About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for...

23

Transcript of About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for...

Page 1: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer
Page 2: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

About EarthRes

• EarthRes Mission and Culture• Market Sectors• Engineering and Consulting Services• Diverse Staff• Prime Locations• EarthRes’ Midstream Services

Page 3: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes Mission and Culture

• Partner with our clients to develop trust

• Understand our client’s needs, first

• Maintain open and honest communication

• Offer solutions that deliver maximum value to the client

• Experienced staff provides superior and creative client services

• Adhere to sound ethics and principles

Page 4: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Markets• Solid Waste

• Mining

• Commercial

• Industrial

• Government

• Oil and Gas

Page 5: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Overall Client Services • Air Quality Permitting and Compliance• Investigation and Remediation• Geology, Hydrogeology and Spring Water• Landfill Gas and Gas-to-Energy• Land Development Engineering• Mineral Mining and Processing• Solid Waste Engineering Services• Water and Wastewater Treatment Services• Wetlands Delineation and Permitting• Shale Gas

Page 6: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Multidisciplinary Engineering Consulting Firm

• Engineers• Civil

• Environmental

• Mechanical

• Chemical

• Scientists• Geologists

• Chemists

• Environmental

Page 7: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Prime Locations

• Morgantown, West Virginia

• Pipersville, Pennsylvania

Convenient location to the

Marcellus footprint

Page 8: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Midstream Plant/Facilities Engineering Services

Page 9: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

How can EarthRes Support Your Midstream Needs?

• Balance of Plant Engineering and Design for:

• Well Pad Connects• Measuring and/or Regulating Stations• Pipeline • Compression• Dehydration• Mainline Interconnects• Gas Heating• NGL Plants• Fuel Gas Conditioning• Storage of Water, Brine, Lube Oil, Condensate,

Glycol

• Air Systems• Acid Gas Removal

Systems• SCADA Systems• More ……..

Page 10: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes Midstream Services - Concept

• Conceptual Engineering and Design for Facilities and Pipeline (Concept Phase)

– Design Basis Development

– Block Flow Diagram

– Conceptual Layouts/Plot Plan/General Arrangements

– Cost Estimate

– Project Schedule

– 3-D Laser Scanning of Facilities

Page 11: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes Midstream Services - Pre-FEED

• Pre-Front End Engineering and Design (Pre-FEED Phase, builds on Concept)– Evaluate Existing Facilities

– Major Equipment Specifications

– Process Flow Diagrams (PFDs)

– Piping & Instrumentation Diagrams (P&IDs)

– Equipment Sizing

– Refined Cost Estimate

– Updated Project Schedule

Page 12: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes Midstream Services - FEED

• FEED (builds on Pre-FEED)

– Geotechnical Investigations

– Site Development and Permitting

• Site Development Plans/Drawings

• Stormwater Management Plans

• Erosion and Sedimentation Control Plans

• Exhaust Emissions

– Procurement Planning

– Material RFQs/Bid Packages

– Bid Evaluations

– Site Grading/Drainage/Paving Plans

– Relief Study/Vapor Handling/Vapor Disposal

– Hydraulic Modeling

– Construction Plan

Page 13: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes Midstream Services - Detailed

• Detailed Engineering and Design (builds on FEED)

– Design Review Meetings

– Project Management

– Operability Review

– Demo Drawings

– Pile Location Plan

– and more …….

Page 14: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Midstream Compressor Station and Pipeline Services

Page 15: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ Approach

o Establish project objectives including scope, schedule, budget and other client expectations

o Obtain basic location/sketch from client

o Identify site specific criteria/conditions/requirements

EarthRes recognizes the importance of communications to develop a common understanding of objectives and any unique circumstances that exist

EarthRes values regular interactions and communications with our clients, we know your time is valuable, so we will make it easy to communicate with us

Page 16: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ Approach

Preliminary Route/Location Review

o Establish preliminary ROW and location of construction easements for additional work space

o Special watershed classification

High Quality/Exceptional Value (PA)

Tier 3 (WV)

Wetland Category (OH)

Naturally reproducing trout stream

o Threatened or endangered species (PA)

o Assist as needed with property owner negotiations

EarthRes works with clients to help with pipeline route selection to avoid challenging environmental and construction issues

Page 17: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ Approach

Field Screening

o Field walk with landman/client

o Select best alignment for wetland and stream crossings

o Delineate wetlands

o Identify alignment concerns related to constructability issues including steep slopes, rock outcrops, property owner concerns…..

o Identify optimal location for road crossings

o Identify location of construction access points

EarthRes has experienced environmental and engineering staff who will conduct field review of the pipe alignment to minimize environmental impacts, avoid challenging construction conditions and identify the optimal locations

Page 18: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ ApproachConstruction Planso Finalize pipeline alignmento Establish easementso Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer to ensure plan

reflects adequate staging locations and work space o Perform Geotechnical investigation as neededo Finalize E&S measures o Detail road crossings

EarthRes combines experienced Engineering staff and Construction Services experience to prepare effective plans.

Page 19: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ ApproachRegulatory Permittingo Erosion and Sedimentation Control Plan permit (ESCGP-2) (PA)o NPDES Stormwater Permit (WV)o Wetland/Waterway impact permit for access drive construction

PADEP GP-5, Utility Line Crossing (PA) PADEP GP-7, Minor Road Crossing (PA) PADEP GP-8, Temporary Road Crossing (PA) WV DEP Section 401 Certification and US Army Corps of Engineers Section 404 NWP (WV and OH)

o PennDOT Highway Occupancy Permit if access is from State roadway (PA)o Road Bonding Agreement/DOH Certification (WV)

EarthRes has a proven record of successful project permitting in a variety of challenging markets including mines and landfills.

EarthRes maintains close contacts and outstanding reputation with regulatory agencies to ensure an efficient and timely approval process.

Page 20: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ Approach

• Construction Survey Stakeout

o Pipeline alignment

o Limit of disturbance and clearingfor work space

o E&S controls

o Access drive locations

Page 21: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

EarthRes’ Goal:

• Collaborate with you to develop trust

• Understand your needs, first

• Maintain open and honest communication

• Offer solutions that deliver you maximum value

• Supply experienced staff to provide superior and creative client services

• Adhere to sound ethics and principles

Page 22: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

• Where do you need support?• What are your needs in midstream

development?• How can the diverse staff at EarthRes assist in

your business development?

Page 23: About EarthRes · o Finalize pipeline alignment o Establish easements o Detail plans for stream/wetland crossings o Horizontal Directional Drilling (HDD). Work closely with HDD contractor/engineer

Thank You!