ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

5
8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 1/5 A 22-Mar-16 ARD/PEL FV/MMU SD PREPARED CHECKED APPROVED  © This document is copyright. No part may be reproduced or used without the written permission of Premier Oil  CLASS REVISION STATUS 1 A IDR MINI OIL REFINERY 2 X 20,000 BPD PROJECT Issued For IDR PREMIER OIL NATUNA SEA B.V. DESCRIPTION FEED CONSULTAN COMPANY PT. ABC Front-End Engineering Design DATA SHEET FOR Y-STRAINER ABC-PI-200-010 STATUS CODE : A= Issued For Comments, B= Issued For Approval, C= Issued For Bid, X=Cancelled, INFO= For Information, ITB = Invitation To Bid REV DATE

Transcript of ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

Page 1: ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 1/5

A 22-Mar-16 ARD/PEL FV/MMU SD

PREPARED CHECKED APPROVED

 © This document is copyright.

No part may be reproduced or used without the written permission of Premier Oil

 CLASS REVISION STATUS

1 A IDR

MINI OIL REFINERY 2 X 20,000 BPD PROJECT

Issued For IDR

PREMIER OIL NATUNA SEA B.V.

DESCRIPTION

FEED CONSULTAN

COMPANY

PT. ABC

Front-End Engineering Design

DATA SHEET FOR Y-STRAINER

ABC-PI-200-010

STATUS CODE : A= Issued For Comments, B= Issued For Approval, C= Issued For Bid,

X=Cancelled, INFO= For Information, ITB = Invitation To Bid

REV DATE

Page 2: ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 2/5

REV. NO. PAGE NO.

A

Doc No : ABC-PI-200-010

Front-End Engineering Project Rev : A Class : 1

Date : 22-Mar-16

PT. ABC Doc. Title:

Data Sheet For Y-StrainerPage 2 of 5

RECORD OF REVISION

Description of Change

Issued For IDR

SECTION

ALL

MINI OIL REFINERY 2 X 20,000 BPD PROJECT

The revisions listed below have been incorporated in this copy of the document.

Page 3: ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 3/5

Sheet 3 of 7

Description Page No

DESCRIPTION OF CHANGES 2CONTENTS 3

Y-STRAINER LIST 4Y-STRAINER DATA 5

 

Doc No : ABC-PI-200-010

Front-End Engineering Project Rev: : A Class: 1

Date : 22-Mar-16

MINI OIL REFINERY 2 X 20,000 BPD PROJECT

CONTENTS

PT. ABCDOC. No.

ABC-PI-210-010Data Sheet For Y-Strainer

Page 4: ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 4/5

A

Rev

Design Operating Design Operating

1 SP-03-01 6" 1 3/4" N.P.T Produced Water 150# RF 7 bar 3-5 bar 650C AMB

2 SP-03-02 6" 1 3/4" N.P.T Produced Water 150# RF 7 bar 3-5 bar 650C AMB

3 SP-03-03 4" 1 3/4" N.P.T Caustic Soda 150# RF 11 bar 3-5 bar 650C 35

0C

4 SP-03-04 4" 1 3/4" N.P.T Caustic Soda 150# RF 11 bar 3-5 bar 650C 35

0C

5 SP-03-05 3" 1 3/4" N.P.T Caustic Soda 150# RF 11 bar 3-5 bar 650C 35

0C

6 SP-03-06 3" 1 3/4" N.P.T Caustic Soda 150# RF 11 bar 3-5 bar 650C 35

0C

7 SP-03-07 4" 1 3/4" N.P.T Fire Water 150# RF 12.5 bar 7.11 bar 650C AMB

8 SP-03-08 4" 1 3/4" N.P.T Fire Water 150# RF 11 bar 3-5 bar 650C AMB

Note : 1. Process Data will be available at detail engineering stage.

Issued For IDR

TBA

(Note 1)

TBA

(Note 1)

TBA

(Note 1)

TBA

(Note 1)

TBA

(Note 1)

ARD/P

Engineering Description PREPA

Table 1. Carbon Steel Y - Strainer List

PT ABC DATA SHEET FOR Y-STRAINER

CRUDE OIL REFINERY PILOT PROJECT

Front-End Engineering Design

NoANSI

RatingService

Flowrate

(Usgpm)

Density

(lb/ft3)

Max allw.

Press. Drop

(psig)

Viscosity

(cP)

TemperatureTAG No.

Line

Size

Qty

(ea)Mesh

Drain

Connection

Pressure

FF

Page 5: ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

8/18/2019 ABC PI 210 010 Y Strainer Data Sheet_Rev A_comment

http://slidepdf.com/reader/full/abc-pi-210-010-y-strainer-data-sheetrev-acomment 5/5

5 of 5

A

Rev

 

RF FLANGED END RATING 150# FF FLANGED END RATING 150#

DESIGN REQUIREMENTS

PIPING CLASSES : MA , UA

DESIGN STANDARD : ASME B 31.3 / ASME SECTION VIII, DIVISION 1

END CONNECTION : RF FLANGED ANSI B 16.5 for MA Piping Class

FF FLANGED ANSI B 16.5 for UA Piping Class

SIZE : SEE TABLE 1

DRAIN CONNECTION : THREADED PLUG FOR RATING 150# (NOTE 3, 4)

MESH SIZE : AS PER TABLE 1, SHALL BE IN ACCORDANCE WITH ASTM E 2016 OR EQUAL

MINIMUM OPEN AREA : 200%

MATERIAL REQUIREMENTS

BODY / COVER : ASTM A 105

SCREEN : SHALL BE IN ACCORDANCE WITH ASTM E 674 OR EQUAL (NOTE 5)GASKET : SPWD 316SS WINDING AND GRAPHITE FILLER

BOLTS : A193 Gr. B7 FLUORO CARBON COATED WITH AMERI-COTE OR EQUAL

NUTS : A194 Gr. 2H FLUORO CARBON COATED WITH AMERI-COTE OR EQUAL

INSPECTION AND TESTING REQUIREMENTS

VISUAL EXAMINATION : 100% AS PER MSS-SP-55

LIQUID PENETRANT EXAMINATION : AS REQUIRED (NOTE 6)

RADIOGRAPHIC EXAMINATION : NOT REQUIRED

HYDROSTATIC PRESSURE TESTING : YES (1.5 X DESIGN PRESSURE)

CERTIFICATION : BS EN 10204 TYPE 3.1

No

1 STRAINER TO BE SUPPLIED WITH A STAINLESS TAG NUMBER STAMPED AS PER TABLE SECURELY FIXED TO THE BODY WITH A NON CORROSIVE WIRE.

2 EXTERNAL PAINTING OF STRAINERS SHALL BE AS PER DOCUMENT : ABC-PI-200-004

3 DRAIN CONNECTION COMPLETE WITH PLUG FOR RATING 150#. DRAIN VALVE WILL BE PROVIDED BY PIPING

4 DRAIN CONNECTION SHALL BE AT LOW POINT ON THE BLIND FLANGE

5 SCREENS SHALL BE A MINIMUM OF 24 GAUGE (0.0239 INCH) PERFORATED TYPE 304 SS PLATE WITH 5/32 INCH (4 mm) DIAMETER STAGGERED HOLES AT 3/16 INCH (5 mm) CENTERS

AND 63 PERCENT OPEN AREA, LINED WITH 30 MESH (567 MICRON) AND 0.011 INCH (0.28 mm) DIAMETER WIRE TYPE 304 S S AND 45 PERCENT OPEN A REA

6 100% LIQUID PENETRANT TEST SHALL BE CONDUCTED FOR WELDED STRAINER 150#.

NOTES

Engineering Description PREPARED CHECKED APPROVED COMPANY

Issued For IDR ARD/PEL FV/MMU SD

ABC-PI-210-010

Sheet

CRUDE OIL REFINERY PILOT

PROJECT

Front-End Engineering Design

PT ABC DATA SHEET FOR Y-STRAINER

DOC. NO

Drain Connection(Note 3, 4)

Drain Connection(Note 3, 4)

Type 3.2

TBA