Six Weeks Industrial Trainingat
SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR DEGREE
AS PART OF COURSE
B.TECH (MECHANICAL ENGINEERING)OF
CGC COLLEGE OF ENGINEERINGLANDRAN, MOHALI
AARTI STEELS LIMITED
![Page 2: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/2.jpg)
INTRODUCTIONAarti group which was incorporated in 1977 has taken rapid strides to emerge at one
of North India’s Leading Manufacture of Steel and Yarn with the annual turnover of
more than US$ 170 Million and workforce of over 2000 Personnel.
Aarti Steels Limited, located at Ludhiana (Punjab) has got a steel plant with capacity
of 1.25 Lakh tonnes per annum. They manufacture wide range of products in carbon,
Alloy, spring and Alloy springs steels confirming to national and international
standards. The installed capacity of wire drawing unit is 36000MT per annum
manufacture wire, like Tyre bead wire, spring wire, etc.
“Spirituality at Work place Award” being run by an International Spirituality at Work place society USA.
Over the years Aarti Group has emerged as a strong organization due to constant hard
work, Commitment and its ability to transform itself according to the global market.
![Page 3: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/3.jpg)
WIRE DRAWING:
Drawing is a metalworking process which uses
tensile forces to stretch wire. As the wire
is drawn (pulled), it stretches thinner, into a
desired shape and thickness.
![Page 4: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/4.jpg)
RAW MATERIAL USED
• Size:-5.50mm – 8mm• Source:-TATA Steel ltd, Jindal Steel, Aarti Steel • Grade:- HCWR, SWRH, (51/55 - 81/85) • Heat no:-*TATA (5 digits) 47075, 47089
*JINDAL – 4201147
*AARTI (4 digits) 0001, 0002
![Page 5: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/5.jpg)
Pre-drawing:-It is defined as the process to draw the wire once before the patenting action by using the dies & drums. It also include inline pickling process
![Page 6: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/6.jpg)
Pulley used for removing tension from wire
![Page 7: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/7.jpg)
Wire is treated with acid H2SO4 for removal scales and rust after that it is coated with Borax to remove moisture and then after passing through a dry oven it is sent for pre drawing operation
![Page 8: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/8.jpg)
Machine Used For Drawing Operation
![Page 9: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/9.jpg)
Wire passes through a dies to reduce the diameter of wire
![Page 10: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/10.jpg)
After drawing process wires are coiled so that they can easily move for packaging or for the next process if required.
![Page 11: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/11.jpg)
Heat Treatment Of Wire
![Page 12: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/12.jpg)
Furnace used for heat treatment of wire ,the fuel used in this furnace is propane gas
![Page 13: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/13.jpg)
Wire is then passes through the Tank in which Led at some specific temperature is present so that it can cool down slowly. After led tank it passes from a sand tray to remove the led present on wire.
![Page 14: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/14.jpg)
Rinsing is done to clean the wire
![Page 15: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/15.jpg)
For removing impurities wire passes though acid tanks and then rinsed with water
![Page 16: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/16.jpg)
Wire is then coated with Borax and Phosphate as per ordered by the buyer
![Page 17: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/17.jpg)
Wire is dried in Dry oven
![Page 18: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/18.jpg)
In the last step wire is sent to coilers where large coils of wires are made
![Page 19: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/19.jpg)
Other product of AARTI STEEL is GI WIRESGI :It stands for Galvanized iron. It is a process by which a base metal is immersed in a molten zinc bath for its coating on base metal surface to prevent corrosion
PROCESS:
![Page 20: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/20.jpg)
At the end product is sent to packaging department for packaging of wires
![Page 21: AARTI STEEL six month training ppt](https://reader033.fdocuments.us/reader033/viewer/2022061505/563db77b550346aa9a8b7522/html5/thumbnails/21.jpg)
THANK YOU