Cecil Avenue West What’s being proposed? The Cecil Avenue project will deliver the following: dedicated bus lanes for public transport and improved bus shelters increased five metre wide verge widths to improve the look of Cecil Avenue as well as increasing pedestrian and cyclist safety improved pedestrian accessibility, with a dedicated pedestrian crossing at the new Pattie Street traffic signals improved road safety and reduced traffic congestion through the construction of a raised median • improved street and footpath lighting greatly increased verge and median landscaping with large trees to provide greater pedestrian shade and amenity increased opportunity to attract and improve development investment into the City Centre What’s New? Cecil Avenue Stage 1 – service relocations You may have noticed construction being undertaken along Cecil Avenue, with City Centre branded mesh creating a perimeter around the construction site. These form part of the Stage 1 work to deliver a new and modern Cecil Avenue. This stage of work is required to relocate service infrastructure like gas, water and power onto the new Cecil Avenue road alignment. Work is being undertaken by Densford Civil. Densford Civil have advised that work should be complete on May 7. The contact person for Densford Civil is Peter Campbell. He can be reached on 0406 752 214. Otherwise, please contact the City on the ‘Contact Us’ details at the end of this bulletin Cecil Avenue Stage 2 – roadwork and landscaping At the Special Council Meeting on 4 April 2019, Council endorsed Georgiou Group Pty Ltd as the preferred contractor to deliver the ‘Stage 2 – Roadwork and Landscaping’ component of the Cecil Avenue West Project. This stage of work will deliver an attractive pedestrian environment, with big street trees, brick paving, widened pedestrian walkways and improved pedestrian access across Cecil Avenue. This will revitalise the entry to the heart of the Canning City Centre, resulting in a major City Centre boulevard with a vibrant street frontage, busy with pedestrian traffic and alfresco dining. Please refer to https://www.yoursaycanning.com.au/ for an indicative timeframe for the future delivery of the Stage 1 and Stage 2 Cecil Avenue works. Canning City Centre - a 10 year vision for jobs, homes and amenity Connect with us canning.wa.gov.au A welcoming and thriving city City of Canning Community Bulletin # 3 BUS LANE ENDS BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE BUS LANE ENDS BUS LANE BUS LANE BUS LANE BUS LANE

Transcript of A welcoming and thriving city - City of Canning - …...Level 1, 289 Murray Street, Perth Western...

Page 1: A welcoming and thriving city - City of Canning - …...Level 1, 289 Murray Street, Perth Western Australia, Australia, 6000 T +61 8 9227 9313 M +61 402 706 162 E: ourplace@placelaboratory.com

Cecil Avenue West What’s being proposed?The Cecil Avenue project will deliver the following:

• dedicated bus lanes for public transport and improved bus shelters

• increased five metre wide verge widths to improve the look of Cecil Avenue as well as increasing pedestrian and cyclist safety

• improved pedestrian accessibility, with a dedicated pedestrian crossing at the new Pattie Street traffic signals

• improved road safety and reduced traffic congestion through the construction of a raised median

• improved street and footpath lighting

• greatly increased verge and median landscaping with large trees to provide greater pedestrian shade and amenity

• increased opportunity to attract and improve development investment into the City Centre

What’s New?Cecil Avenue Stage 1 – service relocations

You may have noticed construction being undertaken along Cecil Avenue, with City Centre branded mesh creating a perimeter around the construction site. These form part of the Stage 1 work to deliver a new and modern Cecil Avenue. This stage of work is required to relocate service infrastructure like gas, water and power onto the new Cecil Avenue road alignment. Work is being undertaken by Densford Civil.

Densford Civil have advised that work should be complete on May 7. The contact person for Densford Civil is Peter Campbell. He can be reached on 0406 752 214.

Otherwise, please contact the City on the ‘Contact Us’ details at the end of this bulletin

Cecil Avenue Stage 2 – roadwork and landscaping

At the Special Council Meeting on 4 April 2019, Council endorsed Georgiou Group Pty Ltd as the preferred contractor to deliver the ‘Stage 2 – Roadwork and Landscaping’ component of the Cecil Avenue West Project.

This stage of work will deliver an attractive pedestrian environment, with big street trees, brick paving, widened pedestrian walkways and improved pedestrian access across Cecil Avenue. This will revitalise the entry to the heart of the Canning City Centre, resulting in a major City Centre boulevard with a vibrant street frontage, busy with pedestrian traffic and alfresco dining.

Please refer to https://www.yoursaycanning.com.au/ for an indicative timeframe for the future delivery of the Stage 1 and Stage 2 Cecil Avenue works.

Canning City Centre - a 10 year vision for jobs, homes and amenity

Connect with us

canning.wa.gov.au

A welcoming and thriving cityCity of Canning

Community Bulletin # 3BUSLANEENDS

BUS

LANE

BUS LANE

BUS LANE

BUS LANE

BUS LANE

BUS LANE

BUS LANE

BUS LANE

BUS LANE

BUSLANEENDS

BUSLANE

BUSLANE

BUSLANE

BUSLANE

MISCELLANOUSSURFACE FINISHES

LANDSCAPE LEGENDFURNITURE ELEMENTS

UNIT PAVING - BUS LANE (TRAFFICABLE)

UNIT PAVING - SIDEWALK

UNIT PAVING - CARRIAGEWAY (TRAFFICABLE)

TREE GRATE

BUS STOP

BENCH (WITH BACK)

BIKE RACKS

PROPOSED LIGHT POLESREFER ELECTRICAL DOCUMENTATION

PROPOSED LIGHT POLESREFER ELECTRICAL DOCUMENTATION

S-01A

S-01B

S-02

F-01

F-02

F-03

GARDEN BED

INSITU CONCRETE

S-03

S-04

S-05

UNIT PAVING (TRAFFICABLE)

F-04 A

DRINKING FOUNTAINF-05

LIMESTONE SPALLING

S-06

TACTILE HAZARD INDICATORS

S-07

RAIN GARDEN

S-08

TREE CELL MODULAR SYSTEMREFER SUPPLIERS DOCUMENTATION

M-01

BENCH (BACKLESS)F-04 B

BACK

M-03

M-02PUBLIC TELEPHONEALLOW FOR RELOCATION. LOCATION TBD

SIGNAGEBY OTHERS. ALLOW FOR ELECTRICAL CONDUIT.LOCATION TBD

SHEETSIZE

DRN BY

DESIGNED

START DATE

CHECKED

ISSUE

PLACE LABPROJ No

SCALE:

DWG No

DWGSTATUS

UNIT:

GENERAL NOTES

1723

L000A1

NTSmm

FOR TENDER

0

NR

SEPT 17

AC

SS

CECIL AVENUE WESTCANNING CITY CENTRECOVER SHEET

P:\1723 cecil avenue\04 drawings & reports\A-Site\CAD\_Sheets\L000 COVER SHEET.dwg - Thu Jan 24 2019 - 3:35pm nick

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7 8 9 10 11 12

REVISIONREV DATE DRN CHK

0 25.01.19 ISSUE FOR TENDER NR SS

NORTH

Level 1, 289 Murray Street, PerthWestern Australia, Australia, 6000

T +61 8 9227 9313M +61 402 706 162E: [email protected]: www.placelaboratory.com

CLIENT

CORNER GEORGE STREET WEST AND ALBANYHIGHWAY,CANNINGTON, WA

CITY OFCANNING

Sheet List TableSheetNumber Sheet Title

L000 COVER SHEET

L001 TILING PLAN

L002 GENERAL NOTES

L003 PLANTING SCHEDULE

L200 GENERAL ARRANGEMENT PLAN

L201 GENERAL ARRANGEMENT PLAN

L202 GENERAL ARRANGEMENT PLAN

L203 GENERAL ARRANGEMENT PLAN

L400 SURFACE FINISHES PLAN

L401 SURFACE FINISHES PLAN

L402 SURFACE FINISHES PLAN

L403 SURFACE FINISHES PLAN

L410 SURFACE PATTERNING PLAN

L411 SURFACE PATTERNING PLAN

L412 SURFACE PATTERNING PLAN

L413 SURFACES PATTERNING PLAN

L500 PLANTING PLAN

L501 PLANTING PLAN

L502 PLANTING PLAN

L800 PEDESTRIAN CROSSING DETAIL

L801 BIOFILTRATION BED DETAILS

L802 MEDIAN DETAILS

L910 SURFACE FINISHES DETAILS

L911 SURFACE FINISHES DETAILS

L915 SURFACE PATTERN DETAILS

L920 SURFACE PATTERN DETAILS

L921 SURFACE PATTERN DETAILS

L922 SURFACE PATTERN DETAILS

L924 SURFACE PATTERN DETAILS

L930 TREE GRATE DETAILS

L940 FURNITURE

L945 DRINKING FOUNTAIN

L950 BUS STOP

L970 INFILL LIDS

L990 SOFTSCAPE

Page 2: A welcoming and thriving city - City of Canning - …...Level 1, 289 Murray Street, Perth Western Australia, Australia, 6000 T +61 8 9227 9313 M +61 402 706 162 E: ourplace@placelaboratory.com

Connect with us

canning.wa.gov.au

Canning City Centre - a 10 year vision for jobs, homes and amenity

Lake Street Urban StreamWhat’s being proposed?The creation of the Lake Street Urban Stream parkland for the community will increase use of the area and provide a welcoming entry point to Canning City Centre from the Cannington Bus/Train Station. The stream will incorporate the following amenities:

• visible water to be seen from the adjoining streets and paths

• path networks for passive recreation and connection to the water

• places for people to pause, including seating, lawns and play spaces

• an abundance of trees to provide shade and reduce temperature which will enhance biodiversity

• improved water quality

• maximised planting zones close to the water

What’s New?A workshop was recently held at the City with key stakeholders Georgiou, Charter Hall and the City’s landscape architectural consultants to understand how the future design could benefit all parties.

The City will finalise designs this year and move to construction phase next year.

40

3938

41

1

401

5

37

S E V E N O A K S S T R E E T

L A K

E

S T

R E

E T

C E C I L A V E N U E

LEVELS

PROPOSED LEVEL

EXTENT OF WORKS

INSITU CONCRETE TERRACE

WALLSW_01

SURFACE FINISHES

CONCRETE PATHS_01

BRIDGES_03

COMPACTED GRAVELS_04

LIMESTONE BOULDERSS_05

EDGES_06

TURFS_09

ROCK PITCHINGW_04

SEATING ELEMENT

FURNITURE

GABION WALLW_03

F_01

PLANTINGS_08

CONCRETE RETAINING WALLW_02

MULCHS_07

RL 5.00

BALUSTRADEF_02

LEGEND

INSITU CONCRETE EDGES_10

LIMESTONE RETAINING WALLW_06

BOULDER RETAININGW_05

BENCHF_05

EXISTING TREE TO BE RETAINED

OTHER

EXISTING TREE TO BE REMOVED

BOLLARD (FIXED)

F_03

REMOVABLE BOLLARDF_04

0m10m 10m 20m

1:500

SHEETSIZE

DRN BY

DESIGNED

START DATE

CHECKED

ISSUE

PLACE LABPROJ No

SCALE:

DWG No

DWGSTATUS

UNIT:

GENERAL NOTES

REFER L-001 FORGENERAL NOTES 1702

L-000A1

1:500mm

COORDINATION

P3

N.ROSE

JULY 2017

N.ROSE

-

LAKE STREETURBAN STREAMCOVER SHEET & LEGEND

Level 1, 289 Murray Street, PerthWestern Australia, Australia, 6000

T +61 8 9227 9313M +61 402 706 162E: [email protected]: www.placelaboratory.com

CLIENT

Suite 4/226 Carr PlLeederville WA 6007

Urbaqua Ltd

REVISIONREV DATE DRN CHK

P1 09.08.17 50% DESIGN NR AC

P2 11.12.17 PRELIMINARY NR SS

P3 13.04.18 85% DESIGN NR SSNORTH

NOT FOR CONSTRUCTIONPRELIMINARY

P:\1702 lake street living stream\05 drawings\overall site\CAD\_Sheets\L-000 Cover Sheet & Legend.dwg - Fri Apr 13 2018 - 11:43am nick

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7 8 9 10 11 12

LAKE ST URBAN STREAMCANNINGTON, WESTERN AUSTRALIA 6107

Project Plan 6 SCSP Round 2 Funding 2018

01.3.1 Proposed site The Next Generation Community Park will be designed to be a passive park that sits well

within the city‟s parks and open spaces network. It will provide significant amenity to the

proposed high-density development surrounding the site in the developing city centre.

Water quality and amenity will be improved within the basin and its surrounds through

revegetation with appropriate local native species. These large areas of landscaping with

native species will add to the City‟s intended outcomes of increasing natural areas, as

stated in its recently adopted Biodiversity Strategy.

Floating bio filtration systems covered in wetland vegetation will be installed within the

waterbody to create additional habitat and breeding areas for water birds,

macroinvertebrates and other fauna inhabiting the site. The islands will be another

element of the site‟s multifunctional infrastructure, providing significant benefits for water

quality and nutrient management, a key issue in these types of inland water bodies within

urban areas.

Figure 3. Wharf Street Basin proposed design concept

Wharf Street BasinWhat’s being proposed?The City has received $1million funding as part of the Smart Cities and Suburbs Program which will revitalise the Wharf Street Basin into a Next Generation Community Park.

The Next Generation Community Park will be designed as a space where the community can sit, enjoy the lake and have areas to discover. The park will provide a great space for residents living in apartments within the Canning City Centre who have little or no backyard space to enjoy the outdoors.

Currently a multifunction drain, the park will embrace smart design and smart technology to deliver opportunities for recreation and education.

What’s New?The City has been engaging with the local community to discuss the project and find out what the community would like incorporated in the park’s design. A landowner briefing was held on 25 February 2019 and a community workshop was held 12 March. We have also met with the nearby school to find out what the teachers and children would like to see in this Next Generation Park.

The feedback from the community and landowners will be incorporated into the concept design for the park.

Josh Byrne & Associates were the successful tenderer and will deliver the landscape architecture components of the project.

Please refer to https://www.yoursaycanning.com.au/ to see the proposed timeline for the Wharf Street Basin project.

Page 3: A welcoming and thriving city - City of Canning - …...Level 1, 289 Murray Street, Perth Western Australia, Australia, 6000 T +61 8 9227 9313 M +61 402 706 162 E: ourplace@placelaboratory.com

Connect with us

canning.wa.gov.au

Canning City Centre - a 10 year vision for jobs, homes and amenity

Southern Link RoadWhat’s being proposed?An important project within the Canning City Centre is the construction of a section of the Southern Link Road between Grose Avenue and Grey Street. This work is funded by Scentre Group (Westfield Carousel Shopping Centre) and Bunnings, as a condition of their development applications approved in December 2014.

This new road will provide a safer route for motorists in and around the area adjacent to Bunnings, Greyhounds WA, Baseball WA and the southern entry points to Westfield Carousel Shopping Centre. It will also accommodate improved cycling and pedestrian movements from surrounding residential areas.

Construction is expected to occur in May and June.

The roadworks include vegetation clearance approved by the Department of Water and Environmental Regulation in March 2018. The road will be called Liege Street once finished.

What’s New?The City has been granted a clearing permit of native vegetation for Southern Link Road Stage 2 by the Department of Water and Environmental Regulation.

Clearing of vegetation and a general tidy up of the site is now occurring in preparation for Stage 2 roadworks, which are expected to commence in May and June.

Page 4: A welcoming and thriving city - City of Canning - …...Level 1, 289 Murray Street, Perth Western Australia, Australia, 6000 T +61 8 9227 9313 M +61 402 706 162 E: ourplace@placelaboratory.com

Connect with us

canning.wa.gov.au

Canning City Centre - a 10 year vision for jobs, homes and amenity

CommunicationsWhat’s New?The City had a soil-turning ceremony on 15 February 2019 with the Mayor, CEO and representatives of the successful contractor, Densford Civil on site to celebrate the commencement of Cecil Avenue West.

Why is communications important to the City?The City of Canning has a deep invested interest in the continued economic success of small businesses in the City Centre. The City has been working with its service relocation contractor, Densford Civil, to mitigate any adverse impacts the Stage 1 works may have on small

businesses and we will do the same with the Stage 2 works contractor - Georgiou Group.

What if construction of one of the Canning City Centre projects interferes with my business?The Canning City Centre team, the City’s Community Engagement Lead and the City’s Business Development Officer are happy to meet with you should you require further information. Please don’t hesitate to contact us if you have any questions.

Alternatively please visit www.yoursaycanning.com.au for project news and updates.

What is the City offering businesses impacted by construction works?The City will work with you to offer its social media platforms and eNewsletters to promote your business during any impacted periods. Over 122,900 people receive the Corporate, Leisure, Libraries, Clubs and the Business eNewsletters. In addition, our social media followers total 12,000 across all platforms.

Please contact us to register your interest in the City promoting your business, with your desired advertising messaging (no more than 80 words) and links to your Facebook page and website.

Contact UsGary McCullough | Senior Project Leader | Canning City Centre (e) [email protected] | (m) 0418 129 964 | (p) 9231 0515Mark Rossi | Project Planner | Canning City Centre (e) [email protected] | (p) 9231 0704