ABDUS SALAM - Latest for Job

5
Page 1 of 5 CV of ABDUS SALAM Curriculum Vitae (CV) for Abdus Salam 1. General Position Title Sr. Electrical Engineer Name of Expert ABDUS SALAM Date of Birth 21 November 1968 Country of Citizenship / Residence Bangladesh Contact and Email No Cell: 01552361745, email: [email protected] 2. Education: B.E. (Electrical) 1993 and Post Graduate Diploma in Information & Communication Technology (BUET), 2007. 3. Employment record relevant to the assignment Period Employing organization and your title / position. Country Summary of activities performed relevant to the Assignment Aug 2014 to Jan 2015 Scientech Engineering & Services Banani, Dhaka Position: Project Manager Bangladesh Overall site management of the project at Bangladesh Still Re-rolling Mills(BSRM) Ltd. at Mirsarai, Chittagong for the project “design, manufacture, supply, testing, erection and commissioning of brand new 33 kV GIS main Receiving substation” under supervision of principal contractor ABB, India. May, 2013 to Jul, 2014 Spectrum Engineering Consortium Ltd. Suvastu Tower, Panthopath, Dhaka Position: Senior Electrical Engineer Bangladesh Supply, Design and implementation of two 500 KVA substations for Bangladesh Railways two Data centers projects. Electrical drawings of Data Center related to computer server power and storage power distribution, involving Generators, Transformers, UPS, batteries, AVR, Isolation transformer. Preparation of Request for proposal and BOQ for different banks, companies, Government Offices. Jun 2010 to Apr 2013 Consortium of SMEC International (Australia), ACE, and Niaz and Associates Ltd. Baridhara, DOHS, Dhaka Position: Computer System Analyst/ Senior Electrical Engineer Bangladesh Responsible for software development, preparation of Engineering study report-voltage drop, power factor improvement, technical loss etc. of 33 PBSs using Windmill software. Assist foreign Distribution System Specialist to help concept design and estimate of 33kV Sub-transmission network and 33/11 kV new and rehabilitated substations of 33 PBSs involving Power Transformers, VCBs, Las, CTs, PTs etc. Nov 2008 to Dec 2009 Genetic Ltd. (Real State Company) Area Manager (Electrical) Bangladesh Preparation of specifications for 400 KVA Sub-station including its related equipments- PFI Plant, HT & LT Switch Gear Panel and earthing Network and accessories for procurement & installation in high rise Residential/Commercial Building related projects. Supervision the installation, Correspondence with top management, consumers, contractors in solving the electrical related problems. Jun 2008 to Oct 2008 Project Engineering Consulting Engineers Ltd. Uttara, sector-4, Dhaka Position: Senior Engineer Bangladesh Preparation of tender documents for electrical distribution systems for PBSs and storm water pumping stations at Rampura funded by World Bank. Preparation of Engineering study report, voltage drop study power factor improvement study, technical loss study of 3 PBSs. Supervision of Conduit Layout, Installation of distribution transformer, HV/LV Switchgear Panel, PFI Panel, earthing network etc.

description

CV format

Transcript of ABDUS SALAM - Latest for Job

  • Page 1 of 5 CV of ABDUS SALAM

    Curriculum Vitae (CV) for Abdus Salam 1. General

    Position Title Sr. Electrical Engineer

    Name of Expert ABDUS SALAM

    Date of Birth 21 November 1968

    Country of Citizenship / Residence Bangladesh

    Contact and Email No Cell: 01552361745, email: [email protected]

    2. Education:

    B.E. (Electrical) 1993 and Post Graduate Diploma in Information & Communication Technology (BUET), 2007.

    3. Employment record relevant to the assignment

    Period Employing organization and your title / position.

    Country Summary of activities performed relevant to the Assignment

    Aug 2014 to Jan 2015

    Scientech Engineering & Services Banani, Dhaka Position: Project Manager

    Bangladesh Overall site management of the project at Bangladesh Still Re-rolling Mills(BSRM) Ltd. at Mirsarai, Chittagong for the project design, manufacture, supply, testing, erection and commissioning of brand new 33 kV GIS main Receiving substation under supervision of principal contractor ABB, India.

    May, 2013 to Jul, 2014

    Spectrum Engineering Consortium Ltd.

    Suvastu Tower, Panthopath, Dhaka Position: Senior Electrical Engineer

    Bangladesh Supply, Design and implementation of two 500 KVA substations for Bangladesh Railways two Data centers projects. Electrical drawings of Data Center related to computer server power and storage power distribution, involving Generators, Transformers, UPS, batteries, AVR, Isolation transformer. Preparation of Request for proposal and BOQ for different banks, companies, Government Offices.

    Jun 2010 to Apr 2013

    Consortium of SMEC International (Australia), ACE, and Niaz and Associates Ltd. Baridhara, DOHS, Dhaka Position: Computer System Analyst/ Senior Electrical Engineer

    Bangladesh Responsible for software development, preparation of Engineering study report-voltage drop, power factor improvement, technical loss etc. of 33 PBSs using Windmill software. Assist foreign Distribution System Specialist to help concept design and estimate of 33kV Sub-transmission network and 33/11 kV new and rehabilitated substations of 33 PBSs involving Power Transformers, VCBs, Las, CTs, PTs etc.

    Nov 2008 to Dec 2009

    Genetic Ltd. (Real State Company) Area Manager (Electrical)

    Bangladesh Preparation of specifications for 400 KVA Sub-station including its related equipments- PFI Plant, HT & LT Switch Gear Panel and earthing Network and accessories for procurement & installation in high rise Residential/Commercial Building related projects. Supervision the installation, Correspondence with top management, consumers, contractors in solving the electrical related problems.

    Jun 2008 to Oct 2008

    Project Engineering Consulting Engineers Ltd. Uttara, sector-4, Dhaka Position: Senior Engineer

    Bangladesh Preparation of tender documents for electrical distribution systems for PBSs and storm water pumping stations at Rampura funded by World Bank. Preparation of Engineering study report, voltage drop study power factor improvement study, technical loss study of 3 PBSs. Supervision of Conduit Layout, Installation of distribution transformer, HV/LV Switchgear Panel, PFI Panel, earthing network etc.

  • Page 2 of 5 CV of ABDUS SALAM

    Apr 2001 to Jun 2008

    Engineers & Consultants Bangladesh Ltd. Dhanmondi, Dhaka Position: Senior Design Engineer

    Bangladesh Control & Supervision of Preparation of Analytical Reports of different electrical distribution system studies such as Block Load Study and proposal for new 33/11kV S/S with the proposed feeder route. Engaged in design works of seven nos. of Rural Electrification Projects undertaken by the firm such as voltage drop, System Protection & Co-ordination between PDB Grid S/S and REB distribution System, PFI & system loss studies; benefit cost ratio analysis and other engineering studies. Sub-Transmission line study: Under this subject item following works were done.

    Analysis of the 132/33 kV network for voltage drop, Selection and Loading of conductor size and capacity, study of Grid S/S on 33 kV source line for 33/11 kV S/S of PBS.

    Protection coordination study between PBS S/S and Grid S/S of PGCB for 33 kV source line of PBS S/S.

    Survey, planning & design of 33kV & distribution system of DESCO & 16 Town Power Distribution Project of BPDB.

    Apr 2000 to Mar 2001

    Engineers and Consultants Bangladesh Ltd. Dhanmondi, Dhaka Position: Staking Engineer

    Bangladesh Was engaged in Hobiganj Palli Biddut Samity, a project of Rural Electrification Board and responsible for Design & Staking of overhead distribution lines, Preparation of staking sheets with bill of materials for new/renovation line, inventory & work-plan of taken over PDB distribution lines, phase balancing, load Pattern of Sub-Station at different locations of feeders. Guiding & Monitoring of field staking activities, bill of materials, sub-stations.

    Feb 1999 to Mar 2000

    Engineers and Consultants Bangladesh Ltd. Position: Junior Engineer, Manikgonj Palli Biddut Samity

    Bangladesh Supervision of distribution line, preparation of As-built staking sheet & bill of Materials, preparation of progress & other reports, preparation of closeout document, Updating of operational single line diagram & As-built Key & Detail maps etc.

    Apr 1998 to Nov 1998

    S@ifurs Writer, part time

    Bangladesh Writer of a Science and Technology Guide for Bangladesh Civil Service Examinations (BCS).

    May 1997 to Dec 1998

    Sun Computers, now non existent Hardware Engineer

    Bangladesh Hardware troubleshoot, repair and replacement of various accessories of Computer, Hardware and Software Installation in PCs having different configurations. Software development in Visual Basic

    Oct 1994 to Apr 1996

    Technological Services Ltd. Dhaka. Banani, Dhaka Assistant Design Engineer

    Bangladesh Load data sorting and analysis, Preparation & study for Voltage drop. Power factor Improvement, System loss & other different Engineering studies of different Rural Electrification Projects.

    4. Membership in Professional Associations and Publications:

    Fellow, IEB and Forum-86 of BUET

    5. Language (English) Skills :

    Speaking Reading Writing

    Bangla (Mother tongue) Excellent Excellent Excellent

    English Excellent Excellent Excellent

  • Page 3 of 5 CV of ABDUS SALAM

    6. Adequacy for the Assignment:

    Detailed Tasks Assigned on Consultants Team of Experts:

    Reference to Prior Work / Assignments that Best Illustrates Capability to Handle the Assigned Tasks

    Name of assignment or project: Bangladesh Still Re-rolling Mills(BSRM) Ltd Year: August 2014 to January 2015 Client: Scientech Engineering & Services

    Positions held: Project Manager Activities performed: Supervision of shifting of material from stores or point of unloading to work place using crane, hydra, trailer

    etc., erection, leveling & alignment of GIS panel base frames supplied along with panels. Erection & Alignment of 33kV GIS

    panels, Reactors, Capacitor Banks, NCTs on lattice structures / plinth. Fabrication & erection of cable tray bend, T, Joints etc.

    Supervision of Electrical wiring of control building and Generator maintenance. Supervision of purchase of materials needed for

    overall maintenance such as office rooms, store room, Management of Store materials, receiving and issuing with unpacking of the

    equipment, Arranging of Hydra / crane on full time, hired basis. . In performing the work, strictly followed the safety rules and

    regulations enforced by ABB, India and by its local counterpart.

    Name of assignment or project: Bangladesh Railways, Bangladesh computer council Year: April 2013 to July 2014 Client:

    Positions held: Activities performed: 1. Visit 24 MW power station project at Ghorasal Fertilizer company.

    2. Design and implementation of Electrical drawings of Data Center related to computer server power and storage power distribution projects involving Generators, Transformers, UPS, batteries, AVR, Isolation transformer, preparation of Request for proposal and BOQ for different banks, groups of companies, Government Organisations etc. Strictly supervise, monitor and implement the construction, commissioning of the projects & handle cost effective matters. Name of assignment or project: PDB and REB Projects. Year: June 2010 to date Location: Bangladesh Client: Niaz & Associates Ltd. (NAL)

    Main project features: System improvement study of different PBSs Positions held: Senior Engineer (Elect.) Activities performed: 1. Visit Five Rural Electric Cooperatives(PBSs) to collect data for study 33/11kV 5, 10 & 20 MVA Sub-stations and 132kV, 33kV and 11 kV lines in order to carry out Plan, Elevation diagrams & protection design and perform technical study such as fault current, insulation level, systems loss, voltage drop with WindMil Software designed in USA.

    2. Planning and Modelling of 132kV Grid S/S, 33kV & 11kV lines and 50 new and 30 rehabilitated Sub-stations of 33 Rural Electric Cooperatives(PBSs) for load flow study such as system loss, voltage drop, capacitor placement, Generator and Motor analysis, fault current calculation, protection coordination etc. to improve existing systems and design new systems.

    3. Assist foreign Distribution System Specialist to help concept design and estimate of 33kV Sub-transmission network and 33/11 kV new and rehabilitated substations of 33 PBSs involving Power Transformers, VCBs, CT, PT, Bus Bars, Indoor & Outdoor Switchgear including UPS, batteries, AVR,

    4. Assist & Coordinate in preparation of Request for proposal and Bid Of Quest for REB existing and new Sub-stations, 33kV and 11kV new & upgraded lines by listing of units required.

    5. i) Assist GIS international consultant to coordinate with REB/PBS to identify measures to improve the current utilization of the Equipment Record Card system of REB/PBS through software. ii) Assist GIS international consultant to monitor GPS data collection and management of REB/PBS personnel. iii) Assist GIS international consultant to interface GIS database file with WindMil software for distribution system analysis.

    Name of assignment or project: Construction, Supervision, Estimation and monitoring of Electrical Design for Real State Company. Year: Nov 2008 to Dec 2009 Location: Bangladesh Client: Genetic Ltd. (Real State Company)

    Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, 11kV, 0.4kV and

  • Page 4 of 5 CV of ABDUS SALAM

    0.23kV distribution lines & House Wiring including Fire protection and CCTV.

    Positions held: Area Manager (Electrical) Activities performed: Correspondence with top management, consumers, contractors in solving the electrical related problems. Design, Checking, Construction and Supervision of layout plan for fixture & fittings, conduit layout, Cable trench layout performed by Contractors. Preparing schematic wiring diagram for Electrical, Telephone outlet, Smoke detection system, Public address system, transformer foundation, Meter Board, Meter Connection, Main Distribution Board, Emergency Distribution Board, Lift & Motors, Power Factor Improvement (PFI) Plant, HT & LT Switch Gear Panel and earthing Network of 11/0.415 kV S/S.

    Name of assignment or project: Preparation of tender documents for electrical distribution systems for storm water pumping stations at Rampura financed by World Bank. Year: Jun 2008 to Oct 2008 Location: Bangladesh Client: Project Engineering Consulting Engineers Ltd. Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, pole-mounted transformers and 33kV, 11kV, 0.4kV and 0.23kV distribution lines & System Analysis Positions held: Senior Engineer Activities performed: Design & Supervision of Conduit Layout, Internal Electrification, Supervision of Installation of distribution transformer & Standby power supply, HV/LV Switchgear Panel, PFI Panel, MDB, EMDB, SDB, Earthing network, HT/LT Cable, Fire Alarm and Control security system & CCTV System, Intercom Telephonic System, Lift & Motors of Multistoried Building.

    Name of assignment or project: Control & Supervision of Preparation of Analytical Reports of different electrical distribution system studies such as Block Load Study and proposal for new 33/11kV S/S with the proposed feeder route. Year: Apr 2001 to Jun 2008 Location: Bangladesh Client: Engineers and Consultants Bangladesh Ltd. Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, pole-mounted transformers and 33kV, 11kV, 0.4kV and 0.23kV distribution lines & System Analysis. Positions held: Senior Design Engineer

    Activities performed: Engaged in design works of seven nos. of Rural Electrification Projects (Manikganj, Hobiganj, Dinajpur-1, Netrokona, Kurigram-Lalmonirhat, Jessore-II and Shariatpur PBS) undertaken by the firm. Responsible for design of distribution system, voltage drop, System Protection & Co-ordination between PDB Grid S/S and REB distribution System, PFI & system loss studies; benefit cost ratio analysis and other engineering studies. His work includes System Analyses, computer programming works in electric utility sector. He is well conversant in Milsoft Windmill Distribution system Analysis software. He is also capable Software designing and developing of data entry software and analysis (oracle, Access based) and framing in line with questionnaire design, Sampling methodology, data entry and data editing, quality controlling of the data and reporting purpose. He is capable to transfer the software/data analysis knowledge/ techniques to REB/PBS personnel. Sub-Transmission line study: Under this subject item following works were done.

    Analysis of the 132/33 kV network for voltage drop, Selection and Loading of conductor size and capacity, study of Grid S/S on 33 kV source line for 33/11 kV S/S of PBS.

    Protection coordination study between PBS S/S and Grid S/S of PGCB for 33 kV source line of PBS S/S.

    Survey, planning & design of 33kV & distribution system of DESCO project.

    Survey, planning & design of 33kV & Distribution System of all town of 16 Town Power Distribution Project of BPDB.

    33 kV network study and analysis of the system under 10-town Power Distribution System Development Project of BPDB Supervision in the above mentioned works performed and completed by Junior Design Engineers in the Design Section.

    Computer Hardware & Networking experiences: Network trouble shooting and Local Area Networking setup with hub, switch, router configuration, Name of assignment or project: Hobiganj Palli Biddut Samity, a project of Rural Electrification Board.

    Year: Apr 2000 to Mar 2001 Location: Bangladesh Client: Rural Electrification Board (REB) Main project features: Staking, Design and supervision of Distribution System including substations, Preparation of BOQ and System Analysis. Positions held: Staking Engineer, Hobigonj Palli Biddut Samity Activities performed: Was responsible for Design & Staking of overhead distribution lines, Preparation of progress & other report, staking sheets with bill of materials for new/renovation line, inventory & work-plan of taken over PDB distribution lines, collection of load data from sub-station for various technical studies. Routine observation of voltage level at selected locations, phase balancing, load Pattern of Sub-Station as well as at different locations of feeders. Guiding & monitoring of field staking activities.

    Name of assignment or project: Manikgonj Palli Biddut Samity

  • Page 5 of 5 CV of ABDUS SALAM

    Year: Feb 1999 to Mar 2000 Location: Bangladesh Client: Manikgonj Palli Biddut Samity Main project features: Supervision of 33/11 KV, 11/0.4 KV, 6.35/0.23 KV Sub-station, 33 KV, 11 KV, 0.4 KV & 0.23 KV distribution line, preparation of As-built Staking sheets, BOQ and Close-out documents. Positions held: Assistant Engineer Activities performed: Supervision of distribution line, preparation of As-built staking sheet & bill of Materials, preparation of progress & other reports, closeout document, Updating of operational single line diagram, As-built Key & Detail maps etc.

    Name of assignment or project: S@ifurs Year: Apr 1998 to Nov 1998 Location: Bangladesh Client: S@ifurs, Main project features: Write a Science and Technology Guide for Bangladesh Civil Service Examinations (BCS). Positions held: Writer, part time Activities performed: Writer of a Science and Technology Guide for Bangladesh Civil Service Examinations (BCS).

    Name of assignment or project: Sun Computers Year: Mar 1998 to Jul 1998 Location: Dhaka Client: Sun Computers Main project features: Hardware and Software troubleshoot, repair and replacement of various accessories of Computer. Positions held: Hardware Engineer Activities performed: Hardware troubleshoot, repair and replacement of various accessories of Computer, Hardware and Software Installation in PCs having different configurations.

    Name of assignment or project: Different Rural Electrification Projects. Year: Oct 1994 to Apr 1995 Location: Bangladesh Client: Rural Electrification Board (REB) Main project features: Survey, design, planning and construction supervision of various 33/11kV substations, pole-mounted transformers and 33kV, 11kV, 0.4kV and 0.23kV distribution lines & System Analysis. Positions held: Assistant Design Engineer Activities performed: Load data sorting and analysis, Preparation & study for Voltage drop. Power factor Improvement, System loss & other different Engineering studies of different Rural Electrification Projects.

    Experts contact information: E-mail: [email protected] Phone: +880-1552-361745

    Signature