Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
gg omera on:
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
1 Water Supply
1.1 Water Treatment 577.77 586.77
1.1.1Yearly Operation & Maintenance costs per capacity of watertreatment plants installed
/ (l/s) 155.35 157.74 768.05 218.73 1,299.87 211.65 185.56 1,031.30 257.30 1,685.80
- Flocculation and Sedimentation / (l/s) 60.12 61.04 297.22 84.64 503.03 81.90 71.81 399.09 99.57 652.38
- Pre-chlorination/ozonisation for oxidation (break-point
chlorination) / (l/s) 0.00 0.00
- Rapid sands filter / (l/s) 30.20 30.67 149.33 42.53 252.73 41.15 36.08 200.51 50.03 327.76
- Slow sand filter / (l/s) 0.00 0.00
- Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00
- Activated carbon filters / (l/s) 0.00 0.00
- Disinfection / (l/s) 65.03 66.03 321.50 91.56 544.11 88.59 77.67 431.69 107.70 705.66
- Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00
1.1.2.Standard Treatment Plant for Surface Water Treatment
(Flocculation, Filtration, Disinfection) / (l/s) 155.35 157.74 768.05 218.73 1,299.87 211.65 185.56 1,031.30 257.30 1,685.80
1.2Pumping Stations and Water abstraction (wells,
intake)1199 1350
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (kW) 11.62 34.94 92.53 0.00 139.09 14.28 37.06 112.05 0.00 163.39
1.3Distribution Network incl. Reservoirs and
Transmission Mains202 249
Yearly Operation & Maintenance costs per length of network
(km) / (km) 471.88 0.00 3,295.81 32.93 3,800.62 529.79 0.00 3,646.96 31.93 4,208.67
Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
SUCEAVA
N Parameter Unit
COVASNA COUNTY 1 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
2/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
N Parameter Unit
2 Wastewater
2.1 Wastewater Treatment Plant 170500 166464
Yearly Operation & Maintenance costs per P.E.
(tertiary treatment above 10.000 P.E.); excl.
sludge management
- 2.000 -5.000 P.E. / (P.E.) 0.00 0.00
- 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00
- 10.000 - 50.000 P.E. / (P.E.) 0.00 0.00
- 50.000 - 100.000 P.E. / (P.E.) 0.56 2.35 1.90 0.75 5.55 0.57 2.71 2.61 0.87 6.77
- > 100.000 P.E. / (P.E.) 0.00 0.00
2.2 Sludge Management 6886 6851
Costs for sludge disposal per m of sludge produced at the
WWTP (wet sludge); incl. Costs for sludge dewatering
- agriculture reuse / (m) 0.00 0.00
- disposal at municipal waste dumpsites / (m) 0.13 0.81 1.08 1.89 3.90 0.13 0.92 1.46 9.46 11.97
- incineration / (m) 0.00 0.00
- other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal
category / (m) 0.00 0.00
2.3 Sewer Network incl. Buffer tanks 118.598 190.277
Yearly Operation & Maintenance costs per length of sewer
network (km) / (km) 2,376.50 0.00 4,556.97 0.00 6,933.48 1,686.86 0.00 3,871.67 0.00 5,558.53
2.4 Wastewater Pumping Stations 87 238
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (Kw) 84.91 103.42 1,744.31 0.00 1,932.63 35.32 43.78 868.42 0.00 947.52
2.5 Decentral Septic Tank
Yearly Operation & Maintenance costs to empty, transport and
treat sludge from septic tank / (P.E.) 0.00 0.00
Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)
** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs
*** Consumables: Chemicals for Treatment, fuel, lubricant, etc.
**** Without Project Scenario: Highlight in % of the with project scenario where significant difference
COVASNA COUNTY 2 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
3/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
gg omera on:
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
1 Water Supply
1.1 Water Treatment 135 135
1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed
/ (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40
- Flocculation and Sedimentation / (l/s) 0.00 0.00
- Pre-chlorination/ozonisation for oxidation (break-point
chlorination) / (l/s) 0.00 0.00
- Rapid sands filter / (l/s) 0.00 0.00
- Slow sand filter / (l/s) 0.00 0.00
- Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00
- Activated carbon filters / (l/s) 0.00 0.00
- Disinfection / (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40
- Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00
1.1.2.Standard Treatment Plant for Surface Water Treatment
(Flocculation, Filtration, Disinfection) / (l/s) 274.61 189.10 617.26 262.22 1,343.19 370.02 183.40 873.67 254.31 1,681.40
1.2Pumping Stations and Water abstraction (wells,
intake)460 405
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (kW) 12.51 25.51 45.29 0.00 83.31 19.15 28.10 72.81 0.00 120.06
1.3Distribution Network incl. Reservoirs and
Transmission Mains35.859 62.113
Yearly Operation & Maintenance costs per length of network
(km) / (km) 1,097.70 0.00 3,485.76 51.96 4,635.42 853.90 0.00 2,848.34 29.09 3,731.34
Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST
FALTICENI
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
COVASNA COUNTY 3 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
4/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
2 Wastewater
2.1 Wastewater Treatment Plant 32000 33150.9
Yearly Operation & Maintenance costs per P.E.
(tertiary treatment above 10.000 P.E.); excl.
sludge management
- 2.000 -5.000 P.E. / (P.E.) 0.00 0.00
- 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00
- 10.000 - 50.000 P.E. / (P.E.) 0.42 3.17 1.68 0.37 5.64 0.41 2.36 2.48 0.49 5.74
- 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00
- > 100.000 P.E. / (P.E.) 0.00 0.00
2.2 Sludge Management 2144 1619
Costs for sludge disposal per m of sludge produced at the
WWTP (wet sludge); incl. Costs for sludge dewatering
- agriculture reuse / (m) 0.00 0.00
- disposal at municipal waste dumpsites / (m) 0.06 0.00 0.57 1.18 1.81 0.08 0.67 1.16 11.96 13.88
- incineration / (m) 0.00 0.00
- other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal
category / (m) 0.00 0.00
2.3 Sewer Network incl. Buffer tanks 36 60
Yearly Operation & Maintenance costs per length of sewer
network (km) / (km) 1,118.14 0.00 2,453.64 0.00 3,571.78 1,177.01 0.00 2,023.05 0.00 3,200.06
2.4 Wastewater Pumping Stations 0 72.61867
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (Kw) 0.00 25.63 90.42 471.93 0.00 587.98
2.5 Decentral Septic Tank
Yearly Operation & Maintenance costs to empty, transport and
treat sludge from septic tank / (P.E.) 0.00 0.00
Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)
** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs
*** Consumables: Chemicals for Treatment, fuel, lubricant, etc.
**** Without Project Scenario: Highlight in % of the with project scenario where significant difference
COVASNA COUNTY 4 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
5/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
gg omera on:
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
1 Water Supply
1.1 Water Treatment 236.4 236.4
1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed
/ (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52
- Flocculation and Sedimentation / (l/s) 0.00 0.00
- Pre-chlorination/ozonisation for oxidation (break-point
chlorination) / (l/s) 0.00 0.00
- Rapid sands filter / (l/s) 0.00 0.00
- Slow sand filter / (l/s) 0.00 0.00
- Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00
- Activated carbon filters / (l/s) 0.00 0.00
- Disinfection / (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52
- Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00
1.1.2.Standard Treatment Plant for Surface Water Treatment
(Flocculation, Filtration, Disinfection) / (l/s) 12.60 54.31 168.12 75.31 310.34 45.55 29.82 208.79 41.35 325.52
1.2Pumping Stations and Water abstraction (wells,
intake)171 249
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (kW) 2.70 34.51 58.11 0.00 95.32 6.72 13.01 49.56 0.00 69.29
1.3Distribution Network incl. Reservoirs and
Transmission Mains39.99 71.045
Yearly Operation & Maintenance costs per length of network
(km) / (km) 79.08 0.00 1,490.78 23.43 1,593.29 160.95 0.00 1,042.13 7.24 1,210.32
Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST
RADAUTI
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
COVASNA COUNTY 5 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
6/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
2 Wastewater
2.1 Wastewater Treatment Plant 34500 38748.9
Yearly Operation & Maintenance costs per P.E.
(tertiary treatment above 10.000 P.E.); excl.
sludge management
- 2.000 -5.000 P.E. / (P.E.) 0.00 0.00
- 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00
- 10.000 - 50.000 P.E. / (P.E.) 0.00 1.24 1.14 0.25 2.63 0.00 2.04 1.74 0.59 4.37
- 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00
- > 100.000 P.E. / (P.E.) 0.00 0.00
2.2 Sludge Management 25.53 1813
Costs for sludge disposal per m of sludge produced at the
WWTP (wet sludge); incl. Costs for sludge dewatering
- agriculture reuse / (m) 0.00 0.00
- disposal at municipal waste dumpsites / (m) 0.03 0.00 35.28 1.69 37.00 0.00 0.61 0.85 3.67 5.13
- incineration / (m) 0.00 0.00
- other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal
category / (m) 0.00 0.00
2.3 Sewer Network incl. Buffer tanks 40 71
Yearly Operation & Maintenance costs per length of sewer
network (km) / (km) 6.25 0.00 1,066.12 0.00 1,072.36 309.47 0.00 838.38 0.00 1,147.85
2.4 Wastewater Pumping Stations 57.0666667 111.84
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (Kw) 0.11 40.00 209.78 0.00 249.90 5.15 30.29 149.54 0.00 184.98
2.5 Decentral Septic Tank
Yearly Operation & Maintenance costs to empty, transport and
treat sludge from septic tank / (P.E.) 0.00 0.00
Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)
** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs
*** Consumables: Chemicals for Treatment, fuel, lubricant, etc.
**** Without Project Scenario: Highlight in % of the with project scenario where significant difference
COVASNA COUNTY 6 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
7/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
gg omera on:
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
1 Water Supply
1.1 Water Treatment 200 200
1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed
/ (l/s) 13.74 150.56 313.32 208.77 686.39 89.19 147.00 385.42 203.84 825.45
- Flocculation and Sedimentation / (l/s) 5.32 58.26 121.25 80.79 265.62 34.52 56.89 149.15 78.88 319.44
- Pre-chlorination/ozonisation for oxidation (break-point
chlorination) / (l/s) 0.00 0.00
- Rapid sands filter / (l/s) 2.67 29.27 60.92 40.59 133.45 17.34 28.58 74.94 39.63 160.49
- Slow sand filter / (l/s) 0.00 0.00
- Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00
- Activated carbon filters / (l/s) 0.00 0.00
- Disinfection / (l/s) 5.75 63.02 131.15 87.39 287.32 37.33 61.53 161.34 85.33 345.53
- Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00
1.1.2.Standard Treatment Plant for Surface Water Treatment
(Flocculation, Filtration, Disinfection) / (l/s) 13.74 150.56 313.32 208.77 686.39 89.19 147.00 385.42 203.84 825.45
1.2Pumping Stations and Water abstraction (wells,
intake)181 181
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (kW) 2.36 76.46 86.55 0.00 165.37 15.30 74.66 106.47 0.00 196.43
1.3Distribution Network incl. Reservoirs and
Transmission Mains33.358 41.658
Yearly Operation & Maintenance costs per length of network
(km)
/ (km) 87.50 0.00 2,817.76 65.88 2,971.14 454.66 0.00 2,775.63 51.51 3,281.80
Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST
VATRA DORNEI
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
COVASNA COUNTY 7 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
8/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
2 Wastewater
2.1 Wastewater Treatment Plant 15833.3333 19217.36
Yearly Operation & Maintenance costs per P.E.
(tertiary treatment above 10.000 P.E.); excl.
sludge management
- 2.000 -5.000 P.E. / (P.E.) 0.00 0.00
- 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00
- 10.000 - 50.000 P.E. / (P.E.) 0.00 0.51 3.39 0.58 4.49 0.00 2.66 4.28 0.57 7.51
- 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00
- > 100.000 P.E. / (P.E.) 0.00 0.00
2.2 Sludge Management 447.89 1127
Costs for sludge disposal per m of sludge produced at the
WWTP (wet sludge); incl. Costs for sludge dewatering
- agriculture reuse / (m) 0.00 0.00
- disposal at municipal waste dumpsites / (m) 0.00 0.00 2.75 3.65 6.40 0.00 0.63 1.67 6.78 9.09
- incineration / (m) 0.00 0.00
- other disposal / (m) 0.00 0.00Average unit costs weighted by volume of each sludge disposal
category / (m) 0.00 0.00
2.3 Sewer Network incl. Buffer tanks 33 42
Yearly Operation & Maintenance costs per length of sewer
network (km) / (km) 6.84 0.00 1,960.96 0.00 1,967.80 691.90 0.00 2,117.09 0.00 2,808.99
2.4 Wastewater Pumping Stations 0 77.09333
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (Kw) 0.00 9.80 7.01 321.22 0.00 338.03
2.5 Decentral Septic Tank
Yearly Operation & Maintenance costs to empty, transport and
treat sludge from septic tank / (P.E.) 0.00 0.00
Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)
** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs
*** Consumables: Chemicals for Treatment, fuel, lubricant, etc.
**** Without Project Scenario: Highlight in % of the with project scenario where significant difference
COVASNA COUNTY 8 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
9/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
gg omera on:
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
1 Water Supply
1.1 Water Treatment 80 80
1.1.1 Yearly Operation & Maintenance costs per capacity of watertreatment plants installed
/ (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33
- Flocculation and Sedimentation / (l/s) 0.00 0.00
- Pre-chlorination/ozonisation for oxidation (break-point
chlorination) / (l/s) 0.00 0.00
- Rapid sands filter / (l/s) 0.00 0.00
- Slow sand filter / (l/s) 0.00 0.00
- Biological filter (i.e. for Fe/Mn) / (l/s) 0.00 0.00
- Activated carbon filters / (l/s) 0.00 0.00
- Disinfection / (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33
- Reverse Osmosis/ultra/nanofiltration / (l/s) 0.00 0.00
1.1.2.Standard Treatment Plant for Surface Water Treatment
(Flocculation, Filtration, Disinfection) / (l/s) 218.44 1.98 629.05 2.74 852.20 458.77 2.16 847.40 2.99 1,311.33
1.2Pumping Stations and Water abstraction (wells,
intake)142.5 144
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (kW) 19.04 0.51 88.29 0.00 107.84 39.58 0.55 117.69 0.00 157.83
1.3Distribution Network incl. Reservoirs and
Transmission Mains36.289 58.341
Yearly Operation & Maintenance costs per length of network
(km)
/ (km) 511.31 0.00 2,080.12 0.32 2,591.75 667.96 0.00 1,743.00 0.22 2,411.18
Table 2c. DETAILED UNIT OPERATION & MAINTENANCE COST
GURA HUMORULUI
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
COVASNA COUNTY 9 / 10
-
7/30/2019 A5.5 - Detailed unit O&M cost.pdf
10/10
Technical Assistance for Preparation of Projects
in the Environmental Sector in Romania
ISPA 2005/RO/16/P/PA/001 - 03
FEASIBILITY STUDY
Maintenance
Costs (Material)
*
ElectricityStaff (direct
costs)**
Consumables
(chemicals)***Total
Maintenance
Costs
(Material)
ElectricityStaff (direct
costs)
Consumables
(chemicals)Total
N Parameter Unit
Unit Costs assumption without project scenario **** Unit Costs assumption with project scenario
2 Wastewater
2.1 Wastewater Treatment Plant 15333.3333 16177.75
Yearly Operation & Maintenance costs per P.E.
(tertiary treatment above 10.000 P.E.); excl.
sludge management
- 2.000 -5.000 P.E. / (P.E.) 0.00 0.00
- 5.000 - 10.000 P.E. / (P.E.) 0.00 0.00
- 10.000 - 50.000 P.E. / (P.E.) 0.03 0.63 3.04 0.02 3.72 0.03 2.85 4.85 0.63 8.36
- 50.000 - 100.000 P.E. / (P.E.) 0.00 0.00
- > 100.000 P.E. / (P.E.) 0.00 0.00
2.2 Sludge Management 15.96 978
Costs for sludge disposal per m of sludge produced at the
WWTP (wet sludge); incl. Costs for sludge dewatering
- agriculture reuse / (m) 0.00 0.00
- disposal at municipal waste dumpsites / (m) 0.29 0.00 66.99 1.72 68.99 0.00 0.66 1.84 6.53 9.04
- incineration / (m) 0.00 0.00
- other disposal / (m) 0.00 0.00
Average unit costs weighted by volume of each sludge disposal
category / (m) 0.00 0.00
2.3 Sewer Network incl. Buffer tanks 36 58
Yearly Operation & Maintenance costs per length of sewer
network (km) / (km) 40.68 0.00 1,336.09 0.00 1,376.77 641.32 0.00 1,171.38 0.00 1,812.70
2.4 Wastewater Pumping Stations 3.9372 30.5772
Yearly Operation & Maintenance costs per capacity (kW)
installed/ (Kw) 9.83 130.30 3,457.90 0.00 3,598.02 32.07 26.01 627.57 0.00 685.65
2.5 Decentral Septic Tank
Yearly Operation & Maintenance costs to empty, transport and
treat sludge from septic tank / (P.E.) 0.00 0.00
Note: * Maintenance costs: Material and external services for regular maintenance (distinguish capital replacement from regular maintenance (i.e. pipe repair up to 6 m replacement of pipes = regular maintenance)
** Staff costs: direct costs for staff allocated to above mentioned cost centers (i.e. WWTP); avoid double counting with staff considered under maintenance costs
*** Consumables: Chemicals for Treatment, fuel, lubricant, etc.
**** Without Project Scenario: Highlight in % of the with project scenario where significant difference
COVASNA COUNTY 10 / 10