    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    gg omera on:

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    1 Water Supply

    1.1 Water Treatment 577.77 586.77

    1.1.1Yearly Operation & Maintenance costs per capacity of watertreatment plants installed

    / (l/s) 155.35 157.74 768.05 218.73 1,299.87 211.65 185.56 1,031.30 257.30 1,685.80

    - Flocculation and Sedimentation / (l/s) 60.12 61.04 297.22 84.64 503.03 81.90 71.81 399.09 99.57 652.38

    - Pre-chlorination/ozonisation for oxidation (break-point

    chlorination) / (l/s) 0.00 0.00

    - Rapid sands filter / (l/s) 30.20 30.67 149.33 42.53 252.73 41.15 36.08 200.51 50.03 327.76

    - Slow sand filter / (l/s) 0.00 0.00

    - Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00

    - Activated carbon filters / (l/s) 0.00 0.00

    - Disinfection / (l/s) 65.03 66.03 321.50 91.56 544.11 88.59 77.67 431.69 107.70 705.66

    - Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00

    1.1.2.Standard Treatment Plant for Surface Water Treatment

    (Flocculation, Filtration, Disinfection) / (l/s) 155.35 157.74 768.05 218.73 1,299.87 211.65 185.56 1,031.30 257.30 1,685.80

    1.2Pumping Stations and Water abstraction (wells,

    intake)1199 1350

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (kW) 11.62 34.94 92.53 0.00 139.09 14.28 37.06 112.05 0.00 163.39

    1.3Distribution Network incl. Reservoirs and

    Transmission Mains202 249

    Yearly Operation & Maintenance costs per length of network

    (km) / (km) 471.88 0.00 3,295.81 32.93 3,800.62 529.79 0.00 3,646.96 31.93 4,208.67

    Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    SUCEAVA

    N Parameter Unit

    COVASNA COUNTY 1 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    2/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    N Parameter Unit

    2 Wastewater

    2.1 Wastewater Treatment Plant 170500 166464

    Yearly Operation & Maintenance costs per P.E.

    (tertiary treatment above 10.000 P.E.); excl.

    sludge management

    - 2.000 -5.000 P.E. / (P.E.) 0.00 0.00

    - 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00

    - 10.000 - 50.000 P.E. / (P.E.) 0.00 0.00

    - 50.000 - 100.000 P.E. / (P.E.) 0.56 2.35 1.90 0.75 5.55 0.57 2.71 2.61 0.87 6.77

    - > 100.000 P.E. / (P.E.) 0.00 0.00

    2.2 Sludge Management 6886 6851

    Costs for sludge disposal per m of sludge produced at the

    WWTP (wet sludge); incl. Costs for sludge dewatering

    - agriculture reuse / (m) 0.00 0.00

    - disposal at municipal waste dumpsites / (m) 0.13 0.81 1.08 1.89 3.90 0.13 0.92 1.46 9.46 11.97

    - incineration / (m) 0.00 0.00

    - other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal

    category / (m) 0.00 0.00

    2.3 Sewer Network incl. Buffer tanks 118.598 190.277

    Yearly Operation & Maintenance costs per length of sewer

    network (km) / (km) 2,376.50 0.00 4,556.97 0.00 6,933.48 1,686.86 0.00 3,871.67 0.00 5,558.53

    2.4 Wastewater Pumping Stations 87 238

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (Kw) 84.91 103.42 1,744.31 0.00 1,932.63 35.32 43.78 868.42 0.00 947.52

    2.5 Decentral Septic Tank

    Yearly Operation & Maintenance costs to empty, transport and

    treat sludge from septic tank / (P.E.) 0.00 0.00

    Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)

    ** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs

    *** Consumables: Chemicals for Treatment, fuel, lubricant, etc.

    **** Without Project Scenario: Highlight in % of the with project scenario where significant difference

    COVASNA COUNTY 2 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    3/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    gg omera on:

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    1 Water Supply

    1.1 Water Treatment 135 135

    1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed

    / (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40

    - Flocculation and Sedimentation / (l/s) 0.00 0.00

    - Pre-chlorination/ozonisation for oxidation (break-point

    chlorination) / (l/s) 0.00 0.00

    - Rapid sands filter / (l/s) 0.00 0.00

    - Slow sand filter / (l/s) 0.00 0.00

    - Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00

    - Activated carbon filters / (l/s) 0.00 0.00

    - Disinfection / (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40

    - Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00

    1.1.2.Standard Treatment Plant for Surface Water Treatment

    (Flocculation, Filtration, Disinfection) / (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40

    1.2Pumping Stations and Water abstraction (wells,

    intake)460 405

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (kW) 12.51 25.51 45.29 0.00 83.31 19.15 28.10 72.81 0.00 120.06

    1.3Distribution Network incl. Reservoirs and

    Transmission Mains35.859 62.113

    Yearly Operation & Maintenance costs per length of network

    (km) / (km) 1,097.70 0.00 3,485.76 51.96 4,635.42 853.90 0.00 2,848.34 29.09 3,731.34

    Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST

    FALTICENI

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    COVASNA COUNTY 3 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    4/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    2 Wastewater

    2.1 Wastewater Treatment Plant 32000 33150.9

    Yearly Operation & Maintenance costs per P.E.

    (tertiary treatment above 10.000 P.E.); excl.

    sludge management

    - 2.000 -5.000 P.E. / (P.E.) 0.00 0.00

    - 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00

    - 10.000 - 50.000 P.E. / (P.E.) 0.42 3.17 1.68 0.37 5.64 0.41 2.36 2.48 0.49 5.74

    - 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00

    - > 100.000 P.E. / (P.E.) 0.00 0.00

    2.2 Sludge Management 2144 1619

    Costs for sludge disposal per m of sludge produced at the

    WWTP (wet sludge); incl. Costs for sludge dewatering

    - agriculture reuse / (m) 0.00 0.00

    - disposal at municipal waste dumpsites / (m) 0.06 0.00 0.57 1.18 1.81 0.08 0.67 1.16 11.96 13.88

    - incineration / (m) 0.00 0.00

    - other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal

    category / (m) 0.00 0.00

    2.3 Sewer Network incl. Buffer tanks 36 60

    Yearly Operation & Maintenance costs per length of sewer

    network (km) / (km) 1,118.14 0.00 2,453.64 0.00 3,571.78 1,177.01 0.00 2,023.05 0.00 3,200.06

    2.4 Wastewater Pumping Stations 0 72.61867

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (Kw) 0.00 25.63 90.42 471.93 0.00 587.98

    2.5 Decentral Septic Tank

    Yearly Operation & Maintenance costs to empty, transport and

    treat sludge from septic tank / (P.E.) 0.00 0.00

    Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)

    ** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs

    *** Consumables: Chemicals for Treatment, fuel, lubricant, etc.

    **** Without Project Scenario: Highlight in % of the with project scenario where significant difference

    COVASNA COUNTY 4 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    5/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    gg omera on:

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    1 Water Supply

    1.1 Water Treatment 236.4 236.4

    1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed

    / (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52

    - Flocculation and Sedimentation / (l/s) 0.00 0.00

    - Pre-chlorination/ozonisation for oxidation (break-point

    chlorination) / (l/s) 0.00 0.00

    - Rapid sands filter / (l/s) 0.00 0.00

    - Slow sand filter / (l/s) 0.00 0.00

    - Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00

    - Activated carbon filters / (l/s) 0.00 0.00

    - Disinfection / (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52

    - Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00

    1.1.2.Standard Treatment Plant for Surface Water Treatment

    (Flocculation, Filtration, Disinfection) / (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52

    1.2Pumping Stations and Water abstraction (wells,

    intake)171 249

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (kW) 2.70 34.51 58.11 0.00 95.32 6.72 13.01 49.56 0.00 69.29

    1.3Distribution Network incl. Reservoirs and

    Transmission Mains39.99 71.045

    Yearly Operation & Maintenance costs per length of network

    (km) / (km) 79.08 0.00 1,490.78 23.43 1,593.29 160.95 0.00 1,042.13 7.24 1,210.32

    Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST

    RADAUTI

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    COVASNA COUNTY 5 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    6/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    2 Wastewater

    2.1 Wastewater Treatment Plant 34500 38748.9

    Yearly Operation & Maintenance costs per P.E.

    (tertiary treatment above 10.000 P.E.); excl.

    sludge management

    - 2.000 -5.000 P.E. / (P.E.) 0.00 0.00

    - 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00

    - 10.000 - 50.000 P.E. / (P.E.) 0.00 1.24 1.14 0.25 2.63 0.00 2.04 1.74 0.59 4.37

    - 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00

    - > 100.000 P.E. / (P.E.) 0.00 0.00

    2.2 Sludge Management 25.53 1813

    Costs for sludge disposal per m of sludge produced at the

    WWTP (wet sludge); incl. Costs for sludge dewatering

    - agriculture reuse / (m) 0.00 0.00

    - disposal at municipal waste dumpsites / (m) 0.03 0.00 35.28 1.69 37.00 0.00 0.61 0.85 3.67 5.13

    - incineration / (m) 0.00 0.00

    - other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal

    category / (m) 0.00 0.00

    2.3 Sewer Network incl. Buffer tanks 40 71

    Yearly Operation & Maintenance costs per length of sewer

    network (km) / (km) 6.25 0.00 1,066.12 0.00 1,072.36 309.47 0.00 838.38 0.00 1,147.85

    2.4 Wastewater Pumping Stations 57.0666667 111.84

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (Kw) 0.11 40.00 209.78 0.00 249.90 5.15 30.29 149.54 0.00 184.98

    2.5 Decentral Septic Tank

    Yearly Operation & Maintenance costs to empty, transport and

    treat sludge from septic tank / (P.E.) 0.00 0.00

    Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)

    ** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs

    *** Consumables: Chemicals for Treatment, fuel, lubricant, etc.

    **** Without Project Scenario: Highlight in % of the with project scenario where significant difference

    COVASNA COUNTY 6 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    7/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    gg omera on:

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    1 Water Supply

    1.1 Water Treatment 200 200

    1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed

    / (l/s) 13.74 150.56 313.32 208.77 686.39 89.19 147.00 385.42 203.84 825.45

    - Flocculation and Sedimentation / (l/s) 5.32 58.26 121.25 80.79 265.62 34.52 56.89 149.15 78.88 319.44

    - Pre-chlorination/ozonisation for oxidation (break-point

    chlorination) / (l/s) 0.00 0.00

    - Rapid sands filter / (l/s) 2.67 29.27 60.92 40.59 133.45 17.34 28.58 74.94 39.63 160.49

    - Slow sand filter / (l/s) 0.00 0.00

    - Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00

    - Activated carbon filters / (l/s) 0.00 0.00

    - Disinfection / (l/s) 5.75 63.02 131.15 87.39 287.32 37.33 61.53 161.34 85.33 345.53

    - Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00

    1.1.2.Standard Treatment Plant for Surface Water Treatment

    (Flocculation, Filtration, Disinfection) / (l/s) 13.74 150.56 313.32 208.77 686.39 89.19 147.00 385.42 203.84 825.45

    1.2Pumping Stations and Water abstraction (wells,

    intake)181 181

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (kW) 2.36 76.46 86.55 0.00 165.37 15.30 74.66 106.47 0.00 196.43

    1.3Distribution Network incl. Reservoirs and

    Transmission Mains33.358 41.658

    Yearly Operation & Maintenance costs per length of network

    (km)

    / (km) 87.50 0.00 2,817.76 65.88 2,971.14 454.66 0.00 2,775.63 51.51 3,281.80

    Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST

    VATRA DORNEI

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    COVASNA COUNTY 7 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    8/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    2 Wastewater

    2.1 Wastewater Treatment Plant 15833.3333 19217.36

    Yearly Operation & Maintenance costs per P.E.

    (tertiary treatment above 10.000 P.E.); excl.

    sludge management

    - 2.000 -5.000 P.E. / (P.E.) 0.00 0.00

    - 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00

    - 10.000 - 50.000 P.E. / (P.E.) 0.00 0.51 3.39 0.58 4.49 0.00 2.66 4.28 0.57 7.51

    - 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00

    - > 100.000 P.E. / (P.E.) 0.00 0.00

    2.2 Sludge Management 447.89 1127

    Costs for sludge disposal per m of sludge produced at the

    WWTP (wet sludge); incl. Costs for sludge dewatering

    - agriculture reuse / (m) 0.00 0.00

    - disposal at municipal waste dumpsites / (m) 0.00 0.00 2.75 3.65 6.40 0.00 0.63 1.67 6.78 9.09

    - incineration / (m) 0.00 0.00

    - other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal

    category / (m) 0.00 0.00

    2.3 Sewer Network incl. Buffer tanks 33 42

    Yearly Operation & Maintenance costs per length of sewer

    network (km) / (km) 6.84 0.00 1,960.96 0.00 1,967.80 691.90 0.00 2,117.09 0.00 2,808.99

    2.4 Wastewater Pumping Stations 0 77.09333

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (Kw) 0.00 9.80 7.01 321.22 0.00 338.03

    2.5 Decentral Septic Tank

    Yearly Operation & Maintenance costs to empty, transport and

    treat sludge from septic tank / (P.E.) 0.00 0.00

    Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)

    ** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs

    *** Consumables: Chemicals for Treatment, fuel, lubricant, etc.

    **** Without Project Scenario: Highlight in % of the with project scenario where significant difference

    COVASNA COUNTY 8 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    9/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    gg omera on:

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    1 Water Supply

    1.1 Water Treatment 80 80

    1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed

    / (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33

    - Flocculation and Sedimentation / (l/s) 0.00 0.00

    - Pre-chlorination/ozonisation for oxidation (break-point

    chlorination) / (l/s) 0.00 0.00

    - Rapid sands filter / (l/s) 0.00 0.00

    - Slow sand filter / (l/s) 0.00 0.00

    - Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00

    - Activated carbon filters / (l/s) 0.00 0.00

    - Disinfection / (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33

    - Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00

    1.1.2.Standard Treatment Plant for Surface Water Treatment

    (Flocculation, Filtration, Disinfection) / (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33

    1.2Pumping Stations and Water abstraction (wells,

    intake)142.5 144

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (kW) 19.04 0.51 88.29 0.00 107.84 39.58 0.55 117.69 0.00 157.83

    1.3Distribution Network incl. Reservoirs and

    Transmission Mains36.289 58.341

    Yearly Operation & Maintenance costs per length of network

    (km)

    / (km) 511.31 0.00 2,080.12 0.32 2,591.75 667.96 0.00 1,743.00 0.22 2,411.18

    Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST

    GURA HUMORULUI

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    COVASNA COUNTY 9 / 10

  • 7/30/2019 A5.5 - Detailed unit O&M cost.pdf

    10/10

    Technical Assistance for Preparation of Projects

    in the Environmental Sector in Romania

    ISPA 2005/RO/16/P/PA/001 - 03

    FEASIBILITY STUDY

    Maintenance

    Costs (Material)

    *

    ElectricityStaff (direct

    costs)**

    Consumables

    (chemicals)***Total

    Maintenance

    Costs

    (Material)

    ElectricityStaff (direct

    costs)

    Consumables

    (chemicals)Total

    N Parameter Unit

    Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario

    2 Wastewater

    2.1 Wastewater Treatment Plant 15333.3333 16177.75

    Yearly Operation & Maintenance costs per P.E.

    (tertiary treatment above 10.000 P.E.); excl.

    sludge management

    - 2.000 -5.000 P.E. / (P.E.) 0.00 0.00

    - 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00

    - 10.000 - 50.000 P.E. / (P.E.) 0.03 0.63 3.04 0.02 3.72 0.03 2.85 4.85 0.63 8.36

    - 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00

    - > 100.000 P.E. / (P.E.) 0.00 0.00

    2.2 Sludge Management 15.96 978

    Costs for sludge disposal per m of sludge produced at the

    WWTP (wet sludge); incl. Costs for sludge dewatering

    - agriculture reuse / (m) 0.00 0.00

    - disposal at municipal waste dumpsites / (m) 0.29 0.00 66.99 1.72 68.99 0.00 0.66 1.84 6.53 9.04

    - incineration / (m) 0.00 0.00

    - other disposal / (m) 0.00 0.00

    Average unit costs weighted by volume of each sludge disposal

    category / (m) 0.00 0.00

    2.3 Sewer Network incl. Buffer tanks 36 58

    Yearly Operation & Maintenance costs per length of sewer

    network (km) / (km) 40.68 0.00 1,336.09 0.00 1,376.77 641.32 0.00 1,171.38 0.00 1,812.70

    2.4 Wastewater Pumping Stations 3.9372 30.5772

    Yearly Operation & Maintenance costs per capacity (kW)

    installed/ (Kw) 9.83 130.30 3,457.90 0.00 3,598.02 32.07 26.01 627.57 0.00 685.65

    2.5 Decentral Septic Tank

    Yearly Operation & Maintenance costs to empty, transport and

    treat sludge from septic tank / (P.E.) 0.00 0.00

    Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)

    ** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs

    *** Consumables: Chemicals for Treatment, fuel, lubricant, etc.

    **** Without Project Scenario: Highlight in % of the with project scenario where significant difference

    COVASNA COUNTY 10 / 10