A96 Report Template - transport.gov.scot
Transcript of A96 Report Template - transport.gov.scot
A96 Dualling East of Huntly to Aberdeen A96 Online Dualling at Inverurie Supplementary Study
Page A1
Appendix A
Drawings D2APc (GSJ) Layout, including drainage basins:
• A96PEA-AMAR-HGN-SWI-DR-CH-335062 – Plan Sheet 1 of 3
• A96PEA-AMAR-HGN-SWI-DR-CH-335070 – Plan Sheet 2 of 3
• A96PEA-AMAR-HGN-SWI-DR-CH-335064 – Plan Sheet 3 of 3
• A96PEA-AMAR-HGN-SWI-SK-CH-335038 – Cross-section
D2APb (At-Grade) Layout, including drainage basins:
• A96PEA-AMAR-HGN-SWI-DR-CH-335071 – Plan Sheet 2 of 3
• A96PEA-AMAR-HGN-SWI-SK-CH-335055 – Cross-section
Utility Drawings:
• A96PEA-AMAR-VUT-SWI-DR-CU-335001 – West
• A96PEA-AMAR-VUT-SWI-DR-CU-335010 – D2APc (GSJ)
• A96PEA-AMAR-VUT-SWI-DR-CU-335011 – D2APb (At-Grade)
• A96PEA-AMAR-VUT-SWI-DR-CU-335003 – East
Indicative Phasing:
• A96PEA-AMAR-HGN-SWI-SK-CH-335049 – W/B Cway
• A96PEA-AMAR-HGN-SWI-SK-CH-335051 – D2APc (GSJ)
• A96PEA-AMAR-HGN-SWI-SK-CH-335050 & 335077 – D2APb (At-Grade)
• A96PEA-AMAR-HGN-SWI-SK-CH-335069 – D2AUP (GSJ)
• A96PEA-AMAR-HGN-SWI-SK-CH-335071 & 335072 – D2AUP (At-Grade)
Environmental Plans:
• A96PEA-AMAR-EGN-SWI-MP-LX-002001 – Key Environmental Constraints
• A96PEA-AMAR-EAQ-SWI-MP-LA-002001 – Air Quality Receptors
• A96PEA-AMAR-ENV-SWI-MP-LN-002001 – Noise and Vibration Receptors
D2UAP Layouts:
• A96PEA-AMAR-HGN-SWI-SK-CH-335056 – D2UAP (GSJ) Layout
• A96PEA-AMAR-HGN-SWI-DR-CH-335074 – D2UAP (At-Grade) Layout
• A96PEA-AMAR-HGN-SWI-SK-CH-335073 – D2UAP (At-Grade) Cross-sections
Cross Sections
Scale 1:200
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
Precision House
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2APb&c Carriageway Widening
Indicative Construction Phasing
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335049
S4 Fit for Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Existing Cross Section Ch4750 Phase 1 - Excavation
Phase 2 - Roadworks
Phase 3 - Re-construct Existing A96
Final D2APb&c Cross Section
Plan
Scale 1:1000
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Construction Area
Cross Sections
Scale 1:250
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2APc Grade Separated Junction
Indicative Construction Phasing
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335051
S4 Fit for Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Plan
Scale 1:1250
Existing Cross Section Ch 3940
Phase 1 - Site clearance
Phase 2 - Eastbound slip road and retaining wall
earthworks and carriageway construction
Phase 3 - Westbound slip road retaining wall
earthworks and carriageway construction
Phase 4 - Construction of elevated section
Phase 5 - Completed Works
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Construction Area
Affected Properties
Assumed Minimum Construction /
Maintenance Area
1.00 7.30
Eastbound
Lane
Westbound
Lane
1.00
Davah Wood
Verge
3.00 1.0 3.653.65 3.653.652.502.50 2.50
26.10
1.00 1.001.00 1.00
3.00
3.00 3.00
Westbound / Eastbound
Temporary Lanes
3.00 3.00
Westbound/ Eastbound
Temporary Lanes
Westbound/ Eastbound
Temporary Lanes
3.653.65 2.501.001.00
Highway Boundary Fence
Affected property
Aquhorthies Circle
Existing retaining wall to the
rear of Aquhorthies Circle
Highway Boundary
Fence
Existing
Carriageway
House demolished and
cleared for excavation
Construction
begins on EB
carriageway
Temporary traffic moved to
newly completed carriageway
Retaining wall assumed to be 1m
thick including facings
Structural form indicative only
Assumed minimum 3m wide area
around highway boundary required for
construction / maintenance access
Existing Fence
Assumed minimum 3m wide area
around highway boundary required
for construction / maintenance access
Construction
begins on WB
carriageway
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Aquhorthies
Circle
Davah Wood
Verge
Highway Boundary Fence
Davah Wood
Verge
Highway Boundary Fence
Davah Wood
Verge
Highway Boundary Fence
Davah Wood
Verge
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
B
a
l
a
n
c
i
n
g
P
o
n
d
D
r
a
i
n
B
9
1
7
0
U
n
d
e
r
p
a
s
s
DAVAH WOOD
A
Q
U
H
O
R
T
H
IE
S
C
IR
C
L
E
E
S
S
P
o
l
i
c
e
S
t
a
t
i
o
n
M
a
s
t
C
o
n
d
o
r
h
i
l
l
D
r
a
in
A
r
k
l
e
a
G
O
L
F
W
A
L
K
N
E
T
H
E
R
GOLF PARK
Lay-by
L
B
A
A
3+
750
4+
000
4+
250
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
Precision House
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2APb At Grade Roundabout
Indicative Construction Phasing (AQ)
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335050
S4 Fit For Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
---
---
---
---
---
---
---
---
---
---
---
---
Existing Cross Section Ch 3940
Phase 1 - Site clearance and temporary traffic management
Phase 2 - Eastbound carriageway filled and constructed
Phase 3 - Westbound carriageway construction
Phase 4 - Completed Works
Cross Sections
Scale 1:250
Plan
Scale 1:1000
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Construction Area
Affected Properties
Assumed Minimum Construction /
Maintenance Area
B
a
l
a
n
c
i
n
g
P
o
n
d
D
r
a
i
n
B
9
1
7
0
U
n
d
e
r
p
a
s
s
DAVAH WOOD
A
Q
U
H
O
R
T
H
IE
S
C
IR
C
L
E
E
S
S
P
o
l
i
c
e
S
t
a
t
i
o
n
M
a
s
t
C
o
n
d
o
r
h
i
l
l
D
r
a
in
A
r
k
l
e
a
G
O
L
F
W
A
L
K
N
E
T
H
E
R
GOLF PARK
L
B
B
B
4+
000
4+
250
3+
750
A
A
1.00 7.30
Eastbound
Lane
Westbound
Lane
1.00
Davah Wood
Verge
3.00 3.00
Westbound / Eastbound
Temporary Lanes
Westbound / Eastbound
Temporary Lanes
Highway Boundary Fence
Affected property
Aquhorthies Circle
Existing retaining wall to the
rear of Aquhorthies Circle
Highway Boundary
Fence
Existing
Carriageway
Construction begins on
WB carriageway and
retaining wall
Temporary traffic moved to
newly completed carriageway
Construction begins
on WB carriageway
and retaining wall
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Aquhorthies
Circle
Davah Wood
Verge
Highway Boundary Fence
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Westbound / Eastbound
Temporary Lanes
For detailed construction method of
retaining wall referer to
A96PEA-AMAR-HGN-SK-CH-335070
Traffic moved to extent of
existing eastbound lane
Retaining wall assumed to be
1m thick including facings
Structural form indicative only
3.00 1.0
Existing A96
Carriageway
Existing
Earthworks
Slope
Existing
Verge
19m
3.653.65 3.653.652.502.50 2.50
26.10
1.00 1.001.00 1.00
Retaining wall assumed to be
1m thick including facings
Structural form indicative only
Assumed minimum 3m wide area around
highway boundary required for
construction / maintenance access
3.00
Assumed minimum 3m wide area
around highway boundary required
for construction / maintenance access
Existing
Verge
1.0
Boundary encroaches in
to local service road for
Davah Wood properties
3.00 3.00
1.0 3.653.652.50 1.00 1.00
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
Precision House
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2APb At-Grade Roundabout
Indicative Construction Phasing (DW)
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335077
S0 Initial non-contractual code P01.1
P01.1
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Cross Sections
Scale 1:250
Plan
Scale 1:1000
Existing Cross Section Ch 3940
Phase 1 - Site clearance and temporary traffic management
Phase 2 - Eastbound carriageway filled and constructed
Phase 3 - Westbound carriageway construction
Phase 4 - Completed Works
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Assumed Minimum Construction /
Maintenance Area
Affected Properties
Construction Area
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
RevisionSuitability Suitability Description
S4 Fit For Stage Approval P01
B
a
l
a
n
c
i
n
g
P
o
n
d
D
r
a
i
n
B
L
A
C
K
H
A
L
L
R
O
A
D
B
9
1
7
0
U
n
d
e
r
p
a
s
s
S
t
a
E
lS
u
b
D
r
a
in
D
r
a
in
DAVAH WOOD
A
Q
U
H
O
R
T
H
IE
S
C
IR
C
L
E
E
S
S
P
o
l
i
c
e
S
t
a
t
i
o
n
M
a
s
t
C
o
n
d
o
r
h
i
l
l
D
r
a
in
A
r
k
l
e
a
OLD
CO
UR
SE
AV
EN
UE
G
O
L
F
W
A
L
K
N
E
T
H
E
R
GOLF PARK
Lay-by
L
B
A
A
1.00
Hardstrip
7.30
Eastbound
Lane
Westbound
Lane
1.00
Davah Wood
Verge
Highway Boundary Fence
Affected property
Davah Wood
Affected property
Aquhorthies
Circle
Existing retaining wall to the
rear of Aquhorthies Circle
Construct retaining retaining
wall and fill behind
Construct eastbound slip road
Demolish houses and
clear vegetation
Existing Carriageway
Excavate for slip road and
construct retaining wall
Construct westbound slip road
Westbound
Temporary Lane
3.00
Transfer traffic to west
side of existing A96
3.00
Existing
Carriageway
3.00
Westbound/ Eastbound
Temporary Lanes
Transfer traffic to east
and west slip roads
Transfer traffic to east
and west slip roads
Construct and retaining walls, infill
and mainline carriageway
Affected property
Davah Wood
Affected property
Aquhorthies Circle
Highway Boundary
Fence Demolish houses and
clear vegetation
Transfer traffic to newly
constructed slip road
7.30 1.001.00
Eastbound
Lane
Westbound
Lane
Eastbound
Temporary Lane
1.00
1.303.703.302.001.00
2.50 3.65 3.65
1.30
3.65 3.65
21.40
2.50 1.00
3.70 3.30 2.00 1.00
1.80Westbound
Temporary Lane
Eastbound
Temporary Lane
Eastbound
Temporary Lane
Cross Sections
Scale 1:250
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2UAP Grade Separated Junction
Indicative Construction Phasing
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335069
S4 Fit for Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
---
Plan
Scale 1:1250
Existing Cross Section Ch 3940
Phase 1 - Site clearance
Phase 2 - Eastbound slip road and retaining wall,
earthworks and carriageway construction
Phase 3 - Westbound slip road retaining wall,
earthworks and carriageway construction
Phase 4 - Construction of elevated section
Phase 5 - Completed Works
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Assumed Minimum Construction /
Maintenance Area
Affected Properties
Construction Area
1.00 7.30
Eastbound
Lane
Westbound
Lane
1.00
3.00 3.00
Westbound / Eastbound
Temporary Lanes
Westbound / Eastbound
Temporary Lanes
Affected property
Aquhorthies Circle
Existing retaining wall to the
rear of Aquhorthies Circle
Highway Boundary
Fence
Existing
Carriageway
Construction begins on
WB carriageway and
retaining wall
Temporary traffic moved to
newly completed carriageway
Retaining wall assumed to be 1m
thick including facings
Structural form indicative only
Assumed minimum 3m wide area
around highway boundary required for
construction / maintenance access
Assumed minimum 3m wide area
around highway boundary required
for construction / maintenance access
Construction begins
on WB carriageway
and retaining wall
Aquhorthies
Circle
Westbound / Eastbound
Temporary Lanes
Traffic moved to extent of
existing westbound lane
3.00 3.00
3.00
1.8 3.65 2.50
1.0
3.65
3.00
3.65 3.652.501.0
29.4
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Highway Boundary Fence
Highway Boundary FenceHighway Boundary Fence
Highway Boundary FenceHighway Boundary Fence
Davah Wood
Verge
Davah Wood
Davah Wood
Verge
Davah Wood
Davah Wood
Verge
Davah Wood
Davah Wood
Verge
Davah Wood
Davah Wood
Verge
Davah Wood
B
a
l
a
n
c
i
n
g
P
o
n
d
D
r
a
i
n
B
9
1
7
0
U
n
d
e
r
p
a
s
s
DAVAH WOOD
A
Q
U
H
O
R
T
H
IE
S
C
IR
C
L
E
E
S
S
P
o
l
i
c
e
S
t
a
t
i
o
n
M
a
s
t
C
o
n
d
o
r
h
i
l
l
D
r
a
in
A
r
k
l
e
a
G
O
L
F
W
A
L
K
N
E
T
H
E
R
GOLF PARK
Lay-by
L
B
A
A
3+
750
4+
000
4+
250
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
Precision House
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2UAP At-Grade Roundabout
Indicative Construction Phasing (AQ)
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335071
S4 Fit For Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
Cross Sections
Scale 1:250
Plan
Scale 1:1000
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Assumed Minimum Construction /
Maintenance Area
Affected Properties
Construction Area
Existing Cross Section Ch 3920
Phase 1 - Site clearance and temporary traffic management
Phase 2 - Eastbound carriageway filled and constructed
Phase 3 - Westbound carriageway construction
Phase 4 - Completed Works
1.00 7.30
Eastbound
Lane
Westbound
Lane
1.00
Davah Wood
Verge
3.00 3.00
Westbound / Eastbound
Temporary Lanes
Westbound / Eastbound
Temporary Lanes
Highway Boundary Fence
Affected property
Aquhorthies Circle
Existing retaining wall to the
rear of Aquhorthies Circle
Highway Boundary
Fence
Existing
Carriageway
Construction begins on
WB carriageway and
retaining wall
Temporary traffic moved to
newly completed carriageway
Retaining wall assumed to be 1m
thick including facings
Structural form indicative only
Assumed minimum 3m wide area
around highway boundary required for
construction / maintenance access
Assumed minimum 3m wide area
around highway boundary required
for construction / maintenance access
Construction begins
on WB carriageway
and retaining wall
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Davah Wood
Aquhorthies
Circle
Davah Wood
Verge
Highway Boundary Fence
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
Aquhorthies
Circle
3.00
3.653.65 1.80
2.501.00
3.00 3.00
Westbound / Eastbound
Temporary Lanes
For detailed construction method of
retaining wall referer to
A96PEA-AMAR-HGN-SK-CH-335070
Traffic moved to extent of
existing eastbound lane
1.8 3.65 2.50
1.0
3.65
3.00
3.65 3.652.501.0
29.4
B
a
l
a
n
c
i
n
g
P
o
n
d
D
r
a
i
n
B
9
1
7
0
U
n
d
e
r
p
a
s
s
DAVAH WOOD
A
Q
U
H
O
R
T
H
IE
S
C
IR
C
L
E
E
S
S
P
o
l
i
c
e
S
t
a
t
i
o
n
M
a
s
t
C
o
n
d
o
r
h
i
l
l
D
r
a
in
A
r
k
l
e
a
G
O
L
F
W
A
L
K
N
E
T
H
E
R
GOLF PARK
Lay-by
L
B
3+
750
4+
000
4+
250
A
A
Project Name
Revision
Scale :
Drawing Title
Dimensions :
Client
Suitability
@ A1Project Ref. No. Stage
Project Originator Volume
Location Type
|
Number
-
|
-
-
||
-
Role
-
|
Drawing Number
Suitability Description
ApprovedReviewed
Revision details
Checked AuthorisedCreated
dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy dd/mm/yy
Revision
|
-
Designer
Precision House
McNeil Drive
Motherwell
ML1 4UR
58 Port Dundas Road
Glasgow
G4 0HF
A96 Dualling East of Huntly to
Aberdeen
D2UAP At-Grade Roundabout
Indicative Construction Phasing (DW)
Online Dualling at Inverurie
Supplementary Study
250002-92 STAGE 2
As Shown
M
A96PEA AMAR HGN
SWI SK CH 335072
S4 Fit For Stage Approval P01
P01
J.Marsh
01/05/20
S.Clifford
01/05/20
R.Oakley
01/05/20
G.MacDonald
01/05/20
G.Wilkie
01/05/20
Cross Sections
Scale 1:250
Plan
Scale 1:1000
LEGEND
New Road Construction
Embankment (1:2 Slope)
Cutting (1:2 Slope)
New Structures
New Attenuation Basin
Assumed Minimum Construction /
Maintenance Area
Affected Properties
Construction Area
Existing Cross Section Ch 3940
Phase 1 - Site clearance and temporary traffic management
Phase 2 - Westbound carriageway excavated and constructed
Phase 3 - Eastbound carriageway construction
Phase 4 - Completed Works