A Visual Approach to LSAR Project Management

11
Company Confidential Company Confidential OmegaPS and Analyzer User Group Meeting 2013 A Visual Approach to LSAR Project Management OmegaPS and Analyzer North American User Group Meeting November 12-13, 2013 Insert photo here. Crop to maintain shape and size of photo box. Anmarie Flamingo LSA Software Administrator

description

A Visual Approach to LSAR Project Management. Insert phot o here. Crop to maintain shape and size of photo box. . OmegaPS and Analyzer North American User Group Meeting November 12-13, 2013. Anmarie Flamingo LSA Software Administrator. Agenda. About Oshkosh Defense - PowerPoint PPT Presentation

Transcript of A Visual Approach to LSAR Project Management

Page 1: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

A Visual Approach to LSAR Project Management

OmegaPS and Analyzer North American User Group Meeting

November 12-13, 2013

Insert photo here. Crop to maintain shape and size of photo box.

Anmarie FlamingoLSA Software Administrator

Page 2: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Agenda

• About Oshkosh Defense• Are we ahead or behind?• Production line example• Define our production line• Using visual models• Demonstration• Questions

2

Page 3: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

About Oshkosh Defense

3

Heavy Equipment Transporter (HET)

Heavy Expanded Mobility Tactical Truck (HEMTT)

Palletized Load System (PLS)

Logistics Vehicle System Replacement (LVSR)

Medium Tactical Vehicle Replacement (MTVR)

Family of Medium Tactical Vehicles (FMTV)

MRAP All-Terrain Vehicle (M-ATV) Base Variant

M-ATV Special Forces Variant

Light Combat Tactical All-Terrain Vehicle (L-ATV)

HMMWV Modernization Solutions

SandCat Tactical Protector Vehicle (TPV)

Special Purpose All-Terrain Vehicle (S-ATV)

Heavy

Light

Medium & MRAP

Page 4: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

L S A - 0 1 9

Logistics Product Data Collection

• Several users create data at one time• Data is often “hidden” in database software• Data is not made visual until a report or technical manual is published

4

Te c hn i c a l

Manu a l

LSAR

Are we ahead or behind?

Page 5: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Production Line Example

Station 1 Station 2 Station 3 Station 4

5

Page 6: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Ahead or Behind?

6

Page 7: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Define the steps

Parts Structure Reliability FMEA & RCM

Task Analysis LORA

7

HA

HB

HD

XH

HA

HG

XB

BA

XB

BD

BK

BA

BF

BICB

BF

BH

CA

CD

Page 8: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

OmegaPS Progress Manager

• Track LSA Activities in an OmegaPS Project by Candidate Item– Actions were used as the assembly line– Progress marks were used as the stations

8

Are we ahead or behind?

Page 9: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

ODBC Link

ODBC Linking

9

LSAR

Page 10: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Demonstration

10

Page 11: A Visual Approach to LSAR Project Management

Company ConfidentialCompany ConfidentialOmegaPS and Analyzer User Group Meeting 2013

Questions?

Anmarie FlamingoLSA Software Administrator920-235-9151 [email protected]