AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG...
Transcript of AASHTOWare Bridge Management Update - BrMUG · 7 Materials will be presented during the 2017 BrMUG...
AASHTOWare Bridge
Management Update
User Group Priorities
User Group Concern/Priority Description Priority Response
More Training on the Pyramid (Optimization), PONWEB-
22561
The 5.2.3 release will included basic use case examples in the user manual.
In addition there is a series of tutorial videos on the website
(aashtowarebridge.com).
Error Check Pre-Script (Upgrade script should perform all
checks, then all installs. Like a checking pre-script),
PONWEB-2179
2 Part of BrM 5.3
Clearance Table / Form / Report, PONWEB-1564 3Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
Default data script (Upgrade scripts need to keep user
customized data.), PONWEB-21904 Part of BrM 5.3
Repsonsiveness of pages to different screens (HTML-5) ,
PONWEB-22655 Part of BrM 5.3 with the rewrite of the condition grid
Cross - Sections Tables / Forms / Reports, PONWEB-1565 6 Part of BrM 5.3
Tracking Historical Changes (Auditing changes to all fields of
database), PONWEB-2900 (Was PONWEB-2204)7
Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
Screen Needs List Export , Export All Lists (e.g. Needs List)
and Graphs, PONWEB-23108 Was approved by the TF to be included in the next release.
Load Ratings , PONWEB-2234 9 Part of BrM 5.3
QC / QA Process , PONWEB-2237 10Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
JIRA needs some improved filtering -This is an issue that is outside the control of the TF. JIRA is the application
selected by AASHTO
Update Multimedia PONWEB-2200 11Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
User Group Priorities User Group Concern/Priority Description Priority Response
Import Process - More detailed errors, PONWEB-2311 12Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
Multiple NBI Deterioration Curves, PONWEB-2312 13
The Taskforce understands the benefit of this enhancement. If this enhancement
is of high priority to the user group the TF will consider including this
enhancement in the next version of the software. I f this enhancement is low
priority and/or is only desired by very few user this will need to be funded
through service units
Incorporate 3-D modeling to inspections (Becky's demo)
PONWEB-219814
Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
Reports Stored Elsewhere , PONWEB-2180 15 Part of BrM 5.3
An App Store , PONWEB-2313 16
The Taskforce understands the benefit of this enhancement. If this enhancement
is of high priority to the user group the TF will consider including this
enhancement in the next version of the software. If this enhancement is low
priority and/or is only desired by very few user this will need to be funded
through service units
Cassini Stability , PONWEB 2314 17 Part of BrM 5.3
Network Policy Rules , PONWEB-2315 18 Part of BrM 5.3
Task Scheduler, PONWEB-2195 19Materials will be presented during the 2017 BrMUG and is included in the list for
voting by the conclave.
Sync , PONWEB-2241 20
The Taskforce understands the benefit of this enhancement. If this enhancement
is of high priority to the user group the TF could consider including this
enhancement in the next version of the software. If this enhancement is low
priority and/or is only desired by very few user this may need to be funded
through service units. Bentley is working on a mobile application that should be
availible in 2018 that will have this functionality.
User Group Priorities Survey Results
User Group Priorities Survey Results
Inspection
Bridge
Groups,
Risk, Utility
Functions
Deterioration
Modeling,
Preservation
Action,
and Projects
Enhanced
Deterioration
Modeling, Enhanced
Project/Program
Planning, and
Administration
Features
5.1.2
Bridge Management 5.2 Stages
5.1.3 5.2.1 5.2.2 5.2.3
• Released in December 2016
• Fully supporting the FHWA Identified Rule Making
• Key Features
• Capability to perform life cycle cost analysis
• Capability to perform network level analysis
• Tracking and reporting of FHWA’s 23 metrics
• Dashboards for easy data visualization and tracking
performance measures
• Enhanced User Help System
• Tunnels module to record and track National
Tunnel Inventory data as required by FHWA
Bridge Management 5.2.3
• Released March 2017
• Key Updates
• Tunnel Defects expanded to better align with the
Specifications for the National Tunnel Inventory
• Rating Factor of 9 is correctly exported to the NBI
file
• USERINSP is now copied over when creating a
new inspection
• Various other minor enhancements and bug fixes
Bridge Management 5.2.3 Release 3
• Released September 2017
• Key Features
• Element Condition Grid Re-Do
• New Load Rating Module
• New Cross Section Module
• Migration from Cassini to IIS Express (Workstation)
• Enhanced Rule Builder for Network Policies
• Updates to Handling of Default Data
• Error Check Prescript
• Miscellaneous Small Enhancements/Bug Fixes
Bridge Management 5.3
Element Condition Grid
Load Rating Module
Load Rating Module
Cross Section Module
Cross Section Module
Cross Section Module
Cross Section Module
Cross Section Module
Cross Section Module
Rule Builder for Network Policies
Rule Builder for Network Policies
Questions?