A554-K-PRG-CV-SPC-C30-003

3

description

A554-K-PRG-CV-SPC-C30-003

Transcript of A554-K-PRG-CV-SPC-C30-003

Ras Tanura Integrated Project (RTIP)Document No: A554-K-PRG-CV-SPC-C30-003 KBR Project No. A554Revision: 0 MAT FOUNDATION FOR TANKS W/O CP SYSTEMIssue Purpose: IFD Contains Confidential Information of Both Dow and Saudi Aramco Page 2 of 2 SUMMARY OF DOCUMENT REVISIONS Rev. No. Date Revised Section RevisedRevision Description 0 14-J un-10NewIssued for Design Issued per RFV No. A554-RFV-542 Issued for EPC / ITB Use Only