GENERAL PLAN NOTES:
1. EXISTING CONDITIONS SHALL BE FIELD VERIFIED BY GENERAL CONTRACTOR PRIORTO COMMENCEMENT OF WORK. ANY DISCREPANCIES OR VARIATIONS SHALL BEREPORTED TO THE ARCHITECT IMMEDIATELY.
2. ANY MODIFICATION OR REMOVAL OF EXISTING CONSTRUCTION NOTE TO REMAINTHAT REQUIRED REMOVAL OR MODIFICATION IN ORDER TO COMPLETE JOB SCOPESHALL BE RETURNED TO ORIGINAL (OR BETTER) CONDITION ONCE PROJECT SCOPEIS COMPLETE.
3. REFER TO ENLARGED PLANS FOR WALL TYPES AND DIMENSIONS4. REFER TO INTERIOR FINISH LEGEND(S), ROOM FINISH SCHEDULE(S), AND FINISH
FLOOR PLANS FOR ALL FINISH INFORMATION.5. REFER TO SHEET A5.00 FOR TOILET AND PLUMBING GROUP DETAILS, ACCESSORIES,
AND MOUNTING HEIGHTS.6. REFER TO WALL TYPES SHEET FOR INTERIOR WALL TYPES, FRAMING CRITERIA, AND
TYPICAL PARTITION DETAILS.7. REFER TO GLAZING SCHEDULES AND ELEVATIONS FOR WINDOW TYPES,
DIMENSIONS, AND DETAILS.8. REFER TO REFLECTED CEILING PLANS FOR CEILING TYPES, LOCATIONS,
DIMENSIONS, AND DETAILS9. REFER TO DOOR SCHEDULE FOR DOOR TYPES, DIMENSIONS, AND DETAILS.10. PROVIDE BLOCKING FOR ALL WALL MOUNTED EQUIPMENT AND CASEWORK. REFER
TO DETAILS FOR BLOCKING CRITERIA.11. FIELD VERIFY ALL WALLS TO RECEIVE CASEWORK AND TOILET PARTITIONS.12. ALL TV'S SHALL BE OWNER PROVIDED, CONTRACTOR INSTALLED. PROVIDE
BLOCKING AS NECESSARY. COORDINATE SIZE AND LOCATION WITH OWNER PRIORTO INSTALLING BLOCKING.
13. COORDINATE ALL OUTLET LOCATIONS AND HEIGHTS WITH MILLWORK.14. ATHLETIC EQUIPMENT & FURNITURE SHALL BE OWNER PROVIDED, CONTRACTOR
INSTALLED U.N.O.15. GENERAL CONTRACTOR SHALL RECEIVE, UNLOAD, STORE AND PROTECT OWNER
FURNISHED HYDROTHERAPY TUBS. GENERAL CONTRACTOR SHALL ALLOW TUBMANUFACTURER TO INSPECT ROUGH-INS AND COORDINATE CLEARANCES PRIORTO INSTALLATION.
FLOOR PLAN LEGEND:
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO REMAIN
BREAK232
GRADSTUDENT
COMPUTERLAB230
ELECTRICALROOM
229
STORAGE228
MECHANICALROOM
227
FACULTYOFFICE
226
FACULTYOFFICE
225
FACULTYOFFICE
224
CORRIDOR223
AV222
CLASSROOM219
ELECTRICALROOM
217CORRIDOR
218FACULTY
WORKROOM213
FACULTYOFFICE
214
FACULTYOFFICE
215
FACULTYOFFICE
216
CLASSROOM201
JANITOR204
FACULTYOFFICE
205
SEMINARCLASSROOM
206
(E) WOMEN'SRESTROOM
210
(E) MEN'SRESTROOM
233
(E)CORRIDOR
211
(E)CORRIDOR
212
(E)CORRIDOR
221
CORRIDOR220
(E)CORRIDOR
231
IT208
LOBBY209
1.01.0
3.03.0
3.33.3
4.04.0
5.05.0
6.06.0
7.07.0
8.08.0
B
B
H
H
L
L O
O
MK
11' -
6 3/8"
12' -
8 7/8"
11' - 6 1/16" 13' - 4 7/8" 10' - 9 7/16" +/-
6' - 1
1 11/1
6" +/
-14
' - 9 7
/8" +/
-
16' - 9 1/2" +/- 15' - 6 1/2" 3' - 6 3/8" +/-
5' - 8 3/16" +/-
6' - 11 7/8" 6' - 3 7/8"
6' - 5
5/8"
+/-
48' -
9 7/16
" +/-
36' - 5"
5' - 6 7/8" +/- 30' - 3 1/2" +/-
11' - 1 1/16" +/- 13' - 4 7/8" 11' - 4 7/16" +/-
6' - 1
1 11/1
6" +/
-14
' - 9 7
/8" +/
-
10' - 10 3/8"
37' -
0 11/1
6" +/
-10
' - 7 1
/8" +/
-
6' - 1
0"15
' - 9 1
/2"
5' - 2
13/16
" +/-15
' - 8 1
/2"6'
- 10 5
/8"
6' - 1
1 1/2"
20' -
10 13
/16" +
/-
22' -
7 1/2"
5' - 2
13/16
" +/-
11' - 2 1/2" 15' - 10 1/2" 8' - 11 5/8" 9' - 2 3/8" 15' - 7 1/4"
10' - 7" 18' - 4 1/2" 31' - 10 3/4"
8"
22' -
7 1/2"
OFFICE235
16' - 1 7/8" 5' - 7 1/2" +/-
16' - 7" 15' - 6 1/2" 3' - 6 3/8"
8' - 4
7/16
" +/-
GD
2.0 2.0
3.4 3.4
E
E
J
J
3.90
3.91
4' - 6
13/16
"22
' - 7 1
/2"16
' - 6 1
/2"16
' - 5 1
/4"13
' - 1 1
/8"3'
- 4 3/
8"17
' - 9 5
/8"2'
- 7"
8' - 6
"
8' - 0" 16' - 6 3/4" 21' - 8 3/4" 8' - 0"
REGISTERED R
ETIHCA
CT
ST A T E O F ISS SSI
II
M
PP
Michael W.
4822
Taylor
PROJECT NO.
CHECKED BY:DRAWN BY:
PryorMorrow PCC 2016Copyright
SCALE:
PryorMorrow
9/1/
2017
3:3
0:01
PM
As indicated
Col
umbu
s, M
issi
ssip
pi
2016111LAS
MWT
SECOND FLOOR PLAN(DIMENSIONED)
A1.2
Demo
nstra
tion S
choo
l Ren
ovati
onG.
S.#1
04-18
7
Bure
au o
f Bui
ldin
g, G
roun
ds a
nd R
eal P
rope
rty M
anag
emen
t
1/8" = 1'-0"1 SECOND FLOOR DIMENSION PLAN
MAR
KDA
TEDE
SCRI
PTIO
NSD
June
17,
201
6SC
HEM
ATIC
DES
IGN
DD
Nov
embe
r 30,
201
6D
ESIG
N D
EVEL
OPM
ENT
CD
May
31,
201
7C
ON
STR
UC
TIO
N D
OC
UM
ENTS
(75%
)C
DSe
ptem
ber 5
, 201
7O
FFIC
IAL
BID
DO
CU
MEN
TS
2017