AA Spring Awakening ME Reports · Spring’Awakening’ME’Reports’ ’...

23
Spring Awakening ME Reports Plot Due – Oct. 11 (Richard III Level Set) Prep Days – Thursday/Monday Accomplished Prepped Buckets Pulled Wrench Box Pull Gel – Gel for follow spots too?? Pull Gobos Ordered Gel/Gobos? Cardboards Circuits Runs Plan Pulled Available Accessories o Scrollers o Scroller Cable o Data Cable o Gender Benders o Brains o Microfills 2 o Barn Doors o Top Hats To Do This Week Hang Set/Move Soko where necessary Install Side Light Truss – Drop Down from Grid o Dave’s Super Project for Thursday Color Blasts – Derek’s Super Project! o How Many Work? o Address them to work with current addresses To Do Later Build Unistrut/Goal Post system with ColorBlasts o Waiting for scenic to finish install Patch Channel Check Build Groups, Palettes, and Effects – Before Focus! Focus Tape Focus Follow Spots and Goodies o Move Cat Spots to new positions o Install Lycians o Telerads o Music Stands o Stand Lights o Headsets – Rent or Find (All in Richard) o Harnesses (Gallery positions) Pull Remaining Accessories from Richard – Strike, Friday Oct. 27

Transcript of AA Spring Awakening ME Reports · Spring’Awakening’ME’Reports’ ’...

  • Spring  Awakening  ME  Reports    Plot  Due  –  Oct.  11  (Richard  III  Level  Set)    Prep  Days  –  Thursday/Monday  Accomplished  

    • Prepped  Buckets  • Pulled  Wrench  Box  • Pull  Gel  –  Gel  for  follow  spots  too??  • Pull  Gobos  • Ordered  Gel/Gobos?  • Cardboards  • Circuits  Runs  Plan  • Pulled  Available  Accessories  

    o Scrollers  o Scroller  Cable  o Data  Cable  o Gender  Benders  o Brains  o Microfills  -‐  2  o Barn  Doors  o Top  Hats  

     To  Do  This  Week  

    • Hang  • Set/Move  Soko  where  necessary  • Install  Side  Light  Truss  –  Drop  Down  from  Grid  

    o Dave’s  Super  Project  for  Thursday  • Color  Blasts  –  Derek’s  Super  Project!  

    o How  Many  Work?  o Address  them  to  work  with  current  addresses  

     To  Do  Later  

    • Build  Unistrut/Goal  Post  system  with  ColorBlasts  o Waiting  for  scenic  to  finish  install  

    • Patch  • Channel  Check  • Build  Groups,  Palettes,  and  Effects  –  Before  Focus!  • Focus  Tape  • Focus  • Follow  Spots  and  Goodies  

    o Move  Cat  Spots  to  new  positions  o Install  Lycians  o Telerads  o Music  Stands  o Stand  Lights  o Headsets  –  Rent  or  Find  (All  in  Richard)  o Harnesses  (Gallery  positions)  

    • Pull  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  

  • o Scrollers  o Scroller  Cable  o Top  Hats?  o Barn  Doors?  o 5  S4  36  degree  barrels  

     

  • Hang  –  Day  1  Accomplished  

    • Hung,  Circuited,  and  Accessorized:  Bridge,  LX  19,  LX  23,  LX  34  o Dropped  3  of  the  current  stock  scrollers,  and  ran  scroller  cable  o Missing  4  Barn  Doors  on  LX  23  –  In  Richard  

    • Pulled  Soko  for  FOH  • Hung  and  Circuited  Cat  1  • Galleries  completed:  Installed  Lycians  and  VLs  in  Galleries  • Moved  Juliats  to  new  placement  

    o They  need  a  longer  cable.    Dave  has  ordered  parts  and  make  in  time.  • Derek  continued  to  work  on  the  ColorBlasts  and  found  several  more  working  ones.    Total  

    count  will  come  when  he  is  able  to  finish.    To  Do  This  Week  

    • Change  the  follow  PAR  lenses  to  NSP  o Cat  1  #16  and  #12  o Up  Bridge  #4  and  #9  

    • Finish  Hang  o LX8  o Finish  Cat  1  o Complete  FOH  o US  Booms  o Cyc  and  ERS  on  Cyc  Pipe  

    • Install  Side  Light  Truss  –  Drop  Down  from  Grid  o Dave’s  Super  Project  for  Thursday  

    • Color  Blasts  –  Derek’s  Super  Project!  o How  Many  Work?  o Address  them  to  work  with  current  addresses  

     To  Do  Later  

    • Get  Proper  Cable  lengths  for  Juliats  • Build  Unistrut/Goal  Post  system  with  ColorBlasts  

    o Waiting  for  scenic  to  finish  install  • Patch  • Channel  Check  • Build  Groups,  Palettes,  and  Effects  –  Before  Focus!  • Focus  Tape  • Focus  • Email  Sound  (Suli)  about  necessary  headset  locations  • Follow  Spots  and  Goodies  

    o Move  Cat  Spots  to  new  positions  o Install  Lycians  o Telerads  o Music  Stands  o Stand  Lights  o Headsets  –  Rent  or  Find  (All  in  Richard)  o Harnesses  (Gallery  positions)  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Scrollers  

  • o Scroller  Cable  o Top  Hats?  o 4  Barn  Doors  o 5  S4  36  degree  barrels  o Headsets?  

       

  • Hang  –  Day  2  Accomplished  Today  

    • Changed  the  follow  PAR  lenses  to  NSP  o Up  Bridge  #4  and  #9  

    • Hung,  Circuited,  Accesorized:  o LX8  o LX54  (Cyc)  o Ground  Row  o US  Booms  

    • Hung  and  Circuited  o Cat  1  o Cat  2    o Cat  3?  (May  not  have  been  circuited)  o Cat  4?  (May  not  have  been  circuited)  o Cat  5  o  

    To  Do  This  Week  • Finish  Hanging  

    o Coves  • Drop  Accessories  in  all  Cats  • Gather  Revolution  Information  and  DMX  Ties  • Change  the  follow  PAR  lenses  to  NSP  

    o Cat  1  #16  and  #12  • Run  Scroller  Cable  on  Cat  1  and  2  in  anticipation  of  new  scrollers  • Install  Side  Light  Truss  –  Drop  Down  from  Grid  

    o Dave’s  Super  Project  for  Thursday  • Color  Blasts  –  Derek’s  Super  Project!  

    o How  Many  Work?  o Address  them  to  work  with  current  addresses  

     To  Do  Before  Focus    

    • Hang  Side  Truss  Positions  (to  be  installed  by  Dave)  • Set  Trim  Heights  • Drop  Ordered  Gobos  –  To  Do  at  Focus  • Re-‐Address  DMX  Elements  • Patch  • Channel  Check  • Build  Groups,  Palettes,  and  Effects  • Focus  Tape  • Drop  5  S4  36  deg  barrels.    Dave  will  be  ordering  more,  and  we  may  get  them  before  Richard  

    strike.    To  Do  Before  Level  Set  

    • Focus  • Drop  new  Scrollers  • Install  Microfills  

    o Waiting  on  Scenic  Element  • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  • Email  Sound  (Suli)  about  necessary  headset  locations  

  • • Follow  Spots  and  Goodies  o Telerads  o Headsets  –  Dave  will  be  renting  them  until  we  can  pull  from  Richard  Harnesses  

    (Gallery  positions)    To  Do  at  Some  Point  (Maybe)  

    • Work  on  ColorBlasts  and  Address  them?  • Build  Unistrut/Goal  Post  system  with  ColorBlasts?  Or  a  Zip  Strip  set  up?  • Install  and  Patch  Color  Blasts?  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Scrollers  o Scroller  Cable  o Top  Hats?  o 4  Barn  Doors  o 5  S4  36  degree  barrels  o Headsets?  

     

  • Post  Hang  -‐  Thursday  Accomplished  Today  

    • Hung,  Circuited,  Accessorized    o Coves  o Cats  

    • Gathered  Revolution  Information  and  DMX  Ties  • Changed  the  follow  PAR  lenses  to  NSP  

    o Cat  1  #16  and  #12  • Ran  Scroller  Cable  on  Cat  1  LX  8  in  anticipation  of  new  scrollers  • Started  a  new  show  in  the  MA  and  Began  Patching  

     To  Do  Tomorrow  by  the  Amazing  Dave  Krueger  

    • Continue  Installing  the  Side  Light  Truss  System  o This  is  now  being  installed  via  booms  

    • Looking  at  using  Zip  Strips  for  under  the  stage  deck,  as  a  viable  option  to  replace  the  Color  Blasts,  as  we  are  dangerously  running  low  on  time  

     To  Do  Before  Focus  (Monday/Tuesday)  

    • Hang  Side  Truss  Positions  (to  be  installed  by  Dave)  • Set  Trim  Heights  • Drop  Ordered  Gobos  –  To  Do  at  Focus  • Re-‐Address  DMX  Elements  • Patch  • Channel  Check  • Build  Groups,  Palettes,  and  Effects  –  Before  Focus!  • Focus  Tape  • Drop  5  S4  36  deg  barrels.    Dave  will  be  ordering  more,  and  we  may  get  them  before  Richard  

    strike.    To  Do  Before  Level  Set  

    • Focus  • Drop  new  Scrollers  • Install  Microfills  

    o Waiting  on  Scenic  Element  • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  • Email  Sound  (Suli)  about  necessary  headset  locations  • Follow  Spots  and  Goodies  

    o Telerads  o Headsets  –  Dave  will  be  renting  them  until  we  can  pull  from  Richard  Harnesses  

    (Gallery  positions)    To  Do  at  Some  Point  

    • Build  Unistrut/Goal  Post  system  with  ColorBlasts?  • Install  and  Patch  Color  Blasts?  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Scrollers  o Scroller  Cable  

  • o Top  Hats?  o 4  Barn  Doors  o 5  S4  36  degree  barrels  o Headsets?  

     Post  Hang  –  Friday  –  Richard  III  Opening  -‐-‐-‐-‐Las  Vegas/LDI-‐-‐-‐-‐    

  • PreFocus  –  Monday  Accomplished  Today  

    • Side  Truss  Hung  –  Thanks  Dave  • Instruments  on  Side  Truss:  Hung,  circuited  (and  accessorized?)  • Set  Trim  Heights  • Readdressed  all  movers  except  Bridge  • Focus  Tape  • Placed  and  Spike  Studio  Colors  on  Deck  • Tucked  in  Cove  0  Lights  • Finish  Patch  of  Hung  Instrumentation  except  scrollers  • Patched  known  DMX  Ties  

    o Still  need  DMX  tie  for  Studio  Colors  –  will  probably  come  from  Deck  level  • Replugged  Cove  lights  that  were  double  patched  with  Cat  lights  • Dave  has  set  up  the  Zip  Strip  set  up  in  the  pit,  so  scenic  can  weld  it…is  this  right  Dave?  • Emailed  Sound  about  Headset  locations  

     To  Do  Tomorrow  

    • Prep  New  Scrollers  when  they  arrive  • Drop  Ordered  Gobos  and  Gel  –  To  Do  at  Focus?  

    o Drop  Color  in  Cyc  lights  tomorrow  • Finish  Channel  Check  and  trouble  Shoot  

    o Cat  3,  Cat  4,  Coves,  Bottom  Cyc,  Truss  • Set  Tech  Table  up  for  Board  • Move  Board  to  Tech  Table  for  focus  • Drop  5  S4  36  deg  barrels.    Dave  will  be  ordering  more,  and  we  may  get  them  before  Richard  

    strike.  • Trouble  Shoot:  bridge  d  247  • LX  8:  300  should  be  nc  • Add  new  S4  19  deg  on  Cat,  circuit  

    If  Time  Tomorrow  • Re-‐Address  Bridge  VLs  • Find  Address  information  so  Movers  can  be  patched  • Studio  Color  Cable  Runs  

    o ND  will  be  running  to  A009  o DMX  tie  will  be  running  to  Deck  

    • Patch  Studio  Colors  • Zip  Strip  Power  Runs  • Build  Groups,  Palettes,  and  Effects,  if  time  

     To  Do  Before  Level  Set  

    • Focus  • Address  and  Drop  New  Scrollers  • Find  Scroller  Addresses  and  Patch  • LX  8  Scroller  Runs  (Half  Done)  • Install  Microfills  

    o Waiting  on  Scenic  Elements  • Install  and  color  Zip  Strips  • Finish  patching  and  trouble  shooting  newly  installed  elements  • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  

  • • Follow  Spots  and  Goodies  o Telerads  o Headsets  –  Dave  will  be  renting  them  until  we  can  pull  from  Richard,  but  sound  

    shout  install  them.  o Harnesses  (Gallery  positions)  o Make  sure  everything  works!  

    If  Not  Done  on  Tuesday  • Re-‐Address  Bridge  VLs  • Find  Address  information  so  Movers  can  be  patched  • Studio  Color  Cable  Runs  

    o ND  will  be  running  to  A009  o DMX  tie  will  be  running  to  Deck  

    • Patch  Studio  Colors  • Zip  Strip  Power  Runs  • Build  Groups,  Palettes,  and  Effects,  if  time  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Scrollers?  o Scroller  Cable?  o Top  Hats?  o 4  Barn  Doors  o 5  S4  36  degree  barrels  o Headsets  

     

  • PreFocus  –  Tuesday  Accomplished  Today  

    • Dropped  Scrollers  o They  arrived  today,  already  strung  –  Thank  you,  Wybron!  

    • Completed  LX  8  Scroller  Cable  Runs  • Fixed  Scroller  Run  situation  on  Cat  1,  so  they  all  work!  • Dropped  Ordered  Gobos  and  Gel,  except  LX  54  –  Upper  Cyc  • Finished  Channel  Check  

    o Trouble  Shot  non-‐working  lights  • Dropped  Color  in  necessary  lights  in  Cats,  whose  barrels  were  dropped  later  • Set  Tech  Table  up  for  Board  • Move  Board  to  Tech  Table  for  focus  • Added  new  S4  19  deg  on  Cat,  circuit.    Ch.  #  295  • Re-‐Address  Bridge  VLs  • Found  Address  information  on  Movers  and  patched  • Got  all  Data  (Movers  and  Scrollers)  to  work!  • Ran  Cable  for  Zip  Strips  • Colored  Zip  Strips  • Need  to  put  Heat  Shield  or  Black  Wrap  Unused  Cells  • Installed  Furthest  US  Zip  Strip  • Scenic  Welded  the  Rig  for  the  Pipe  under  the  deck,  but  Dave  will  need  to  find  a  solution  for  

    the  pipes  needed  for  this  installation  • Drilled  hole  for  Studios  and  Ran  Data  for  Studios  to  SL  Deck  –  needs  to  be  plugged  in  and  

    patched  • Ran  Cable  from  A009  ND  to  trap  room  for  Studio  Colors  

     To  Do  Tomorrow  

    • Focus!  • Beginning  on  DS  portion,  to  allow  scenic  to  finish  the  installation  of  trees  • Continue  the  Studio  Color  Project  

    o Plug  in  the  DMX  and  Patch  in  booth  o Run  ND  Cables  from  lights  to  trap  room  

     To  Do  Before  Level  Set  

    • Focus  • Finish  Dropping  LX  54  (Upper  Cyc)  Color  • Install  Microfills  

    o Waiting  on  Scenic  Elements  • Finish  the  Zip  Strip  Installation  

    o Dave  will  need  to  find  a  solution  for  the  pipes  o Hang  and  circuit  the  4  DS  Zips  o Circuit  the  US  Zip  o Black  Wrap  unused  cells  so  that  dust,  etc  from  the  sweeping/mopping  doesn’t  get  

    into  the  light  • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  • Move  Board  back  to  booth?    or  Redo  the  Tech  Table  set  up  so  SM  has  a  place  to  sit  • Follow  Spots  and  Goodies  

    o Telerads  

  • o Headsets  –  Dave  will  be  renting  them  until  we  can  pull  from  Richard,  but  sound  shout  install  them.  

    o Harnesses  (Gallery  positions)  o Make  sure  everything  works!  

    • Build  Groups,  Palettes,  and  Effects    To  Do  by  Sunday  Tech  

    • Install  Hazers  –  both  of  them!  o Base  Hazer  in  bridge  platform  level  –  will  need  power  and  DMX  o CO2  Hazer  in  HR  Cove  0  Level  2  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Top  Hats?  o 4  Barn  Doors  o Headsets  o Base  Hazer  

     

  • Focus  –  Day  1  Accomplished  Today  

    • Focused:  o Cat  4  o Cat  3  o HR  Cove  0  o Bridge  o LX8  o SR  Truss  o SL  Truss  o Part  of  LX  19,  LX  23,  Cat  1,  Cat  2  o Totalling  in  115  out  of  230  (non-‐cyc,  non-‐mover  lights)  

    • Completed  the  Studio  Color  Project  o Plugged  in  the  DMX  and  Patch  in  booth  o Ran  ND  Cables  from  lights  to  trap  room  o Cleaned  up  A009  

    • Installed  CO2  Hazer  o Still  needs  a  DMX  Cable  –  pull  from  Richard  Strike  

    • Finished  dropping  Color  in  Cyc  and  Zip  Strips  • Confirmed  and  (mostly)  Finished  Follow  Spot  Goodies  

    o Telerads  o Harnesses  o Color  o Music  Stands  o Music  Stand  Lights  o Still  Waiting  on  Headsets  –  Dave  will  be  picking  these  up  on  Friday  

    • Moved  Carts  to  Upstage  • Placed  and  Spiked  Booms  • Dropped  Remaining  Gobos  during  Focus  

     To  Do  Tomorrow  

    • Finish  Focus  • Lee  will  need  to  find  a  solution  to  the  Booms  and  their  lights  

     To  Do  Before  Level  Set  

    • Finish  Focus  • Install  Microfills  

    o Waiting  on  Scenic  Elements  • Finish  the  Zip  Strip  Installation  

    o Dave  will  need  to  find  a  solution  for  the  pipes  o Hang  and  circuit  the  4  DS  Zips  o Circuit  the  US  Zip  o Black  Wrap  unused  cells  so  that  dust,  etc  from  the  sweeping/mopping  doesn’t  get  

    into  the  light  • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  • Move  Board  back  to  booth?    or  Redo  the  Tech  Table  set  up  so  SM  has  a  place  to  sit  • Check  Installation  of  Headsets  (to  be  installed  by  Sound)  

    o Follow  Spots  o Board  

  • o Tech  Table  • Build  Groups,  Palettes,  and  Effects  

     To  Do  by  Sunday  Tech  

    • Install  Base  Hazer  in  bridge  platform  level  –  will  need  power  and  DMX  –  Pull  from  Richard    To  Do  At  Some  Point  

    • Drop  Top  Hats  on  All  Cat  1  lights  –  pulling  from  Richard  • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  –  pulling  from  Richard  • Ch.  85,  102,  188  –  have  major  flicker  action;  lamp  change  soon  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.    To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Top  Hats  –  All  o 4  Barn  Doors  o Headsets  o Base  Hazer  

     

  • Focus  –  Day  2  Accomplished  Today  

    • Finished  Focus  except  Ch  o Lee  found  happiness  with  her  boom  lights!  

    • Finish  the  Zip  Strip  Installation  o Installed  the  pipes  o Hung  and  circuited  the  4  DS  Zips  o Circuited  and  Patcehd  the  US  Zip  o Black  Wrap  unused  cells  so  that  dust,  etc  from  the  sweeping/mopping  doesn’t  get  

    into  the  light  • Patched  House  • Cleaned  Gak  • Cleaned  Gel  Table  • Dave  Began  the  setup  of  the  monitors  for  Ray  and  Joe  • Built  Groups  

     To  Do  Tomorrow  

    • Install  Microfills  o Waiting  on  Scenic  Elements  

    • Get  Proper  Cable  lengths  for  Juliats  –  Another  Super  Dave  Project  –  this  will  happen  tomorrow!  

    • Redo  the  Tech  Table  set  up  so  SM  has  a  place  to  sit  • Test  Studio  Colors  • Check  Installation  of  Headsets  (to  be  installed  by  Sound)  –  Dave  will  be  getting  them  

    tomorrow!  o Follow  Spots  o Board  o Tech  Table  

    • Build  Palettes,  and  Effects    To  Do  by  Sunday  Tech  

    • Install  Base  Hazer  in  bridge  platform  level  –  will  need  power  and  DMX  –  Pull  from  Richard  and  Patch  

     To  Do  At  Some  Point  

    • Drop  Top  Hats  on  All  Cat  1  lights  –  pulling  from  Richard  • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  –  pulling  from  Richard  • Ch.  85,  102,  188  –  have  major  flicker  action;  lamp  change  soon  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.  • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Top  Hats  –  All  o 4  Barn  Doors  o Headsets  o Base  Hazer  

  • Post  Focus  –  Friday  Accomplished  Today  

    • Finished  focusing  final  2  lights  • Installed,  patched,  focused  Microfills  • Got  Cables  for  Juliats  and  they  work    –  Thanks  Dave!!  • Redid  the  Tech  Table  set  up  so  SM  has  a  place  to  sit  • Tested  Studio  Colors  and  Trouble  Shoot  Shutter  Module  and  Color  Wheels  • Installed  Headsets  • Changed  Lamp  on  Ch.  102  • Taped  Boom  lights,  so  they  can  be  clearly  seen  by  Actors  • Began  Building  Palettes  and  Effects  –  discovered  problems  and  found  solutions!  

     To  Do  Tomorrow  

    • LEVEL  SET  • Schedule  

    o 8  –  8:30  –  Training  o 8:30  –  10:00  –  Finish  PreSets  and  Effects  o 10:00  –  1:00  –  Main  Cues  o 1:00  –  2:00  –  Lunch  o 2:00  –  4:00  –  Cue  Songs  o 4:00  -‐  ^:00  –  George  will  look  at  cues  

     To  Do  by  Sunday  Tech  

    • Install  Base  Hazer  in  bridge  platform  level  –  will  need  power  and  DMX  –  Pull  from  Richard  and  Patch  

     To  Do  At  Some  Point  

    • Drop  Top  Hats  on  All  Cat  1  lights  –  pulling  from  Richard  • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  –  pulling  from  Richard  • Ch.  85,  188  –  have  major  flicker  action;  lamp  change  soon  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.  • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  

     To  Do  After  Richard  Strike  

    • Pull  and  Drop  Remaining  Accessories  from  Richard  –  Strike,  Friday  Oct.  27  o Top  Hats  –  All  o 4  Barn  Doors  o Headsets  o Base  Hazer  o DMX  Cable  o Gender  Bender?  

    •    

  • Level  Set  Accomplished  Today  

    • Set  some  levels  o We  got  the  basic  cues  in  the  board  (ins  and  outs)  as  well  as  about  half  the  songs.  

     To  Do  Tonight  At/After  Richard  Strike  

    • Pull  the  Following  o Top  Hats  –  All  o 4  Barn  Doors  o Headsets  o Base  Hazer  o DMX  Cable  o Gender  Bender?  

    • Install  Base  Hazer  in  bridge  platform  level    To  Do  Tomorrow  

    • Check  Cyc  Gel  for  burnouts  and  replace  • Replace  Lamps    -‐  several  went  out  during  Level  Set  

    o Including  Channel  83  (Cat  1),  Top  Blue  Cyc  • Refocus  Ch.  292  • Index  Studio  Colors’  Color  Wheel  • Look  at  Groups,  fix  them  

     To  Do  At  Some  Point  

    • Drop  Top  Hats  on  All  Cat  1  lights  –  pulling  from  Richard  • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  –  pulling  from  Richard  • Ch.  85,  188  –  have  major  flicker  action;  lamp  change  soon  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.  • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  • Black  Wrap/Gel  Better  the  Gallery  Music  Stand  Lights  • Fix  the  Telerads,  so  the  spot  ops  can  use  them  

    o Some  need  batteries,  some  need  to  be  replaced  • Replace  borrowed  Headsets  with  Headsets  from  Richard  

       

  • Tech  Accomplished  Last  Night/Today  

    • Pulled  the  Following  o Top  Hats  –  All  o 4  Barn  Doors  o Headsets  o Base  Hazer  o DMX  Cable  o Gender  Bender?  

    • Installed  Base  Hazer  in  bridge  platform  level  • Installed  CO2  tank  for  other  Hazer  • Replaced  Gel  burnouts  on  Cyc  • Replaced  Lamps  • Indexed  Studio  Colors  • Black  Wrapped  Gallery  Music  Stand  Lights  • Black  Wrapped  Microfills  • Adjusted  Tracking  in  Board  • Replaced  Borrowed  Headsets  

     To  Do  Tomorrow  

    • Cue  Notes!  –  Lee  and  I  will  be  spending  all  of  tomorrow  working  on  Cue  Notes,  with  others  working  on  the  work  notes  if  possible  

    • Look  at  Groups,  fix  them  • Look  at  Juliats,  they  seem  to  not  be  as  bright  as  they  can  be  • Make  sure  all  follow  spots  are  super  sharp  • Get  all  Telerads  working  • Replace  Cyc  Gel  Burnouts  • Fly  LX  54  to  spike  • Label  the  rest  of  Non  Dims  

    o Pit  Music  Stands  –  ND  7  o Cat  4  Music  Stands  –  ND  16?  

     To  Do  At  Some  Point  

    • Drop  Top  Hats  on  All  Cat  1  lights  –  pulling  from  Richard  • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  –  pulling  from  Richard  • Ch.  85,  188  –  have  major  flicker  action;  lamp  change  soon  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.  • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  • Refocus  Source  Fours  on  LX  54,  since  it  wasn’t  on  spike    • Scroller/Mover  Check  

     

  • Dress  1  Accomplished  Today  

    • Replace  Cyc  Gel  Burnouts  • Fly  LX  54  to  spike  • Label  the  rest  of  Non  Dims  

    o Pit  Music  Stands  –  ND  7  o Cat  4  Music  Stands  –  ND  16?  

     To  Do  Tomorrow  

    • Add  Two  New  Lights  –  one  FOH,  one  overstage.    Lee  will  let  me  know  what  and  where  tomorrow  

    • Focus  Two  New  Lights  • Replace  Lamps  in  Juliats  –  Dave  Special  Project  • Make  sure  all  follow  spots  are  super  sharp  • Change  Cyc  Gel  –  Find  out  if  we  need  to  order  more  gel  • Point  Base  Hazer  US  some  • Look  at  Hazer  Fluid  –  Order  More?  • Move  Stage  Management  to  Booth?  • Cue  Notes!  

     To  Do  Wednesday  

    • Get  all  Telerads  working  • Drop  Top  Hats  on  All  Cat  1  lights    • Refocus  S4  Lights  on  LX54  • Build  Scroller  and  Mover  Check  

     To  Do  Thursday  

    • Drop  Barn  Doors  on  Pars  Ch.  290  –  293  • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  

    L20___  Color.  • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  • Strike  Tech  Table  

     

  • Dress  2  Accomplished  Today  

    • Added  Two  New  Lights  –  one  FOH  (Ch.  278)  and  one  overstage  (Ch.  169)  • Focused  Two  New  Lights  • Replaced  Lamp  in  HR  Juliat  –  Dave  has  ordered  more  • Made  sure  all  follow  spots  are  super  sharp  • Pointed  Base  Hazer  US  some  • Look  at  Hazer  Fluid  –  We  only  have  1/3  of  the  bottle.    Dave,  should  we  order  more?  • Pulled  Focus  Tape  • Checked  Stock  of  R68  –  we  only  have  5  cuts  • Cue  Notes!  

     To  Do  Tomorrow  

    • Replace  Gender  Bender  for  Studio  Colors  • Figure  out  why  Studio  Colors  may  turn  off  on  their  own  • Soften  all  side  light  (Ch.  21  –  29,  51  –  59,  121  –  129,  151  –  159)  and  Ch.  107  • Remove  R119  from  Ch.  278,  drop  R132  instead  • Drop  Top  Hats  in  Cove  Lights  • Refocus  Ch.  480,  481  (down  on  cyc),  460,  461  (onstge,  within  Rake  Deck)  • Change  Burnt  out  R75  (Ch.  191  –  198)  • Get  all  Telerads  working  • Build  Scroller  and  Mover  Check  • Move  Joe  to  Booth  • Move  Light  board  at  tech  table,  so  student  can  press  GO  button  • Cue  Notes  

     To  Do  Thursday  

    • Tower  Down  lights,  Ch.  242  and  247  need  to  become  something  other  than  NC,  perhaps  a  L20___  Color.  

    • Look  at  Shutter  Cuts  of  201  –  209,  221  –  229??  –  Lee  is  unhappy  with  them  • Ch.  23  –  it  is  ugly  and  Lee  doesn’t  approve  • Strike  Tech  Table  

     To  Do  By  Friday  

    • Check  Gel  Burnouts,  Replace  what  is  needed  • Replace  other  Juliat  Lamp  

     

  • Dress  3  Accomplished  Today  

    • Replaced  Gender  Bender  for  Studio  Colors  • Looked  at  Studios.    We  were  unable  to  recreate  the  problem,  but  they  worked  just  fine  

    tonight.  • Soften  all  side  light  (Ch.  21  –  29,  51  –  59,  121  –  129,  151  –  159)  and  Ch.  107  • Removed  R119  from  Ch.  278,  drop  R132  instead  • Dropped  Top  Hats  in  Cove  Lights  • Refocused  Ch.  480,  481  (down  on  cyc),  460,  461  (onstge,  within  Rake  Deck)  • Changed  Burnt  out  R75  (Ch.  191  –  198)  • Got  all  Telerads  working  • Built  Scroller  and  Mover  Check  • Moved  Joe  to  Booth  • Moved  Light  board  at  tech  table,  so  student  can  press  GO  button  • Cue  Notes!  

     To  Do  Tomorrow  

    • Look  for  Hazer  Fluid  in  A009  • Spot  4’s  telerad  is  preventing  him  from  using  color  6.    We  need  to  move  it.  • Spot  3  is  having  issues  with  his  telerad  –  fix  it?  • Record  Hazer  into  cues  • Add  2  Headsets  in  Booth  

    o 1  for  Amanda  o 1  for  Stage  Management  students  

    • Change  R75  in  2  lights  in  LX  8  • Change  R26  in  Cyc?  • Look  at  top  Cyc  color  for  changes  as  well  • Cue  Notes!  • Move  Board  to  Booth  • Strike  Tech  Table  

     To  Do  By  Friday  

    • Check  Gel  Burnouts,  Replace  what  is  needed    To  Do  Later  

    • Replace  other  Juliat  Lamp  when  it  comes  in    

  • Preview  Accomplished  Today  

    • Add  2  Headsets  in  Booth  o 1  for  Amanda  o 1  for  Stage  Management  students  

    • Checked  Hazer  Fluid  –  We  have  plenty  of  it!  • Move  Board  to  Booth  • Changed  R68  and  R26  in  Cyc  tonight  • Strike  Tech  Table  • Changed  Hazer  Sub  so  Max  is  20%  • Removed  Telerads  from  Spots  1  and  4  • Gave  new  Telerad  to  Spot  3  • Cue  Notes!  

     To  Do  Tomorrow  

    • Change  R75  in  2  lights  in  LX  8  • Look  at  Channel  107  –  Lee  is  unhappy  • Blue  Tape  Blue  Runs  • Cue  Notes  

     To  Do  Later  

    • Replace  other  Juliat  Lamp  when  it  comes  in  • Replace  more  burnt  Cyc  gel  when  it  gets  in  on  Monday.  

       Opening  Night  Accomplished  Today  

    • Changed  R75  in  2  lights  in  LX  8  • Fixed  Channel  107  • Blue  Tape  Blue  Runs  • Cue  Notes  

     To  Do  Later  

    • Replace  other  Juliat  Lamp  when  it  comes  in  • Replace  more  burnt  Cyc  gel  when  it  gets  in  on  Monday.  

     

  • Strike  PreStrike  

    • Studios  o Begin  Cable  Strike  

    • Strips  o Cables,  Pipes,  Etc  

    • Booms/Truss  SL    Strike  

    • FOH  while  Scenic  finishes  Strike  o Strike  VLs  for  Dance  o Don’t  strike  Spots  

    • Booms  and  Truss  • Overhead  once  Scenic  Finishes  • Bring  Top  Hats  to  Wells  Metz