A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve...
Transcript of A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve...
![Page 1: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/1.jpg)
A Work Proposition Method to Improve
Reliability Indices
Code: 19.018
Authors: Alden U. Antunes¹, André Meffe¹, Dário Takahata¹, João
Castilho Neto¹, Leonardo S. Sousa¹, Tiago M. Miranda¹, Ademálio A.
Cordeiro², Gustavo P. Guedes², Marcelo R. C. Paes Júnior²
Filiation: 1 – Daimon Engenharia e Sistemas
2 – Grupo Energisa
10/11/2017 1
![Page 2: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/2.jpg)
• Propor obras que possam melhorar os índices de Confiabilidade dos sistemas de média tensão (FEC = SAIFI e DEC = SAIDI);
• Apresentar as trajetórias possíveis para cada solução encontrada, tanto na área urbana quanto na rural;
• Apresentar os índices de mérito (I.M.) das alternativas produzidas;
• Auxílio na renovação do contrato de concessão do serviço de distribuição de energia elétrica.
Objetivos
10/11/2017 2
![Page 3: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/3.jpg)
Projeto de P&D ANEEL (Agência Nacional de
Energia Elétrica) • Elaboração de uma ferramenta computacional
QualiPlan - Quality Indices Planning • Quatro módulos no total: o Diagnóstico; o Proposição de Obras; o Priorização de Obras; o Previsão de Indicadores de Confiabilidade;
Introdução
10/11/2017 3
![Page 4: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/4.jpg)
Grupo ENERGISA • Principais grupos privados do setor elétrico
brasileiro; • Controla 13 empresas de distribuição no Brasil; • Presente em 788 municípios; • Atende cerca de 6,5 milhões de consumidores; • Corresponde a cerca de 16,3 milhões de
habitantes;
Introdução
10/11/2017 4
![Page 5: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/5.jpg)
Introdução: DEC e FEC Brasil (Fonte ANEEL)
10/11/2017
Valores apurados
Valores limites
![Page 6: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/6.jpg)
Metodologia: QualiPlan – 4 Módulos
10/11/2017 6
Módulo de Diagnósticos
Módulo de Proposição de Obras
Módulo de Priorização
Módulo de Previsão dos Indicadores
![Page 7: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/7.jpg)
Metodologia: Ideia Básica do Módulo 2
10/11/2017 7
• Ferramenta computacional da área de Planejamento (Plano de Obras);
• Proposição de obras para melhorar os indicadores de Continuidade utilizando chaves automatizadas, e extensão de circuitos para transferência de cargas;
• Visa-se restringir ao máximo a abrangência de um possível defeito, indicado pelo usuário;
• Flexibilidade operativa em tempo < 3 minutos; • Alternativas avaliadas por um método de otimização,
baseado em Algoritmo Genético; • Traçado auxiliado por ferramenta API do Google.
![Page 8: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/8.jpg)
Metodologia: Premissas e Definições
10/11/2017 8
• Consumidor VIP: Consumidor que pelos critérios da concessionária necessita de atendimento prioritário;
• DIC: Intervalo de tempo que, no período de apuração, cada unidade consumidora ficou desenergizada (horas);
• FIC: Número de interrupções ocorridas no período de apuração, em cada unidade consumidora;
• SOMADIC: Somatória de tempo das unidades consumidoras interrompidas (DEC do bloco);
• O histórico de ocorrências da empresa não contempla o local dos defeitos;
![Page 9: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/9.jpg)
Metodologia: Premissas e Definições
10/11/2017 9
![Page 10: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/10.jpg)
Metodologia: Premissas e Definições
10/11/2017 10
![Page 11: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/11.jpg)
Metodologia: Premissas e Definições
10/11/2017 11
• Bloco do defeito: Conjunto de cargas que sofreram interrupção no fornecimento de energia elétrica, limitadas por 2 chaves de manobra telecomandadas NF que serão propostas pelo QualiPlan e que permanecerão desligadas até a chegada das turmas de manutenção de emergência;
![Page 12: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/12.jpg)
Metodologia: Premissas e Definições
10/11/2017 12
![Page 13: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/13.jpg)
Metodologia: Premissas e Definições
10/11/2017 13
• Bloco de cargas socorrido: Conjunto de cargas que sofreram interrupção no fornecimento de energia elétrica e serão objeto de ações em menos de 3 minutos através de chaves automáticas : o Reenergização do dispositivo de proteção
situado à montante do defeito e; o Transferência de cargas situadas à jusante do
defeito.
![Page 14: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/14.jpg)
Metodologia: Premissas e Definições
10/11/2017 14
![Page 15: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/15.jpg)
Metodologia: Premissas e Definições
10/11/2017 15
• Bloco de cargas socorrista: Conjunto de cargas que não sofreram interrupção no fornecimento de energia elétrica e que absorverão cargas de outros circuitos elétricos (bloco de cargas socorrido).
![Page 16: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/16.jpg)
Metodologia: Premissas e Definições
10/11/2017 16
![Page 17: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/17.jpg)
Px (Proteção Relevante):
o Maior contribuição para o FEC da empresa;
o Maior contribuição para o DEC da empresa;
o Maior número de interrupções;
o Maior quantidade de consumidores
VIP´s à jusante
Metodologia: Etapas – Escolha de Px
10/11/2017 17
![Page 18: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/18.jpg)
• O software QualiPlan irá inicialmente, locar o ponto da falta no
ponto médio entre os dispositivos de proteção PX e PY, quando não houver nenhuma informação disponível sobre o defeito;
• O usuário escolherá a seu critério, o local da falta entre dois dispositivos de proteção contíguos, sendo aquele situado à montante, o dispositivo de proteção relevante (PX).
Metodologia: Etapas – Localização da Falta
10/11/2017 18
![Page 19: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/19.jpg)
• O software QualiPlan disponibilizará para o usuário, a partir do
local do defeito (no exemplo, o ponto médio), a opção de busca de chaves de manobra existentes, através de um algoritmo de busca (no exemplo, 100 metros);
• Caso não existam chaves telecomandadas na distância parametrizada, o QualiPlan irá instalá-las.
Metodologia: Etapas – Isolamento da Falta
10/11/2017 19
![Page 20: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/20.jpg)
Metodologia: Etapas – Otimização - AGCB
10/11/2017 20
![Page 21: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/21.jpg)
Metodologia: Índices de Mérito - Custos
10/11/2017 21
• Custo Modular (CMOD): Investimentos a serem realizados para a obra. • Custo Devido às Compensações Individuais
(CCOMP): Somatória anual das compensações por transgressão dos indicadores individuais de continuidade.
![Page 22: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/22.jpg)
Metodologia: Índices de Mérito - FD
10/11/2017 22
• Fator de Disponibilidade (FD): Reflete a capacidade de transferência de cargas de uma determinada alternativa de socorro.
• Supõe-se que haverá 2 tipos de reforço na rede: o Puro (sem reforço); o Reforço no bloco socorrista.
• Cada opção resultará carregamentos: o Adequado: Carregamento < 66%; o Precário: Carregamento entre 66% e 100%; o Crítico: Carregamento > 100.
• Consideram-se VIP´s nos blocos de carga envolvidos
![Page 23: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/23.jpg)
Metodologia: Índices de Mérito - FD
10/11/2017 23
Matriz do Fator de Disponibilidade em Função
do Tipo de Consumidor FD (Socorrido - Socorrista)
Socorro
Carregamento VIP - Não VIP VIP -VIP Não VIP -VIP Não VIP - Não VIP
Crítico 1 0,8 0,5 0,8
Precário 1 1 0,75 1
Adequado 1 1 1 1
![Page 24: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/24.jpg)
Metodologia: Mérito – Impacto no DEC/FEC
10/11/2017 24
𝐼𝑚𝑝𝑎𝑐𝑡𝑜 = 𝑆𝑂𝑀𝐴𝐷𝐼𝐶𝑆𝑂𝐶𝑂𝑅𝑅𝐼𝐷𝑂
Impacto = Soma dos benefícios técnicos sob o ponto de vista da Continuidade (diminuição do DEC do alimentador ou no caso, quanto mais unidades consumidoras transferir, melhor a alternativa)
![Page 25: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/25.jpg)
Metodologia: Mérito - Caract. Bloco de Defeito
10/11/2017 25
𝐵𝑙𝑜𝑐𝑜 𝐷𝑒𝑓. = (𝑉𝐼𝑃´𝑠 𝐸𝑚𝑝𝑟𝑒𝑠𝑎 + 𝑉𝐼𝑃´𝑠 𝑓𝑜𝑟𝑎 𝑑𝑜 𝑏𝑙𝑜𝑐𝑜 𝑑𝑒 𝑑𝑒𝑓𝑒𝑖𝑡𝑜)
![Page 26: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/26.jpg)
Metodologia: Função Objetivo
10/11/2017 26
𝐹. 𝑂. =𝐶𝐶𝑂𝑀𝑃
𝐶𝑀𝑂𝐷∗ 𝐹𝐷 ∗ 𝐼𝑚𝑝𝑎𝑐𝑡𝑜 ∗ 𝐵𝑙𝑜𝑐𝑜 𝑑𝑒 𝐷𝑒𝑓𝑒𝑖𝑡𝑜
A alternativa vencedora será o objeto da maximização da equação acima: Max. f(F.O.), sujeito às seguintes restrições:
• Restrição de carregamento do transformador da subestação do alimentador socorrista;
• Restrição da capacidade das chaves de manobra existente nos blocos socorrido e socorrista.
![Page 27: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/27.jpg)
Write here
Resultados Experimentais : BVT-M1 - Urbano
10/11/2017 27
![Page 28: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/28.jpg)
Resultados Experimentais: BVT-M1 - Urbano
10/11/2017 28
![Page 29: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/29.jpg)
Write here
Resultados Experimentais : BVT-M1 - Urbano
10/11/2017 29
![Page 30: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/30.jpg)
Write here
Resultados Experimentais : BVT-M1 - Urbano
10/11/2017 30
![Page 31: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/31.jpg)
Resultados Experimentais: BVT-M1 - Urbano
10/11/2017 31
![Page 32: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/32.jpg)
Resultados Experimentais: BVT-M1 - Urbano
10/11/2017 32
Alimentador CCOMP (US$) CMOD
(US$) FD Impacto
Bloco de Defeito
F.O.
BVT-M1 49,10 86.727,0
0 1 36,78 ------------- 0,02
1 US$ ≈ R$ 3,30
Índices de Mérito do Alimentador BVT-M1
• PX 000962 • 4 chaves automatizadas novas
• 980 m de cabo para trecho de socorro
![Page 33: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/33.jpg)
Resultados Experimentais: ABR-V1 - Rural
10/11/2017 33
![Page 34: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/34.jpg)
Resultados Experimentais: ABR-V1 - Rural
10/11/2017 34
![Page 35: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/35.jpg)
Resultados Experimentais: ABR-V1 - Rural
10/11/2017 35
Alimentador CCOMP
(US$) CMOD (US$) FD Impacto
Bloco de Defeito
F.0.
ABR-V1 573,80 117.137,00 1 333 -------------
1,63
1 US$ ≈ R$ 3,30
Índices de Mérito do Alimentador ABR-V1
• PX 002294 • 4 chaves automatizadas novas
• 1.960 m de cabo para trecho de socorro
![Page 36: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/36.jpg)
• Nova metodologia para a proposição de obras a ser realizada em alimentadores de média tensão, utilizando-se de conceitos de bloco de carga socorrido e bloco de carga socorrista, bem como de um algoritmo de otimização baseado em AG;
• Soluções levam em conta o recondutoramento de circuitos e a extensão de alimentadores, além de recursos de automação (onde necessários), e seus respectivos custos;
• A relação final de obras será realizada no Módulo 3, por uma nova metodologia e por uma nova função objetivo que a otimize, levando-se em consideração:
o Outros índices de mérito, eventualmente; o Orçamento disponível .
Conclusões
10/11/2017 36
![Page 37: A Work Proposition Method to Improve Reliability Indices · A Work Proposition Method to Improve Reliability Indices Code: 19.018 Authors: Alden U. Antunes¹, André Meffe¹, Dário](https://reader031.fdocuments.us/reader031/viewer/2022020216/5c45645993f3c34c416ec0c5/html5/thumbnails/37.jpg)
¡ GRACIAS !
10/11/2017 37
DAIMON ENGENHARIA E SISTEMAS LTDA Av. Paulista, 1.776 – 22º andar – Cj 22B – Bela Vista
São Paulo – SP – CEP 01310-200 Contato: +11 55 3266-2929
www.daimon.com.br