNED TO THEIR ORIGINALCONDITION AS PART OF THE NEW CONSTRUCTION SCOPE OF WORK.

6. CONTRACTOR SHALL NOTIFY ARCHITECT OF ANY CONFLICTS BETWEENEXISTING CONSTRUCTION AND CONSTRUCTION DOCUMENTS.

7. REFERENCE STRUCTURAL, CIVIL, AND MEP DRAWINGS FOR OTHERDISCIPLINE DEMOLITION SCOPE OF WORK.

8. WHERE EXISTING WALL MOUNTED DEVICES, FIXTURES OR OTHER WALLMOUNTED ITEMS ARE SCHEDULED TO BE SALVAGED, REFERENCECONSTRUCTION DRAWINGS FOR NEW LOCATIONS OR COORDINATE WITHOWNER FOR STORAGE LOCATION.

9. PARTITIONS SCHEDULED TO BE REMOVED; DEMOLITION SHOULD INCLUDEMISCELLANEOUS BRACING, TRACK, ETC. TO BOTTOM OF STRUCTURE.

10. CONTRACTOR SHALL MAINTAIN ALL REQUIRED EXITS UNOBSTRUCTED,ILLUMINATED AND PROTECTED FROM CONSTRUCTION ACTIVITIES.

11. CONTRACTOR TO CLEAN AREAS ADJACENT TO DEMOLITION AREA OF DUST,DIRT AND DEBRIS CAUSED BY DEMOLITIONS OPERATIONS.

12. PROMPTLY DISPOSE OF DEMOLISHED MATERIALS. DO NOT ALLOWDEMOLISHED MATERIALS TO ACCUMULATE ON-SITE. TRANSPORTDEMOLISHED MATERIALS AND LEGALLY DISPOSE OF THEM.

DEMOLITION NUMBERED NOTES

DEMO AND REMOVE EXISTING COAT CHECK BOOTH, LIGHTING, ANDASSOCIATED ELECTRICAL. REFER TO ELEC FOR ADDITIONALINFORMATION.

DEMO AND REMOVE EXISTING CONCESSIONS BOOTH, LIGHTING, ANDASSOCIATED ELECTRICAL. REFER TO ELEC FOR ADDITIONALINFORMATION.

REMOVE EXISTING MERCHANDISE DISPLAY COUNTER & MILLWORK FOROWNER SURPLUS

REMOVE EXISTING CURTAIN & ROD

REMOVE EXISTING TALL STORAGE CABINETS

REMOVE EXISTING COMPUTER WORKSTATION, MILLWORK STORAGE,FIRST AID KIT & MISC EQUIPMENT

DEMO EXISTING CONCRETE FLOOR SLAB AS REQUIRED FOR NEWELECTRICAL CONDUIT FROM MECHANICAL TUNNEL - REFER TO ELECPLANS

REMOVE EXISTING REFRIGERATOR

REMOVE EXISTING FIRE EXTINGUISHER

REMOVE EXISTING 3-BASIN SINK, FLOOR SINK, RELATED FIXTURES &PIPING- REFER TO PLUMB PLANS

EXISTING TOUCHSCREEN LIGHTING CONTROL TO REMAIN- REFER TO ELECPLANS

EXISTING ELECTRICAL LOAD CENTER- REFER TO ELEC

REMOVE EXISTING FLOOR TILE, PREP CONCRETE FLOOR SLAB TORECEIVE NEW FLOOR FINISHES

DEMO EXISTING CONCRETE FLOOR SLAB AS REQUIRED FOR NEWPLUMBING- REFER TO PLUMB PLANS

EXISTING FLOOR-MOUNTED RETURN AIR DIFFUSER GRILLS TO REMAIN.REMOVE AS NEEDED FOR WORK IN MECHANICAL TUNNEL BELOW.PROTECT GRILLS FOR REINSTALLATION.

PROTECT IN PLACE EXISTING CHIHULY GLASS SCULPTURE, BASE, ANDRAILING

REPLACE EXISTING CARPET WHERE DISTURBED BY NEW CONSTRUCTION

TEMPORARILY REMOVE AND PROTECT EXISTING GLASS DOORS ANDHARDWARE AS NEEDED FOR CONSTRUCTION ACCESS. REINSTALL ANDRETURN TO ORIGINAL WORKING CONDITION.

REFER TO AV DRAWINGS FOR EXISTING AV RACK IN EXISTING COATCHECK BOOTH.

NOT USED.

NOT USED.

PROTECT IN PLACE EXISTING GOLD WALL FINISH

CORE DRILL CONCRETE FLOOR SLAB FOR INSTALLATION OF NEWDRINKING FOUNTAINS- REFER TO PLUMBING

SHORT-CUT EXISTING CARPET AT NEW COUNTER LOCATION, PROTECTCARPET AND ROLL INTO PLACE, TRIM FOR COUNTER AND MILLWORKINSTALLATION

EXISTING LIGHT FIXTURES TO REMAIN, PROTECT IN PLACE

EXISTING WOOD CEILING TO REMAIN, PROTECT IN PLACE

REMOVE EXISTING SURFACE MOUNTED TRACK & LIGHT FIXTURES, PATCH& REPAIR WOOD CEILING

OWNER TO REMOVE EXISTING TVs, SPEAKERS AND OTHER EQUIPMENTABOVE THE COAT CHECK & CONCESSIONS BOOTHS

EXISTING SECURITY CAMERAS TO REMAIN- REFER TO ELEC

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

30

31

32

33

22

34

23

24

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE

:

ISSUE

© 2017 HKS ARCHITECTS, INC.

TE

MP

LAT

E V

ER

SIO

N:

KEY PLAN

HORTON LEES BROGDEN LIGHTING DESIGN

SAN FRANCISCO, CA 94107

LIGHTING CONSULTANT

300 BRANNAN STREET, SUITE 212

AB

RA

VA

NE

L H

AL

L

LO

BB

Y R

EN

OV

AT

ION

COLVIN ENGINEERING ASSOCIATES

SALT LAKE CITY, UTAH 84103

ELECTRICAL ENGINEER

244 WEST 300 NORTH, SUITE 200

VAN BOERUM & FRANK ASSOCIATES

SALT LAKE CITY, UTAH 84111

MECHANICAL ENGINEER

330 SOUTH 300 EAST

HKS ARCHITECTS, INC.

SALT LAKE CITY, UTAH 84101

ARCHITECT

90 SOUTH 400 WEST, SUITE 110

12

3 W

SO

UT

H T

EM

PL

E

SA

LT

LA

KE

CIT

Y, U

TA

H 8

410

1

UTAH SYMPHONY | UTAH OPERA

SALT LAKE CITY, UTAH 84101

OWNER

123 W SOUTH TEMPLE

CONSTRUCTION CONTROL CORPORATION

SALT LAKE CITY, UT 84101

OWNER'S CONSULTANT

307 WEST 200 SOUTH, SUITE 4006

SALT LAKE COUNTY CENTER FOR THE ARTS

SALT LAKE CITY, UTAH 84190-3000

OWNER

2001 SOUTH STATE STREET, N4300

REVISION

04/24/2017

6/2/

2017

10:

53:3

7 A

M

AD2.01

LEVEL 01

DEMOLITION

FLOOR PLAN &

RCP

04/24/17

17350.008

PERMIT SET

2.6.

4.20

1306

21

1/8" = 1'-0"01 LEVEL 01 (LOBBY) DEMOLITION PLAN

1/8" = 1'-0"02 LEVEL 01 (LOBBY) RCP DEMOLITION PLAN

N

N

NO. DESCRIPTION DATE

1 ADDENDUM 01 05/16/20172 ADDENDUM 02 06/02/2017

1

2

2

2

2

Page 6: Abravanel Hall Lobby Renovation Project Addendum #2arnell-west.com/wp-content/uploads/2017/05/Addendum-2.pdf · Abravanel Hall Lobby Renovation Project Addendum ... of the area above

LEVEL 01 (LOBBY)98' - 0"

FZR REFFOLDINGTABLES

STORAGE

STANCHIONS& ROPESSTORAGE

MARKER BOARD(OFCI)

18"

44"

36"

8' -

0"

3' -

0"

JBOX JBOXJBOX

W/CEMT BOARDS

STRYKER CHAIRSTORAGE

POCKET DOOR W/TRACK & SLIDERS

PORTABLECABINET

SS01 COUNTER, FULL-HEIGHTBACKSPLASH & SIDESPLASHAT SINK AREA & COFFEE MAKING

COFFEE MAKER- CONNECTTO WATER LINE PER PLUMB

WP02 TOPWP02 TOP

ACOUSTICINSULATION AT ALLSIDES & TOP OFREFRIGERATORALCOVE

LOCKABLEREFRIGERATOR& FREEZER

36" a 15" a 21" a 21" a 21" a

WP01

AB01

WP01

AB01

BOTTLEDWATER

STORAGE

WP01

WP01

AB01

WP01

AB01

WP01

AB01

05

A3.55

06

A3.55

07

A3.55

08

A3.55

09

A3.55

POCKET DOOR W/TRACK & SLIDERS CABINET DOORS

W/ ATTACHEDTOE KICK

12

A3.56SHORT COAT

STORAGESHORT COAT

STORAGELONG COATSTORAGE

SSF01SS CPCP

LOCKABLE UPPERSTORAGE

10

A3.55PAPER TOWEL &SOAP DISPENSER(OFCI)

26" DEEP CABINETS

FILLER END PANEL

FILLER END PANEL FILLER END PANEL

11

1

1

1

1

SS

COFFEE MAKINGAREA

VENTED SLIDINGDOORS

1

AV RACKSTORAGE

NETWORKRACK

STORAGE

16

A3.56

1

1

LEVEL 01 (LOBBY)98' - 0"

55" TV (OFCI)TV MOUNTING (CFCI)

PER AV PLANS

5' - 4" 5' - 4"

7' - 9" 10' - 8" 3' - 0" 27' - 2" 3' - 0" 10' - 8" 7' - 9"

GUEST SERVICES

7' -

0"

5' -

1"

DRINKINGFOUNTAINS PERPLUMBING

LOCKABLEDOORS

SOUND BAR PER AV PLANS

05

A3.55ALUMINUM LETTERSIGNAGE

EQ EQ /A3.56 06/A3.56 06

06

A3.55

07

A3.55

MERCHDISPLAY

MERCHSTORAGE

10

A3.55

08

A3.55

09

A3.55

OUTLET FACEPLATE TOMATCH BASE FINISH,TYPICAL- SEE ELEC

80" TV W/ LIVE CAMERAFEED FROM STAGE- SEEAV PLANS (OFCI)

BORDER OFEXISTING GOLDWALL

LINE OF EXISTINGGOLD WALL

5' -

0"

13

A3.5613

A3.56

WP02 TOP WP02 TOP

WP01

WP01

AB01 AB01

WP01

AB01

WP01, ALL SIDES

/A3.56 14

WALL MOUNTEDBRACKET (CFCI)

7' -

7 1/

4"

10" 1"

EXISTING 1"CONCRETEWALL JOINT3/4"

72 1/2" 3/4"

5' - 6" 5' - 6"

16

A3.56

LEVEL 01 (LOBBY)98' - 0"

POS #1 POS #2 POS #3

3' -

6"PROGRAM BOXSTORAGE

MERCH

POS#2

GZ01

MERCHSTORAGEDRAWERS(LOCKABLE)

3' -

0"

3' -

0"

3' -

6"

MERCH

POS#1

01

A3.55

/A3.56 06/A3.56 06

01

A3.55

01

A3.55

21" a21" a 36" a 18" a 30" a 30" a18" a 18" a 18" a36" a

OPPPORTABLE REFRIGERATEDUNIT- SEE SHEET A3.56 FORDETAILS

PORTABLEREFRIGERATED UNIT- SEESHEET A3.56 FOR DETAILS

(3) PORTABLE REFRIGERATED UNITS PART OF BASE BID.(3) PORTABLE REFRIGERATED UNITS PART OF BID ALTERNATE #1.

NOTE:28" DEEP BASE CABINETS,TYP AT FRONT COUNTER

03

A3.55

03

A3.55

02

A3.55

11

A3.56

1' -

6"

3' -

0"

CP

CP

CP CP

CP

CP

f

AV CONTROLPANEL STORAGEAT BASE CABINET-SEE AV PLANS 1

LEVEL 01 (LOBBY)98' - 0"

POS #3 POS #2 POS #1

GZ01 DISPLAYGLASS

3' -

6"

LIGHTING

01

A3.55 02

A3.55

MT01

SSF01

AB01

3"2'

- 11

"4"

3' -

6"

3' -

0"

AB01

WP01

SSF01

WP01

MT01 AB01MT01

SSF01

WP01

MT01

SSF01WP01

SSF01WP01

11

A3.56CP

CPCP CP

CPCP

GUEST SERVICES

SPEAKER MOUNTEDAT TOP OF COLUMN-REF AV DWGS

2

2SPEAKER- REF AV DWGS

LEVEL 01 (LOBBY)98' - 0"

PORTABLECONCESSIONS ISLAND

LOCKING CASTORSAT REAR

GROMMET ATEACH UNIT

/A3.56 06/A3.56 06

3' -

0"

10

A3.56

OPP

SSF01WP01,ALL SIDES

CP

6' - 0" 1 1/2" 6' - 0"

LEVEL 01 (LOBBY)98' - 0"

07

A3.56/A3.55 02

CP

LEVEL 01 (LOBBY)98' - 0"

MERCH

POS #1

MERCH

POS #2 06

A3.56SSF01

GZ01

WP01

AB01

DISPLAYGLASS

CP

SLIDING DOORS(LOCKABLE)

06

A3.56

07

A3.56 SSF01

WP01, ALLSIDES

AB01

LOCKINGCASTORS

CP

3' -

0"

LEVEL 01 (LOBBY)98' - 0"

SSF01

WP01

AB01

10

A3.56

CP

2' -

2"10

"

3' -

0"

3/4" 6' - 0" 3/4" 3/4" 6' - 0" 3/4"

HKS PROJECT NUMBER

DATE

SHEET TITLE

SHEET NO.

PLO

T D

ATE

:

ISSUE

© 2017 HKS ARCHITECTS, INC.

TE

MP

LAT

E V

ER

SIO

N:

KEY PLAN

HORTON LEES BROGDEN LIGHTING DESIGN

SAN FRANCISCO, CA 94107

LIGHTING CONSULTANT

300 BRANNAN STREET, SUITE 212

AB

RA

VA

NE

L H

AL

L

LO

BB

Y R

EN

OV

AT

ION

COLVIN ENGINEERING ASSOCIATES

SALT LAKE CITY, UTAH 84103

ELECTRICAL ENGINEER

244 WEST 300 NORTH, SUITE 200

VAN BOERUM & FRANK ASSOCIATES

SALT LAKE CITY, UTAH 84111

MECHANICAL ENGINEER

330 SOUTH 300 EAST

HKS ARCHITECTS, INC.

SALT LAKE CITY, UTAH 84101

ARCHITECT

90 SOUTH 400 WEST, SUITE 110

12

3 W

SO

UT

H T

EM

PL

E

SA

LT

LA

KE

CIT

Y, U

TA

H 8

410

1

UTAH SYMPHONY | UTAH OPERA

SALT LAKE CITY, UTAH 84101

OWNER

123 W SOUTH TEMPLE

CONSTRUCTION CONTROL CORPORATION

SALT LAKE CITY, UT 84101

OWNER'S CONSULTANT

307 WEST 200 SOUTH, SUITE 4006

SALT LAKE COUNTY CENTER FOR THE ARTS

SALT LAKE CITY, UTAH 84190-3000

OWNER

2001 SOUTH STATE STREET, N4300

REVISION

04/24/2017

6/2/

2017

10:

53:2

9 A

M

A3.51

INTERIOR

ELEVATIONS

04/24/17

17350.008

PERMIT SET

2.6.

4.20

1306

21

3/8" = 1'-0"01 LOBBY MILLWORK ELEVATION - REAR PREP/ COATS

3/8" = 1'-0"04 LOBBY MILLWORK ELEVATION - FRONT TV

3/8" = 1'-0"05 LOBBY MILLWORK ELEVATION - REAR SALES

3/8" = 1'-0"10 LOBBY MILLWORK ELEVATION - FRONT SALES

3/8" = 1'-0"07 LOBBY MILLWORK ELEVATION - REAR ISLAND 3/8" = 1'-0"08 REAR MERCH @ PATRON COUNTER

3/8" = 1'-0"06 LOBBY MILLWORK ELEV - FRONT MERCH

3/8" = 1'-0"09 REAR MERCH

3/8" = 1'-0"02 PORTABLE ISLANDS - FRONT

NO. DESCRIPTION DATE

1 ADDENDUM 01 05/16/20172 ADDENDUM 02 06/02/2017