Cecil Avenue West What’s being proposed?The Cecil Avenue project will deliver the following:
• dedicated bus lanes for public transport and improved bus shelters
• increased five metre wide verge widths to improve the look of Cecil Avenue as well as increasing pedestrian and cyclist safety
• improved pedestrian accessibility, with a dedicated pedestrian crossing at the new Pattie Street traffic signals
• improved road safety and reduced traffic congestion through the construction of a raised median
• improved street and footpath lighting
• greatly increased verge and median landscaping with large trees to provide greater pedestrian shade and amenity
• increased opportunity to attract and improve development investment into the City Centre
What’s New?Cecil Avenue Stage 1 – service relocations
You may have noticed construction being undertaken along Cecil Avenue, with City Centre branded mesh creating a perimeter around the construction site. These form part of the Stage 1 work to deliver a new and modern Cecil Avenue. This stage of work is required to relocate service infrastructure like gas, water and power onto the new Cecil Avenue road alignment. Work is being undertaken by Densford Civil.
Densford Civil have advised that work should be complete on May 7. The contact person for Densford Civil is Peter Campbell. He can be reached on 0406 752 214.
Otherwise, please contact the City on the ‘Contact Us’ details at the end of this bulletin
Cecil Avenue Stage 2 – roadwork and landscaping
At the Special Council Meeting on 4 April 2019, Council endorsed Georgiou Group Pty Ltd as the preferred contractor to deliver the ‘Stage 2 – Roadwork and Landscaping’ component of the Cecil Avenue West Project.
This stage of work will deliver an attractive pedestrian environment, with big street trees, brick paving, widened pedestrian walkways and improved pedestrian access across Cecil Avenue. This will revitalise the entry to the heart of the Canning City Centre, resulting in a major City Centre boulevard with a vibrant street frontage, busy with pedestrian traffic and alfresco dining.
Please refer to https://www.yoursaycanning.com.au/ for an indicative timeframe for the future delivery of the Stage 1 and Stage 2 Cecil Avenue works.
Canning City Centre - a 10 year vision for jobs, homes and amenity
Connect with us
canning.wa.gov.au
A welcoming and thriving cityCity of Canning
Community Bulletin # 3BUSLANEENDS
BUS
LANE
BUS LANE
BUS LANE
BUS LANE
BUS LANE
BUS LANE
BUS LANE
BUS LANE
BUS LANE
BUSLANEENDS
BUSLANE
BUSLANE
BUSLANE
BUSLANE
MISCELLANOUSSURFACE FINISHES
LANDSCAPE LEGENDFURNITURE ELEMENTS
UNIT PAVING - BUS LANE (TRAFFICABLE)
UNIT PAVING - SIDEWALK
UNIT PAVING - CARRIAGEWAY (TRAFFICABLE)
TREE GRATE
BUS STOP
BENCH (WITH BACK)
BIKE RACKS
PROPOSED LIGHT POLESREFER ELECTRICAL DOCUMENTATION
PROPOSED LIGHT POLESREFER ELECTRICAL DOCUMENTATION
S-01A
S-01B
S-02
F-01
F-02
F-03
GARDEN BED
INSITU CONCRETE
S-03
S-04
S-05
UNIT PAVING (TRAFFICABLE)
F-04 A
DRINKING FOUNTAINF-05
LIMESTONE SPALLING
S-06
TACTILE HAZARD INDICATORS
S-07
RAIN GARDEN
S-08
TREE CELL MODULAR SYSTEMREFER SUPPLIERS DOCUMENTATION
M-01
BENCH (BACKLESS)F-04 B
BACK
M-03
M-02PUBLIC TELEPHONEALLOW FOR RELOCATION. LOCATION TBD
SIGNAGEBY OTHERS. ALLOW FOR ELECTRICAL CONDUIT.LOCATION TBD
SHEETSIZE
DRN BY
DESIGNED
START DATE
CHECKED
ISSUE
PLACE LABPROJ No
SCALE:
DWG No
DWGSTATUS
UNIT:
GENERAL NOTES
1723
L000A1
NTSmm
FOR TENDER
0
NR
SEPT 17
AC
SS
CECIL AVENUE WESTCANNING CITY CENTRECOVER SHEET
P:\1723 cecil avenue\04 drawings & reports\A-Site\CAD\_Sheets\L000 COVER SHEET.dwg - Thu Jan 24 2019 - 3:35pm nick
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
REVISIONREV DATE DRN CHK
0 25.01.19 ISSUE FOR TENDER NR SS
NORTH
Level 1, 289 Murray Street, PerthWestern Australia, Australia, 6000
T +61 8 9227 9313M +61 402 706 162E: [email protected]: www.placelaboratory.com
CLIENT
CORNER GEORGE STREET WEST AND ALBANYHIGHWAY,CANNINGTON, WA
CITY OFCANNING
Sheet List TableSheetNumber Sheet Title
L000 COVER SHEET
L001 TILING PLAN
L002 GENERAL NOTES
L003 PLANTING SCHEDULE
L200 GENERAL ARRANGEMENT PLAN
L201 GENERAL ARRANGEMENT PLAN
L202 GENERAL ARRANGEMENT PLAN
L203 GENERAL ARRANGEMENT PLAN
L400 SURFACE FINISHES PLAN
L401 SURFACE FINISHES PLAN
L402 SURFACE FINISHES PLAN
L403 SURFACE FINISHES PLAN
L410 SURFACE PATTERNING PLAN
L411 SURFACE PATTERNING PLAN
L412 SURFACE PATTERNING PLAN
L413 SURFACES PATTERNING PLAN
L500 PLANTING PLAN
L501 PLANTING PLAN
L502 PLANTING PLAN
L800 PEDESTRIAN CROSSING DETAIL
L801 BIOFILTRATION BED DETAILS
L802 MEDIAN DETAILS
L910 SURFACE FINISHES DETAILS
L911 SURFACE FINISHES DETAILS
L915 SURFACE PATTERN DETAILS
L920 SURFACE PATTERN DETAILS
L921 SURFACE PATTERN DETAILS
L922 SURFACE PATTERN DETAILS
L924 SURFACE PATTERN DETAILS
L930 TREE GRATE DETAILS
L940 FURNITURE
L945 DRINKING FOUNTAIN
L950 BUS STOP
L970 INFILL LIDS
L990 SOFTSCAPE
Connect with us
canning.wa.gov.au
Canning City Centre - a 10 year vision for jobs, homes and amenity
Lake Street Urban StreamWhat’s being proposed?The creation of the Lake Street Urban Stream parkland for the community will increase use of the area and provide a welcoming entry point to Canning City Centre from the Cannington Bus/Train Station. The stream will incorporate the following amenities:
• visible water to be seen from the adjoining streets and paths
• path networks for passive recreation and connection to the water
• places for people to pause, including seating, lawns and play spaces
• an abundance of trees to provide shade and reduce temperature which will enhance biodiversity
• improved water quality
• maximised planting zones close to the water
What’s New?A workshop was recently held at the City with key stakeholders Georgiou, Charter Hall and the City’s landscape architectural consultants to understand how the future design could benefit all parties.
The City will finalise designs this year and move to construction phase next year.
40
3938
41
1
401
5
37
S E V E N O A K S S T R E E T
L A K
E
S T
R E
E T
C E C I L A V E N U E
LEVELS
PROPOSED LEVEL
EXTENT OF WORKS
INSITU CONCRETE TERRACE
WALLSW_01
SURFACE FINISHES
CONCRETE PATHS_01
BRIDGES_03
COMPACTED GRAVELS_04
LIMESTONE BOULDERSS_05
EDGES_06
TURFS_09
ROCK PITCHINGW_04
SEATING ELEMENT
FURNITURE
GABION WALLW_03
F_01
PLANTINGS_08
CONCRETE RETAINING WALLW_02
MULCHS_07
RL 5.00
BALUSTRADEF_02
LEGEND
INSITU CONCRETE EDGES_10
LIMESTONE RETAINING WALLW_06
BOULDER RETAININGW_05
BENCHF_05
EXISTING TREE TO BE RETAINED
OTHER
EXISTING TREE TO BE REMOVED
BOLLARD (FIXED)
F_03
REMOVABLE BOLLARDF_04
0m10m 10m 20m
1:500
SHEETSIZE
DRN BY
DESIGNED
START DATE
CHECKED
ISSUE
PLACE LABPROJ No
SCALE:
DWG No
DWGSTATUS
UNIT:
GENERAL NOTES
REFER L-001 FORGENERAL NOTES 1702
L-000A1
1:500mm
COORDINATION
P3
N.ROSE
JULY 2017
N.ROSE
-
LAKE STREETURBAN STREAMCOVER SHEET & LEGEND
Level 1, 289 Murray Street, PerthWestern Australia, Australia, 6000
T +61 8 9227 9313M +61 402 706 162E: [email protected]: www.placelaboratory.com
CLIENT
Suite 4/226 Carr PlLeederville WA 6007
Urbaqua Ltd
REVISIONREV DATE DRN CHK
P1 09.08.17 50% DESIGN NR AC
P2 11.12.17 PRELIMINARY NR SS
P3 13.04.18 85% DESIGN NR SSNORTH
NOT FOR CONSTRUCTIONPRELIMINARY
P:\1702 lake street living stream\05 drawings\overall site\CAD\_Sheets\L-000 Cover Sheet & Legend.dwg - Fri Apr 13 2018 - 11:43am nick
A
B
C
D
E
F
G
H
1 2 3 4 5 6 7 8 9 10 11 12
LAKE ST URBAN STREAMCANNINGTON, WESTERN AUSTRALIA 6107
Project Plan 6 SCSP Round 2 Funding 2018
01.3.1 Proposed site The Next Generation Community Park will be designed to be a passive park that sits well
within the city‟s parks and open spaces network. It will provide significant amenity to the
proposed high-density development surrounding the site in the developing city centre.
Water quality and amenity will be improved within the basin and its surrounds through
revegetation with appropriate local native species. These large areas of landscaping with
native species will add to the City‟s intended outcomes of increasing natural areas, as
stated in its recently adopted Biodiversity Strategy.
Floating bio filtration systems covered in wetland vegetation will be installed within the
waterbody to create additional habitat and breeding areas for water birds,
macroinvertebrates and other fauna inhabiting the site. The islands will be another
element of the site‟s multifunctional infrastructure, providing significant benefits for water
quality and nutrient management, a key issue in these types of inland water bodies within
urban areas.
Figure 3. Wharf Street Basin proposed design concept
Wharf Street BasinWhat’s being proposed?The City has received $1million funding as part of the Smart Cities and Suburbs Program which will revitalise the Wharf Street Basin into a Next Generation Community Park.
The Next Generation Community Park will be designed as a space where the community can sit, enjoy the lake and have areas to discover. The park will provide a great space for residents living in apartments within the Canning City Centre who have little or no backyard space to enjoy the outdoors.
Currently a multifunction drain, the park will embrace smart design and smart technology to deliver opportunities for recreation and education.
What’s New?The City has been engaging with the local community to discuss the project and find out what the community would like incorporated in the park’s design. A landowner briefing was held on 25 February 2019 and a community workshop was held 12 March. We have also met with the nearby school to find out what the teachers and children would like to see in this Next Generation Park.
The feedback from the community and landowners will be incorporated into the concept design for the park.
Josh Byrne & Associates were the successful tenderer and will deliver the landscape architecture components of the project.
Please refer to https://www.yoursaycanning.com.au/ to see the proposed timeline for the Wharf Street Basin project.
Connect with us
canning.wa.gov.au
Canning City Centre - a 10 year vision for jobs, homes and amenity
Southern Link RoadWhat’s being proposed?An important project within the Canning City Centre is the construction of a section of the Southern Link Road between Grose Avenue and Grey Street. This work is funded by Scentre Group (Westfield Carousel Shopping Centre) and Bunnings, as a condition of their development applications approved in December 2014.
This new road will provide a safer route for motorists in and around the area adjacent to Bunnings, Greyhounds WA, Baseball WA and the southern entry points to Westfield Carousel Shopping Centre. It will also accommodate improved cycling and pedestrian movements from surrounding residential areas.
Construction is expected to occur in May and June.
The roadworks include vegetation clearance approved by the Department of Water and Environmental Regulation in March 2018. The road will be called Liege Street once finished.
What’s New?The City has been granted a clearing permit of native vegetation for Southern Link Road Stage 2 by the Department of Water and Environmental Regulation.
Clearing of vegetation and a general tidy up of the site is now occurring in preparation for Stage 2 roadworks, which are expected to commence in May and June.
Connect with us
canning.wa.gov.au
Canning City Centre - a 10 year vision for jobs, homes and amenity
CommunicationsWhat’s New?The City had a soil-turning ceremony on 15 February 2019 with the Mayor, CEO and representatives of the successful contractor, Densford Civil on site to celebrate the commencement of Cecil Avenue West.
Why is communications important to the City?The City of Canning has a deep invested interest in the continued economic success of small businesses in the City Centre. The City has been working with its service relocation contractor, Densford Civil, to mitigate any adverse impacts the Stage 1 works may have on small
businesses and we will do the same with the Stage 2 works contractor - Georgiou Group.
What if construction of one of the Canning City Centre projects interferes with my business?The Canning City Centre team, the City’s Community Engagement Lead and the City’s Business Development Officer are happy to meet with you should you require further information. Please don’t hesitate to contact us if you have any questions.
Alternatively please visit www.yoursaycanning.com.au for project news and updates.
What is the City offering businesses impacted by construction works?The City will work with you to offer its social media platforms and eNewsletters to promote your business during any impacted periods. Over 122,900 people receive the Corporate, Leisure, Libraries, Clubs and the Business eNewsletters. In addition, our social media followers total 12,000 across all platforms.
Please contact us to register your interest in the City promoting your business, with your desired advertising messaging (no more than 80 words) and links to your Facebook page and website.
Contact UsGary McCullough | Senior Project Leader | Canning City Centre (e) [email protected] | (m) 0418 129 964 | (p) 9231 0515Mark Rossi | Project Planner | Canning City Centre (e) [email protected] | (p) 9231 0704