Safety at Fulton Hogan Tony Aloisio October 2012 AAPA 15 th Road Construction and Surfacing Health & Safety Conference

Transcript of AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing...

Page 1: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

Safety at Fulton Hogan

Tony Aloisio October 2012

AAPA 15th Road Construction and Surfacing Health & Safety

Conference

Page 2: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

A bit of history on Fulton Hogan….

Page 3: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

The journey so far

Fulton Hogan started business in 1933

Bob Hogan on the job – West Coast, NZ.

John Fulton –“If you can’t manage safety, you can’t manage.”

Page 4: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

History - 79 years of expansion

1933

1940

1950’s

1970’s

1980’s

1990’s

Julius (Jules) Fulton & Robert (Bob) Hogan formed Fulton Hogan in Dunedin, NZ

WWII – critical shortage of manpower and bitumen ceasing construction works

Fairfield Asphalt and Maxwell Bros

Tasman Asphalt, Marlborough Asphalts, British Pavements, NZ

Entered Australia with 80% share in Rowe Asphalt (1981), purchased remaining shared in 1985

Expanded organically through CPP, NZ

Tasman Howie Earthworks (1985), Reliable Group (1989), NZ

Page 5: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

History (cont)

2000

2002

2004

2005

2007

2008

RoadCare JV commences in WA – Fulton Hogan & PRS

Standard Roads and Astec – staff numbers in Aus grew from approx 40 to 400 – traded as FRH

Central Precast, Vic

Belmadar Construction, NSW

Tylden Quarry, Vic Rebranded Australia as Fulton Hogan

PMP, SA & NT

2009 Specialised Tanker Transport Pioneer Road Services

Page 6: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Employee Growth

0

1000

2000

3000

4000

5000

6000

7000

Page 7: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

0

500

1000

1500

2000

2500

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Continual Growth in Australia

Page 8: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Total Injury Frequency Rate

Group Safety

ZERO HARM FOCUS

0

10

20

30

40

50

60

70

2007 2008 2009 2010 2011 2012

NZ TIFR

Aust TIFR

Group TIFR

Page 9: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

ZERO HARM focuses on improving one day at a time

We are now more interested in lead indicators

The target

The achievement

The measures

The tools

“If it’s not a Zero Harm Day, make it so tomorrow”

Page 10: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

0

10

20

30

40

50

60

70

2007 2008 2009 2010 2011 2012

NZ TIFR

Aust TIFR

Group TIFR

Total Injury Frequency Rate

Step Change Improvement

ZERO HARM FOCUS

0

10

20

30

40

50

60

70

2007 2008 2009 2010 2011 2012

NZ TIFR

Aust TIFR

Group TIFR

2013 2018

Page 11: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Jeff Kunst – 16 August 2011

Page 12: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Richard McGavin – 10 May 2012

Page 13: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Journey to Zero Harm

Safe Plant Safe Systems Safe Behaviours

Page 14: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

The key to good Safety

Page 15: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Safety Leadership Behaviours

4 key safety leadership behaviours

1. Role modelling Consistent safety behaviour –an informed and fair culture

2. Prioritise safety No shortcuts, balancing competing demands – promoting learning and adaptability

3. Actively source safety data Gain knowledge, know where to go for information and best practice – e.g. Working Safely with Bitumen. An informed organisation

4. Build and maintain trust Be active – listen and respond. Promoting a reporting and responsive culture

If you see a safety risk – STOP it! Never walk past.

Page 16: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

5 Critical Risk Work Groups – on average 70% of Fulton Hogan’s incidents fall within these 5 risk groups.

Critical Risks

Page 17: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Expectations & Consequences

Publicise and launch the Golden Rules

Rigorously implement

Apply in a fair, consistent and just way.

Page 18: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

“Having a go” – Three Points of Contact

Page 19: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Key Challenges for success of this forum: What can we as key stakeholders do to create the conditions for step change improvement in safety performance? FH commitment Actively participate Share knowledge and stories Seek to learn from others

There are some things we can do as individual organisations, and others where a collective industry commitment can achieve so much more.

Page 20: AAPA 15th Road Construction and€¦ · WWII – critical shortage of manpower and bitumen ceasing construction works . Fairfield Asphalt and Maxwell Bros . Tasman Asphalt, Marlborough

www.fultonhogan.com

Can we make a difference?

Mobile Plant & Equipment Focus on people and Reversing session

Traffic Focus on Worksite Design session

One month at FH