Aboriginal Participation in Construction
Participation Plan Project name Wentworth Point Public School
Contracting agency Department of Education
Contractor details Richard Crookes Construction
APIC Category: Category 1 (primarily directed at Aboriginal community) × Category 2 (over $10 million) Category 3 ($1 million ‐ $10 million)
Total project spend ($)
$18M APIC spend as a per cent (%)
1.5% (adjust if higher)
APIC spend ($)
$270,000
Direct Expenditure Type of expenditure Recipients (if known) Estimated Amount
a) Direct employment (employees, apprentices)
b) Other employment (contractors, group training)
c) Goods/services bought from Aboriginal businesses
d) Education expenses
e) Payments to Aboriginal business/community organisations
f) Other type of expenditure approved by the agency
Total Amount ($) $135,000.00
As a per cent of APIC spend (%) 0.75%
Indirect Expenditure
As a per cent of APIC spend (%)
0.75% Actual amount ($) $135,000.00
Refer attached Aboriginal Participation Plan. Engaged Career Trackers to advise / liaise.
Approved by: See attached plan.
W
WENTW
A
WOR
ABORIG
RTH P
GINAL P
POINT
PARTIC
T SCH
IPATIO
Date 2
HOOL1073
N PLAN
20/07/201
L 3
N
6
Con
Statement o
Revision .......
1 Intro
1.1
1.2
1.3
1.3.1
1.3.2
1.4
1.5
2 Role
2.1
2.2
2.3
2.4
2.5
3 Impl
3.1
3.2
3.3
3.4
3.5
3.6
4 Mea
5 Reco
Appendix 2
ntentof Support for
...............................
oduction.............
Scope ..........
Background
Objectives
Company S
Project Obj
Performanc
Legal and O
es and Respon
RCC Senio
Project Ma
Aboriginal
Liaison Off
Subcontrac
ementation .....
Planning ......
Communic
Resources .
Subcontrac
Training ......
Delivery .....
asurement, Eva
ords .....................
2 – Resources
ts r Aboriginal Pa
..............................
..............................
..............................
d ...........................
.............................
Strategy .............
jectives .............
ce Targets .......
Other Require
nsibilities .............
or Managemen
anager .................
Project Perso
ficer .....................
ctors ....................
..............................
..............................
cation ..................
..............................
ctors ....................
..............................
..............................
aluation and R
..............................
and Informatio
articipation in C
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
ements ...............
..............................
nt ...........................
..............................
nnel .....................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
eview .................
..............................
on ........................
Construction ..
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
ABORIGINA
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
..............................
L PARTICIPATIOREVISION: JU
........................... 3
........................... 4
........................... 5
........................... 5
........................... 5
........................... 6
........................... 6
........................... 6
........................... 6
........................... 6
........................... 8
........................... 8
........................... 8
........................... 8
........................... 8
........................... 8
........................... 9
........................... 9
........................... 9
........................... 9
........................... 9
........................ 10
........................ 10
........................ 14
........................ 15
........................ 18
ON PLAN ULY 2016
Page | 2
4
6
6
6
6
6
8
8
8
8
8
8
0
0
4
8
A
In line with employmenCrookes CoAboriginal pcompany an
RCC is an Ebe given a fthe Compa
The extent project to pexperienced
Aboriginal pstakeholderachieving th
Jamie Croo
Managing D
STATABORIG
the objectivesnt and businessonstructions Ptpeople and Abnd project leve
Equal Employmfair chance to dny at all levels
to which Aboproject dependd resources.
participation prs. Within in Rhe targeted ou
kes
Director
TEMENTGINAL
s of the NSW s opportunitie
Pty Limited (RCboriginal enterels.
ment Opportudemonstrate t.
original participding on the siz
lans will be deRCC, project mutcomes of the
T OF S PARTI
CON
Government es for AboriginCC) is commitrprises to parti
unity employertheir abilities a
pation can be ize, location, na
eveloped for pmanagers will be Aboriginal Pa
SUPPOICIPATNSTRU
for supportingal people, sentted to extendcipate in const
r and accordinand have equit
ncluded in coature and avail
projects followbe responsiblearticipation Pla
RT FOTION INUCTION
ABORIGINA
g and encoura
nior managemeding opportuntruction at bo
ngly Aboriginal table access to
nstruction willability of suita
wing consultatioe for monitorinan.
OR N N
L PARTICIPATIOREVISION: JU
aging more ent of Richard ities for th the
people will o jobs within
l vary from bly
on with ng and
ON PLAN ULY 2016
Page | 3
Revi
Rev Date
20/07/2016
18/08/2016
sion
Revision
6 Original Is
6 Updated
Description
ssues
Agency (AP)
ABORIGINA
PM’s Iacceptchange
MR
MR
L PARTICIPATIOREVISION: JU
nitials (i.e. tance of es)
ON PLAN ULY 2016
Page | 4
1
1.1
1.2
Intro
Scope The requireContract fo
Reference A
The contrac
BackgroTo address Director-GeEmploymendevelopmen
The Steerinagencies to targets and the workfor
oduct
ement for an Allowing the pr
Aboriginal Part
ct nominates t
ound the issues ideeneral of the Nnt and Developnt of “Making
g Committee focus their strrecognise andrce of NSW:
tion
Aboriginal Partrocess shown
ticipation in C
this project as
ntified in the WNSW Premierpment SteerinIt Our Busines
has establisherategies to facd enhance, the
ticipation Plan below:
onstruction G
a Category 2
Workforce Plar’s Departmenng Committee ss”.
ed the followinilitate the achi
e valuable cont
(APP) has bee
uidelines (Jan2
project.
anning Agencyt established t in November
ng Key Result Aevement of Atribution that A
ABORIGINA
en nominated
2007)
y Survey (CEOthe NSW Abor, 2005 to guid
Areas to assistAboriginal empAboriginal peo
L PARTICIPATIOREVISION: JU
by the
O Survey), the original de the
t public sectorloyment
ople make to
ON PLAN ULY 2016
Page | 5
r
1.3
1.3.1
1.3.2
1.4
1.5
Re Sk Re Cu Co
Objectiv
Company
RCC has deSupport andbe modifiedAboriginal wstatus.
Our compa
Invof RCforthe
Ofschvia
Wme
Incprprin
Project O
Add or rem
Project leve
Assu
Trsureq
Enpu
Invop
Based on thperformanc
PerformThe perform
De No No
op
Legal anLegal and o
Ab
ecruitment kills Acquisitionetention ultural Educatioommunity Eng
ves
y Strategy
eveloped a comd the project ld over time deworkers and in
any strategy fo
vestigating posemployment w
CC takes on nreman, site mae basis of the ffering work exhool visits to dable career.
We will liase witetropolitan ancluding an annograms, subsidovide our subconstruction.
Objectives
move Objective
el objectives of
ssisting, in conjbcontractors, Araining (inductibcontractors bquirements of
ngaging and coublic meetings vestigating skillpportunities be
he outcomes oce indicators. R
mance Targmance target a
etermine baseotifying the locotifying all subpportunity for
d Other Rther requirem
boriginal Land
n & Career De
on gagement
mpany wide stlevel objectiveepending on thndigenous sup
r Aboriginal p
sitions for Abowhere appropew employeeanagers, and omost suitable xperience for discuss and en
th local indigend regional schexure of infordies and tradecontractors w
es depending
f the APP inclu
junction with tAboriginal traon and site babecome culturf the APP. onsulting with t
and visiting cols shortages weyond the life
of the consultaReview and mo
gets agreed for this
ed in the outcocal Aboriginal -contractors aemployment.
Requiremements relevant
Rights Act 19
evelopment
trategy to comes for Aboriginhe locality of oport programs
articipation in
original incumbpriate) labourins for the life o
other professiocandidate. Aboriginal schcourage Abor
nous groups aools where th
rmation on regsmen lists in o
with an informa
on your proje
ude the follow
the Indigenousinees to compased) to ensurrally aware and
the Aboriginal ommunity grou
within the indusof the project
ation process, odify the APP
s project is:
omes of Sectioemployment g
at tender time
ents to the APP in
83
mpliment the cal participation
our projects, ths and RCC’s w
construction i
bents to sourceng and leadingf a project. Fo
onal staff, empl
hool children. Wriginal student
nd other stakehis may be appgional stakeholour subcontracation package o
ct
wing:
s group/contraplete apprenticre all of the prod embrace and
community thups. stry with the v.
set targets, revto maximise it
on 3.6 of this Pgroups prior to of the require
clude:
ABORIGINA
company Staten. Company ohe availability owork in hand /
includes:
e for interviewg hand positionor positions suloyees will be
We will particto consider co
eholders to idpropriate. lder groups, actor questionnon Aboriginal
act liaison rep ceships. roject team and implement t
hrough inform
view of providi
view outcomeits objectives.
Plan o commencemement to allow
L PARTICIPATIOREVISION: JU
ement of objectives will of both cash flow
w (and offers ns where uch as selected on
cipate in onstruction as
entify
pprentice naires, to participation
and our
d our the
mation days,
ing
es and
ment. w maximum
ON PLAN ULY 2016
Page | 6
An Pr
Note: the re
nti-Discriminativacy and Pers
eporting of Ab
tion Act 1977 sonal Informat
boriginality sta
ion Act 1998
atus by an indivvidual is a volu
ABORIGINA
untary process
L PARTICIPATIOREVISION: JU
.
ON PLAN ULY 2016
Page | 7
2
2.1
2.2
2.3
2.4
2.5
Role
RCC SeSenior manwith the RCbe taken wh
Project The projectof the APP. via the proje
AboriginFor personnconjunctioncompetencedescriptionscommunica
Pu Ac Su Re Cr
Liaison OThe staff of RCC and infor monitorLiaison Officprocess.
SubcontSubcontractopportunitie
The ability tbase on consubcontractencourage, participation
es and
nior Manaagement will b
CC’s procedurhen outcomes
Manager t manager will The project ect monthly re
nal Projectnel directly em with local indes for develops will be consisate:
urpose of the pccountabilities ccess goals as
equired compereativity and in
Officer f the site local ndigenous worring subcontraccer will report
tractors tors who are aes for the Abo
to provide thentract conditiot questionnairemonitor and rn.
d Resp
agement be responsibleres. The results are not meet
be responsiblmanager will reports.
t Personnmployed by RCdigenous grouppment that relastent with RC
position of the employ agreed betweetencies nnovation requ
indigenous grorkers for the pctors’ evolvemt to the extern
awarded workoriginal comm
ese opportunitons set by RCCe, subcontractreport subcon
ponsib
e for monitorints of audits wilting the requir
e for monitorreport to RCC
el CC, position dep/contract liaisate to their ocC’s requireme
yee een to employ
uired for the ro
oup/contract lroject. The Lia
ment and commnal stakeholde
k on this projeunities either d
ties will be parC. Our subco, subcontract mtractor perfor
bilitie
ng that the APl be reviewed
rements of the
ing and achievC senior manag
escriptions wilson rep so theccupation or trents for other e
yees and their
ole.
iaison rep will aison officer(s)mitment to thrs as identified
ct will be encodirectly or ind
rt of the selectntracting procmeetings, progrmance with re
ABORIGINA
es
PP is audited ind and approprie Plan.
ving the targetegement on a m
l be developeey reflect the srade. The posemployees an
manager
act as the liais) will also be ris APP. Addit
d during the co
ouraged to prirectly.
tion and awardcesses (tendergress claims) wespect to Abo
L PARTICIPATIOREVISION: JU
n accordance ate action will
ed outcomes monthly basis
d in kill level and sition d will
son between responsible tionally, the onsultation
rovide
d process r offer, will define, original
ON PLAN ULY 2016
Page | 8
3
3.1
3.2
3.3
3.4
Impl
PlanningReview of tparticipationliase closelyestablish a pperformanc
The APP w
A in
Prsta
CommuConsultatio
Sta Pr Co
ResourcSpecialist reand commu
ThAb
ThAbex
Strfunfor
Nawitem
Comaco
http://wwwmes.htm
At a project
My
Further info
SubcontFor the key with the Suapprentices
emen
g he tender docn requirement with the locatprogram to mece targets for t
ill be develope
strategic plan a culturally senotocols for unakeholders.
unication n and commu
akeholders, RCoject toolbox ompany and p
ces esources and cunication of th
he NSW Depaboriginal businhe NSW Depaboriginal Peopxperienced Abructures Trainnding p[packagr long term jobational Indigenth employers
mployment whorporate Leadajor private se
ommercially ba
.workplace.gov
t level:
y Gateway gro
ormation is pro
tractors trades anticipbcontracts & Chips.
ntatio
cuments will bts or issues noation group/coeet the objectthe project (se
ed and review
for ensuring dnsitive manne
ndertaking effe
unication proce
CC, the princip talks
project newslet
consultants wile APP at a pro
artment of Staesses registereartment of Edule (NCAP) O
boriginal jobseeing and Emploges of tailoredbs (ph. 1802
nous Cadetshipwho can give
hile undertakiners for Indigen
ector Australiaased Aborigina
v.au/workplace
oup training sc
ovided in Appe
pated to be onCareer Tracke
n
be undertaken minated. If RCntract liaison rtives of the Coee Section 1.3)
wed as required
dealings with Ar.
ective commun
esses during th
pal and subcon
tters; and
l be engaged toject level. Re
ate and Regioned on its databucation and Tfficer who canekers to fill prooyment Projecd assistance, inc102). p Project (NICAboriginal stug tertiary studnous Employmn companies aal job opportu
e/Individual/Ind
heme;
endix 2.
nsite for the mers to facilitate
to determine CC is the succrep to further ontract and thi).
d, to provide:
Aboriginal peop
nication & con
he project may
ntractors work
to assist in theesources includ
nal Developmebase in a rangeraining – empl
n refer appropoject vacanciests (STEP) - STcluding structu
CP) – the NICudents work skies.
ment Project (Cand assists themnities.
digenousAustr
ajority of the p the placemen
ABORIGINA
any Aboriginacessful tendererefine project is APP, with m
ple consistent
nsultation with
y include:
kshops and m
e facilitation, dede:
ent – has overe of industriesloyees New Criately qualifies.
TEP provided fured and accre
CP links Aborigkills and profes
CLIEP) – the Cm in creating v
ralians/Indeige
project, RCC nt of trainees a
L PARTICIPATIOREVISION: JU
al er, we will goals and to
measurable
ly takes place
Aboriginal
eetings;
evelopment
r 350 .
Careers for d and
flexible edited training
ginal students ssional
CLIEP is for viable
nousProgram
will work and
ON PLAN ULY 2016
Page | 9
3.5
3.6
TrainingIn relation t
EnwoCo
Supr
Wca
Motra
DeliveryThe table b
Ac
Engage Aboofficer.
Develop sudocumentatinclude Aboparticipationrequiremen
Present theClient/Clienreview.
Advise Aboorganisationpotential prpositions anapplicationscontact betwapplicants asubcontract
Subcontractinterview/te
EmploymenAboriginal c
Review the ensure targe
g o the APP, we
nsure all Aborigork, in accordaourse); pport Aborigiovide support
Work with subcrry out their wonitor subcontaining courses
y elow outlines
ction
original liaison
bcontract tion to original n ts.
APP to the nt Rep for
original ns of the roject nd invite or facilitate ween nd tors.
tors ender process.
nt of candidates.
APP to ets are met.
e will endeavo
ginal workers ance with the
nal team memt; contractors to work; tractors to veand required
the delivery p
Targe
After contaward
Before wocommence
Constructiperiod
Constructiperiod
. Constructiperiod
Constructiperiod
Six month
our to: receive approWHS Act 20
mbers with a m
ensure Aborig
rify that apprefor their role/t
plan for the pro
t R
ract Projec
ork es
ProjecContrAdmi
on Projec
on LiaisoProjec
on ProjecContrAdmi
on RCC Subco
ly LiaisoProjec
priate training11 (such as att
mentor from th
ginal employee
ntices and traitrade etc.
oject.
Responsibility
ct Manager
ct Manager & ract nistrator
ct Manager
n Officer & ct Manager
ct Manager & ract nistrator
& ontractors
n Officer / ct Manager
ABORIGINA
g prior to comtending the Jo
he Career Tra
es are trained
inees attend a
O
Position
Subcontback witcontract
Approva
No. of Acandidatemploymproject. Subcontseeking
Subcontselectedcriteria fparticipa
No. emp
Report tsenior mexternal
Review Amodify a
L PARTICIPATIOREVISION: JU
mencing b Ready
ackers to
and skilled to
accredited
Outcome
filled.
tract back to th head t conditions.
al.
Aboriginal tes seeking ment on
tractors employees.
tractors that meet for Aboriginal ation.
ployees.
to RCC management & stakeholders.
APP and as necessary.
ON PLAN ULY 2016
Page | 10
&
4 4.1
MovAboriginRichard Cropossible. Wput in place
Our managemployees welcoming
Cultural Divbase and sp
We are curParticipation
Indirect Expput in placestrategy mo
Ab
AES Recruitpeople. OuTorres Straresults and
AES will proexperience,and other k
Next StepsCoordinatotogether. We are discRCC’s ApprRCC’s CadeTraffic ContLabour Hire
ving Fonal Participookes Constru
We understand e, and endorse
ement team uenhances an oa broader rang
versity will enapecifically the g
rrently initiatingn through our
penditure is ae and are takinoving forward.
boriginal Empl
tment Servicesr strategy is toit people into career develo
ovide us with a review of edu
key personal at
1. AEStr
2. Heca
3. Asski
4. Rig5. Th
Strret
: Hamish Croor) met with Ro
cussing the follrenticeship Proet Program troller opporte
orwarpation uctions extend this is an area
ed by our com
understands thorganisation’s rge of clients, s
able us to bettgovernment ag
g Direct Exper Apprenticesh
n area we areg steps by spe
loyment Strat
s focuses on co partner with careers and cpment.
a service that ucation and trttributes of the
ES will assist urait Islander caelp us to sourcreer seekers fossess – utilisingilled and suitabght referrals – hey will providrait Islander catention results
okes (RCC Coohan Tobler a
lowing opportogram
tunities
rd
ds opportunitiea we need to dpany directors
hat nurturing areputation. It bsubcontractors
ter understandgencies that w
enditure on ouhip Program an
further develoeaking with rel
tegy (AES)
careers for une AES who helpoach each car
focuses on curaining credente Aboriginal a
s with the “HOareer seekers ce – suitable Afor the roles wg assessment tble Aboriginal right career se a coach (Me
areer seekers as
onstruction Maand Ed Groch t
tunities:
es to Aboriginadevelop and sos.
nd harnessing broadens links s and staff.
d and service ae work closely
ur projects whnd Subcontract
oping and havevant bodies t
employed Abop place unempreer seeker to
ltural identity, tials, working hnd Torres Stra
OW” to recru
Aboriginal and will have availab
ools provide sand Torres Steeker for the entor) to suppand the busine
anager) and Nto discuss way
ABORIGINA
al communitieome strategies
the cultural d with the com
an increasingly y with.
hich require Abctors.
ve some ideas to implement
original and Toployed Aborig achieve great
review of skilhistory, voluntaait Islander car
uit Aboriginal a
Torres Strait ble specific informtrait Islander cright career
port Aboriginaess to achieve
Nyerie Levoniays in which we
L PARTICIPATIOREVISION: JU
es wherever s have been
iversity of mmunity,
diverse client
boriginal
we intend to a company
orres Strait ginal and retention
ls and ary activities reer seeker.
and Torres
Islander
mation on areer seekers
al and Torres great
n (HR can work
ON PLAN ULY 2016
Page | 11
Tradesman AES have seorganisation
Ca
CareerTraccreates priv
CareerTracprivate sect
Students pefrom intern
In addition tsupport servcommunity.
Next StepsAdvisor Petfor indigenocommunica
Career Tracinterviewed
Pa
UTS producwill see us wthat particu
Through theprograms th
Next Steps
We also hauniversity o
W
RCC has seInsurance B
Origin is a mAustralian b
Gu
Through onGordon wh
(opportunities
ent through thn.
areer Tracker
kers Indigenouvate sector inte
kers recruits por employers
erform their int into full-time
to making longrvices to help p.
: Nyerie Levota-Lee Moran. ous students, nations, account
ckers will be ind.
artnering with
ce graduates twork closely wlarly demonstr
e partnership what reach the c
: RCC has com
ve paid internn to leverage
Workers Comp
ecured our Worokers (Origin
majority-ownebusinesses in b
unni Thakun (
ne of our Suthho is part of th
s for RCC sub
heir labour rate
rs – Internship
us Internship Pernship oppor
pre-profession to participate
ternship with employee upo
g-lasting placeprepare stude
onian(HR Coor We are worknot just studyinting, computing
n touch in the
the Universit
that are work with the univerrate these attr
we will be ablcommunity.
mmitted to a $
ships and cadeon their ‘best
pensation Insu
orkers Compen).
ed Indigenous both the privat
(Aboriginal As
erland Hospithe non-profit a
bcontractor inv
es and we are
p
Program is a nartunities for tal
al Indigenous u in a multi-yea
a sponsoring con completion
ments CareerTnts for leaders
rdinator) is cuking together tng constructiog, etc.
coming week
ty of Technolo
ready, innovatrsity through gributes; their st
e to leverage
$100,000 spen
etships on offeand brightest’
urance Policy
ensation for A
insurance brokte and Govern
ssociation)
al Building Cadassociation refe
volvement)
considering la
ational non-prented Indigeno
university studar internship.
company withn of their degr
Trackers provship in the wo
rrently having to identify oppn / engineering
ks and provide
ogy Sydney
tive and disciplaining access ttudent athlete
and participate
nd with UTS o
er where we a students.
(ACT)
CT, valued at
kerage businesnment sectors.
dets we have berred to as Gu
ABORIGINA
abour hire thro
rofit social enteous university
dents and links
h the aim of coree program.
vides a wide sprkplace and th
discussions wportunities for g but in other
CVs for cand
lined. The UTto two groups
es and their hig
te in their Abo
over the next
are working clo
$140,000, wit
ss servicing the.
been introducunni Thakun.
L PARTICIPATIOREVISION: JU
ough this
erprise that students.
them with
onverting
pectrum of he
with National internships
r areas also i.e.
idates to be
S partnership s of students gh achievers.
original
three years.
osely with the
th Origin
e needs of
ced to Paul
ON PLAN ULY 2016
Page | 12
The main pand reconnbeing, self-eviolent hom
The organischiropracto
Paul Gordoproperty whThere are u
Next Stepsfunding for
Ot
RCC is rese
urpose of this ect them with
esteem and actmes.
sation includesr, social worke
n has been pahich allows himup to 100 child
: 4/5 RCC is lotheir events an
ther initiatives
earching ways
Cole Wpossibiseeking
The Ve9907 4
School 11/5)
organisation ih their Story ants as mentorin
s Paul Gordoners who volun
art of this orgam to take the dren in this pro
ooking at waynd provide mo
s
in which we c
Workwear QLlity of supplying sample hardh
erifact Group a4991)
to Work NR
is to help and nd Country. Tng program as
(who leads thteer their time
anisation for 25children campogram at any o
ys we can helponetary assista
can support Ind
D (Indigenousng our hardhathat
about Traffic C
L program (m
support younghis organisatiomost of them
he group) alone to assist with
5 years and ovping, teaching tone time.
support this oance with their
digenous busin
s owned – Supts (Contact: M
Control service
eeting with Kr
ABORIGINA
g Aboriginal Aon helps with tm come from b
ng with many dh support.
ver time purchthem culture a
organisation thr mentoring p
nesses nation-
pply Nation) aMichael Cima) –
es and manag
ristian Heffema
L PARTICIPATIOREVISION: JU
Adolescence their well-broken and/or
doctor,
hased a and identity.
hrough rograms.
wide.
about the – currently
ement (Ph:
an Wed
ON PLAN ULY 2016
Page | 13
r
5
MeasRevi
Measureme
Reim
Rean
Ch Re
tar Th
repim
suremew
ent, evaluation
eporting and aplemented an
egular review od assists to buhecking that reeporting, both rgets for both he use of correporting, non-cprove the Ab
ment,
and review o
auditing of the nd is effective; of training planuild skill levels fecords associat internally (pro RCC and ourective and preconformance roriginal partici
Evalu
f the APP will
APP (where r
nned and comfor team memted with the Aoject reports) r subcontractoeventative actioreports, contrapation proces
uation
include:
relevant) to ve
pleted to ensumbers; APP are retainand externallyrs have been ons (by way ofactual notices, s and improve
ABORIGINA
n and
erify that the P
ure it has been
ed and retrievy that the APPmet or not;
of training, incidand audit repo
e decision mak
L PARTICIPATIOREVISION: JU
Plan is being
n effective
vable; P performance
dent orts) to king.
ON PLAN ULY 2016
Page | 14
6
Reco
Records of maintained
Monthly rep
ords
all communicain accordance
porting will be
ations, meetinge with the Proj
e completed o
gs, audits and ject Managem
n the Form att
corrective actent Plan and R
tached.
ABORIGINA
tions will be coRCC’s proced
L PARTICIPATIOREVISION: JU
ollated and ures.
ON PLAN ULY 2016
Page | 15
Proj
Sc
Demo
Earthw
Hydra
Electr
Formw
Conc
Mech
Brickw
Struct
Roofin
Intern
Glazin
Vinyl
Joiner
Painte
Tiler
Labou
Crana
Scaffo
Traffic
Extern
1073 WRevisio
ect:
cope of Work
olition
works
aulics
rician
work
reters
anical
work
tural Steel
ng
nal Wall Lining
ng
layers
ry
er
urer (RCC)
age
old
c Control
nal works
Wentworth Point Schooon Date: July 2016
1073- Wentw
Trade Company Name
ol Project Management P
worth Point Sc
No. Position Offered
1
1
lan – Appendix 1, Aborig
hool
No. Target Outcome A
ginal Participation Plan
No. Achieved P
Br
T
Position F
EmD
ricklayer
Trainee
Forecast mployment Duration
Eng
gagement Date
Perioon
ABORIGINAL PARTICREVIS
od of Time Project
TyU
CIPATION PLAN SION: JULY 2016
Page | 16
pe or Work Undertaken
Proj
1073 WRevisio
ect:
Trade
Wentworth Point Schooon Date: July 2016
1073- Wen
N
ol Project Management P
ntworth Point
Name
lan – Appendix 1, Aborig
School
Conta
Total
ginal Participation Plan
act
% APar
No. Aboriginal Employees
Aboriginal rticipation
Total No. Employees
ABORIGINAL PARTICREVIS
Comments
CIPATION PLAN SION: JULY 2016
Page | 17
ApInfo
ppendforma
ix 2 –ation
– Resoource
es and
ABORIGINA
d
L PARTICIPATIOREVISION: JU
ON PLAN ULY 2016
Page | 18