Page 1: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ABDULLAH AL -NEMSHAN

CONTRACTING CENTER

P.O. BOX # 1022, Jubail-31951 KSA

TEL 03 367 1181

E-Mail [email protected]

URL http://www.alnemshan.com

CONSTRUCTION

DIVISION

SABIC VENDOR # 502542

ARAMCO VENDOR # 10053125

Page 2: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

01- Introduction

02- Services We Provide

03- Work Completed

04- Manpower List

05- Equipment / Facility

06- Main Clients

07- Other Docs. C.R/ CV’s etc.

TABLE OF CONTENTS

2

Page 3: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ABDULLAH AL-NEMSHAN EST. HAS BEEN IN CONSTRUCTION BUSINESS FOR MORE THAN TWENTY YEARS IN

EASTERN PROVINCE AND YANBU REGIONS OF KSA.

OUR EST. HAS COMPLETED MANY CIVIL & MECHANICAL WORKS INCLUDING NEW CONSTRUCTION AND

MAINTENANCE WORKS WITH SABIC AND RC JUBAIL / YANBU.

IN OUR PROFILE WE HAVE TRIED TO GIVE YOU SOME BRIEF INTRODUCTION OF OUR COMPLETED AND

ONGOING CONSTRUCTION/ MAINTENANCE WORKS AND OUR MANPOWER AND EQUIPMENT RESOURCES SO

THAT YOU CAN EVALUATE OUR PRESENT CAPABILITY AND MAY CONSIDER OUR SERVICES AVAILABLE IN

FUTURE .

1: BRIEF INTRODUCTION

3

FOLLOWING ARE THE AREAS WHERE WE CAN PROVIDE YOU OUR BEST SERVICES!

Civil/Mechanical/Electrical Maintenance Works

Plants & Factories Overall Construction

Electrical/Communication Tower Fabrication & Erection

General Fabrication & Erection Works

Engineering & Technical Services

Page 4: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

CIRCULAR PLATFORMS

Light Columns, Beams, Brackets, Bracings & Monorails

Circular Frames

Circular Handrails

Straight Handrails

Ladders With Hoops

Tanks and Vessels Platforms

CIRCULAR LIGHT STRUCTURE CONFORMS TO THE FOLLOWING STANDARDS:

• PROCESS INDUSTRY PRACTICE STF5535

• PROCESS INDUSTRY PRACTICE STF5530

• PROCESS INDUSTRY PRACTICE STF5520

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• ANSI/NAAMM MBG531-00

• ANSI/NAAMM MBG532-00

• BSI BS 4592: PART 1:1995

• OR AS PER CUSTOMERS’ REQUIREMENTS

2A :

DESIGN & FABRICATION OF

LIGHT STRUCTURE (CIRCULAR)

4

2: Services:

Page 5: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

RECTANGULAR/STRAIGHT PLATFORM Light Columns, Beams & Stringers

Straight Handrails

Ladders With Hoops

Stair Treads

Tanks and Vessels Platforms

RECTANGULAR LIGHT, MEDIUM & HEAVY STRUCTURE CONFORMS TO THE FOLLOWING STANDARDS:

• PROCESS INDUSTRY PRACTICE STF05535

• PROCESS INDUSTRY PRACTICE STF05530

• PROCESS INDUSTRY PRACTICE STF05520

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• ANSI/NAAMM MBG531-00

• ANSI/NAAMM MBG532-00

• BSI BS 4592: PART 1:1995

• OR AS PER CUSTOMERS’ REQUIREMENTS

2B :

DESIGN & FABRICATION OF

LIGHT/MEDIUM & HEAVY STRUCTURE

(STRAIGHT)

5

Page 6: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• OR AS PER CUSTOMERS’ REQUIREMENTS

2C :

DESIGN & FABRICATION OF

CIRCULAR HANDRAILS

6

2D :

DESIGN & FABRICATION OF

STRAIGHT HANDRAILS

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• OR AS PER CUSTOMERS’ REQUIREMENTS

2E :

DESIGN & FABRICATION OF

STAIR HANDRAILS

HANDRAILS CONFORMS TO THE FOLLOWING STANDARDS:

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• OR AS PER CUSTOMERS’ REQUIREMENTS

Page 7: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

LADDERS CONFORMS TO THE FOLLOWING STANDARDS:

• SABIC ENGINEERING STANDARDS B04-F01

• PROCESS INDUSTRY PRACTICE STF05501

• SAUDI ARAMCO ENGINEERING STANDARDS 12-SAMSS-007

• OR AS PER CUSTOMERS’ REQUIREMENTS

2F :

DESIGN & FABRICATION OF

LADDERS WITH HOOPS CAGES

7

2G :

DESIGN & FABRICATION OF

FENCES (ALL TYPES )

• ALL TYPES OF SAUDI ARAMCO FENCE INSTALLATION WORK

• ALL KINDS OF SABIC APPROVED FENCE FABRICATION AND

INSTALLATION WORK

• DESIGN & FABRICATION OF ANY OTHER TYPE OF FENCE AS

PER CLIENT REQUIREMENTS

2H :

DESIGN & INSTALLATION OF

FIRE FIGHTING/SPRINKLER SYSTEM

• For All Kinds Of Hangers

• For Office & Residential Buildings

• For Shopping Malls & Business Centers Etc

Page 8: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

• Pipes & Pipe Spools

• Misc. Structure

• Tanks (Inner & Outer)

30,000 SQ. METER PAINTING YARD

WITH QUALIFIED MANPOWER AND

EQUIPMENT & TOOLS ETC.

OUR PAINTING COMPLY WITH

SAUDI ARAMCO &

SABIC STANDARDS.

2J :

SAND BLASTING & PAINTING

8

2K :

DESIGN & FABRICATION OF

HANGERS & PORTABLES

• Storage Hangers/ Warehouses

• Production/Factory Hangers

• Multi Layer Office Buildings Etc

2L :

CIVIL CONSTRUCTION

INDUSTRIAL, BUILDINGS & MISC. WORKS

• Foundations For Machines & Structure Etc

• Sand Filling, Marl Capping, Leveling Etc

• Pipe Line , Corridor Sleepers & Thrust Anchors Etc

• Ducks Banks/ Pilling

• Building Works

• Floor Concreting

• Fencing & Boundary Walls Etc

Page 9: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-601

FABRICATION, PAINTING & ERECTION OF 300 TON

STEEL STRUCTURE @ JOI’AMAH GAS PLANT

CLIENT: FAISAL M. QAHTANI SONS CO.

DURATION: 10 MONTHS (FEB TO DEC 05)

3: COMPLETED PROJECT

9

Page 10: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-602

WELDING OF 20” DIA CRUDE PIPELINE (20 KM)@

HARADH - UNDER SAUDI ARAMCO

CLIENT: FAISAL M. QAHTANI SONS CO.

DURATION: 15 MONTHS (JUL 05 TO OCT 06)

COMPLETED PROJECT

10

Page 11: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-603

PIPING INSTALLATION @ QASSIM CEMENT PLANT

CLIENT: AMEN ENGG. INTN’L

DURATION: 10 MONTHS (JUN 05 ~MAR 06)

COMPLETED PROJECT

11

Page 12: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-604

FABRICATION, PAINTING & ERECTION OF 1,450 TON

STRUCTURE, 50,000 DIA-INCH PIPING & 150 TON

CABLE TRAYS @ SULFUR FACTORY DAMMAM-II

CLIENT: SULFUR FACTORY DAMMAM-II

DURATION: 12 MONTHS (JAN TO DEC 06)

COMPLETED PROJECT

12

Page 13: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-605

FABRICATION OF 11,000 DIA-INCH CS / SS PIPING @

TASNEE ETHYLENE PROJECT JUBAIL

CLIENT: CONTRACTING & TRADING CO. CAT

/SAMSUNG ENGG. SAUDI ARABIA

DURATION: 08 MONTHS (JUL 06 TO MAR 07)

COMPLETED PROJECT

13

Page 14: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-606

FABRICATION OF APROX. 800 TON STRUCTURE @

FABRICATION YARD JUBAIL

CLIENT: SAUDI PAN GULF CO.

/SAUDI ARAMCO

DURATION: 09 MONTHS (JAN TO SEP 07)

COMPLETED PROJECT

14

Page 15: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-607

SAND BLASTING & PAINTING OF PIPES & PIPE SPOOLS/

SUPPORTS (APROX. 55,000 SQ.M) @ AL-WAHA /

SAHARA PROJECT- JUBAIL

CLIENT: OLAYAN DESCON INDUSTRIAL CO.

JUBAIL- SAUDI ARABIA

DURATION: 12 MONTHS (JUL 07 TO JUN 08)

COMPLETED PROJECT

15

Page 16: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-608

FABRICATION OF APROX. 85,000 INCH-DIA OF

PIPING & 28,000 INCH-DIA SITE INSTALLATION @ AL-

WAHA / SAHARA PROJECT- JUBAIL

CLIENT: OLAYAN DESCON INDUSTRIAL CO.

JUBAIL- SAUDI ARABIA

DURATION: 12 MONTHS(SEP 07 TO AUG 08)

COMPLETED PROJECT

16

Page 17: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

COMPLETED PROJECT

17

Page 18: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-610

CIVIL STRUCTURE/ BLOCK WORK/ FINISHING WORK

FOR NESMA WORKERS CAMP AL-JUBAIL (5,200

SQ.METER COVERED AREA)

CLIENT: RAKAN TRADING & CONTRACTING

CO.

AL-KHOBAR, SAUDI ARABIA

DURATION: 10 MONTHS (JUNE 09 TO APRIL 10)

COMPLETED PROJECT

18

Page 19: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-611

FABRICATION & WELDING OF APROX. 520 TONS OF

STEEL STRUCTURE /HANDRAILS/ LADDERS &

PAINTING OF 750 TONS OF FENCE AT AL-NEMSHAN

FAB. YARD JUBAIL

CLIENT: SAUDI PAN GULF

JUBAIL- SAUDI ARABIA

DURATION: 12 MONTHS (JULY 09 TO JULY 10)

COMPLETED PROJECT

19

Page 20: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-612

BLASTING & PAINTING OF APROX. 30,000 SQ. MTR

OF STEEL STRUCTURE, TANKS, HANDRAILS, LADDERS

& PIPES AT MA’ADEN MAGNASITE PROJECT AL-

MADINA

CLIENT: OLAYAN DESCON INDUSTRIAL CO

JUBAIL- SAUDI ARABIA

DURATION: 10 MONTHS (DEC 09 TO SEP 10)

COMPLETED PROJECT

20

Page 21: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-613

SAND BLASTING, PAINTING, FABRICATION &

INSTALLATION OF FABRICATION/ STORAGE HANGERS

APROX. 950 SQ METER STRUCTURE AT AL-

NEMSHAN FAB. YARD JUBAIL

CLIENT: SINOPEC

JUBAIL- SAUDI ARABIA

DURATION: 04 MONTHS (JUNE 10 TO SEP 10)

COMPLETED PROJECT

21

Page 22: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-614

150,000 M³ SAND FILLING AND 50,000 M² MARL

CAPPING WITH 20CM THICKNESS AT ODICO YARD

ABU-HADRIYA

CLIENT: OLAYAN DESCON INDUSTRIAL CO

JUBAIL- SAUDI ARABIA

DURATION: 02 MONTHS (OCT 10 TO NOV 10)

COMPLETED PROJECT

22

Page 23: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-615

FABRICATION OF 50 TONS OF STEEL STRUCTURE

HANDRAILS AT AL-NEMSHAN FAB. YARD JUBAIL

CLIENT: SAUDI PAN GULF

JUBAIL- SAUDI ARABIA

DURATION: 06 MONTHS (SEP 10 TO AUG 11)

COMPLETED PROJECT

23

Page 24: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-616

SAND BLASTING, PAINTING, FABRICATION &

ERECTION OF HANGER APROX. 1000 SQ METER

STEEL STRUCTURE AT UNITED ARAB CAN

MANUFACTURING CO. DAMMAM INDUSTRIAL II.

CLIENT: UNITED ARAB CAN MANUFACTURING CO

DAMMAM INDUSTRIAL II- SAUDI ARABIA

DURATION: 02 MONTHS (DEC 11 TO JAN 12)

COMPLETED PROJECT

24

Page 25: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-617

ERECTION OF FOUR HANGRS APROX. 8,000 SQ. MTR

OF STEEL STRUCTURE AT WASIT GAS FIELD

KHURASNIA

CLIENT: SENDAN INTERNATIONAL CO.

JUBAIL- SAUDI ARABIA

DURATION: 03 MONTHS (DEC 11 TO Feb 12)

COMPLETED PROJECT

25

Page 26: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-618

BLASTING & PAINTING OF APROX. 32,000 SQ. MTR

OF STEEL STRUCTURE & PIPES AT ODICO YARD ABU-

HADRIYA JUBAIL

CLIENT: OLAYAN DESCON INDUSTRIAL CO

JUBAIL- SAUDI ARABIA

DURATION: 8 MONTHS (MAR 12 TO Nov 12)

COMPLETED PROJECT

26

Page 27: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-619

STEEL STRUCTURE WORK, EXCAVATION, CONCRETE

FOUNDATION, CONCRETE FLOORING AT H.H.I

YARD AL-JUBAIL

Client: Hamte Heavy Industries

Jubail- Saudi Arabia

Duration: 04 months (Jan 12 to Apr 12)

COMPLETED PROJECT

27

Page 28: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-620

EXCAVATION, FOUNDATIONS & STEEL HANGER

STRUCTURE ERECTION AT SENDAN HEAD OFFICE

ROYAL COMMISION AL-JUBAIL

CLIENT: SENDAN INTERNATIONAL CO.

JUBAIL- SAUDI ARABIA

DURATION: 02 MONTHS (APRIL 12 TO Jun 12)

COMPLETED PROJECT

28

Page 29: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-621

HRSG STRUCTURE AND PIPES ERECTION &

INSTALLATION @ RAS ALKHAIR POWER &

DESTILLATION PLANT

CLIENT: HAMTE HEAVY INDUSTRIES.

JUBAIL- SAUDI ARABIA

DURATION: 01 YEARS (JAN 13 TO DEC 14)

COMPLETED PROJECT

29

Page 30: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-622

CLADDING/STRUCTURE INSTALLATION WORK @ AL

BAYRONI PLANT, JUBAIL

CLIENT: OLAYAN DESCON INDUSTRIAL CO.

JUBAIL- SAUDI ARABIA

DURATION: 03 MONTHS (FEB 14 TO APR 14)

COMPLETED PROJECT

30

Page 31: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

ANCC-623

SAND BLASTING & PAINTING OF MISC. PIPES , PIPE

SPOOLS & PIPE SUPPORTS FOR SADARA PROJECT @

TAMIMI YARD, JUBAIL

CLIENT: TAMIMI GLOBAL IND. DIVISION.

JUBAIL- SAUDI ARABIA

DURATION: 03 MONTHS (MAR 14 TO JUN 14)

COMPLETED PROJECT

31

Page 32: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

4. Manpower Distribution

4% 4%8%

11%

18%

9%5%

6%

4%

6%

6%

3% 16%

Engineers Supervisors

Foreman Fabricators

Pipe Fitter Welders

Sand Blasters Industrial Painters

Carpenters Steel Fixer

Mason Electrician

Helpers

32

Page 33: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

Lay Down & Painting/ Fabrication Yard -In Jubail Area -50,000 M²

Graders -02 Nos.

Loader -03 Nos.

Roller/Compacter -04 Nos.

Dump Truck -08 Nos.

Trailer -22 Nos.

Water Tanker -06 Nos.

Fork Lifter 5 Ton - 02 Nos.

Cars + Pick Ups - 15 Nos.

Grooving/ Threading Machines -02 Nos.

CNC Cutting Machine -01 No.

Shearing Machine -01 No.

Bending & Rolling Machine - 02 Nos.

Welding Generators Lincoln SAE-400 - 15 Nos.

Welding Rectifiers 450 Amps. - 20 Nos.

Radial Drill Machine - 01 Nos.

Diesel Generator 200 KVA - 04 Nos.

Dyna Truck/ Boom Truck - 04 Nos.

Airless Paint Spray Machine - 08 Sets

Sand Blasting Machine - 06 Sets

Air Compressor – 750 CFM - 04 Nos.

Air Compressor – 390 CFM - 04 Nos.

Air Compressor – 265 CFM - 05 Nos.

Buses/ Hiace etc -05 Nos.

5. CURRENT ASSETS

33

Page 34: Abdullah Al-Nemshan Contracting Center Profile.pdf · abdullah al-nemshan est. has been in construction business for more than twenty years in eastern province and yanbu regions of

6. Our Main Clients!

Faisal M. Qahtani Sons Co. (FMQ)

P.O. Box # 31712, Al-Khobar 31952

Mr. Santiago F. Talaue – Project Director

Phone: 03-814 0404 Fax: 3 814 0300

Amen Engineering International

P.O. Box # 3381,Al-Khobar 31952–Flour Arabia Bldg.Suit # 407

Mr. Haikal bin Abdullah – Project Manager

Phone: 03-887 0174 Fax: 3 887 0484

National Est. for Industrial & Agricultural

Sulfur- Sulfur Factory Dammam-II

P.O. Box # 3891, Dammam 31481

Mr. R.U.M Rao – Tech. Plant Manager

Phone: 03-812 1009 / 03-812 1541 Fax: 3 812 1002

Contracting & Trading Co. C.A.T

P.O. Box # 338, Al-Khobar 31952

Mr. Fouad G. Sarkis – Area Manager

Phone: 03-895 1120 / 03-864 1455 Fax: 3 895 0427

Saudi Pan Gulf Co.

P.O. Box # 10143, Jubail Industrial Area 31961

Mr. Irfan Ahmed Khan – Operation Manager

Phone: 340 0691 / 050 685 8288 Fax: 340 0692

Olayan Descon Industrial Co.

P.O. Box # 10108, Jubail Industrial area 31961

Mr. Zakir Hussain– Manager E & !

Phone: 341 0671 / 340 7024 Fax: 341 0950

Rakan Trading & Contracting Co. (RTCC)

P.O. Box # 31968, Al-Khobar 31952

Engr. Geyad – Project Manager (Al-Turki Compound Jubail)

Phone: 03 889 1929 / 03 865 5571 Fax: 3 889 1895

United Arab Can Manufacturing Co.

Dammam Industrial II

Mr. Qasim – Operation Manager

Phone: 059 185 0850

Sendan International Co.

Jubail Industrial Area 31961

Mr. Mohammad Sohail – Project Manager

Phone: 050 019 3692

Tamimi Global Industrial Division.