A2 colour service p2

2
Water UBBL 123(1), Where ducts or enclosures are provided in any building to accommodate pipes, cables or conduits the dimension of such ducts or enclosure shall be – (b) sufficiently large to permit access to cleaning eyes, stop cocks and other controls there to enable repairs, extensions and modifications to be made to each or all of the services accommodated. UBBL 84 (1), Suitable measure shall be taken to prevent the penetration of dampness and moisture into ta building. Reasoning: The work of repairing or modification pipes will be easier to access as they don’t last forever. Electricity UBBL Section 123 (1): Where ducts or enclosures are provided in any building to accommodate pipes, cables or conduits the dimensions of such ducts or enclosures shall be – (a) adequate for the accommodation if the pipes, cables or conduits and for crossings of branches and main together with supports and fixing. Electricity Supply Act1997 (Act 447) 38/9 Electricity Regulations 1994 – Regulation 16, Switch, switch fuse, fuse switch, circuit breaker, contractor, fuse, etc. (3)(b) constructed and guarded or place in a manner as to prevent danger of overheating, arcing or from scattering of hot metal or other substance. Reasoning: The wires are not supposed to be exposed because the electric current in it can endanger life. Teo Kean Hui (0310165) Building Services (ARC 2423) Project 2: Application of building services Lecture: Mr. Siva KwH Meter Distribution Board 2-gang switch point Starter switch for heater and Air-cond. 13v plug point Shower Ball cock in water tank PVC water tank Ball valve

Transcript of A2 colour service p2

WaterUBBL 123(1), Where ducts or enclosures are provided in any building to accommodate pipes, cables or conduits the dimension of such ducts or enclosure shall be – (b) sufficiently large to permit access to cleaning eyes, stop cocks and other controls there to enable repairs, extensions and modifications to be made to each or all of the services accommodated.UBBL 84 (1), Suitable measure shall be taken to prevent the penetration of dampness and moisture into ta building.

Reasoning: The work of repairing or modification pipes will be easier to access as they don’t last forever.

ElectricityUBBL Section 123 (1): Where ducts or enclosures are provided in any building to accommodate pipes, cables or conduits the dimensions of such ducts or enclosures shall be – (a) adequate for the accommodation if the pipes, cables or conduits and for crossings of branches and main together with supports and fixing.Electricity Supply Act1997 (Act 447) 38/9 Electricity Regulations 1994 – Regulation 16, Switch, switch fuse, fuse switch, circuit breaker, contractor, fuse, etc.(3)(b) constructed and guarded or place in a manner as to prevent danger of overheating, arcing or from scattering of hot metal or other substance.

Reasoning: The wires are not supposed to be exposed because the electric current in it can endanger life.

Teo Kean Hui (0310165)Building Services (ARC 2423)Project 2: Application of building services

Lecture: Mr. Siva

KwH Meter

Distribution Board

2-gang switchpoint

Starter switch for heater and Air-cond.

13v plug point

Shower Ball cock in water tank

PVC water tank

Ball valve

SewerageLaw of Malaysia Act 133 Street, Drainage and Building Act 1974 Section 56 (1) Rainwater pipes not to be used as soil-pipes states that, “Not pipe used for carrying off rain water from any roof shall be used for the purpose of carrying off soil or drainage from any privy or water closet or any sullage water.”

Reasoning: They are not for soil it is because soil can cause blockage and it won’t decompose.

Drainage / Storm waterUBBL Section 115, All roofs of buildings shall be so constructed as to drain effectually to suitable and sufficient channels, gutters, chutes or troughs which shall be provided in accordance with the requirements of these By-Laws for receiving and conveying all water which may fall on and from the roof.UBBL Section 91 (2), every parapet wall, free-standing wall or boundary wall shall be finished on top with an impervious material.UBBL Section 84 (1), Suitable measures shall be taken to prevent the penetration of dampness and moisture into the building.

Reasoning: Ineffective drainage can cause the roof to held lots of water which increase the load. Besides, if the water stay there for long, they will cause damage to the roof and cause leakage.

Teo Kean Hui (0310165)Building Services (ARC 2423)Project 2: Application of building services

Lecture: Mr. Siva

Floor TrapSink P-Trap

Vent cowl

Perimeter drain

Gutter and rainwater down pipe